IR 05000397/1980008
| ML17275B028 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/10/1981 |
| From: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17275B027 | List: |
| References | |
| NUDOCS 8105150347 | |
| Download: ML17275B028 (2) | |
Text
~8 RE@II~
"o Cy O
IIA
~+
o~
UNITED STATES NUCLEAR R EG 0 LATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD SUITE 202, WALNUTCREEK PLAZA WALNUTCREEK, CALIFORNIA94596 APR 10 1SBl Docket No. 50-397 Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way Richland, Washington 99352 Attention:
Mr. R.
G. Matlock WNP-2 Program Director Gentlemen:
t Thank you for your letter dated March 10, 1981 informing us of the additional steps you have taken to correct the items which we brought to your attention in our letter dated August 15, 1980.
Your corrective actions will be verified during a future inspection.
Your cooperation with us is appreciated.
Sincerely, 7I B. H.
au kenber Reactor Construe ion Projects Branch 83i05150$ $$
4 '1
~
P
~~
h V