Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23257A24119 September 2023Summary of August 15, 2023, Pre-submittal Teleconference with Entergy Operations, Inc. to Discuss Proposed License Amendment Request Concerning Pressurizer Heaters for Arkansas Nuclear One, Unit 1Anticipated operational occurrence
ML23181A03411 July 2023Summary of Classification Meeting with TMI-2 Solutions, LLC Regarding the Process for Consultation Under Section 106 of the National Historic Preservation Act of 1966 as Related to the Historic and Culture Resources Review License Amendment
ML23152A2555 June 2023Summary of the May 17, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station
ML23118A2852 May 2023Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Catawba Nuclear Station, McGuire Nuclear and Oconee Nuclear StationSubsequent License Renewal
ML23047A38221 March 2023Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting
ML22215A1919 August 2022Summary of July 13, 2022, Teleconference Meeting with Entergy Operations, Inc. to Discuss Planned License Amendment Requests to Adopt Technical Specifications Task Force (TSTF) Traveler 505, Risk-Informed Extended Completion TimesProbabilistic Risk Assessment
FLEX
Large early release frequency
Offsite Circuit
ML22200A0778 August 2022SLRA - Summary of July 14, 2022 and July 28, 2022 Public MeetingsLicense Renewal
Subsequent License Renewal
ML22193A01818 July 2022SLRA - Summary of June 30, 2022 Public MeetingLicense Renewal
Subsequent License Renewal
ML22178A23128 June 2022Summary of the June 22, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Davis Besse Nuclear Power Station
ML22147A0936 June 20222021 Annual Assessment Public Meeting SummaryPandemic
Coronavirus
COVID-19
ML22151A1302 June 2022May 10, 2022, Summary of Teleconference Meeting W/Entergy Operations, Inc. to Discuss a Planned Alternative for a One-Time Schedule Extension for the In-Service Examination of Control Rod Drive Mechanism Penetration No. 1 in the Reactor VesNondestructive Examination
ML22129A00610 May 2022Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00Surveillance Frequency Control Program
Operational leakage
ML22125A2459 May 2022May 3, 2022, Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for ANO, Units 1 & 2 Regarding Proposed Revision to Emergency Plan and On-Shift Staff Analysis
ML22124A2054 May 2022Summary of May 4, 2022, Clarification Call with Duke Energy Carolinas, LLC, Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System
ML22130A0124 May 2022SLRA - Summary of April 28, 2022 Public MeetingLicense Renewal
Subsequent License Renewal
ML22075A2045 April 2022SLRA - Summary of March 7, 2022 Public MeetingLicense Renewal
Subsequent License Renewal
ML22094A1114 April 2022Public Meeting Summary 2021 Annual Assessment Meeting Catawba Dockets Nos. 50-413 and 50-414; McGuire No. 50-369 and 50-370; Oconee. 50-269, 50-270, and 50-287Coronavirus
ML22084A6144 April 2022SLRA - Summary of March 16, 2022 (Closed Public Meeting)License Renewal
Subsequent License Renewal
ML22088A19730 March 2022Summary of March 11, 2022, Call Regarding the Spring 2022 Steam Generator Tube Inspections
ML22084A10227 March 2022Reissue Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory CommissionProbabilistic Risk Assessment
ML22077A80623 March 2022Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory CommissionProbabilistic Risk Assessment
ML22063A1168 March 2022SLRA - Summary of Public Meeting Dated February 17, 2022License Renewal
Subsequent License Renewal
ML22003A05610 January 2022Summary of December 16, 2021, Presubmittal Teleconference with Entergy Operations, Inc. to Discuss Proposed Amendment Request Concerning TS 3.4.4, RCS Loops, Modes 1 and 2, for Arkansas Nuclear One, Unit 1
ML21341A55429 December 2021Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate
ML21348A54514 December 2021December 13, 2021, Clarification Call Summary Use of an Alternative to the ASME Code Case N-853 Acceptance CriteriaWeld Overlay
Stress corrosion cracking
ML21323A0476 December 2021Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors
ML21314A53618 November 2021Summary of November 8, 2021, Meeting with Energy Harbor Nuclear Corp. Regarding Its Proposed Alternate for Examination of Steam Generator Welds atIncorporated by reference
ML21279A1548 November 2021August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Summary MemoLicense Renewal
Subsequent License Renewal
ML21288A03918 October 2021September 14, 2021, Summary of Public Workshop on Scale/Melcor Source Term Demonstration Project - Pebble-Bed Molten-Salt-Cooled Reactor
ML21279A11925 August 2021August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting SummaryLicense Renewal
Subsequent License Renewal
ML21195A26914 July 2021Meeting Summary: Pre-Submittal Meeting for the Oconee Subsequent License Renewal Application (EPID Number: L-2020-RNW-0028) (Docket Numbers: 50 269, 50-270, and 50-287) - MemoLicense Renewal
ML21195A27114 July 2021Meeting Summary: Pre-Submittal Meeting for the Oconee Subsequent License Renewal Application (EPID Number: L-2020-RNW-0028) (Docket Numbers: 50 269, 50-270, and 50-287) - SummaryLicense Renewal
Subsequent License Renewal
Power Uprate
Measurement Uncertainty Recapture
ML21181A3351 July 2021June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application ProjectProbabilistic Risk Assessment
ML21180A46329 June 2021Summary of the June 22, 2021, Public Outreach to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant
ML21158A2238 June 2021Meeting Summary for Ticap Workshop 3Probabilistic Risk Assessment
Maintenance Rule Program
ML21140A38924 May 2021Riv Column 1 EOC 2020 Public Meeting SummaryCoronavirus
COVID-19
ML21132A29514 May 2021Summary of Public Meeting to Discuss Technology Inclusive Content of Application ProjectProbabilistic Risk Assessment
Maintenance Rule Program
ML21117A0265 May 2021Summary of Teleconference with Entergy Operations, Inc. to Discuss Forthcoming LAR Concerning Reactor Coolant System Primary Activity and Primary-to-Secondary Leak Rate
ML21102A06127 April 2021April 14, 2021, Meeting Summary Regarding Pre-Application Meeting to Discuss Proposed Relief Request Related to Code Case N-853Weld Overlay
ML21099A0939 April 2021Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Catawba, McGuire, and Oconee Nuclear StationsCoronavirus
ML20337A1578 December 2020Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss the Forthcoming Supplemental Response Concerning Generic Letter 2004-02 for Arkansas Nuclear One, Units 1 and 2
ML20266G2193 November 2020Regulatory Audit Report Regarding License Amendment Request to Revise the Licensing Basis for High Energy Line Breaks Outside of the Containment BuildingSafe Shutdown
FLEX
Time Critical Operator Action
License Renewal
Commercial Grade
GOTHIC
ML20287A40126 October 2020Summary of September 17, 2020, Meeting with Entergy to Discuss Proposed License Amendment Request for Arkansas Nuclear One, Units 1 and 2 Request to the Extend Allowable Outage Time for the Emergency Cooling Pond
ML20260G99916 September 2020Summary of August 4, 2020, Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Arkansas Nuclear One, Units 1 and 2 Regarding Adoption of 10 CFR 50.69Probabilistic Risk Assessment
ML20240A29427 August 2020July 23, 2020 Summary of Public Webinar to Discuss the Nrc 2019 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station and the Perry Nuclear Power Plant
ML20189A2837 July 2020Summary of Region IV Annual Assessment Public MeetingCoronavirus
ML20153A2254 June 2020April 29, 2020, Summary of Meeting with Entergy Operations, Inc. to Discuss a Proposed Relief Request Use of Carbon Fiber Reinforced Polymer Piping for Underground Service Water Piping at Arkansas Nuclear One, Units 1 and 2
ML20141L41720 May 2020EOC Public Meeting Summary
ML19331A52012 December 2019Summary of Meeting with Duke Energy Carolinas, LLC to Discuss Submitted License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding High Energy Line Break Licensing BasisSafe Shutdown
Time Critical Operator Action
Affidavit
ML19326A3153 December 2019Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing RequirementsAnchor Darling