PLA-6520, Third Annual Amendment to the Application for Renewed Operating License Numbers NPF-14 and NPF-22 Pursuant to 10 CFR 54.21(b)

From kanterella
Jump to navigation Jump to search
Third Annual Amendment to the Application for Renewed Operating License Numbers NPF-14 and NPF-22 Pursuant to 10 CFR 54.21(b)
ML091590041
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/28/2009
From: Spence W
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-6520
Download: ML091590041 (2)


Text

William H. Spence PPL Susquehanna, LLC President and Chief Nuclear Officer 769 Salem Boulevard Berwick, PA 18603 %ID Tel.610.774.3683 Fax 610.774.5019 whspence@pplweb.com 0 MAY 2 8 2009 P pp tITM U. S. Nuclear Regulatory Commission Document Control Desk Mail Stop OP1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION THIRD ANNUAL AMENDMENT TO THE APPLICATION FOR RENEWED OPERATING LICENSE NUMBERS NPF-14 AND NPF-22 PURSUANT TO 10 CFR 54.21(b) Doi cket Nos. 50-387 PLA-6520 and 50-388

References:

1) PLA-61 10, Mr. B. T McKinney (PPL)to Document Control Desk (USNRC),

"Applicationfor Renewed OperatingLicense Numbers NPF-14 and NPF-22,"

dated September 13, 2006.

2) PLA-6429, Mr. B. T. McKinney (PPL)to Document Control Desk (USNRC),

"Second Annual Amendment to the Applicationfor Renewed OperatingLicense Numbers NPF-14 and NPF-22 Pursuantto 10 CFR 54.21(b),"

dated September 26, 2008.

In accordance with the requirements of 10 CFR 50, 51, and 54, PPL Susquehanna, LLC (PPL) requested the renewal of the operating licenses for the Susquehanna Steam Electric Station (SSES) Units 1 and 2 in Reference 1.

The License Renewal Rule, 10 CFR 54.21(b), requires that each year following submittal of a license renewal application (LRA), and at least 3 months before scheduled completion of the NRC review, an amendment to the renewal application must be submitted that identifies any change to the current licensing basis (CLB) of the facility that materially affects the content of the LRA.

In accordance with this requirement, PPL performed a review of CLB changes since the submittal of Reference 2, to determine whether any sections of the LRA were affected by these changes.

The PPL review did not identify any CLB changes that materially affect the information in the LRA. Therefore, an amendment to the LRA is not necessary.

Document Control Desk PLA-6520 If you have any questions, please contact Mr. Duane L Filchner at (610) 774-7819.

I declare, under penalty of perjury, that the foregoing is true and correct.

Executed on: ____

W. H. Spence Copy: NRC Region I Ms. E. H. Gettys, NRC Project Manager, License Renewal, Safety Mr. R. R. Janati, DEP/BRP Mr. F. W. Jaxheimer, NRC Sr. Resident Inspector Mr. A. L. Stuyvenberg, NRC Project Manager, License Renewal, Environmental