UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLAZA
WALNUTCREEK, CALIFORNIA94696
March 18,
1981
LIEU~F~~
Docket No. 50-397
Washington Public Power Supply System
P. 0.
Box 968
Richland, Washington
99352
Attention:
R.
G. Matlock
Program Director,
WNP-2
gf
g
~~Aj 3 IggIh -11
III'CI~
CO~ISSI0,
ip
Gentlemen:
Subject:
NRC Inspection of HNP-2 (Preoperational
Test Phase)
This refers to the inspection
conducted
by Mr. J. Carlson of this office
on March 2-5,
1981 of activities authorized
by
NRC Construction
Permit
No. CPPR-93,
and to the discussion of our findings held by the inspector
with Mr. J. Martin and other members of your staff at the conclusion of
the inspection.
Areas
examined during this inspection are described
in the enclosed
inspection report.
Within these areas,
the inspection consisted of
selective
examinations of procedures
and representative
records, inter-
views with personnel,
and observations
by the inspector.
No items of noncompliance with NRC requirements
were identified within
the scope of this inspection.
In accordance
with Section 2.790 of the
NRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulations,
a copy of this letter and
the enclosed
inspection report will be placed in the
NRC's Public
Document
Room. If this report contains
any information that you believe
to be proprietary, it is necessary
that you submit
a written application
to this office, within 20 days of the date of this letter, requesting
that such information be withheld from public disclosure.
The applica-
tion must include
a full statement of the reasons
why it is claimed that
l
Washington Public Power Supply System.
-2-
MAR 18 lgg
the information is proprietary.
The application should. be prepared
so
that any proprietary information identified is contained in an enclosure
to the application, since the application without the enclosure will
also
be placed in the Public Document
Room.
If we do not hear from you
in this regard within the specified period, the report will.be placed in
the Public Document
Room.
Should you have any questions. concerning this inspection,
we will be
glad to discuss
them with you.
Sincerely,
Enclosure:
IE Inspection Report
No. 50-397/81-04
t
cc w/o enclosure:
K. T. Perkins,
J.
D. Hartin,
.
L
C ews, Chief
Reactor Operations
and Nuclear
Support
Branch