Text
~'8
SUBJECT:
Advises that 810504 scheduled fuel load date of Sept 1983 may be moved up to Dec 1982 'cceler'ation caused by recent'egislative 8 labor developments L conservatism of preliminary schedule Suggests late June'981 onsite meeting, DISTRIBUTION CODE,:
8001S COPIES RECEIVED:LTR J 'NCL Q-SIZE;-
TITLE.: PSAR/FSAR AMDTS and Related Corr espondence NOTES:PM:
2 copies of al l material.i cy.'BWR-LRG PM(L'.RIB) 05000397 REGULAT'NFORMATION DISTRIBUTIO YSTEM (RIDS)
ACCESSION NBR 8105200222'OC
~ DATE 81/05/13 NOTARIZED ~
NO DOCKET FACIL::50'-397 WPPSS Nuclear Projecti Unit 2F Washington Public Powe 05000397 AUTH BYNAME AUTHOR AFFILIATION BOUCHERY<G.D.
Washington Public Power Supply System RECIP,NAME, RECIPIENT AFFILIATION EISENHUTFD ~ G ~
Division of Licensing RECIPIENT ID CODE/NAMF:
ACTION:
A/D LICENSNG RUSHBROOKFM ~
INTERNALS ACCID EVAL BR26 CHEM ENG BR 08 CORE PERF BR 10 EMERG PREP 22 GEOSCIENCES 14 HYD/GEO BR 15 ILE~
06 LIC QUAL BR MECH ENG BR 18 NRC PDR 02 OP LIC BR PROC/TST REV 20 RAD ASSESS BR22 01 STH L
ENG BR25 COPIES LTTR ENC 1
1 1
1 1
.1 1
2 3
1 1-1 1
1 1
1 1
RECIPIENT ID CODE/NAME L IC BR A 2" BC AULUCKER~
04 AUX SYS BR 07 CONT SYS BR 09 EFF TR SYS BR12 EQUI'P QUAL-BR13 HUM FACT ENG BR I8C SYS" BR 16 LI C GUID BR NATL ENG BR 17 MPA OELD POWER SYS BR 19 QA BR 21 REAC SYS BR 23 SIT ANAL BR 24 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
EXTERNAL: ACRS NSIC 27 05 16 1
1 LPDR 03 g zR )$4 TOTAL NUMBER OF COPIES REQUIRED:
LTTR
'56 ENCL I
g k
ll' o
~
W k,
f I
f \\
cl t
n K
e II
'I I
V I
I X
A 0
V r
II A
N tI,~
II
Washington Public Power Supply System A JOINT OPERATING AGENCY P.O. BOX 968 3000 GEO. WASHINGTONWAY RICHLAND,WASHINGTON 99352 PHONE (509) 372-5000 Docket No. 50-397 May 13, 1981 G02-81-97 NS-L-GCS-81-129 c5 q)
'tgit]g "
MAY19 tg8~~
8-Mr. D.
G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Eisenhut:
Subject:
FUEL LOAD SCHEDULE FOR NUCLEAR PROJECT NO.
2 The preliminary results of our evaluation of the WNP-2 completion schedule, taking into account the impact of last years extended labor dispute and the resultant labor force buildup to date,. indicates a scheduled fuel load date for WNP-2 of September 1983.
This date was reported by the local news media on May 4, 1981.
We are presently re-evaluating the critical path milestones associated with the preliminary schedule with an objective of achieving a fuel load date no later than December 1982.
Several recent legislative and labor'evelopments along with the conservative nature of the preliminary schedule lead us to believe that a December 1982 fuel load date may be achievable.
Prior to any revision to your scheduled review of the WINP-2 docket, we suggest a meeting where we would discuss our project, scheduling in more detail.
We recommend that the discussion take place in late June 1981 in conjunction with a case load forecast panel site visit.
Preliminary 8105200 Pgg
pr h
V H
H t
4 E
R
Nr.
D.
G. Eisenhut Page Two discussions of the WNP-2 schedule may be in order prior to that time, and we are prepared to meet'with you at your request.
Should you have any questions regarding this letter, please contact me.
Very truly yours, G ~
D. Bouchey Director, Nuclear Safety bf cc:
R. Auluck, NRC W.
S. Chin, BPA 0.
K. Earle, B&R J.
A. Forrest, B&R F. A. MacLean, GE N.
S.
- Reynolds, D&L A. Schwencer, NRC S. Smith, GE A.
D. Toth, NRC
'I I