ML17275B042
| ML17275B042 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 05/27/1981 |
| From: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17275B043 | List: |
| References | |
| NUDOCS 8106010374 | |
| Download: ML17275B042 (4) | |
See also: IR 05000397/1981009
Text
~R RE0y~
~C"
Vp
+
0
Cy
A.
~ l
O
I
++*++
Docket No. 50-397
UNITED STATES
. NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLAZA
WALNUTCREEK, CALIFORNIA94596
May 27,
1981
~E FILfgoy@
0
Washington Public Power Supply System
P. 0.
Box 968
3000 George
Way
Richland,
99352
Attention:
Mr. R.
G. Matlock
Program Director,
WNP-2 Project
Gentlemen:
Subject:
This refers to the inspection conducted
by Messrs.
D.
P. Haist, J. 0. Elin
and A. J.
D'Angelo of this office on April 13-16
and April 28-May 1,
1981
of activities authorized
by
NRC Const uction Permit No. CPPR-93,
and to
the discussion of'heir findings held with Mr.
W. C. Bibb and other members
of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection
report.
Within these areas,
the inspection consisted of selective
examinations
of procedures
and representative
r'ecords,
interviews with personnel,
and
observations
by the inspector .
No items of noncompliance with NRC requirements
were identified within the
scope of this inspection.
In accordance
with 10 CFR 2.790 of the ComIission's regulations,
a copy of
this letter and the enclosed
inspection report will be placed in the
NRC's
Public Document
Room. If this report contains
any information that you
(or your contractor's)
believe to be exempt from disclosure
under
it is necessary
that you (a) notify this office by telephone within ten
(10) days from the date of this letter of your intention to file a request
for withholding; and (b) submit within 25 days from the date of this letter
a written application to this 'office to withhold such information. If your
receipt of this letter has
been delayed
such that less
than seven
(7) days
are available for your review, please notify this office promptly so that
a new due date
may be established.
Consistent with section 2.790(b)(l),
any such application must
be accompanied
by an affidavit executed
by the
owner of the information which identifies the document or part sought to
be withheld, and which contains
a full statement of the basis
on which it
is claimed that the information should
be withheld from public disclosure.
I
yg
e
,o
Cp
CQ f
Washington Public Power Supply System
May 27,
1981
This section further requires the statement to add} ess with specificity
the considerations
listed in 10 CFR 2.790(b)(4).
The information sought
to be withheld shall
be incorporated
as far as possible into a separate
part of the affidavit. If we do not hear from you in this regard within
the specified periods
noted above,
the report will be placed in the Public
Document
Room.
Should you have any questions
concerning this inspection,
we will be glad
to discuss
them with you.
Sincerely,
Enclosure:
IE Inspection
Repor t
No. 50-397/81-09
J
cc w/o enclosure:
R.
B. Glasscock, guality Assurance
Director
W. C. Bibb, Project
Manager
Wl'lP-2 Project
B.
H. Faulkenber
Reactor Construe 'ects
Branch
e