ML17275B024
| ML17275B024 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 05/08/1981 |
| From: | Tedesco R Office of Nuclear Reactor Regulation |
| To: | Ferguson R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| NUDOCS 8105140037 | |
| Download: ML17275B024 (4) | |
Text
0 Docket No.
50-397 D
T ION 1981 ocket r central ile DEisenhut ASchwencer MRushbrook Washington Public Supply System RAu1uck ATTN:
Mr. R. L. Ferguson RTe des'co t<anaging Director RVollmer 3000 Ge'..".'ge Washington Way TMurley
- Richland, WA 99352 DRoss RHartfield, MPA
Dear Mr. Ferguson:
VNoonan OELD
Subject:
Fire Pretection Safety EvaluaMbn(.3)
OIE PSears eQ'I'I)'-,k F)1e g/l)/
bcc:
~
C~
T ERA NRC PDR L PDR NSIC TIC ACRS (16)
The Fire Protection Review Group has advised us that Appendix R to 10 CFR Part 50 will be used as a guidance for their fire protection review.
Compliance with the requirements set forth in Appendix R as modified with accepted exceptions will be made enlicensing condition for WNP, Unit 2.
A copy of this notification is enclosed for your information.
If you desire any discussion or clarification on this matter, p,":ease con-tact R. Auluck, Licensing Pro+act Manager at (301) 492-7702.
Enclosure:
As stated Robert L. Tedesco, Assistant Director for Licensing Division of Licensing exes x:4O>>~
OFFICE/
SURNAME(
- DATE)
LBII'2 uck:sp
~
~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~
LB8 ASch neer
~ ~ ~ ~ ~ ~
0 ~ ~ ~ ~
~ ~ ~ ~
5/g /81 5/
/81 RTe 5/
I ~
~
esc
/81
~ ~
~
~
~
~ L 0 ~ ~
i 0
~ ~ 0 ~
~ 0
~
~ 0
~ ~
~ ~
NRC FORM 318110/80) NRCM 0240 0 FICIAL RECORD COPY 1 USGPO: 1980-829 824
f I "I IC
~
I
'I
'Ill CCCC
~
~ 'Iaa'-
4
' CIII
~
II,*:II
"~
~I I I
I
~ aaI'.
a
/a ~
I CCC C' ra e
I I
I I
~
~ II a.
I
),
),)
~,!
) ~
'"0 ENCLOSURE NOTIFICATION OF APPENDIX R TO
- 10. CFR PART,,<g)'S A LICENSING RE(UIREt)ENT J
U Appendix R to 10 CFR Part 50 will also be used. as 'guidance for'ur review of your'fire protection program.
Your compliance with the requirements set forth in Appendix R as modified by accepted exceptions will be made a
license'ondition.
Identify any exceptions. your prog'ram takes to'he require-ments of Appendix R as well as BTP ASB 9.5-1, and describe'our alternative for providing an equivalent level of fire protection.
1 4
1