ML17275B017
| ML17275B017 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 05/01/1981 |
| From: | Bouchey G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17275B018 | List: |
| References | |
| GO2-81-89, NS-L-GCS-81-115, NUDOCS 8105050699 | |
| Download: ML17275B017 (4) | |
Text
I REGULA INFORMATION DISTRIBUTI STEM (RIDS)
ACCESSION NBR!8105050699 DOC ~ DATE! 81/05/01 NOTARIZED; NO DOCKET FACIL>>:50~397 NPPSS Nuclear ProJectE Unit 2'g Washington Public Powe 05000397 AUTH~ NAME, AUTHOR AFFIL'IATION BOUCHEYEG.D, Washington Public Power Supply System RECIP, NAME>>
RECIPIENT" AFF IL'IATION SCHNENCERgA ~
Lifcehsing Branch 2
SUBJECT:
For war ds r ev$ sed design 8 const QA pr ogram per 810318 r equest;Rev sed program effective date
- 810601, DISTRIBUTION CODE>>
B001SMOPIES RECEIVED:LTR [ ENCL J
" SIZE<<)'Q
'l>>E.
TITLE~: PSAR/FSAR AMDTS and Re.lated Correspondence NOTES:PM!
2". copies'f all materhal
~
05000397 RECIPIENT ID CODE/NAMEl ACTION:=
A)P'.ICENSNG RUSHBROOKiM~
COPIES LTTR ENCL>
0 1
~
0 RECIPIENT.
ID CODE/NAME LCC'R ¹2'C AULUCKgR~
00 COPIES-LTTR'NCL 1
0 1
1 INTERNAI.:; ACCID EVAL BR26' CHEM ENG BR 08'RE'-PERF BR 10'-
'MERG PREP 22.
GEOSCIENCES 14 1
HYD/GEO BR.15>>
?
"I8E<<>>
--.,0'6""'fb 3
L>>IC'UAL'R 1
MECH ENG BR" 18 1
NRC PDR
-02!
1 OP IIC BR 1
PROC/
REV 20.
1 R
ES 8R22.
1 EG F
01 1
CT" ENG BR25 1
1 1
1 0
12' 1
1<<
1 1
1 1
AUX SYS BR 07 CONT'>> SYS BR 09 EFF TR SYS BR12'QUIP QUAl. BR13 HUM FACT ENG BR IBC", SYS'R 16'IC GUID BR MATL< ENG BR'7 MPA OELD POWER SYS BR 19 QA SR 21 REAC SYS BR -23 SIT ANAL BR
?4 1
1 1
1 1
1 3>>
3i 1
1 1
1 1
1 0
0.
1 1
1<> OF COPIES REQUIREDS'TTR 5
ENCL
'(~
P a
r l
r,r '
~
fr I
ri ff
'rrt r rr, r
fprre'E>>
y f
'I'>
~ y Pf I
II I
N g~ fft, f f)
),g wnf e~,,
<<ft rrf k
r'r U
1 kl r II+
p
~
fl If II,,J~
Ir 4
r
~
r
'f~r r
g n
Tr I
r) i 1J Pl'f 1 QIA g l~'r
'f I'
~rr I
l,ll IP
~rh
<'Nl
'I l r
4
Washington Public Power Supply System A JOINT OPERATING AGENCY P.O. BOX 968 3000 GEO. WASHINGTONWAY RICHLAND>WASHINGTON 99352 PHONE I509) 372.5000 Docket No. 50-397 G02-81-89 May 1, 1981 NS-L-GCS-81-115 U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C.
20555 Attention:
Mr. A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing
Dear Mr> Schwencer:
Subject:
DESIGN AND CONSTRUCTION A PROGRAM, WNP-2 Ref.:
1)
- Letter, R. L. Tedesco to R. L. Ferguson, "QA Program Change for WNP-2," dated March 18, 1981.
2)
- Letter, G.
D. Bouchey to B. J.
Youngblood, "gA Program Changes for WNP-2," dated April 6, 1981.
Attached for your review are eight (8) copies of the revised Design and Construction guality Assurance Program for WNP-2 as requested by Reference 1).
Two (2) copies of this report are also being sent to NRC Region V office with this letter.
As noted in our letter of April 6 (Refer ence 2), the effective date for this revised program will be June 1, 1981.
We are prepared to meet with you if necessary to resolve any questions that may arise during your review.
The program documents being submitted at this time are final draft material and will be incorporated in an FSAR amendment by August 1, 1981'.
Should you have any questions, please contact me.
Very truly yours, G.
D. Bouchey, Director Nuclear Sa,ety nm cc:
R.
H. Engelken, NRC X 5O5O699
'P J!
II p
c N p t
gj g
H 4