ML17275B054

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-397/81-06 on 810301-31.No Noncompliance Noted
ML17275B054
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/27/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17275B055 List:
References
NUDOCS 8106080098
Download: ML17275B054 (4)


See also: IR 05000397/1981006

Text

C

~g8 REoo,

Mp

~4

0

Op

0O

g

++*++

Docket No. 50-397

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLA2A

WALNUTCREEK, CALIFORNIA94599

April 27,

1981

~NmC K9~

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

~

Attention:

Mr. R.

G. Matlock

Program Director

Gentlemen:

s

JUN05198t~

9

4% Surya IIgaIggggg

4R5555}II

/

Subject:

NRC Inspection

This refers to the routine inspection

conducted

by Mr. A. Toth of this

office on March 1-31,

1981, of activities authorized

by

NRC Construction

Permit No. CPPR-93,

and to the discussion of our findings held by Mr. Toth

with Mr. R. T. Johnson

and other

members of your staff at the conclusion

of the inspection.

Areas

examined during this inspection

are described

in the'nclosed

in-

spection report.

Within these

areas,

the inspection consisted of selec-

tive examinations of procedures

and representative

records,

interviews

with personnel,

and observations

by the inspector.

No items of noncompliance with NRC requirements

were identified'within the

scope of this inspection.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and the en-

closed inspection report will be placed in the NRC's Public Document

Room.

If this report contains

any information that you believe to be proprietary,

it is necessary

that you submit a written application to this office, within

30 days of the date of this letter, requesting that such information be with-

held from public disclosure.

The application must include

a full 'statement

of the reasons

why it is claimed that the information is proprietary.

The

application should

be prepared

so that any proprietary information identi-

fied is contained in an enclosure

to the application, since the application

without the enclosure will also

be placed in the Public Document

Room.

If

we do not hear from you in this regard within the specified period, the

report will be placed in the Public Document

Room.

o~ oo omo CIA@

~ N

N

l

v>

1 7

n

g-L'

fa

~ g l'/

ff

N

I

K

WA

Jk

)l

-2-

April 27,

1981

Should you have

any questions

concerning this inspection,

we will be glad

to discuss

them with you.

Sincerely,

B. H.

aulkenberr

IH

Reactor Construct

n Projects

Branch

Enclosure:

IE Inspection

Report

No. 50-397/81-06

cc w4 enclosure

R.

B. Glasscock

equality Assurance

Director