Forwards IE Insp Rept 50-397/81-08 on 810401-30.No Noncompliance Noted
ML17275B039
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/22/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Matlock B
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17275B040 List:
References
NUDOCS 8105280257
Download: ML17275B039 (4)


Text

4 ~p,8 AKcy t

o '53g

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD SUITE 202; WALNUTCREEK PLAZA WALNUTCREEK, CALIFORNIA94596 MAY 22 1981

@XLKcoLv Docket No. 50-397 Washington Public Power Supply System P. 0.

Box 968 Richland, Washington 99352 Attention:

Mr. B.

G. Matlock Program Director Gentlemen:

Subject:

NRC INSPECTION This refers to the routine inspection conducted by Mr. A. Toth of this office during April 1981 of activities authorized by NRC Construction Permit No. CPPR-93, and to the discussion of our findings held by Mr. Toth with Mr. R.

Johnson and other members of -your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection report.

Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observa-tions by the inspector.

No items of noncompliance with NRC requirements were identified within the scope of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you believe to be exempt from disclosure under

CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within ten ( 10) days from the date of this letter of you intention to file a-request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven (7) days are available for your review, please notify this office promptly so that a new due date may be established.

Consistent with section 2.790(b)(l),

any such application must be accompanied by an affidavit excuted by the owner of the.information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on basis vIhich it is claimed that the information should be withheld form public disclosure.

This section fur ther requires the statement to address with

CI f

&

f$

f t

AN '22 1981 specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be glad to discuss them with you,

Sincerely,

~

~

B. H. Faulkenberry, Chief Reactor Construction Projects Branch Enclosure:

IE Inspection Report No. 50-397/81-08 cc w/o enclosure:

W.

C. Bibb, Project Manager R.

B. Glasscock, guality Assurance Director

I J 0