Text
~it RE0II
C +
O~
A.
I
O
0 ++*++
4
P
~ >
h
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
'SUITE 202, WALNUTCREEK PLAZA,
WALNUTCREEK, CALIFORNIA94999
APR
II 1981
JUH 04 1981~
II@ II0~g~( REQULAT0I0I
gOhVAISSI08
"
I
Docket No. 50-397
Washington Public Power Supply System
P. 0.
Box 968
Richland, Washington
Attention:
R.
G. Matlock
Program Director,
WNP-2 Project
Gentlemen:
Subject:
NRC Inspection of Washington Nuclear Project
No.
2
This refers to the inspection
conducted
by Mr.
W. J.
Wagner of this office
on March 23-25,
1981 of activities authorized
by
NRC Construction
Permit
No.
CPPR-93,
and to the discussion of our findings with Mr.
W.
G. Keltner
and other members of your staff at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspection report.
Within these areas,
the inspection consisted of
selective
examinations of procedures
and representative
records, inter-
views with personnel,
and observations
by the inspector.
No items of noncompliance with NRC requirements
were identified within
the scope of this inspection.
In accordance
with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulations,
a copy of this letter and
the enclosed
inspection report will be placed in the
NRC's Public
Document
Room.
If this report contains
any information that you believe
to be proprietary, it is necessary
that you submit a written application
to this office, within 20 days of the date of this letter, requesting
that such information be withheld from public disclosure.
The applica-
tion must include
a full statement of the reasons
why it is claimed that
SX06080
4'1c I
h
I
A
Washington Public Power Supply System
-2-
gpss
g 1981
the information is proprietary.
The application should
be prepared
so
that any proprietary information identified is contained in an enclosure
to the application,
since the application without the enclosure will
also
be placed in the Public Document
Room.
If we do not hear from you
in this regard within the specified period, the report will be placed in
the Public Document
Room.
Should you have any questions
concerning this inspection,
we will be
glad to discuss
them with you.
Sincerely,
Enclosure:
IE Inspection Report
'o.
50-397/81-07
IK.AM
.B,
H. Faulkenberry
Chic
Reactor Construction
sects
Branch
cc w/o enclosure:
N.
E. Witherspoon,
equality Assurance Director
W.
C. Bibb, Project Hanager