ML050900043

From kanterella
Jump to navigation Jump to search

Technical Specification Pages Re ADS-LPCI Discharge Pressure
ML050900043
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/29/2005
From:
Office of Nuclear Reactor Regulation
To:
References
TAC MC2376, TAC MC2377
Download: ML050900043 (4)


Text

t I PPL Rev. 1 ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 5 of 6)

Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REFERENCED OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEIULANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE

4. ADS Trip System A (continued)
f. Low Pressure 4 F SR 3.3.5.12 2 115 psig I Coolant 2 3(' SR 3.3.5.1.3 and Injection Pump SR 3.3.5.1.5 S 135 psig Discharge Pressure-High
g. Automatic 2 F SR 3.3.5.1.2 S 450 sec Depressurization 2"' 3(0) SR 3.3.5.1.3 System Drywell SR 3.3.5.1.5 Pressure Bypass Actuation Timer h Manual Initiation 12 2 F SR 3.3.5.1.5 NA 2(e)3(6)
5. ADS Trip System B
a. Reactor Vessel 2 E SR 3.3.5.1.1  :-136 Inches Water Level- 2(' 1,3() SR 3.3.5.1.2 Low Low Low, SR 3.3.5.1.4 Level 1 SR 3.3.5.1.5
b. Drywell 1. 2 E SR 3.3.5.12 S 1.88 psig Pressure-High 2(e), 3(8) SR 3.3.5.1.3 SR 3.3.5.1.5
c. Automatic 1 F SR 3.3.5.1.2 S114sec Depressurization 2" 3"0 SR 3.3.5.1.3 System Initiation SR 3.3.5.1.5 Timer 1,
d. Reactor Vessel 1 E SR 3.3.5.1.1 2 11.5 Inches Water Level- 2 3(6) SR 3.3.5.1.2 Low, Level 3 SR 3.3.5.1.4 (Confirmatory) SR 3.3.5.1.5 2() 3(e)
e. Core Spray Pump 1, 2 F SR 3.3.5.1.2 2 125 psig Discharge SR 3.3.5.1.3 and Pressure-High SR 3.3.5.1.5 S 165 psIg (continued)

(e) With reactor steam dome pressure> 150 psig.

SUSQUEHANNA - UNIT 1 TS /3.3-46 Amendment ?64 220

I PPL Rev. 1 ECCS Instrumentation 3.3.5.1 Table 3.3.5.1 -1 (page 6 of 6)

Emergency Core Cooling System Instrumentation APPLICABLE CONDmONS MODES OR REFERENCED OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTiON CONDITIONS FUNCTiON ACTION A.1 REQUIREMENTS VALUE

5. ADS Trip System 8 (continued)
f. LowPressure 1, 4 F SR 3.3.5.12 2115psIg Coolant In]ection 2e),3e) SR 3.3.5.1.3 and Pump Discharge SR 3.3.5.1.5 S 135 psig Pressure-High
9. Automatic 1, 2 F SR 3.3.5.12 450sec Depressurtzaton 2(e), 3(e) SR 3.3.5.1.3 System Drywell SR 3.3.5.1.5 Pressure Bypass Actuation Timer
h. Manual Initiation 1, 2 F SR 3.3.5.1.5 NA 2(e)3 (e) WfIth reactor steam dome pressure> 150 psig.

SUSQUEHANNA - UNIT I 3.3-47 Amendment J'8 220

I PPL Rev. 1 ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 4 of 5)

Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REFERENCED OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDmONS FUNCTION ACTION A.1 REQUIREMENTS VALUE

4. Automatic Depressurization System (ADS) Trip System A
a. Reactor'Vessel 1, 2 E SR 3.3.5.1.1 .2-136Inches Water Level-Low 2 , 3(e) SR 3.3.5.1.2 Low Low, Level 1 SR 3.3.5.1.4 SR 3.3.5.1.5
b. Drywell Pressure- 2 E SR 3.3.5.1.2 S 1.88 psig High 0) (e) SR 3.3.5.1.3 SR 3.3.5.1.5
c. Automatic 1. 1 F SR 3.3.5.12 S 114 seconds Depressurkzation 2(e) 3(6) SR 3.3.5.1.3 System Initiation SR 3.3.5.1.5 Timer
d. Reactor Vessel Water Level-w, 1 E SR SR 3.3.5.1.1 3.3.5.1.2 2 11.5 Inches Level 3 SR 3.3.5.1.4 (Confirmatory) SR 3.3.5.1.5
e. Core Spray Pump 2 F SR 3.3.5.12 2 125 psig Discharge 2(6). 3(6) SR 3.3.5.1.3 and

- Pressure-High )1, SR 3.3.5.1.5 S 165 psig 2(6), 3()

f. Low Pressure 4 F SR 3.3.5.12 2 115 psig I Coolant Injection SR 3.3.5.1.3 and Pump Discharge SR 3.3.5.1.5 S 135 psig Pressure - High
g. Automatic 1, 2 F SR 3.3.5.12 S 450 seconds Depressurizatlon 2(e), 3 (e) SR 3.3.5.1.3 System Drywell SR 3.3.5.1.5 Pressure Bypass Actuation Timer
h. Manual Initiation 1, 2 F SR 3.3.5.1.5 NA 0 ()

(continued)

(e) With reactor steam dome pressure > 150 psig.

SUSQUEHANNA - UNIT 2 TS / 3.3-46 Amendment 10 196

PPL Rev. 1 ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 5 of 5)

Emergency Core Cooling System Instrumentation APPLtCABLE CONDmONS MODES OR REFERENCED OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDmONS FUNCTION ACTION A.1 REQUIREMENTS VALUE

5. ADS Trip System B
a. ReactorVessel 1, 2 E SR 3.3.5.1.1 2-1368 iches Water Level - Low 2(a, ') SR 3.3.5.12 Low Low, Level 1 SR 3.3.5.1.4 SR 3.3.5.1.5
b. DrywellPressure- 1, 2 E SR 3.3.5.12 5 1.88 pstg High 2te 3(e) SR 3.3.5.1.3 SR 3.3.5.1.5
c. Automatic 1, 1 F SR 3.3.5.12 5114sec Depressurization 2(e), 3(0) SR 3.3.5.1.3 System Initiation SR 3.3.5.1.5 Timer
d. ReactorVessel 1, 1 E SR 3.3.5.1.1 211.5tinches Water Levet-Low. 2e), 3(e) SR 3.3.5.12 Level3 SR 3.3.5.1.4 (Confirmatory) SR 3.3.5.1.5
e. Core Spray Pump 1, 2 F SR 3.3.5.12 2 125 psig Discharge 2 3(0) SR 3.3.5.1.3 and Pressure-High SR 3.3.5.1.5 5 165 psig
f. LowPressure 1, 4 F SR 3.3.5.12 2115psig Coolant Injection 2(0),3(.) SR 3.3.5.1.3 and Pump Discharge SR 3.3.5.1.5 s 135 psg Pressure-Hlgh
g. Automatic 1 2 F SR 3.3.5.12 5 450 seconds Depressurlzation 2(e), 3() SR 3.3.5.1.3 System Drywell SR 3.3.5.1.5 Pressure Bypass Actuation Timer
h. Manual InItiation 1, 2 F SR 3.3.5.1.5 NA 2() 3(')

(e) With reactor steam dome pressure> 150 psig.

SUSQUEHANNA - UNIT 2 TS / 3.3-47 Amendment 1i5 196