Letter Sequence Other |
|---|
|
|
MONTHYEARPLA-5967, Proposed Amendment No. 282 to Facility Operating License NPF-14: Proposed Change to Technical Specification 2.1.1.2 MCPR Safety Limit2005-10-14014 October 2005 Proposed Amendment No. 282 to Facility Operating License NPF-14: Proposed Change to Technical Specification 2.1.1.2 MCPR Safety Limit Project stage: Request ML0529002152005-10-17017 October 2005 Notice of Consideration, Proposed Amendment Would Revise SSES 1 TS Section 2.1.1.2 SSES 1 Cycle 14 Minimum Critical Power Ratio Safety Limit for Two-Loop Operation from 1.08 to 1.09 Project stage: Other PLA-5976, Proposed Amendment No. 282 to Facility Operating License NPF-14: Proposed Change to Technical Specification 2.1.1.2, MCPR Safety Limit, Supplemental Information2005-10-21021 October 2005 Proposed Amendment No. 282 to Facility Operating License NPF-14: Proposed Change to Technical Specification 2.1.1.2, MCPR Safety Limit, Supplemental Information Project stage: Request ML0529802392005-10-27027 October 2005 Summary of 10/12/05, Category 1 Working-Level Meeting with PPL & Framatome, Advanced Nuclear Power (Anp) to Discuss the Licensees Proposed Exigent TS Request Related to Minimum Critical Power Ratio Safety Limit & Control Cell Friction Issue Project stage: Request ML0530502762005-11-0101 November 2005 Request for Additional Information, Revised Minimum Critical Power Ratio Safety Limit Project stage: RAI ML0531803282005-11-10010 November 2005 Technical Specification Page Regarding Minimum Critical Power Ratio Safety Limit Project stage: Other ML0531203932005-11-10010 November 2005 Issuance of Amendment Regarding Minimum Critical Power Ratio Safety Limit Project stage: Approval 2005-10-21
[Table View] |
Text
PPL Rev. 2 Safety Limits (SLs) 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow
< 10 million Ibm/hr THERMAL POWER shall be < 25% RTP.
2.1.1.2 With the reactor steam dome pressure 2 785 psig and core flow 2 10 million Ibm/hr:
MCPR shall be 2 1.09 for two recirculation loop operation or 2 1.10 for single recirculation loop operation.
2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.
2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be
2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:
2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods.
SUSQUEHANNA-UNIT 1 TS /2.0-1 Amendment Vd, 2,f6,227