Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217N331 | 25 October 1999 | Informs That Attached Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation on 990929,of Operating License Amends 180 & 172,re Transition to Westinghouse-supplied Fuel | |
ML20217L717 | 22 October 1999 | Informs That Encl Questions Were Transmitted by Email to PT Vu of Duke Energy Corp,In Preparation for Upcoming Telcon Re 990624 Amend Request | Anticipated operational occurrence |
ML20217K343 | 12 October 1999 | Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990921-23 | Safe Shutdown Shutdown Margin Tornado Generated Missile Job Performance Measure Earthquake Fire Protection Program GOTHIC Exclusive Use |
ML20217K252 | 12 October 1999 | Forwards NRC Operator Licensing Exam Repts 50-413/99-302 & 50-414/99-302 (Including Completed & Graded Tests) for Tests Administered on 990921-23 | |
ML20217G504 | 30 September 1999 | Forwards NRC Operator Licensing Exam Repts 50-413/99-301 & 50-414/99-301 (Including Completed & Graded Tests) for Tests Administered on 990524-27,0603,07-10 & 16 | |
ML20216J217 | 30 September 1999 | Informs That Encl Questions Were Transmitted by Email on 990930 to M Purser of Duke Energy Corp for Preparation of Upcoming Telcon.Questions Pertain to 990624 Amend Request | |
ML20216J672 | 22 September 1999 | Forwards Copy of Memorandum ,received from La Robertson,Fema Region Iv,Re Summary of Disaster Initiated Review,Hurricane Floyd for Bnpp,Offsite Preparedness.Memo Accurately Reflects Issues Discussed During 990918 Telcon | Siren |
ML20217A839 | 21 September 1999 | Concurs on Section E3.1 of Insp Repts 50-413/99-05 & 50-414/99-05 Re Review of Rev 7 of Catawba Ufsar.Notes Minor Typo Made in Input.Ref to Year Should Be 1998 & Not 1997 | |
ML20217A812 | 21 September 1999 | Concurs with Insp Repts 50-413/99-05 & 50-414/99-05 for Catawba | |
ML20211L354 | 3 September 1999 | Notification of 990914 Meeting with Util in Southport,Nc to Discuss Brunswick Practices Re Protection of Threatened & Endangered Species of Sea Turtles Near Plant | |
ML20211K388 | 2 September 1999 | Forwards Document Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amend 179 & 171 Re Reactor Trip System & Engineered Safety Feature Sys Setpoints on 990824 | |
ML20210L660 | 5 August 1999 | Forwards single-page Document Given to G Belisle of Region II by T Clements of Nuclear Control Institute Re Mixed Oxide Fuel | |
ML20196K623 | 1 July 1999 | Forwards Draft Safety Evaluation on TR DPC-NE-2009, Duke Power Co Westinghouse Fuel Transition Rept. Rept Was Transmitted to Warren in Order to Prepare for Conference Call | Power change |
ML20195J071 | 14 June 1999 | Submits Issues to Be Discussed in Upcoming Conference Call Re Licensee Response to GL 98-04 | Coatings |
ML20207G371 | 9 June 1999 | Forwards Questions That Were Transmitted to G Gilbert of DPC for Preparation for Upcoming Review on Site Re Rev 7 of Updated Final Safety Analysis Rept | |
ML20206U423 | 18 May 1999 | Notification of 990602 Meeting with Duke Energy Corp,Vepco & Others in Rockville,Md to Discuss Technical,Regulatory & Licensing Issues Related to Proposed Future Use of Mixed Oxide Fuel at Catawba,Mcguire & North Anna Nuclear Stations | |
ML20206H186 | 6 May 1999 | Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Amends 177 for Unit 1 & 169 for Unit 2, Concerning CR & Auxiliary Bldg Ventilation Actuation Instrumentation on 990423 | |
ML20206H167 | 5 May 1999 | Forwards Document,Transmitted by Fax from Duke Energy Corp, Which Signifies Implementation of Operating License Amends 178 & 170 Re Reactor Bldg Integrity Surveillance & Containment Leak Rate Testing on 990423 | |
ML20206E895 | 3 May 1999 | Informs That Attached Questions Transmitted by Fax on 990503 to G Gilbert of Duke Energy Corp to Prepare Gilbert & Others for Upcoming Onsite Review of Changes Made Per 10CFR50.59 During 1998 | Fire Barrier Temporary Modification |
ML20205N892 | 12 April 1999 | Forwards Implementation of Amend 176 & 168 to Operating Licenses for Units 1 & 2 Re Fuel Handling Ventilation Exhaust Sys on 990326 | |
ML20205J098 | 5 April 1999 | Forwards Questions Transmitted on 990405 to G Gilbert of Duke Energy Corp to Prepare for Upcoming Telephone Calls | |
ML20204E285 | 17 March 1999 | Requests Entry of Attached Draft Info Provided by CP&L on 990315,into Brunswick Steam Electric Plant Docket Files & Pdr.Info Pertains to Pending Request to Extend Electrical Bus Allowed Outage Time Submitted to NRC on 961101 | Temporary Modification Incorporated by reference Hardened vent |
ML20203F362 | 11 February 1999 | Forwards Exam Repts 50-413/97-300 & 50-414/97-300,with as Given Written Exam for Test Administered at Facility During Period 971201-05 & 15-19 | |
ML20203C249 | 9 February 1999 | Notification of 990309 Meeting with Util in Rockville,Md to Discuss NRC Staff Questions Re Application to Amend Brunswick Steam Electric Plant TSs to Extend Allowable Outage Time for Specific Electrical Buses | |
ML20207L697 | 9 February 1999 | Notification of 990309 Meeting with Util in Rockville,Md to Discuss NRC Staff Questions Re Application to Amend BSEP TSs to Extend AOT for Specific Electrical Buses.Meeting Has Been Cancelled | |
ML20202H904 | 3 February 1999 | Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 175 & 167 Re Diesel Engine Lube Oil Surveillance on 990116 | |
ML20202H901 | 3 February 1999 | Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 174 & 166 Re Containment Pressure Control Sys on 990116 | |
ML20202C418 | 28 January 1999 | Informs That Time Provided by NRC within Which Commission May Act to Review Decision of Presiding Officer (LBP-98-30) Has Expired.Commission May Decline Any Review.With Certificate of Svc.Served on 990129 | |
ML20199J107 | 21 January 1999 | Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation Operating License Amends 173 & 165 Re Improved TSs on 990116 | |
ML20199J120 | 21 January 1999 | Informs That Encl Questions Were Transmitted by Fax on 990121 to a Jones-Young of Duke Energy Corp,In Order to Prepare for Upcoming Telephone Call.Memo & Encl Do Not Convey Formal Request for Info or Represent NRC Position | |
ML20195H042 | 17 November 1998 | Informs That Encl Questions Were Transmitted by e-mail to Warren of Duke Energy Corp in Preparation for Upcoming Telephone Call.Memo & Enclosure Do Not Convey Formal Request for Info or Represent NRC Staff Position | |
ML20155E081 | 30 October 1998 | Notification of 981117 Meeting with CP&L in Rockville MD to Discuss NRC Staff Questions Re Application to Amend TSs to Extend Allowable Outage Time for Specific Electrical Buses | |
ML20154N260 | 19 October 1998 | Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 172 & 163 on 981007 | |
ML20154N266 | 16 October 1998 | Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 171 & 164 on 981007 | |
ML20154N322 | 15 October 1998 | Forwards Document Signifying Implementation of Amends 170 & 162 to Licenses NPF-35 & NPF-52,respectively on 981001 | |
ML20154A943 | 29 September 1998 | Forwards Lists of Plant Licensing Actions & Activities Which Were Transmitted by Fax on 980929 to M Kitlan,G Gilbert & L Keller.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subj to Change | Hydrostatic |
ML20153H095 | 28 September 1998 | Forwards Fax from Util,Verifying Implementation of Operating License Amend 168 for Unit 1 & Amend 160 for Unit 2 on 980922 | |
ML20151Y052 | 16 September 1998 | Forwards Notarized Affidavit of D Payne,Supporting Denial of SRO License for Rl Herring.Staff Noted That Payne Signature Had Not Been Notarized | Affidavit |
ML20239A080 | 3 September 1998 | Forwards App D 221 Facility Operating License TS Amend Implementation Sheet Faxed from Duke Energy Corp.Document Signifies Implementation of Operating License Amend 169 for Unit 1 & 161 for Unit 2 on 980902 | |
ML20237D627 | 24 August 1998 | Informs That Attached Questions Transmitted by Fax on 980824 by M Kitlan of Duke Energy Corp to Prepare for Upcoming Conference Call.Memo & Attached Do Not Cover Formal Request for Info or Represent NRC Staff Position | |
ML20236U742 | 28 July 1998 | Forwards Questions Transmitted by Fax to M Purser of Duke Energy Corp to Prepare for Upcoming Conference Call on Licensee Response to GL 96-06 | |
ML20236R954 | 23 July 1998 | Forwards Hearing File & Table of Contents Re R Herring,Per Presiding Officer Order of 980630 & 10CFR2.1231(b). W/Certificate of Svc | Safe Shutdown Unanalyzed Condition Time of Discovery Shutdown Margin Grab sample Offsite Dose Calculation Manual Fire Barrier Stroke time Past operability Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Missed surveillance Job Performance Measure Operability Determination Exemption Request Power Operated Valves Fuel cladding Pressure Boundary Leakage Scaffolding Backfit Operational leakage |
ML20236R777 | 20 July 1998 | Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 166 & 158 on 980715 | |
ML20236R786 | 16 July 1998 | Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 167 & 159 on 980715 | |
ML20236R038 | 16 July 1998 | Forwards List of Catawba Licensing Actions & Activities Transmitted by 980716 Fax to M Kitlan & L Keller of Duke Energy Corp.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subject to Change W/O Notice | |
ML20249C645 | 25 June 1998 | Notification of 980709-10 Meeting W/Duke Energy Corp in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations | |
ML20248F106 | 2 June 1998 | Notification of 980617 & 18 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations | |
ML20248A960 | 26 May 1998 | Forwards 980427 Facsimile Transmitted from Duke Energy Corp Which Signifies Implementation of Amends 164 (for Unit 1) & 156 (for Unit 2) on 980526 | |
ML20248A273 | 26 May 1998 | Forwards Document,Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amends 165 & 157 for Unit 2 on 980526 | |
ML20247M845 | 19 May 1998 | Forwards Document Listing 10CFR50.59 Evaluations,Selected to Review Onsite & Questions on Rept Summarizing Plant Changes Made Under 10CFR50.59 in 1997.Memo & Attachments Does Not Convey Formal Request for Info or Represent Staff Position | Coatings Temporary Modification Emergency Lighting Scaffolding |