Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17275A981 + (ML17275A981)
- ML17275A982 + (ML17275A982)
- ML17275A991 + (ML17275A991)
- ML17275A992 + (ML17275A992)
- ML17275A994 + (ML17275A994)
- ML17275A996 + (ML17275A996)
- IR 05000397/1981004 + (ML17275A997)
- ML17275B003 + (ML17275B003)
- ML17275B004 + (ML17275B004)
- ML17275B005 + (ML17275B005)
- ML17275B007 + (ML17275B007)
- ML17275B008 + (ML17275B008)
- ML17275B011 + (ML17275B011)
- ML17275B013 + (ML17275B013)
- ML17275B015 + (ML17275B015)
- ML17275B016 + (ML17275B016)
- ML17275B017 + (ML17275B017)
- ML17275B018 + (ML17275B018)
- ML17275B019 + (ML17275B019)
- ML17275B022 + (ML17275B022)
- GO2-81-093, Requests Changes to Svc List for Correspondence from NRC Due to Personnel Changes in Facility Project Organization + (ML17275B023)
- ML17275B024 + (ML17275B024)
- ML17275B026 + (ML17275B026)
- IR 05000397/1980008 + (ML17275B028)
- ML17275B029 + (ML17275B029)
- ML17275B030 + (ML17275B030)
- ML17275B032 + (ML17275B032)
- ML17275B033 + (ML17275B033)
- ML17275B034 + (ML17275B034)
- GO2-81-101, Forwards 810518 Transmittal Ltr to & Certificate of Svc on L Dallas,Chairman of Benton County Board of Commissioners & Nd Lewis,Chairman of Energy Facility Site Evaluation Council,For FSAR Amend 14 + (ML17275B035)
- GO2-81-112, Final Deficiency Rept Re Thermite Welding on Buried Standby Svc Water Pipe,Initially Reported on 801222.No Adverse Effect on Plant Operation.Issue Determined Not Reportable Per 10CFR50.55(e) + (ML17275B036)
- GO2-81-111, Interim Deficiency Rept Re Utilization of Deficient Std Design Details for Small Bore Supports Initially Reported on 810417.Re-evaluation of Basic Design Criteria Initiated. Final Rept to Be Submitted by 810731 + (ML17275B037)
- GO2-81-106, Closeout Deficiency Rept Re Verification of Base Metal Thickness After Repairs,Originally Reported 801215.No Adverse Effect on Safe Plant Operation Noted.Condition Determined Not Reportable Per 10CFR50.55e + (ML17275B038)
- IR 05000397/1981008 + (ML17275B039)
- ML17275B042 + (ML17275B042)
- IR 05000397/1981009 + (ML17275B044)
- GO2-81-100, Forwards Amend 14 to FSAR + (ML17275B045)
- ML17275B049 + (ML17275B049)
- GO2-81-119, Interim Deficiency Rept Re Annulus Pressurization on Piping Sys Attached to or Supported from Reactor Vessel or Sacrificial Shield Wall,Initially Reported 810122.Deficiency Found Reportable.Final Rept by June 1982 + (ML17275B051)
- GO2-81-120, Final Deficiency Rept Re Contract 215 Temporary Installation Program,Initially Submitted 810309.Contractor Will Use Insp Rept to Document & Control Temporary Installation.Condition Not Reportable Per 10CFR50.55e + (ML17275B052)
- ML17275B054 + (ML17275B054)
- IR 05000397/1981006 + (ML17275B056)
- GO2-81-125, Forwards Revised Code Re Privilege Taxes & Taxation of Energy Generating Facilities During Const & Operation, in Response to Anl Request + (ML17275B057)
- ML17275B058 + (ML17275B058)
- ML17275B059 + (ML17275B059)
- ML17275B060 + (ML17275B060)
- IR 05000397/1981007 + (ML17275B062)
- ML17275B063 + (ML17275B063)
- GO2-81-121, Advises That Util re-evaluation of Mechanical Contractor WSH-Boecon-Geri Methods,Controls & Performance Has Been Completed.Improvements in Quality Program Assure Proper Work.Requests NRC Lift Stop Work Directive + (ML17275B064)
- ML17275B065 + (ML17275B065)
- ML17275B066 + (ML17275B066)