Forwards IE Insp Rept 50-397/81-09 on 810413-16 & 0428-0501. No Noncompliance Noted
ML17275B042
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/27/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17275B043 List:
References
NUDOCS 8106010374
Download: ML17275B042 (4)


See also: IR 05000397/1981009

Text

~R RE0y~

~C"

Vp

+

0

Cy

A.

~ l

O

I

++*++

Docket No. 50-397

UNITED STATES

. NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

May 27,

1981

~E FILfgoy@

0

Washington Public Power Supply System

P. 0.

Box 968

3000 George

Washington

Way

Richland,

Washington

99352

Attention:

Mr. R.

G. Matlock

Program Director,

WNP-2 Project

Gentlemen:

Subject:

This refers to the inspection conducted

by Messrs.

D.

P. Haist, J. 0. Elin

and A. J.

D'Angelo of this office on April 13-16

and April 28-May 1,

1981

of activities authorized

by

NRC Const uction Permit No. CPPR-93,

and to

the discussion of'heir findings held with Mr.

W. C. Bibb and other members

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection

report.

Within these areas,

the inspection consisted of selective

examinations

of procedures

and representative

r'ecords,

interviews with personnel,

and

observations

by the inspector .

No items of noncompliance with NRC requirements

were identified within the

scope of this inspection.

In accordance

with 10 CFR 2.790 of the ComIission's regulations,

a copy of

this letter and the enclosed

inspection report will be placed in the

NRC's

Public Document

Room. If this report contains

any information that you

(or your contractor's)

believe to be exempt from disclosure

under

10 CFR 9.5(a)(4),

it is necessary

that you (a) notify this office by telephone within ten

(10) days from the date of this letter of your intention to file a request

for withholding; and (b) submit within 25 days from the date of this letter

a written application to this 'office to withhold such information. If your

receipt of this letter has

been delayed

such that less

than seven

(7) days

are available for your review, please notify this office promptly so that

a new due date

may be established.

Consistent with section 2.790(b)(l),

any such application must

be accompanied

by an affidavit executed

by the

owner of the information which identifies the document or part sought to

be withheld, and which contains

a full statement of the basis

on which it

is claimed that the information should

be withheld from public disclosure.

I

yg

e

,o

Cp

CQ f

Washington Public Power Supply System

May 27,

1981

This section further requires the statement to add} ess with specificity

the considerations

listed in 10 CFR 2.790(b)(4).

The information sought

to be withheld shall

be incorporated

as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within

the specified periods

noted above,

the report will be placed in the Public

Document

Room.

Should you have any questions

concerning this inspection,

we will be glad

to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection

Repor t

No. 50-397/81-09

J

cc w/o enclosure:

R.

B. Glasscock, guality Assurance

Director

W. C. Bibb, Project

Manager

Wl'lP-2 Project

B.

H. Faulkenber

Reactor Construe 'ects

Branch