Forwards Requests for Addl Info Re Auxiliary Sys for FSAR Review.Response Due 810626
ML17275B015
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/27/1981
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Ferguson R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8105050219
Download: ML17275B015 (14)


Text

Docket No.

50-397 Washington Public Supply System ATTN:

Mr. R. L. Ferguson Managing Director 3000 George Washington Way Richland, Washington 99352

Subject:

Request for Additional Information for the Review of the WNP-2 Facility

Dear Mr. Ferguson:

As a result of our continuing review of the WMP, Unit 2 FSAR. we find that we need additional information to complete our evaluation.

The specific information required is in the area of auxiliary systems and is presented in the 6nclosure.

To maintain our licensing review schedule for the WNP-2 FSAR, we will need responses to the enclosed request by June 26, 1981. If you cannot.

meet this date, p'lease inform us within seven days after receipt of this letter of the date you plan to submit your responses so that we may review our schedule for any accessary ch'anges.

Please contact Raj Auluck, WNP-2 Licensing Project Manager, if you desire any discussion or clarification of the enclosed request.

Sincerely,

~@gg

@pl@1 Robert I Ted ESEO Robert L. Tldesco, Assistant Director for Licensing Division of Licensing

Enclosure:

As stated cc:

See next page. -=-

D UTION Docket r Central File LBg ale DEisenhut RJYoungblo d

RAuluck MRushbrook RTedesco RVollmer TMurley DRoss RHartfield, MPA VNoonan LRib OELD OIE (3)

JRi dgely bcc:

ACRS (16)

TERA NRC/PDR L/PDR NSIC TIC OFFICE)

SURNAME/

DATEP BB

~

~ ~

R u uck:sp

'4'/$$/81""

LB8 ASch encer "Q""781"'"'

~

0 RLT esco 4~/81

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~

MRc FQRM 313113/Ro) MRc 5 05 0 hg OFFICIAL RECORD COPY o USGPO,'9~29.82I

4 SlSN ff 44 ~ r

~ t

~

I I

I 4

I

~

P 4

I I

I ~ $()f

~%44e

~ 4 "I 4 4

<< ~

4 I"

4

=4S I 4

+%4)QQ QNI fg)N l,,l QJz')AT I 8,

<",<,p 4

~

=

.4

~

I I'L'I

>i4 II\\>>

/ ~

4 4 ~

~ - Nt m V

~

44NNII~

I 04 I 4l I I

~

444 I

4 I

I

\\

4

~

~

I 4-I I ~ ~

~

I -

~

I I *Nil I

~ g 4

1

~ ~

Nl 4

~ I

ENCLOSURE 01 0 ~ 3s.

w )

The FSAR s-ates that the "seismic Category i Pipinc and electrical con~" i>>.

~ene-~ationz are be1o~ grade... are...

nc.; sr~led

~.",-',n-'grovn",;~'..'.

pressure."

i)emonstrate ihat tne safety functions would not. be compro"...ise

'y water flowing into the bvi1ding through hese piping an" conduit pene-1 )

A'1c 'e+ co Ipa>t¹r t is f1 c oded and water is flowing ovt of the bv 1ci".:

through the piping and conduit penetrations, resulting in saturated ground conditions.

2)

A non-seismic Category I tank ruptures emptying all of its contents.

010.36

!t is the Staff's position that a11 safety-re'lated equipment sha11 be appro-(3.5.1)

ZSP priately protected against the effects of internally generated missi1es in accordance with Table 10, Code of Federal Regulations Part 50, Appendix A, General Design Criteria 4.

The effects of internally generated missiles such as valves stems,

bonnets, control rod drive mechanisms, and high pressure accumulators impacting onto safety related equipment must be evaluated.

Appropriate protection must be provided to assure that a missile will not prevent a safe shutdown of. the plant or result in uncontrolled release of radioactivity during normal operation or during the most severe design basis 'accident with the most limiting single active failure.

Dgscribe the means provided for assuring protection of safety related equipment from all internally generated missiles.

l l,

4 gr yV ~ Vl ~

l 3 o MV) hd. 3+

fp I /

it o< amendment

'<2 to th FSAR.

l'hen you provide yc~r response, revise th=

ho resoonse has been received to questions 211.101. 2ll.10-', and 2',1.10"-

as question numbering scheme as follows:

211.107 to 010.37, 211.108 to 010.38, and 211.109 to 010.39.

0.40

..s.>)

The FSAR states that the water lines are "...tornado-hardened."

State your criteria for protecting pipes located outsid buildings from tornado

missiles, including depth below grade requirements and provide drawings which show all pertinent tornado protection features as necessary.

Demonstrate that the scram discharge system meets the criteria enumerated in the Generic Safety Evaluation Report Bh'R Scram Discharge

System, dated December 1, 1980.

3.42 Demonstrate that a slow or partial loss of air pressure to the scram dis-6) charge valves will not result in the following:

1)

Rapid fil'ting of both the scram discharge volume and the instrument volume due to the lifting of mo.",t or all scram discharge valves, with 4

consequent loss of adequate scram discharge volume.

2)

Loss of reactor coolant due to the combination of lifting of most or all scram discharge valves, without compensating closure of the vent and drain valves, with consequent environmental effects inside con-.

~

tainment.

Unless it can be demonstrated that no adverse effects can result, a system g jw 4 shall be provided and described in this section to protect against these I

I two conditions.

tv

t

!II~

~

~

~I~I

~~

~

I t

I~~~

~

~

~~I~

~

~

~~

I<<

~

I~i~I Id

~

~

4

~~II

~

~~

~

~~

~~I~

~~

~ ~

~ ~

~

~~

n

~

~

~~

~

I f

g.'8>>

G~'6.43,Describe the effects on the safety and operability of the control rod drive 4.6) hvdraulic system if the following control rod drive systen valves either fail closed or fail open:

2)

Drive water pressure control valve (between F060 and F061) r Cooling water pressure control valve (between F070 and F071)

,310.44, No response has been received to questions 211.130, 211.131, 211.133, 211.134,

' 0.45

10.46, 211.135, 211.006, 211.122, 211.123, 211.125 and 211.126 as of amendment 12 310.47, 310.48, to the FSAR.

When you provide your res'ponse, revise the question numbering i4.6)

"<<10.49, scheme as follows:

211.130 to 010.44, 211.131 to 010.45, 211.133 to 010.46, "1 0.50; 310.51, 211.134 to 010.47, 211.135 to 010.48, 211.006 to 010.49, 211.122 to 010.50,

10.52, 310.53 211.123 to 010.51, 211.125 to 010.52, and 211.126 to 010.53.

,~.Z.5)

.'0.54 Provide the K ff and the, density for optimum moderation for the new fuel

9.1.1)

';storage facility, assuming the infinite array of maximum enriched new fuel

'I

'for the optimum case.

Describe the preventive measures taken to assure

- that K ff'<.98 for the new'fuel storage facility forall,moderating condi-

.-,e tions.

Alternately, demonstrate that no moderating 'condition between lOOC water and 05 water densities can credibly exist.

,:30.55 9.1.2)

Describe, discuss, and verify that the maximum potential kinetic energy contained in all objects of less weight than a spent fuel assembly which '

will be handled over spent fuel -will not exceed the effects of the fuel handling accident described in section 15.7.4 of the FSAR.

4>>

,e

)'our rasnonci.

to nuestion Oi0.2 I is completely inadenuati'.

Our d~s>on should pp r,",a";fied to provide one of the following alte~n= t've~-

1) a seis-....'" Category I, Quality Group C, tornado missile protected spen:

fuel pool cooling system, including the secondary fuel pool heat exchano r cooling system.

2) a seismic Category I, Quality Group C, tornado missile protected, make-up water supply to the spent fuel pool and HYLIC (the HVAC design environment should be 212 F and lOOX humidity).

The structure above the refueling floor should be seismic Category I and tornado missile protected.

3) a seismic Category I, Quality Group C, make-up water supply to the spent fuel pool and the results of an analysis which verifies that with the loss of the structure above the tefueling floor, cooling with only the seismic Category I make-up, and the most unfavorable atmos-pheric diffusion conditions (X/Q) that the site boundary dose will not exceed 25% of the limits.specified in Title,10. Code of Federal Regulations, Part 100.

Verify that your use of the phrase controlled and supported to seismic Category I requirements" means that it meets all requirements for seismic

~0 Category I qualification.

I01 0.58 (g.Z.2)

D Since the non-safety related reactor building component cooling water I

system provides cooling for the reactor recirculation pumps, state the length of time that the pumps can be left without component cooling water flow before significant seal damage can occur, gath consequent potential primary coolant leakage:

4 4

J

(a),if pumps are

'> (b) i f pumps Br~

kept running turr >d g'~f".

A'j I'>>

C'h

~ \\

~n c)

( i ~ C

~ >>. )

f e"

'amatory Guide 1.2i requires that there be sufficient water in the spray ponds for 30 days of cooling without make-up.

Discuss how you will monitor the build up of sediment on the floor of the ponds so as to assure availability of the 30 day water supply.

Describe how you will clean the spray ponds without losing redundancy or degradation of the system.

010.60

{9.Z.6)

The FSAR states there is "...a suction head of at least 20 feet during RCIC Ii operation from the condensate storage tank at elevation 443'0" and the RCIC impeller elevation 427'3".

Discuss how the 15'9" elevational difference between the condensate storage tank and the RCIC impeller satisfies the 20'equirement.

~10.61 3.3.1)

RSP The nitrogen bottles with its associated equipment and containment instru-

'ment air system shall be a minimum of guality Grog C.

@310.62

~9.4.1)

,In your response to question 010.29 there seems to be a contradiction between the thickness of the air intake roof,.squab and the height of, the i

top of the roof slab above grade.

Please clarify'your numbers and provide physical. drawing(s) of'the air handling system with details of the remote air intake structures.

- 10.63 "9.4.1)

P I

4>>

Discuss the control room environment which will result from the most extreme I

ambient and accident conditions (including the worst single failure for the HYAC).

Note:

the temperature/humidity for all operating/accident conditions

>>>>>> x~*,>>

shall be maintained within the comfort. zone as defined by ASHRAE.

This requirement applies to all areas which require operating personnel.

e

~

g>> u,'.;

f),i-

~

~

4<

>>>>tv

\\

gt'

P

~

C a

0

~1 Q.pp

<5.~,10)

.ui's(.us& itis ei ie~L5 0th'c p'UfenL,Io

> fa IIUl'6 of tile non-seisriic Cateo(iry I

't heater~

i," inc s-andny servic~ water oumphous~

under th= mo;-t adv~r.==

environm ntal conditions on the operability of the pumps.

.10.e5

.10.4.5)

Your responses to question 010.3~ regarding the potential flooding of safety related equipment due to a circulating water failure are inadequate.

An analysis shall be conducted in accordance with Standard Review Plan 10.4.5, "Circulating

';,'a.er System," which assumes:

1)

An expansion joint break (Note:

an incident of this type occurred at an operating BWR).

2)

No credit shall be taken for isolation valve closure unless these valves are designed to safety grade requirements.

  • h:

h I

OA":

~

hh 0

hh

~

h W'

~A4

~,

IF 0

~

~

~

~

I

~

F I

I h,

I lh I

fs h

.I I,

C t

a l