ML050900043
| ML050900043 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/29/2005 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| References | |
| TAC MC2376, TAC MC2377 | |
| Download: ML050900043 (4) | |
Text
t I
PPL Rev. 1 ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 5 of 6)
Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REFERENCED OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEIULANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
- 4.
ADS Trip System A (continued)
- f.
Low Pressure Coolant Injection Pump Discharge Pressure-High
- g.
Automatic Depressurization System Drywell Pressure Bypass Actuation Timer h
Manual Initiation 2
3('
2"' 3(0) 12 2(e) 3(6) 4 2
2 F
SR 3.3.5.12 SR 3.3.5.1.3 SR 3.3.5.1.5 F
SR 3.3.5.1.2 SR 3.3.5.1.3 SR 3.3.5.1.5 F
SR 3.3.5.1.5 2 1 15 psig and S 135 psig I
S 450 sec NA
- 5.
ADS Trip System B
- a.
Reactor Vessel Water Level-Low Low Low, Level 1
- b.
Drywell Pressure-High
- c.
Automatic Depressurization System Initiation Timer
- d.
Reactor Vessel Water Level-Low, Level 3 (Confirmatory)
- e.
Core Spray Pump Discharge Pressure-High 1,
2('
3()
1.
2(e), 3(8) 2" 3"0 1,
2 3(6) 1, 2() 3(e) 2 2
1 1
2 E
SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 E
SR 3.3.5.12 SR 3.3.5.1.3 SR 3.3.5.1.5 F
SR 3.3.5.1.2 SR 3.3.5.1.3 SR 3.3.5.1.5 E
SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 F
SR 3.3.5.1.2 SR 3.3.5.1.3 SR 3.3.5.1.5
- -136 Inches S 1.88 psig S114sec 2 11.5 Inches 2 125 psig and S 165 psIg (continued)
(e) With reactor steam dome pressure> 150 psig.
SUSQUEHANNA - UNIT 1 TS /3.3-46 Amendment ?64 220
I PPL Rev. 1 ECCS Instrumentation 3.3.5.1 Table 3.3.5.1 -1 (page 6 of 6)
Emergency Core Cooling System Instrumentation APPLICABLE CONDmONS MODES OR REFERENCED OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTiON CONDITIONS FUNCTiON ACTION A.1 REQUIREMENTS VALUE
- 5.
ADS Trip System 8 (continued)
- f. LowPressure 1,
4 F
SR 3.3.5.12 2115psIg Coolant In]ection 2e),3e)
SR 3.3.5.1.3 and Pump Discharge SR 3.3.5.1.5 S 135 psig Pressure-High
- 9. Automatic 1,
2 F
SR 3.3.5.12 450sec Depressurtzaton 2(e), 3(e)
SR 3.3.5.1.3 System Drywell SR 3.3.5.1.5 Pressure Bypass Actuation Timer
- h. Manual Initiation 1,
2 F
SR 3.3.5.1.5 NA 2(e)3 (e) WfIth reactor steam dome pressure> 150 psig.
SUSQUEHANNA - UNIT I 3.3-47 Amendment J'8 220
I PPL Rev. 1 ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 4 of 5)
Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REFERENCED OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDmONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
- 4. Automatic Depressurization System (ADS) Trip System A
- a. Reactor'Vessel Water Level-Low Low Low, Level 1
- b. Drywell Pressure-High 1,
2, 3(e)
- 0)
(e) 2 2
E SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 E
SR 3.3.5.1.2 SR 3.3.5.1.3 SR 3.3.5.1.5
.2-136 Inches S 1.88 psig
- c. Automatic Depressurkzation System Initiation Timer 1.
2(e) 3(6) 1 F
SR 3.3.5.12 SR 3.3.5.1.3 SR 3.3.5.1.5 S 114 seconds
- d. Reactor Vessel Water Level-w, Level 3 (Confirmatory)
- e. Core Spray Pump Discharge
- Pressure-High
- f. Low Pressure Coolant Injection Pump Discharge Pressure - High 2(6). 3(6)
)1, 2(6), 3()
1 2
4 E
SR 3.3.5.1.1 SR 3.3.5.1.2 SR 3.3.5.1.4 SR 3.3.5.1.5 F
SR 3.3.5.12 SR 3.3.5.1.3 SR 3.3.5.1.5 F
SR 3.3.5.12 SR 3.3.5.1.3 SR 3.3.5.1.5 2 11.5 Inches 2 125 psig and S 165 psig 2 115 psig and S 135 psig I
- g. Automatic Depressurizatlon System Drywell Pressure Bypass Actuation Timer 1,
2(e), 3 (e) 2 F
SR 3.3.5.12 SR 3.3.5.1.3 SR 3.3.5.1.5 S 450 seconds
- h. Manual Initiation 1,
0
()
2 F
SR 3.3.5.1.5 NA (continued)
(e) With reactor steam dome pressure > 150 psig.
SUSQUEHANNA - UNIT 2 TS / 3.3-46 Amendment 10 196
PPL Rev. 1 ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 5 of 5)
Emergency Core Cooling System Instrumentation APPLtCABLE CONDmONS MODES OR REFERENCED OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDmONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
- 5. ADS Trip System B
- a. ReactorVessel 1,
2 E
SR 3.3.5.1.1 2-1368 iches Water Level - Low 2(a, ')
SR 3.3.5.12 Low Low, Level 1 SR 3.3.5.1.4 SR 3.3.5.1.5
- b. Drywell Pressure-1, 2
E SR 3.3.5.12 5 1.88 pstg High 2te 3(e)
SR 3.3.5.1.3 SR 3.3.5.1.5
- c. Automatic 1,
1 F
SR 3.3.5.12 5114sec Depressurization 2(e), 3(0)
SR 3.3.5.1.3 System Initiation SR 3.3.5.1.5 Timer
- d. ReactorVessel 1,
1 E
SR 3.3.5.1.1 211.5tinches Water Levet-Low.
2e), 3(e)
SR 3.3.5.12 Level3 SR 3.3.5.1.4 (Confirmatory)
- e. Core Spray Pump 1,
2 F
SR 3.3.5.12 2 125 psig Discharge 2
3(0)
SR 3.3.5.1.3 and Pressure-High SR 3.3.5.1.5 5 165 psig
- f.
LowPressure 1,
4 F
SR 3.3.5.12 2115psig Coolant Injection 2(0),3(.)
SR 3.3.5.1.3 and Pump Discharge SR 3.3.5.1.5 s 135 psg Pressure-Hlgh
- g. Automatic 1
2 F
SR 3.3.5.12 5 450 seconds Depressurlzation 2(e), 3()
SR 3.3.5.1.3 System Drywell SR 3.3.5.1.5 Pressure Bypass Actuation Timer
- h. Manual InItiation 1,
2 F
SR 3.3.5.1.5 NA 2() 3(')
(e) With reactor steam dome pressure> 150 psig.
SUSQUEHANNA - UNIT 2 TS / 3.3-47 Amendment 1i5 196