ML23257A241 | 19 September 2023 | Summary of August 15, 2023, Pre-submittal Teleconference with Entergy Operations, Inc. to Discuss Proposed License Amendment Request Concerning Pressurizer Heaters for Arkansas Nuclear One, Unit 1 | Anticipated operational occurrence |
ML23181A034 | 11 July 2023 | Summary of Classification Meeting with TMI-2 Solutions, LLC Regarding the Process for Consultation Under Section 106 of the National Historic Preservation Act of 1966 as Related to the Historic and Culture Resources Review License Amendment | |
ML23152A255 | 5 June 2023 | Summary of the May 17, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station | |
ML23118A285 | 2 May 2023 | Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Catawba Nuclear Station, McGuire Nuclear and Oconee Nuclear Station | Subsequent License Renewal |
ML23047A382 | 21 March 2023 | Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting | |
ML22215A191 | 9 August 2022 | Summary of July 13, 2022, Teleconference Meeting with Entergy Operations, Inc. to Discuss Planned License Amendment Requests to Adopt Technical Specifications Task Force (TSTF) Traveler 505, Risk-Informed Extended Completion Times | Probabilistic Risk Assessment FLEX Large early release frequency Offsite Circuit |
ML22200A077 | 8 August 2022 | SLRA - Summary of July 14, 2022 and July 28, 2022 Public Meetings | License Renewal Subsequent License Renewal |
ML22193A018 | 18 July 2022 | SLRA - Summary of June 30, 2022 Public Meeting | License Renewal Subsequent License Renewal |
ML22178A231 | 28 June 2022 | Summary of the June 22, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Davis Besse Nuclear Power Station | |
ML22147A093 | 6 June 2022 | 2021 Annual Assessment Public Meeting Summary | Pandemic Coronavirus COVID-19 |
ML22151A130 | 2 June 2022 | May 10, 2022, Summary of Teleconference Meeting W/Entergy Operations, Inc. to Discuss a Planned Alternative for a One-Time Schedule Extension for the In-Service Examination of Control Rod Drive Mechanism Penetration No. 1 in the Reactor Ves | Nondestructive Examination |
ML22129A006 | 10 May 2022 | Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 | Surveillance Frequency Control Program Operational leakage |
ML22125A245 | 9 May 2022 | May 3, 2022, Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for ANO, Units 1 & 2 Regarding Proposed Revision to Emergency Plan and On-Shift Staff Analysis | |
ML22124A205 | 4 May 2022 | Summary of May 4, 2022, Clarification Call with Duke Energy Carolinas, LLC, Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System | |
ML22130A012 | 4 May 2022 | SLRA - Summary of April 28, 2022 Public Meeting | License Renewal Subsequent License Renewal |
ML22075A204 | 5 April 2022 | SLRA - Summary of March 7, 2022 Public Meeting | License Renewal Subsequent License Renewal |
ML22094A111 | 4 April 2022 | Public Meeting Summary 2021 Annual Assessment Meeting Catawba Dockets Nos. 50-413 and 50-414; McGuire No. 50-369 and 50-370; Oconee. 50-269, 50-270, and 50-287 | Coronavirus |
ML22084A614 | 4 April 2022 | SLRA - Summary of March 16, 2022 (Closed Public Meeting) | License Renewal Subsequent License Renewal |
ML22088A197 | 30 March 2022 | Summary of March 11, 2022, Call Regarding the Spring 2022 Steam Generator Tube Inspections | |
ML22084A102 | 27 March 2022 | Reissue Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission | Probabilistic Risk Assessment |
ML22077A806 | 23 March 2022 | Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission | Probabilistic Risk Assessment |
ML22063A116 | 8 March 2022 | SLRA - Summary of Public Meeting Dated February 17, 2022 | License Renewal Subsequent License Renewal |
ML22003A056 | 10 January 2022 | Summary of December 16, 2021, Presubmittal Teleconference with Entergy Operations, Inc. to Discuss Proposed Amendment Request Concerning TS 3.4.4, RCS Loops, Modes 1 and 2, for Arkansas Nuclear One, Unit 1 | |
ML21341A554 | 29 December 2021 | Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate | |
ML21348A545 | 14 December 2021 | December 13, 2021, Clarification Call Summary Use of an Alternative to the ASME Code Case N-853 Acceptance Criteria | Weld Overlay Stress corrosion cracking |
ML21323A047 | 6 December 2021 | Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors | |
ML21314A536 | 18 November 2021 | Summary of November 8, 2021, Meeting with Energy Harbor Nuclear Corp. Regarding Its Proposed Alternate for Examination of Steam Generator Welds at | Incorporated by reference |
ML21279A154 | 8 November 2021 | August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Summary Memo | License Renewal Subsequent License Renewal |
ML21288A039 | 18 October 2021 | September 14, 2021, Summary of Public Workshop on Scale/Melcor Source Term Demonstration Project - Pebble-Bed Molten-Salt-Cooled Reactor | |
ML21279A119 | 25 August 2021 | August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Summary | License Renewal Subsequent License Renewal |
ML21195A269 | 14 July 2021 | Meeting Summary: Pre-Submittal Meeting for the Oconee Subsequent License Renewal Application (EPID Number: L-2020-RNW-0028) (Docket Numbers: 50 269, 50-270, and 50-287) - Memo | License Renewal |
ML21195A271 | 14 July 2021 | Meeting Summary: Pre-Submittal Meeting for the Oconee Subsequent License Renewal Application (EPID Number: L-2020-RNW-0028) (Docket Numbers: 50 269, 50-270, and 50-287) - Summary | License Renewal Subsequent License Renewal Power Uprate Measurement Uncertainty Recapture |
ML21181A335 | 1 July 2021 | June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project | Probabilistic Risk Assessment |
ML21180A463 | 29 June 2021 | Summary of the June 22, 2021, Public Outreach to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant | |
ML21158A223 | 8 June 2021 | Meeting Summary for Ticap Workshop 3 | Probabilistic Risk Assessment Maintenance Rule Program |
ML21140A389 | 24 May 2021 | Riv Column 1 EOC 2020 Public Meeting Summary | Coronavirus COVID-19 |
ML21132A295 | 14 May 2021 | Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project | Probabilistic Risk Assessment Maintenance Rule Program |
ML21117A026 | 5 May 2021 | Summary of Teleconference with Entergy Operations, Inc. to Discuss Forthcoming LAR Concerning Reactor Coolant System Primary Activity and Primary-to-Secondary Leak Rate | |
ML21102A061 | 27 April 2021 | April 14, 2021, Meeting Summary Regarding Pre-Application Meeting to Discuss Proposed Relief Request Related to Code Case N-853 | Weld Overlay |
ML21099A093 | 9 April 2021 | Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Catawba, McGuire, and Oconee Nuclear Stations | Coronavirus |
ML20337A157 | 8 December 2020 | Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss the Forthcoming Supplemental Response Concerning Generic Letter 2004-02 for Arkansas Nuclear One, Units 1 and 2 | |
ML20266G219 | 3 November 2020 | Regulatory Audit Report Regarding License Amendment Request to Revise the Licensing Basis for High Energy Line Breaks Outside of the Containment Building | Safe Shutdown FLEX Time Critical Operator Action License Renewal Commercial Grade GOTHIC |
ML20287A401 | 26 October 2020 | Summary of September 17, 2020, Meeting with Entergy to Discuss Proposed License Amendment Request for Arkansas Nuclear One, Units 1 and 2 Request to the Extend Allowable Outage Time for the Emergency Cooling Pond | |
ML20260G999 | 16 September 2020 | Summary of August 4, 2020, Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Arkansas Nuclear One, Units 1 and 2 Regarding Adoption of 10 CFR 50.69 | Probabilistic Risk Assessment |
ML20240A294 | 27 August 2020 | July 23, 2020 Summary of Public Webinar to Discuss the Nrc 2019 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station and the Perry Nuclear Power Plant | |
ML20189A283 | 7 July 2020 | Summary of Region IV Annual Assessment Public Meeting | Coronavirus |
ML20153A225 | 4 June 2020 | April 29, 2020, Summary of Meeting with Entergy Operations, Inc. to Discuss a Proposed Relief Request Use of Carbon Fiber Reinforced Polymer Piping for Underground Service Water Piping at Arkansas Nuclear One, Units 1 and 2 | |
ML20141L417 | 20 May 2020 | EOC Public Meeting Summary | |
ML19331A520 | 12 December 2019 | Summary of Meeting with Duke Energy Carolinas, LLC to Discuss Submitted License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding High Energy Line Break Licensing Basis | Safe Shutdown Time Critical Operator Action Affidavit |
ML19326A315 | 3 December 2019 | Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing Requirements | Anchor Darling |