ML17275A994

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-397/81-04 on 810302-05.No Noncompliance Noted
ML17275A994
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/18/1981
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17275A995 List:
References
NUDOCS 8104160408
Download: ML17275A994 (3)


See also: IR 05000397/1981004

Text

~R Rso(p

P

~4

0

Cy

4,

~c

O

lgd

I

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94696

March 18,

1981

LIEU~F~~

Docket No. 50-397

Washington Public Power Supply System

P. 0.

Box 968

Richland, Washington

99352

Attention:

R.

G. Matlock

Program Director,

WNP-2

gf

g

~~Aj 3 IggIh -11

III'CI~

CO~ISSI0,

ip

Gentlemen:

Subject:

NRC Inspection of HNP-2 (Preoperational

Test Phase)

This refers to the inspection

conducted

by Mr. J. Carlson of this office

on March 2-5,

1981 of activities authorized

by

NRC Construction

Permit

No. CPPR-93,

and to the discussion of our findings held by the inspector

with Mr. J. Martin and other members of your staff at the conclusion of

the inspection.

Areas

examined during this inspection are described

in the enclosed

inspection report.

Within these areas,

the inspection consisted of

selective

examinations of procedures

and representative

records, inter-

views with personnel,

and observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordance

with Section 2.790 of the

NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the

NRC's Public

Document

Room. If this report contains

any information that you believe

to be proprietary, it is necessary

that you submit

a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The applica-

tion must include

a full statement of the reasons

why it is claimed that

l

Washington Public Power Supply System.

-2-

MAR 18 lgg

the information is proprietary.

The application should. be prepared

so

that any proprietary information identified is contained in an enclosure

to the application, since the application without the enclosure will

also

be placed in the Public Document

Room.

If we do not hear from you

in this regard within the specified period, the report will.be placed in

the Public Document

Room.

Should you have any questions. concerning this inspection,

we will be

glad to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection Report

No. 50-397/81-04

t

cc w/o enclosure:

K. T. Perkins,

WPPSS

J.

D. Hartin,

WPPSS

.

L

C ews, Chief

Reactor Operations

and Nuclear

Support

Branch