Category:Letter type:PLA
MONTHYEARPLA-8145, Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-81452024-10-21021 October 2024 Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-8145 PLA-8148, Registration for the Use of Spent Fuel Storage Casks 311, 308, and 3102024-10-15015 October 2024 Registration for the Use of Spent Fuel Storage Casks 311, 308, and 310 PLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8076, Unit 2 - 21st Refueling Outage Owners Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owners Activity Report (PLA-8076) PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums PLA-8048, Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence2023-01-14014 January 2023 Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8038, Notification of Petition for Bankruptcy (PLA-8038)2022-12-14014 December 2022 Notification of Petition for Bankruptcy (PLA-8038) PLA-8036, Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-80362022-11-30030 November 2022 Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-8036 PLA-8035, Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-80352022-11-0808 November 2022 Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-8035 2024-09-18
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARPLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8015, Application for Order Approving Indirect Transfer of Control of Licenses2022-09-29029 September 2022 Application for Order Approving Indirect Transfer of Control of Licenses PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 PLA-7979, Supplement to License Amendment to Revise Reactor Steam Dome Pressure Low Instrumentation Function Allowable Value2021-12-16016 December 2021 Supplement to License Amendment to Revise Reactor Steam Dome Pressure Low Instrumentation Function Allowable Value PLA-7950, Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-7950)2021-10-0505 October 2021 Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-7950) PLA-7897, Proprosed Amendment to Licenses NPF-14 and NPF-22: License Amendment Request to Revise Technical Specification to Adopt Risk Informed Completion Times TSTF-505, Rev 2, Provide Risk Informed Extended Completion.2021-04-0808 April 2021 Proprosed Amendment to Licenses NPF-14 and NPF-22: License Amendment Request to Revise Technical Specification to Adopt Risk Informed Completion Times TSTF-505, Rev 2, Provide Risk Informed Extended Completion. ML20245E1922020-09-0101 September 2020 Talen Energy - Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements PLA-7880 PLA-7866, Electric Station Proposed Amendment Licenses NPF-14 and - NPF-22: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules PLA-78662020-06-25025 June 2020 Electric Station Proposed Amendment Licenses NPF-14 and - NPF-22: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules PLA-7866 PLA-7842, Proposed Amendment to Licenses NPF-14 and NPF-22: Revise Technical Specification 3.8.1 to Create a New Condition for an Inoperable Manual Synchronization Circuit PLA-72482020-05-26026 May 2020 Proposed Amendment to Licenses NPF-14 and NPF-22: Revise Technical Specification 3.8.1 to Create a New Condition for an Inoperable Manual Synchronization Circuit PLA-7248 PLA-7823, Proposed Amendment to Licenses NPF-014 and NPF-022: Revision to the Dose Consequence Analysis for a Loss of Coolant Accident2020-01-0202 January 2020 Proposed Amendment to Licenses NPF-014 and NPF-022: Revision to the Dose Consequence Analysis for a Loss of Coolant Accident PLA-7783, Proposed Amendment to Licenses: Application of Advanced Framatome Methodologies and TSTF-535 PLA-77832019-07-15015 July 2019 Proposed Amendment to Licenses: Application of Advanced Framatome Methodologies and TSTF-535 PLA-7783 PLA-7772, Application to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco.2019-03-28028 March 2019 Application to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco. PLA-7751, Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping2019-01-0909 January 2019 Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping PLA-7729, Technical Specifications Task Force Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2018-12-0404 December 2018 Technical Specifications Task Force Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. PLA-7605, Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A2017-05-17017 May 2017 Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A PLA-7528, Supplemental Information for License Amendment Request to Address Secondary Containment Access Openings2016-09-13013 September 2016 Supplemental Information for License Amendment Request to Address Secondary Containment Access Openings PLA-7486, Proposed Amendment Request to Address Secondary Containment Access Openings2016-07-27027 July 2016 Proposed Amendment Request to Address Secondary Containment Access Openings ML16181A4172016-06-29029 June 2016 Projected Income Statement and Calculation of Six-Month Fixed Costs (Redacted) ML16181A4152016-06-29029 June 2016 Request for Order Approving Indirect Transfer of Control - PLA-7500 ML16181A4192016-06-29029 June 2016 Capacity Factor Assumptions (Redacted) PLA-7441, Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-4252016-01-29029 January 2016 Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-425 PLA-7384, Proposed Amendment No. 292, Temporary Change to Allow Replacement on Unit 1 480 V Ess Load Center Transformers in Unit 2 Technical Specifications 3.8.7 and 3.7.12016-01-28028 January 2016 Proposed Amendment No. 292, Temporary Change to Allow Replacement on Unit 1 480 V Ess Load Center Transformers in Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-7378, Proposed Amendment No. 317 to License NPF-14 and Proposed Amendment No. 289 to License NPF-22: Supplement to Change Milestone 8 Date2015-08-28028 August 2015 Proposed Amendment No. 317 to License NPF-14 and Proposed Amendment No. 289 to License NPF-22: Supplement to Change Milestone 8 Date PLA-7360, Supplemental Information to License Amendment Request for Changes in RCS Pressure and Temperature (P/T) Limits2015-07-16016 July 2015 Supplemental Information to License Amendment Request for Changes in RCS Pressure and Temperature (P/T) Limits ML15091A6612015-03-19019 March 2015 Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme NEI 99-01, Susquehanna, Units 1 and 2 - Proposed License Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.2015-03-19019 March 2015 Susquehanna, Units 1 and 2 - Proposed License Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. NEI 99-01, Susquehanna, Units 1 and 2 - Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme2015-03-19019 March 2015 Susquehanna, Units 1 and 2 - Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme ML15091A6602015-03-19019 March 2015 Proposed License Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. PLA-7181, Submittal of Request for Amendment to the Technical Specification 3.4.10, RCS Pressure and Temperature (Pit) Limits.2014-08-11011 August 2014 Submittal of Request for Amendment to the Technical Specification 3.4.10, RCS Pressure and Temperature (Pit) Limits. ML14195A1132014-07-11011 July 2014 Enclosure to PLA-7191 Application for Order Approving Indirect Transfer of Control of Facility Operating License Nos. NPF-14 and NPF-22 and Conforming Amendments ML14042A1152014-01-29029 January 2014 License Amendment Request - Increase of the Allowable Gas Treatment System Maximum Flow Rates from Secondary Containment PLA-6977, Proposed Amendment No. 313 to License NPF-14 and Proposed Amendment No. 285 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.5.1.122013-06-0606 June 2013 Proposed Amendment No. 313 to License NPF-14 and Proposed Amendment No. 285 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.5.1.12 PLA-6915, Proposed Amendment No. 312 to Unit 1, and Proposed Amendment No. 284 to Unit 2 Low Pressure Safety Limit and Reference Changes2012-12-19019 December 2012 Proposed Amendment No. 312 to Unit 1, and Proposed Amendment No. 284 to Unit 2 Low Pressure Safety Limit and Reference Changes PLA-6825, Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage2012-09-18018 September 2012 Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage PLA-6817, Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1 4160 V Buses Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-68172012-03-0808 March 2012 Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1 4160 V Buses Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-6817 ML11152A0092011-07-21021 July 2011 Issuance of Amendment Approval of the PPL Susquehanna, LLC Cyber Security Plan PLA-6695, Amend. Request No. 308 to License NPF-14 & Amend. Request No. 279 to License NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-514, Rev. 3, Revise BWR Operability Requirements & Actions RCS Leakage Instrumentation2011-04-0808 April 2011 Amend. Request No. 308 to License NPF-14 & Amend. Request No. 279 to License NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-514, Rev. 3, Revise BWR Operability Requirements & Actions RCS Leakage Instrumentation PLA-6628, Proposed Amendment No. 306 to License NPF-14 & Proposed Amendment No. 277 to License NPF-22: Withdrawal & Resubmittal of Request for Approval of the Cyber Security Plan2010-07-22022 July 2010 Proposed Amendment No. 306 to License NPF-14 & Proposed Amendment No. 277 to License NPF-22: Withdrawal & Resubmittal of Request for Approval of the Cyber Security Plan PLA-6606, Submittal of NRC Notification of NPDES Permit Renewal Application2010-03-26026 March 2010 Submittal of NRC Notification of NPDES Permit Renewal Application PLA-6556, License Renewal Application (LRA) Amendment to LRA Commitment 602009-09-0909 September 2009 License Renewal Application (LRA) Amendment to LRA Commitment #60 PLA-6539, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information2009-07-10010 July 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information PLA-6520, Third Annual Amendment to the Application for Renewed Operating License Numbers NPF-14 and NPF-22 Pursuant to 10 CFR 54.21(b)2009-05-28028 May 2009 Third Annual Amendment to the Application for Renewed Operating License Numbers NPF-14 and NPF-22 Pursuant to 10 CFR 54.21(b) PLA-6509, Supplemental Electrical Information to License Amendment Request on the Technical Specifications2009-05-12012 May 2009 Supplemental Electrical Information to License Amendment Request on the Technical Specifications PLA-6505, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information2009-04-30030 April 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information PLA-6474, Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 262009-03-24024 March 2009 Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 PLA-6480, One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-64802009-03-24024 March 2009 One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-6480 2023-06-08
[Table view] Category:Technical Specification
MONTHYEARML24183A2622024-06-19019 June 2024 Unit, Technical Specification Bases, Manual ML24183A2682024-06-19019 June 2024 Technical Specifications Bases, Manual ML24103A2152024-04-0505 April 2024 Revision to Technical Bases Manual PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 PLA-7892, Temporary Change to the Technical Specifications to Allow Replacement of Transformers 1X230 and 1X240 PLA-78922020-11-0505 November 2020 Temporary Change to the Technical Specifications to Allow Replacement of Transformers 1X230 and 1X240 PLA-7892 ML20129J9132020-04-23023 April 2020 Technical Specification Bases, Unit 1, Manual ML20036C9682020-01-29029 January 2020 Technical Specifications Bases, Manual ML20036C9732020-01-29029 January 2020 Technical Specification Bases, Manual ML19161A1372019-05-15015 May 2019 Technical Specification Bases Manual ML19078A1332019-03-0606 March 2019 Technical Requirements Manual ML19078A1342019-03-0606 March 2019 Technical Requirements Manual ML19078A2102019-03-0606 March 2019 Technical Specification Bases, Manual ML19078A2112019-03-0606 March 2019 Technical Specifications Bases, Manual PLA-7751, Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping2019-01-0909 January 2019 Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping ML19011A0572019-01-0707 January 2019 Technical Requirements Manual ML19011A0582019-01-0404 January 2019 Technical Specifications Bases Manual ML19011A0592019-01-0404 January 2019 Technical Specification Bases Manual ML18306A4882018-10-25025 October 2018 Revised Technical Specifications Manual ML18267A3792018-10-0303 October 2018 Correction to Technical Specification Page 3.6-37 for Error Introduced During the Issuance of Amendment Nos. 266 and 247 ML18201A1992018-07-11011 July 2018 Technical Specifications Bases, Manual ML18197A0782018-07-0909 July 2018 Revision 15 to Technical Specifications Bases Manual ML18128A2022018-04-25025 April 2018 Revision to Technical Specifications Bases Manual ML18128A2032018-04-25025 April 2018 Revision to Technical Specification Bases, Manual ML18072A0992018-02-28028 February 2018 Technical Specification Bases Manual ML18072A1002018-02-28028 February 2018 Revision 11 to Technical Specifications Bases Manual ML18033A3342018-01-24024 January 2018 Technical Specifications Bases Manual ML18033A3312018-01-24024 January 2018 Technical Specification Bases Manual PLA-7644, Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644)2017-12-14014 December 2017 Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644) ML17284A1772017-10-0202 October 2017 Technical Specification Bases Manual ML17265A4412017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 2 of 3) ML17265A4432017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 3 of 3) ML17270A0632017-09-18018 September 2017 Technical Specifications Bases, Manual ML17164A1772017-06-0101 June 2017 Revision to Technical Specifications Bases Manual ML17118A0752017-04-20020 April 2017 Revision to Technical Specification Bases Manual ML17118A0762017-04-20020 April 2017 Revisions to Technical Specifications Bases Unit 2 Manual PLA-7444, Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To...2017-02-0101 February 2017 Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To... ML16334A2652016-11-17017 November 2016 Technical Specification Bases Manual ML16110A3162016-04-14014 April 2016 Technical Specification Bases Manual ML16040A2032016-02-0303 February 2016 Technical Specification Bases Manual ML15329A1652015-11-11011 November 2015 Technical Requirements Manual ML15329A1662015-11-11011 November 2015 Technical Requirements Manual ML15317A0092015-11-0505 November 2015 Technical Specifications Bases Manual ML15317A0102015-11-0505 November 2015 Technical Specifications Bases Manual ML15077A4562015-03-0606 March 2015 Technical Requirements Manual ML15034A3112015-01-23023 January 2015 Technical Specifications Bases, Unit 2 Manual ML15034A3102015-01-23023 January 2015 Technical Specification Bases Unit 1 Manual 2024-06-19
[Table view] Category:Amendment
MONTHYEARPLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) ML18267A3792018-10-0303 October 2018 Correction to Technical Specification Page 3.6-37 for Error Introduced During the Issuance of Amendment Nos. 266 and 247 PLA-7644, Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644)2017-12-14014 December 2017 Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644) ML17265A4412017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 2 of 3) ML17265A4432017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 3 of 3) PLA-7444, Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To...2017-02-0101 February 2017 Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To... ML12242A2442012-08-14014 August 2012 Technical Specifications Bases Unit 2 Manual PLA-6539, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information2009-07-10010 July 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information PLA-6509, Supplemental Electrical Information to License Amendment Request on the Technical Specifications2009-05-12012 May 2009 Supplemental Electrical Information to License Amendment Request on the Technical Specifications PLA-6505, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information2009-04-30030 April 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information PLA-6235, Emergency Core Cooling System Instrumentation - Technical Specification (TS) Table 3.3.5.1+1 and Editorial Change to TS 3.10.8.f2009-03-24024 March 2009 Emergency Core Cooling System Instrumentation - Technical Specification (TS) Table 3.3.5.1+1 and Editorial Change to TS 3.10.8.f PLA-6480, One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-64802009-03-24024 March 2009 One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-6480 PLA-6474, Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 262009-03-24024 March 2009 Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 PLA-6359, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (CLIIP) PLA-63592009-02-20020 February 2009 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (CLIIP) PLA-6359 PLA-5604, Proposed Amendment No. 253 to License NPF-14 and Proposed Amendment No. 218 to License NPF-22: Request for Adoption of TSTF-460-A, Rev. 0, Control Rod Scram Time Test Frequency Using the CLIIP2008-07-0707 July 2008 Proposed Amendment No. 253 to License NPF-14 and Proposed Amendment No. 218 to License NPF-22: Request for Adoption of TSTF-460-A, Rev. 0, Control Rod Scram Time Test Frequency Using the CLIIP PLA-6304, Proposed Amendment No. 298 to Unit 1 License NPF-14 and Amendment No. 268 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specification 3.8.42008-03-28028 March 2008 Proposed Amendment No. 298 to Unit 1 License NPF-14 and Amendment No. 268 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specification 3.8.4 PLA-6306, Proposed License Amendments 285 and 253 - Constant Pressure Power Uprate Application - Supplement2007-11-30030 November 2007 Proposed License Amendments 285 and 253 - Constant Pressure Power Uprate Application - Supplement PLA-6266, Proposed License Amendment No. 285 for Unit 1, License No. NPF-14 & Proposed License Amendment No. 253 for Unit 2, License No. NPF-22, Extended Power Uprate Application Regarding Change to Technical Specification SR 3.7.1 - RHRSW and UHS2007-08-28028 August 2007 Proposed License Amendment No. 285 for Unit 1, License No. NPF-14 & Proposed License Amendment No. 253 for Unit 2, License No. NPF-22, Extended Power Uprate Application Regarding Change to Technical Specification SR 3.7.1 - RHRSW and UHS PLA-6172, Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-61722007-03-22022 March 2007 Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-6172 PLA-6114, Proposed Amendment Nos. 281 and 251 to Licenses NPF-22 and NPF-22, Application for License Amendment and Related Technical Specification Changes to Implement Full-Scope Alternative Source Term in Accordance with 10 CFR 50.67...2006-09-15015 September 2006 Proposed Amendment Nos. 281 and 251 to Licenses NPF-22 and NPF-22, Application for License Amendment and Related Technical Specification Changes to Implement Full-Scope Alternative Source Term in Accordance with 10 CFR 50.67... ML0619100912006-07-0707 July 2006 Technical Specifications Pages Re 3.0 Limiting Condition for Operation (LCO) Applicability PLA-6049, Proposed License Amendment Nos. 289 and 257, Standby Liquid Control System2006-04-28028 April 2006 Proposed License Amendment Nos. 289 and 257, Standby Liquid Control System ML0609603342006-03-31031 March 2006 Susquehanna - Proposed License Amendment Numbers 285 for Unit 1 and 253 for Unit 2, Constant Pressure Power Uprate, PLA-6002 ML0609004652006-03-30030 March 2006 Technical Specification 3.4.10 RCS Pressure and Temperature (P/T) Limits, October 5, 2005 ML0608007312006-03-20020 March 2006 Tech Spec for Susquehanna, Unit 1 - Issuance of Amendment Regarding Minimum Critical Power Ratio Safety Limit and Reference Changes ML0603306392006-02-0202 February 2006 Tech Spec Susquehanna Steam Electric Station, Unites 1 and 2 - Issuance of Amendment Revision to Specification Surveillance Requirement 3.6.4.1.4 and 3.6.4.1.5, Secondary Containment and Draw Down Testing PLA-5993, Proposed Amendment No. 284 to License NPF-14 & Proposed Amendment No. 252 to License NPF-22 to Revise Technical Specification 3.1.4, Control Rod Scram Times.2006-02-0101 February 2006 Proposed Amendment No. 284 to License NPF-14 & Proposed Amendment No. 252 to License NPF-22 to Revise Technical Specification 3.1.4, Control Rod Scram Times. ML0531803282005-11-10010 November 2005 Technical Specification Page Regarding Minimum Critical Power Ratio Safety Limit PLA-5967, Proposed Amendment No. 282 to Facility Operating License NPF-14: Proposed Change to Technical Specification 2.1.1.2 MCPR Safety Limit2005-10-14014 October 2005 Proposed Amendment No. 282 to Facility Operating License NPF-14: Proposed Change to Technical Specification 2.1.1.2 MCPR Safety Limit PLA-5888, Proposed Amendment Nos. 274 and 243 to License Nos. NPF-14 and NPF-22, Application for Technical Specification Improvement to Revise Technical Specifications to Eliminate Requirements for Monthly Operating Reports.2005-10-0505 October 2005 Proposed Amendment Nos. 274 and 243 to License Nos. NPF-14 and NPF-22, Application for Technical Specification Improvement to Revise Technical Specifications to Eliminate Requirements for Monthly Operating Reports. ML0521700382005-08-0404 August 2005 Technical Specification Pages Re Containment Purge Value Leak Rate Test Frequency PLA-5880, Proposed License Amendment Numbers 272 for Unit 1 Operating License No. NTF-14 and 241 for Unit 2 Operating License No. NPF-22, Power Range Neutron Monitor System Digital Upgrade PLA-58802005-06-27027 June 2005 Proposed License Amendment Numbers 272 for Unit 1 Operating License No. NTF-14 and 241 for Unit 2 Operating License No. NPF-22, Power Range Neutron Monitor System Digital Upgrade PLA-5880 PLA-5891, Proposed Amendment No. 275 to Unit 1 Facility Operating License NPF-14 and Proposed Amendment No. 244 to Unit 2 Facility Operating License NPF-22: Exigent Change to Technical Specification 3.8.4, PLA-58912005-04-27027 April 2005 Proposed Amendment No. 275 to Unit 1 Facility Operating License NPF-14 and Proposed Amendment No. 244 to Unit 2 Facility Operating License NPF-22: Exigent Change to Technical Specification 3.8.4, PLA-5891 ML0509000432005-03-29029 March 2005 Technical Specification Pages Re ADS-LPCI Discharge Pressure PLA-5869, Proposed Amendment No. 240 to License No. NPF-22 Regarding Revision to Technical Specifications 3.3.8.1 and 3.8.72005-03-18018 March 2005 Proposed Amendment No. 240 to License No. NPF-22 Regarding Revision to Technical Specifications 3.3.8.1 and 3.8.7 PLA-5850, Proposed Amendment No. 238 to Unit 2 License NFP-22: Editorial Change to Technical Specification Table 3.3.5.1-1 PLA-58502005-01-28028 January 2005 Proposed Amendment No. 238 to Unit 2 License NFP-22: Editorial Change to Technical Specification Table 3.3.5.1-1 PLA-5850 PLA-5840, Proposed Amendment: Revision to Technical Specification 5.5.6., PLA-58402005-01-28028 January 2005 Proposed Amendment: Revision to Technical Specification 5.5.6., PLA-5840 PLA-5825, Proposed Amendment No. 269 to Unit 1 License NPF-14 and Amendment No. 236 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specifications Rewrite PLA-58252004-11-0909 November 2004 Proposed Amendment No. 269 to Unit 1 License NPF-14 and Amendment No. 236 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specifications Rewrite PLA-5825 PLA-5764, Proposed License Amendment Numbers 267 for Unit 1 and 232 for Unit 2 Mode Change Limitations Using the Consolidated Line Item Improvement (CLIIP) Process PLA-57642004-09-22022 September 2004 Proposed License Amendment Numbers 267 for Unit 1 and 232 for Unit 2 Mode Change Limitations Using the Consolidated Line Item Improvement (CLIIP) Process PLA-5764 PLA-5811, Proposed Amendment No. 235 to License NFP-22: Changes to Reactor Pressure Vessel Pressure-temperature (P-T) Limits PLA-58112004-09-22022 September 2004 Proposed Amendment No. 235 to License NFP-22: Changes to Reactor Pressure Vessel Pressure-temperature (P-T) Limits PLA-5811 PLA-5755, Proposed Amendment No. 265 to License NPF-14 & Proposed Amendment No. 230 to License NPF-22: Application for Technical Specification Improvement to Revise Technical Specification 3.1.8 Scram Discharge Volume.2004-09-0808 September 2004 Proposed Amendment No. 265 to License NPF-14 & Proposed Amendment No. 230 to License NPF-22: Application for Technical Specification Improvement to Revise Technical Specification 3.1.8 Scram Discharge Volume. PLA-5785, Table of Contents Revisions Proposed Amendment No. 259 and Proposed Amendment No. 224 Revised Response to GL 94-02: Long-Term Stability Solution PLA-57852004-07-15015 July 2004 Table of Contents Revisions Proposed Amendment No. 259 and Proposed Amendment No. 224 Revised Response to GL 94-02: Long-Term Stability Solution PLA-5785 PLA-5739, Proposed Amendment Nos. 264 and 229, Respectively Regarding Resolution of URI 2001-04-03 Standby Liquid Control/Atws2004-05-11011 May 2004 Proposed Amendment Nos. 264 and 229, Respectively Regarding Resolution of URI 2001-04-03 Standby Liquid Control/Atws PLA-5726, Proposed License Amendment Regarding Secondary Containment Access Doors Surveillance Requirements 3.6.4.1.32004-03-0505 March 2004 Proposed License Amendment Regarding Secondary Containment Access Doors Surveillance Requirements 3.6.4.1.3 PLA-5722, Proposed License Amendments Regarding ADS-LPCI Discharge Pressure, TS 3.3.5.1-1, Function 4.f and 5.f2004-03-0404 March 2004 Proposed License Amendments Regarding ADS-LPCI Discharge Pressure, TS 3.3.5.1-1, Function 4.f and 5.f PLA-5686, Proposed Amendment No. 259 to License NPF-14, and Proposed Amendment No. 224 to License NPF-22, Revised Response to Gl 94-02: Long-term Stability Solution2003-12-22022 December 2003 Proposed Amendment No. 259 to License NPF-14, and Proposed Amendment No. 224 to License NPF-22, Revised Response to Gl 94-02: Long-term Stability Solution PLA-5694, Proposed Amendment Regarding Revised Main Turbine Bypass System Requirements2003-12-0505 December 2003 Proposed Amendment Regarding Revised Main Turbine Bypass System Requirements ML0330904032003-10-29029 October 2003 Tech Spec Pages for Amendments 215 & 190 Revised Response to Generic Letter 94-02 Long-Term Stability Solution 2023-11-02
[Table view] |
Text
Brtt T. McKlnney PPL Susquehanna, LLC Vice President-Nuclear Site Operations 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney@pplweb.corn pp JAN 2 8 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OPI-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NO. 270 TO LICENSE NPF-14 AND PROPOSED AMENDMENT NO. 237 TO LICENSE NPF-22: REVISION TO TECHNICAL SPECIFICATION 5.5.6 Docket Nos. 50-387 PLA-5840 and 50-388 In accordance with the provisions of 10 CFR 50.90, PPL Susquehanna, LLC is submitting a request for an amendment to the Technical Specifications for Susquehanna Units 1 and 2.
The proposed amendment replaces the reference to ASME Boiler and Pressure Vessel Code with a reference to ASME Code for Operation and Maintenance of Nuclear Power Plants in Technical Specification 5.5.6.
These proposed changes have been reviewed by the Plant Operations Review Committee and approved by the Susquehanna Review Committee.
The Enclosure to this letter provides a description of the proposed change. Attachment 1 provides the existing Technical Specification pages marked-up to show the proposed change. Attachment 2 provides the corresponding TS Bases "markup" pages. No new regulatory commitments are made herein.
We request approval of the proposed License Amendment by November 1, 2005, with the amendment being implemented within 30 days following approval.
In accordance with 10 CFR 50.91(b), PPL Susquehanna, LLC is providing the Commonwealth of Pennsylvania with a copy of this proposed License Amendment request.
p~ 6) i i
Document Control Desk PLA-5840 These proposed amendments are similar to the amendments approved for Turkey Point Units 3 and 4 on July 22, 2004 (ADAMS Accession No. ML042050230).
If you have any questions regarding this submittal, please contact Mr. C. T. Coddington at (610) 774-4019.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on: 101( <
B. T. McKinney
Enclosure:
PPL Susquehanna Evaluation of the Proposed Changes Attachments:
Attachment 1 - Proposed Technical Specification Changes Units 1 & 2, (Mark-ups)
Attachment 2 - Proposed Technical Specification Bases Changes Units 1 & 2, (Mark-ups provided for information.)
cc: NRC Region I Mr. A. J. Blamey, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Project Manager Mr. R. Janati, DEPIBRP
Enclosure to PLA-5840 PPL Susquehanna, LLC Evaluation of Proposed Changes Technical Specification 5.5.6
- 1. DESCRIPTION
- 2. PROPOSED CHANGES
- 3. BACKGROUND
- 4. TECHNICAL ANALYSIS
- 5. REGULATORY SAFETY ANALYSIS 5.1 No Significant Hazards Consideration 5.2 Applicable Regulatory Requirements/Criteria
- 6. ENVIRONMENTAL CONSIDERATION
- 7. REFERENCES
Enclosure to PLA-5840 Page 1 of 6 PPL EVALUATION
Subject:
TECHNICAL SPECIFICATION 5.5.6
1.0 DESCRIPTION
This is a request to amend Operating Licenses NPF-14 and NPF-22 for PPL Susquehanna, LLC (PPL), Susquehanna Steam Electric Station (SSES) Units 1 and 2 respectively.
The proposed changes would revise the Operating Licenses to update references to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI as the source of requirements for the inservice testing of ASME Code Class 1, 2, and 3 pumps and valves in Technical Specification 5.5.6.
The proposed changes delete reference to Section XI of the Code and incorporate reference to the ASME Code for Operation and Maintenance of Nuclear Power Plants (ASME OM Code). These changes are being submitted to conform the technical specifications to the revised Inservice Testing Program.
The proposed changes are consistent with the implementation of the SSES Third 10-Year Interval Inservice Testing (IST) Program in accordance with the requirements of 10 CFR 50.55a(f). The Third 10-Year Interval started on June 1, 2004 for both Units.
2.0 PROPOSED CHANGE
S Revise TS 5.5.6 to read:
5.5.6 Inservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following:
- a. Testing frequencies specified in the ASME Operation and Maintenance Code and applicable Addenda are as follows:
Enclosure to PLA-5840 Page 2 of 6 ASME Operation and Maintenance Code and Required Frequencies applicable Addenda terminology for performing for inservice testing activities inservice testing activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every 2 years At least once per 731 days
- b. The provisions of SR 3.0.2 are applicable to the above required Frequencies for performing inservice testing activities;
- c. The provisions of SR 3.0.3 are applicable to inservice testing activities; and
- d. Nothing in the ASME Operation and Maintenance Code shall be construed to supersede the requirements of any TS.
Technical Specification Bases Sections B 3.4.3, B 3.4.5, B 3.5.1, and B 3.6.2.3 will also be revised to replace the reference to Section XI of the ASME Boiler and Pressure Vessel Code with a reference to the ASME OM Code.
3.0 BACKGROUND
In 1990, the ASME published the initial edition of the ASME OM Code that provides rules for inservice testing of pumps and valves. The ASME OM Code replaced Section XI of the Boiler and Pressure Vessel Code for inservice testing of pumps and valves. The 1995 edition of the ASME OM Code was incorporated by reference into 10 CFR 50.55a(b) on September 22, 1999. Since 10 CFR 50.55a(f)(4)(ii) requires that inservice testing during successive 10-year intervals comply with the requirements of the latest edition and addenda of the Code incorporated into 10 CFR 50.55a(b), Technical Specification 5.5.6 and Technical Specifications Bases Sections B 3.4.3, B 3.4.5, B 3.5.1, and B 3.6.2.3 must be revised to reference the ASME OM Code.
Enclosure to PLA-5840 Page 3 of 6
4.0 TECHNICAL ANALYSIS
By final rule issued on September 22, 1999 (64 FR 51370) the NRC amended 10 CFR 50.55a(f)(4)(ii) to require licensees to update their IST program to the latest approved edition of the ASME OM Code incorporated by reference into 10 CFR 50.55a(b).
The Technical Specifications for SSES Units 1 and 2 currently reference the ASME Boiler and Pressure Vessel Code,Section XI, as the source of the IST requirements for ASME Code 1, 2, and 3 components. The Code of record for the ongoing Third 10-Year IST interval is the 1998 Edition through the OMb-2000 Addenda of the ASME OM Code. The proposed changes to Technical Specification 5.5.6 would be revised to reference the ASME OM Code.
The proposed changes to Technical Specification 5.5.6 are necessary for consistency with the IST requirements of 10 CER 50.55a. The IST requirements of 10 CFR 50.55a(f) for nuclear power plants have been demonstrated and accepted by the NRC as providing an adequate level of protection to the public health and safety. The proposed changes to Technical Specification 5.5.6 conform the technical specifications to the requirements of 10 CFR 50.55a(f) and will not adversely affect nuclear safety.
5.0 REGULATORY SAFETY ANALYSIS 5.1 No Significant Hazards Consideration PPL Susquehanna, LLC (PPL) has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of Amendment," as discussed below:
- 1. Does the proposed change involve a significant increase in the probability of occurrence or consequences of an accident previously evaluated?
Response: No.
The proposed changes revise Technical Specification 5.5.6 for SSES Units 1 and 2 to conform to the requirements of 10 CFR 50.55a(f) regarding the inservice testing of pumps and valves for the Third 10-Year Interval. The current Technical Specifications reference the ASME Boiler and Pressure Vessel Code,Section XI, requirements for the inservice testing of ASME Code Class 1, 2, and 3 pumps and valves. The proposed changes would
Enclosure to PLA-5840 Page 4 of 6 reference the ASME OM Code, which is consistent with 10 CFR 50.55a(f) and accepted for use by the NRC. The proposed changes are administrative in nature.
Therefore, this change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed changes revise Technical Specification 5.5.6 for SSES Units I and 2 to conform to the requirements of 10 CFR 50.55a(f) regarding the inservice testing of pumps and valves for the Third 10-Year Interval. The current Technical Specifications reference the ASME Boiler and Pressure Vessel Code,Section XI, requirements for the inservice testing of ASME Code Class 1, 2, and 3 pumps and valves. The proposed changes would reference the ASME OM Code, which is consistent with 10 CFR 50.55a(f) and accepted for use by the NRC. The proposed changes are administrative in nature.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
The proposed changes revise Technical Specification 5.5.6 for SSES Units 1 and 2 to conform to the requirements of 10 CFR 50.55a(f) regarding the inservice testing of pumps and valves for the Third 10-Year Interval. The current Technical Specifications reference the ASME Boiler and Pressure Vessel Code,Section XI, requirements for the inservice testing of ASME Code Class 1, 2, and 3 pumps and valves. The proposed changes would reference the ASME OM Code, which is consistent with 10 CFR 50.55a(f) and accepted for use by the NRC. The proposed changes are administrative in nature.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Enclosure to PLA-5840 Page 5 of 6 Based on the above, PPL concludes that the proposed changes present no significant hazards consideration under the standards set forth in 10 CFR 50.92(c),
and, accordingly, a finding of "no significant hazards consideration" is justified.
5.2 Applicable Regulatory Requirements/Criteria SSES FSAR Sections 3.1 and 3.13 provide detailed discussion of SSES compliance with the applicable regulatory requirements and guidance. The proposed TS amendment:
(a) Does not alter the design or function of any system; (b) Does not result in any change in the qualifications of any component; and (c) Does not result in the reclassification of any component's status in the areas of shared, safety-related, independent, redundant, and physically or electrically separated.
In conclusion, based on the considerations discussed above: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
6.0 ENVIRONMENTAL CONSIDERATION
S 10 CFR 51.22(c)(9) identifies certain licensing and regulatory actions, which are eligible for categorical exclusion from the requirement to perform an environmental assessment. A proposed amendment to an operating license for a facility does not require an environmental assessment if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant hazards consideration; (2) result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite; or (3) result in a significant increase in individual or cumulative occupational radiation exposure. PPL Susquehanna, LLC has evaluated the proposed changes and has determined that the proposed change meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Accordingly, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with issuance of the amendment. The basis for this determination, using the above criteria, follows:
Enclosure to PLA-5840 Page 6 of 6 Basis As demonstrated in the No Significant Hazards Consideration Evaluation, the proposed amendment does not involve a significant hazards consideration.
There is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite. The proposed change does not involve any physical alteration of the plant (no new or different type of equipment will be installed) or change in methods governing normal plant operation.
There is no significant increase in individual or cumulative occupational radiation exposure. The proposed changes do not involve any physical alteration of the plant (no new or different type of equipment will be installed) or change in methods governing normal plant operation.
7.0 REFERENCES
- 1. ASME Operation and Maintenance Code for Operation and Maintenance of Nuclear Power Plants, 1998 Edition through the OMb-2000 Addenda.
Attachment 1 to PLA-5840 Proposed Technical Specification Changes Units 1 & 2 (Mark-ups)
PPL~lRe Programs and Manuals 5.5 5.5 - Programs and Manuals (continued) 5.5.6 Inservice Testinq Procram This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 r-nmnnnanfc The onrnnrm sha llincludiir the fnllnwin I r@-@-...... _.__.._
6 ._.....
zb ---
Ofera ~,. Aab~ wam\nC,6
- a. Testing frequencies specified in So tion Xl-of the ASME Boiler and ProcFur Vessel Code and applicable Addenda are as follows:
ASME Boilor and Pressure
-VesselCode and applicable Addenda terminology for Required Frequencies inservice testing for performing inservice activities testing activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every 2 years At least once per 731 days
- b. The provisions of SR 3.0.2 are applicable to the above required Frequencies for performing inservice testing activities;
- c. The provisions of SR 3.0.3 are applicable to inservice testing activites; and
- d. Nothing in the ASME =ar- -Prccuro /elescolCodeshall be construed to supersede the requirements of any TS.
(continued)
SUSQUEHANNA - UNIT 1 TS I 5.0-11 Amendment 17/8 29-,
P PI /Yed.
Programs and Manuals 55 -
5.5 Programs and Manuals (continued) 5.5.6 Inservice Testing Program This program provides controls for inservice testing of ASME Code Class 1,2, and 3 components. The program shall include the following:
- a. Testing frequencies specified inSection Xi of the ASME Boiler and Pressure Vessel Code and applicable Addenda are as follows:
ASME Boiler and Vcssol Code and applicable Addenda terminology for Required Frequencies for inservice testing activities Derformina inservice'testino activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days' Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every 2 years At least once per 731 days
- b. The provisions of SR 3.0.2 are applicable to the above required Frequencies for performing inservice testing activities;
- c. The provisions of SR 3.0.3 are applicable to inservice testing activities; and
- d. Nothing in the ASME Boler and Pressure Vessol Code shall be construed to
.supersede the requirements of any TS.
(continued)
SUSQUEHANNA - UNIT 2 *TS/5.0-11 Amendment 48 X
Attachment 2 to PLA-5840 Technical Specification Bases Changes (Mark-ups Provided for Information)
- IPPL Rev./
. S/RVs
- .B 3.4.3 BASES SURVEILLANCE SR 3.4.3.1 (continued)
REQUIREMENTS The Frequency of this Surveillance is established in accordance with the Inservice Testing Program.
REFERENCES 1. FSAR, Section 5.2.2.1.4.
- 2. FSAR, Section 15.
- 3. A\SME, Boilor and Prou V l Cod., Section MI.
- 4. Final Policy Statement on Technical Specifications Improvements, July22, 1993(58 FR39132).
AsmE ohpcs anA Y Yy^. cats SUSQUEHANNA - UNIT 1 TS /B 3.4-18 RevisionY
PPL Rev./B BCS PIV Leakage B 3.4.5 BASES SURVEILLANCE SR 3.4.5.1 (continued)
REQUIREMENTS 0,11w The 24 moh F euired by the Inservice Testing Program is within the ASM e,-Se n.Xl, Frequency requirement and is based on the need to pert fol nce during an outage and the potential for an unplanned transient if the Surveillance were performed with the reactor at power.
This SR is modified by a Note that states the leakage Surveillance is not required to be performed in MODE 3. Entry into MODE 3 is permitted for leakage testing at high differential pressures with stable conditions not possible in the lower MODES.
REFERENCES 1. 10 CFR 50.2.
- 2. 10 CFR 50.55a(c).
- 3. 10 CFR 50, A pendix A, GDC 55.
- 5. NUREG-0677, May 1980.
- 6. Final Policy Statement on Technical Specifications Improvements, July 22,1993 (58 FR 39132).
SUSQUEHANNA - UNIT 1 TS/ .B 3.4-28 Revisionps
PPL Rev.,/'
ECCS-Qperating B 3.5.1 BASES SURVEILLANCE SR 3.5.1.6 (continued)
REQUIREMENTS the demonstrated reliability of these valves. If the valve is inoperable and in the open position, the associated LPCI subsystem must be declared inoperable.
SR 3.5.1.7. SR 3.5.1.8. and SR 3.5.1.9 The performance requirements of the low pressure ECCS pumps are determined through application of the 10 CFR 50, Appendix K criteria L8). T~ei llance is performed (in accordance with the ASMECf 04 ee~
etin , rquirements for the ECCS pumps) to verify that the ECC~puie1op the flow rates required by the respective analyses. The low pressure ECCS pump flow rates ensure that adequate core cooling is provided to satisfy the acceptance criteria of Reference 10.
The pump flow rates are verified against a system head equivalent to the RPV pressure expected during a LOCA. The total system pump outlet pressure is adequate to overcome the elevation head pressure between the pump suction and the vessel discharge, the piping friction losses, and RPV pressure present during a LOCA. These values may be established during preoperational testing.
The flow tests for the HPCI System are performed at two different pressure ranges such that system capability to provide rated flow is tested at both the higher and lower operating ranges of the system. Additionally, adequate steam flow must be passing through the main turbine or turbine bypass valves to continue to control reactor pressure when the HPCI System diverts steam flow. Reactor steam pressure is considered adequate when > 920 psig to perform SR 3.5.1.8 and 2 150 psig to perform SR 3.5.1.9. However, the requirements of SR 3.5.1.9 are met by a successful performance at any pressure < 165 psig. Adequate steam flow is represented by at least 1.25 turbine bypass valves open.
Therefore, sufficient time is allowed after adequate pressure and flow are achieved to perform these tests. Reactor startup is allowed prior to performing the low pressure Surveillance test because the reactor pressure is low and the time allowed to satisfactorily perform the Surveillance test is short. The reactor pressure is allowed to be increased to normal operating pressure since it is assumed that the low pressure test has been satisfactorily (continued)
SUSQUEHANNA - UNIT 1 TS / B3.5-13 Revisiono
P/I ke.O RHR Suppression Pool Cooling B 3.6.2.3 BASES SURVEILLANCE SR 3.6.2.3.1 (continued)
REQUIREMENTS The Frequency of 31 days is justified because the valves are operated under procedural control, improper valve position would affect only a single subsystem, the probability of an event requiring initiation of the system is low, and the subsystem is a manually initiated system. This Frequency has been shown to be acceptable based on operating experience.
SR 3.6.2.3.2 Verifying that each RHR pump develops a flow rate > 9750 gpm while operating in the suppression pool cooling mode with flow through the associated heat exchanger ensures that pump performance has not degraded during the cycle. Flow is a normal tP-performance required by ASMETode,, eotieR-Xl (Ref. 2). This test confirms one point on the pump design curve, and the results are indicative of overall performance. Such inservice inspections confirm component OPERABILITY, trend performance, and detect incipient failures by indicating abnormal performance. The Frequency of this SR is in accordance with the Inservice Testing Program.
REFERENCES 1. FSAR, Section 6.2.
Axilr-.n P.esur 'eselGo e,Sf+nW
- 3. Final Policy a m e ons Improvements, July 22, 1993 (58 FR 39132).
SUSQUEHANNA - UNIT 1 75'1 B 3.6-65 'Revision,0
. PPL Rev.,e SIRVs B 3.4.3 BASES SURVEILLANCE SR 3.4.3.1 (continued)
REQUIREMENTS The Frequency of this Surveillance is established in accordance with the Inservice Testing Program.
REFERENCES 1. FSAR, Section 5.2.2.1.4.
- 2. FSAR, Section 15.
nment on Technical Specifications Improve July 22, 1993 (58 FR 39132).
SUSQUEHANNA - UNIT 2 TS / B3.4-18 Revisions
PPL Rev.,0f RCS PIV Leakage B 3.4.5 BASES SURVEILLANCE SR 3.4.5.1 (continued)
REQUIREMENTS The 24 month Fr equired by the Inservice Testing Program is within m the ASMEUC CSec-;requencyrequirement and is based on the need to perforh ce during an outage and the potential for an unplanned transient if the Surveillance were performed with the reactor at power.
This SR is modified by a Note that states the leakage Surveillance is not required to be performed in MODE 3. Entry into MODE 3 is permitted for leakage testing at high differential pressures with stable conditions not possible in the lower MODES.
REFERENCES 1. 10 CFR 50.2.
- 2. 10 CFR 50.55a(c).
- 3. 10F5 A d'A-D 5
- 4. ASMEN Baier and Pressuro Vessel Cod&Seetiien Xi.
- 5. NUREG-0677, May 1980.
- 6. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).
SUSQUEHANNA - UNIT 2 75/-B 3.4-28 RevisionsW
PPL Rev.,e ECCS-Operating B 3.5.1 BASES SURVEILLANCE SR 3.5.1.6 (continued)
REQUIREMENTS The specified Frequency is once during reactor startup before THERMAL POWER is > 25% RTP. However, this SR is modified by a Note that states the Surveillance is only required to be performed if the last performance was more than 31 days ago. Therefore, implementation of this Note requires this test to be performed during reactor startup before exceeding 25% RTP.
Verification during reactor startup prior to reaching > 25% RTP is an exception to the normal Inservice Testing Program generic valve cycling Frequency of 92 days, but is considered acceptable due to the demonstrated reliability of these valves. If the valve is inoperable and in the open position, the associated LPCI subsystem must be declared inoperable.
SR 3.5.1.7. SR 3.5.1.8. and SR 3.5.1.9 The performance requirements of the low pressure ECCS pumps are determined through application of the 10 CFR 50, Appendix K criteria (Ref. 8). Th Suveillance is performed (in accordance with the OM SMEto Setien-Xj4quirements for the ECCS pumps) to verify that the ECCS w elop the flow rates required by the respective analyses. The low pressure ECCS pump flow rates ensure that adequate core cooling is provided to satisfy the acceptance criteria of Reference 10.
The pump flow rates are verified against a system head equivalent to the RPV pressure expected during a LOCA. The total system pump outlet pressure is adequate to overcome the elevation head pressure between the pump suction and the vessel discharge, the piping friction losses, and RPV pressure present during a LOCA. These values may be established during preoperational testing.
The flow tests for the HPCI System are performed at two different pressure ranges such that system capability to provide rated flow is tested at both the higher and lower operating ranges of the system. 'Additionally, adequate steam flow must be passing through the main turbine or turbine bypass valves to continue to control reactor pressure when the HPCI System diverts steam flow. Reactor steam pressure is considered adequate when 2 920 psig to perform SR 3.5.1.8 and > 150 psig to perform SR 3.5.1.9. However, the requirements of SR 3.5.1.9 are met by a successful performance at any pressure < 165 psig. 'Adequate steam flow is represented by at least 1.25 turbine bypass valves open. Therefore, sufficient time is allowed after adequate pressure and flow are achieved to perform these tests. Reactor startup is allowed prior to performing the low pressure Surveillance test because the reactor pressure is low and the time allowed to satisfactorily (continued)
SUSQUEHANNA - UNIT 2 TS / B3.5-12 Revision/
10)PLI '.
RHR Suppression Pool Cooling
-B 3.6.2.3 BASES SURVEILLANCE SR 3.6.2.3.1 (continued).
REQUIREMENTS The Frequency of 31 days is justified because the valves are operated under procedural control, improper valve position would affect only a single subsystem, the probability of an event requiring initiation of the system is low, and the subsystem is a manually initiated system. This Frequency has:
been shown to be acceptable based on operating experience.
SR 3.6.2.3.2 Verifying that each RHR pump develops a flow rate 2 9750 gpm while operating in the suppression pool cooling mode with flow through the associated heat exchanger ensures that pump performance has not degraded during the cycle. Flow is a normal test of centrifugal pump performance required by ASME Code, eslff (Ref. 2). This test confirms one point on the pump design curve, and the results are indicative of overall performance. Such inservice inspections confirm component OPERABILITY, trend performance, and detect incipient failures by indicating abnormal performance. The Frequency of this SR is in accordance with the Inservice Testing Program.
REFERENCES 1. FSAR, Section 6.2.
ollor nd F2
(_2. AME,, essw1 CodeSt.
- 3. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).
SUSQUEHANNA - UNIT 2 75/ B3.6-64 RevisionsW