Category:Letter type:PLA
MONTHYEARPLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums PLA-8048, Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence2023-01-14014 January 2023 Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8038, Notification of Petition for Bankruptcy (PLA-8038)2022-12-14014 December 2022 Notification of Petition for Bankruptcy (PLA-8038) PLA-8036, Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-80362022-11-30030 November 2022 Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-8036 PLA-8035, Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-80352022-11-0808 November 2022 Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-8035 PLA-8031, Emergency Plan Revision 66 (PLA-8031)2022-11-0707 November 2022 Emergency Plan Revision 66 (PLA-8031) PLA-8032, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032)2022-10-28028 October 2022 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032) PLA-8026, Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026)2022-10-19019 October 2022 Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026) PLA-8015, Application for Order Approving Indirect Transfer of Control of Licenses2022-09-29029 September 2022 Application for Order Approving Indirect Transfer of Control of Licenses PLA-8030, Evacuation Time Estimate Report PLA-80302022-09-15015 September 2022 Evacuation Time Estimate Report PLA-8030 PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-8019, Nd Refueling Outage Owner'S Activity Report, PLA-80192022-07-13013 July 2022 Nd Refueling Outage Owner'S Activity Report, PLA-8019 PLA-8013, Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-80132022-06-27027 June 2022 Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-8013 PLA-8012, 10 CFR 50.46 Annual Report2022-06-10010 June 2022 10 CFR 50.46 Annual Report PLA-8005, Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005)2022-05-23023 May 2022 Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005) PLA-8001, Radiation Exposure Information and Reporting System - PLA-80012022-04-28028 April 2022 Radiation Exposure Information and Reporting System - PLA-8001 PLA-7987, Radioactive Effluent Release Report and Offsite Dose Calculation Manual - (PLA-7987)2022-04-26026 April 2022 Radioactive Effluent Release Report and Offsite Dose Calculation Manual - (PLA-7987) PLA-7986, 2021 Annual Environmental Operating Report (Nonradiological) Docket No. 50-387, PLA-79862022-04-26026 April 2022 2021 Annual Environmental Operating Report (Nonradiological) Docket No. 50-387, PLA-7986 PLA-7985, Annual Radiological Environmental Operating Report2022-04-22022 April 2022 Annual Radiological Environmental Operating Report PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) PLA-7995, Property Insurance Program (PLA-7995)2022-03-30030 March 2022 Property Insurance Program (PLA-7995) PLA-7998, Submittal of Unit 1 Cycle 23 Core Operating Limits Report and Reload Safety Analysis Report2022-03-29029 March 2022 Submittal of Unit 1 Cycle 23 Core Operating Limits Report and Reload Safety Analysis Report PLA-7991, Proof of Financial Protection and Guarantee of Payment of Deferred Premium2022-03-24024 March 2022 Proof of Financial Protection and Guarantee of Payment of Deferred Premium PLA-7984, Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 22022-03-0808 March 2022 Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 2024-01-04
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARPLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8015, Application for Order Approving Indirect Transfer of Control of Licenses2022-09-29029 September 2022 Application for Order Approving Indirect Transfer of Control of Licenses PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 PLA-7979, Supplement to License Amendment to Revise Reactor Steam Dome Pressure Low Instrumentation Function Allowable Value2021-12-16016 December 2021 Supplement to License Amendment to Revise Reactor Steam Dome Pressure Low Instrumentation Function Allowable Value PLA-7950, Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-7950)2021-10-0505 October 2021 Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-7950) PLA-7897, Proprosed Amendment to Licenses NPF-14 and NPF-22: License Amendment Request to Revise Technical Specification to Adopt Risk Informed Completion Times TSTF-505, Rev 2, Provide Risk Informed Extended Completion.2021-04-0808 April 2021 Proprosed Amendment to Licenses NPF-14 and NPF-22: License Amendment Request to Revise Technical Specification to Adopt Risk Informed Completion Times TSTF-505, Rev 2, Provide Risk Informed Extended Completion. ML20245E1922020-09-0101 September 2020 Talen Energy - Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements PLA-7880 PLA-7866, Electric Station Proposed Amendment Licenses NPF-14 and - NPF-22: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules PLA-78662020-06-25025 June 2020 Electric Station Proposed Amendment Licenses NPF-14 and - NPF-22: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules PLA-7866 PLA-7842, Proposed Amendment to Licenses NPF-14 and NPF-22: Revise Technical Specification 3.8.1 to Create a New Condition for an Inoperable Manual Synchronization Circuit PLA-72482020-05-26026 May 2020 Proposed Amendment to Licenses NPF-14 and NPF-22: Revise Technical Specification 3.8.1 to Create a New Condition for an Inoperable Manual Synchronization Circuit PLA-7248 PLA-7823, Proposed Amendment to Licenses NPF-014 and NPF-022: Revision to the Dose Consequence Analysis for a Loss of Coolant Accident2020-01-0202 January 2020 Proposed Amendment to Licenses NPF-014 and NPF-022: Revision to the Dose Consequence Analysis for a Loss of Coolant Accident PLA-7783, Proposed Amendment to Licenses: Application of Advanced Framatome Methodologies and TSTF-535 PLA-77832019-07-15015 July 2019 Proposed Amendment to Licenses: Application of Advanced Framatome Methodologies and TSTF-535 PLA-7783 PLA-7772, Application to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco.2019-03-28028 March 2019 Application to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco. PLA-7751, Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping2019-01-0909 January 2019 Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping PLA-7729, Technical Specifications Task Force Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2018-12-0404 December 2018 Technical Specifications Task Force Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. PLA-7605, Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A2017-05-17017 May 2017 Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A PLA-7528, Supplemental Information for License Amendment Request to Address Secondary Containment Access Openings2016-09-13013 September 2016 Supplemental Information for License Amendment Request to Address Secondary Containment Access Openings PLA-7486, Proposed Amendment Request to Address Secondary Containment Access Openings2016-07-27027 July 2016 Proposed Amendment Request to Address Secondary Containment Access Openings ML16181A4172016-06-29029 June 2016 Projected Income Statement and Calculation of Six-Month Fixed Costs (Redacted) ML16181A4152016-06-29029 June 2016 Request for Order Approving Indirect Transfer of Control - PLA-7500 ML16181A4192016-06-29029 June 2016 Capacity Factor Assumptions (Redacted) PLA-7441, Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-4252016-01-29029 January 2016 Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-425 PLA-7384, Proposed Amendment No. 292, Temporary Change to Allow Replacement on Unit 1 480 V Ess Load Center Transformers in Unit 2 Technical Specifications 3.8.7 and 3.7.12016-01-28028 January 2016 Proposed Amendment No. 292, Temporary Change to Allow Replacement on Unit 1 480 V Ess Load Center Transformers in Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-7378, Proposed Amendment No. 317 to License NPF-14 and Proposed Amendment No. 289 to License NPF-22: Supplement to Change Milestone 8 Date2015-08-28028 August 2015 Proposed Amendment No. 317 to License NPF-14 and Proposed Amendment No. 289 to License NPF-22: Supplement to Change Milestone 8 Date PLA-7360, Supplemental Information to License Amendment Request for Changes in RCS Pressure and Temperature (P/T) Limits2015-07-16016 July 2015 Supplemental Information to License Amendment Request for Changes in RCS Pressure and Temperature (P/T) Limits ML15091A6612015-03-19019 March 2015 Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme NEI 99-01, Susquehanna, Units 1 and 2 - Proposed License Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.2015-03-19019 March 2015 Susquehanna, Units 1 and 2 - Proposed License Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. NEI 99-01, Susquehanna, Units 1 and 2 - Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme2015-03-19019 March 2015 Susquehanna, Units 1 and 2 - Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme ML15091A6602015-03-19019 March 2015 Proposed License Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. PLA-7181, Submittal of Request for Amendment to the Technical Specification 3.4.10, RCS Pressure and Temperature (Pit) Limits.2014-08-11011 August 2014 Submittal of Request for Amendment to the Technical Specification 3.4.10, RCS Pressure and Temperature (Pit) Limits. ML14195A1132014-07-11011 July 2014 Enclosure to PLA-7191 Application for Order Approving Indirect Transfer of Control of Facility Operating License Nos. NPF-14 and NPF-22 and Conforming Amendments ML14042A1152014-01-29029 January 2014 License Amendment Request - Increase of the Allowable Gas Treatment System Maximum Flow Rates from Secondary Containment PLA-6977, Proposed Amendment No. 313 to License NPF-14 and Proposed Amendment No. 285 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.5.1.122013-06-0606 June 2013 Proposed Amendment No. 313 to License NPF-14 and Proposed Amendment No. 285 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.5.1.12 PLA-6915, Proposed Amendment No. 312 to Unit 1, and Proposed Amendment No. 284 to Unit 2 Low Pressure Safety Limit and Reference Changes2012-12-19019 December 2012 Proposed Amendment No. 312 to Unit 1, and Proposed Amendment No. 284 to Unit 2 Low Pressure Safety Limit and Reference Changes PLA-6825, Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage2012-09-18018 September 2012 Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage PLA-6817, Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1 4160 V Buses Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-68172012-03-0808 March 2012 Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1 4160 V Buses Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-6817 ML11152A0092011-07-21021 July 2011 Issuance of Amendment Approval of the PPL Susquehanna, LLC Cyber Security Plan PLA-6695, Amend. Request No. 308 to License NPF-14 & Amend. Request No. 279 to License NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-514, Rev. 3, Revise BWR Operability Requirements & Actions RCS Leakage Instrumentation2011-04-0808 April 2011 Amend. Request No. 308 to License NPF-14 & Amend. Request No. 279 to License NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-514, Rev. 3, Revise BWR Operability Requirements & Actions RCS Leakage Instrumentation PLA-6628, Proposed Amendment No. 306 to License NPF-14 & Proposed Amendment No. 277 to License NPF-22: Withdrawal & Resubmittal of Request for Approval of the Cyber Security Plan2010-07-22022 July 2010 Proposed Amendment No. 306 to License NPF-14 & Proposed Amendment No. 277 to License NPF-22: Withdrawal & Resubmittal of Request for Approval of the Cyber Security Plan PLA-6606, Submittal of NRC Notification of NPDES Permit Renewal Application2010-03-26026 March 2010 Submittal of NRC Notification of NPDES Permit Renewal Application PLA-6539, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information2009-07-10010 July 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information PLA-6520, Third Annual Amendment to the Application for Renewed Operating License Numbers NPF-14 and NPF-22 Pursuant to 10 CFR 54.21(b)2009-05-28028 May 2009 Third Annual Amendment to the Application for Renewed Operating License Numbers NPF-14 and NPF-22 Pursuant to 10 CFR 54.21(b) PLA-6509, Supplemental Electrical Information to License Amendment Request on the Technical Specifications2009-05-12012 May 2009 Supplemental Electrical Information to License Amendment Request on the Technical Specifications PLA-6505, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information2009-04-30030 April 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information PLA-6474, Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 262009-03-24024 March 2009 Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 PLA-6480, One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-64802009-03-24024 March 2009 One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-6480 PLA-6359, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (CLIIP) PLA-63592009-02-20020 February 2009 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (CLIIP) PLA-6359 2023-06-08
[Table view] Category:Technical Specification
MONTHYEARPLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 PLA-7892, Temporary Change to the Technical Specifications to Allow Replacement of Transformers 1X230 and 1X240 PLA-78922020-11-0505 November 2020 Temporary Change to the Technical Specifications to Allow Replacement of Transformers 1X230 and 1X240 PLA-7892 ML20129J9132020-04-23023 April 2020 Technical Specification Bases, Unit 1, Manual ML20036C9682020-01-29029 January 2020 Technical Specifications Bases, Manual ML20036C9732020-01-29029 January 2020 Technical Specification Bases, Manual ML19161A1372019-05-15015 May 2019 Technical Specification Bases Manual ML19078A1332019-03-0606 March 2019 Technical Requirements Manual ML19078A1342019-03-0606 March 2019 Technical Requirements Manual ML19078A2102019-03-0606 March 2019 Technical Specification Bases, Manual ML19078A2112019-03-0606 March 2019 Technical Specifications Bases, Manual PLA-7751, Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping2019-01-0909 January 2019 Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping ML19011A0572019-01-0707 January 2019 Technical Requirements Manual ML19011A0592019-01-0404 January 2019 Technical Specification Bases Manual ML19011A0582019-01-0404 January 2019 Technical Specifications Bases Manual ML18306A4882018-10-25025 October 2018 Revised Technical Specifications Manual ML18267A3792018-10-0303 October 2018 Correction to Technical Specification Page 3.6-37 for Error Introduced During the Issuance of Amendment Nos. 266 and 247 ML18201A1992018-07-11011 July 2018 Technical Specifications Bases, Manual ML18197A0782018-07-0909 July 2018 Revision 15 to Technical Specifications Bases Manual ML18128A2022018-04-25025 April 2018 Revision to Technical Specifications Bases Manual ML18128A2032018-04-25025 April 2018 Revision to Technical Specification Bases, Manual ML18072A1002018-02-28028 February 2018 Revision 11 to Technical Specifications Bases Manual ML18072A0992018-02-28028 February 2018 Technical Specification Bases Manual ML18033A3312018-01-24024 January 2018 Technical Specification Bases Manual ML18033A3342018-01-24024 January 2018 Technical Specifications Bases Manual PLA-7644, Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644)2017-12-14014 December 2017 Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644) ML17284A1772017-10-0202 October 2017 Technical Specification Bases Manual ML17265A4432017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 3 of 3) ML17265A4412017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 2 of 3) ML17270A0632017-09-18018 September 2017 Technical Specifications Bases, Manual ML17164A1772017-06-0101 June 2017 Revision to Technical Specifications Bases Manual ML17118A0762017-04-20020 April 2017 Revisions to Technical Specifications Bases Unit 2 Manual ML17118A0752017-04-20020 April 2017 Revision to Technical Specification Bases Manual PLA-7444, Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To...2017-02-0101 February 2017 Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To... ML16334A2652016-11-17017 November 2016 Technical Specification Bases Manual ML16110A3162016-04-14014 April 2016 Technical Specification Bases Manual ML16040A2032016-02-0303 February 2016 Technical Specification Bases Manual ML15329A1662015-11-11011 November 2015 Technical Requirements Manual ML15329A1652015-11-11011 November 2015 Technical Requirements Manual ML15317A0102015-11-0505 November 2015 Technical Specifications Bases Manual ML15317A0092015-11-0505 November 2015 Technical Specifications Bases Manual ML15077A4562015-03-0606 March 2015 Technical Requirements Manual ML15034A3102015-01-23023 January 2015 Technical Specification Bases Unit 1 Manual ML15034A3112015-01-23023 January 2015 Technical Specifications Bases, Unit 2 Manual PLA-7181, Submittal of Request for Amendment to the Technical Specification 3.4.10, RCS Pressure and Temperature (Pit) Limits.2014-08-11011 August 2014 Submittal of Request for Amendment to the Technical Specification 3.4.10, RCS Pressure and Temperature (Pit) Limits. ML14205A0132014-07-17017 July 2014 Technical Specification Bases, Manual, Revisions ML14196A0412014-07-0303 July 2014 Technical Specifications Bases, Manual 2023-11-02
[Table view] Category:Amendment
MONTHYEARPLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) ML18267A3792018-10-0303 October 2018 Correction to Technical Specification Page 3.6-37 for Error Introduced During the Issuance of Amendment Nos. 266 and 247 PLA-7644, Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644)2017-12-14014 December 2017 Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644) ML17265A4412017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 2 of 3) ML17265A4432017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 3 of 3) PLA-7444, Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To...2017-02-0101 February 2017 Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To... ML12242A2442012-08-14014 August 2012 Technical Specifications Bases Unit 2 Manual PLA-6539, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information2009-07-10010 July 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information PLA-6509, Supplemental Electrical Information to License Amendment Request on the Technical Specifications2009-05-12012 May 2009 Supplemental Electrical Information to License Amendment Request on the Technical Specifications PLA-6505, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information2009-04-30030 April 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information PLA-6235, Emergency Core Cooling System Instrumentation - Technical Specification (TS) Table 3.3.5.1+1 and Editorial Change to TS 3.10.8.f2009-03-24024 March 2009 Emergency Core Cooling System Instrumentation - Technical Specification (TS) Table 3.3.5.1+1 and Editorial Change to TS 3.10.8.f PLA-6480, One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-64802009-03-24024 March 2009 One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-6480 PLA-6474, Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 262009-03-24024 March 2009 Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 PLA-6359, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (CLIIP) PLA-63592009-02-20020 February 2009 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (CLIIP) PLA-6359 PLA-5604, Proposed Amendment No. 253 to License NPF-14 and Proposed Amendment No. 218 to License NPF-22: Request for Adoption of TSTF-460-A, Rev. 0, Control Rod Scram Time Test Frequency Using the CLIIP2008-07-0707 July 2008 Proposed Amendment No. 253 to License NPF-14 and Proposed Amendment No. 218 to License NPF-22: Request for Adoption of TSTF-460-A, Rev. 0, Control Rod Scram Time Test Frequency Using the CLIIP PLA-6304, Proposed Amendment No. 298 to Unit 1 License NPF-14 and Amendment No. 268 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specification 3.8.42008-03-28028 March 2008 Proposed Amendment No. 298 to Unit 1 License NPF-14 and Amendment No. 268 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specification 3.8.4 PLA-6306, Proposed License Amendments 285 and 253 - Constant Pressure Power Uprate Application - Supplement2007-11-30030 November 2007 Proposed License Amendments 285 and 253 - Constant Pressure Power Uprate Application - Supplement PLA-6266, Proposed License Amendment No. 285 for Unit 1, License No. NPF-14 & Proposed License Amendment No. 253 for Unit 2, License No. NPF-22, Extended Power Uprate Application Regarding Change to Technical Specification SR 3.7.1 - RHRSW and UHS2007-08-28028 August 2007 Proposed License Amendment No. 285 for Unit 1, License No. NPF-14 & Proposed License Amendment No. 253 for Unit 2, License No. NPF-22, Extended Power Uprate Application Regarding Change to Technical Specification SR 3.7.1 - RHRSW and UHS PLA-6172, Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-61722007-03-22022 March 2007 Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-6172 PLA-6114, Proposed Amendment Nos. 281 and 251 to Licenses NPF-22 and NPF-22, Application for License Amendment and Related Technical Specification Changes to Implement Full-Scope Alternative Source Term in Accordance with 10 CFR 50.67...2006-09-15015 September 2006 Proposed Amendment Nos. 281 and 251 to Licenses NPF-22 and NPF-22, Application for License Amendment and Related Technical Specification Changes to Implement Full-Scope Alternative Source Term in Accordance with 10 CFR 50.67... ML0619100912006-07-0707 July 2006 Technical Specifications Pages Re 3.0 Limiting Condition for Operation (LCO) Applicability PLA-6049, Proposed License Amendment Nos. 289 and 257, Standby Liquid Control System2006-04-28028 April 2006 Proposed License Amendment Nos. 289 and 257, Standby Liquid Control System ML0609603342006-03-31031 March 2006 Susquehanna - Proposed License Amendment Numbers 285 for Unit 1 and 253 for Unit 2, Constant Pressure Power Uprate, PLA-6002 ML0609004652006-03-30030 March 2006 Technical Specification 3.4.10 RCS Pressure and Temperature (P/T) Limits, October 5, 2005 ML0608007312006-03-20020 March 2006 Tech Spec for Susquehanna, Unit 1 - Issuance of Amendment Regarding Minimum Critical Power Ratio Safety Limit and Reference Changes ML0603306392006-02-0202 February 2006 Tech Spec Susquehanna Steam Electric Station, Unites 1 and 2 - Issuance of Amendment Revision to Specification Surveillance Requirement 3.6.4.1.4 and 3.6.4.1.5, Secondary Containment and Draw Down Testing PLA-5993, Proposed Amendment No. 284 to License NPF-14 & Proposed Amendment No. 252 to License NPF-22 to Revise Technical Specification 3.1.4, Control Rod Scram Times.2006-02-0101 February 2006 Proposed Amendment No. 284 to License NPF-14 & Proposed Amendment No. 252 to License NPF-22 to Revise Technical Specification 3.1.4, Control Rod Scram Times. ML0531803282005-11-10010 November 2005 Technical Specification Page Regarding Minimum Critical Power Ratio Safety Limit PLA-5967, Proposed Amendment No. 282 to Facility Operating License NPF-14: Proposed Change to Technical Specification 2.1.1.2 MCPR Safety Limit2005-10-14014 October 2005 Proposed Amendment No. 282 to Facility Operating License NPF-14: Proposed Change to Technical Specification 2.1.1.2 MCPR Safety Limit PLA-5888, Proposed Amendment Nos. 274 and 243 to License Nos. NPF-14 and NPF-22, Application for Technical Specification Improvement to Revise Technical Specifications to Eliminate Requirements for Monthly Operating Reports.2005-10-0505 October 2005 Proposed Amendment Nos. 274 and 243 to License Nos. NPF-14 and NPF-22, Application for Technical Specification Improvement to Revise Technical Specifications to Eliminate Requirements for Monthly Operating Reports. ML0521700382005-08-0404 August 2005 Technical Specification Pages Re Containment Purge Value Leak Rate Test Frequency PLA-5880, Proposed License Amendment Numbers 272 for Unit 1 Operating License No. NTF-14 and 241 for Unit 2 Operating License No. NPF-22, Power Range Neutron Monitor System Digital Upgrade PLA-58802005-06-27027 June 2005 Proposed License Amendment Numbers 272 for Unit 1 Operating License No. NTF-14 and 241 for Unit 2 Operating License No. NPF-22, Power Range Neutron Monitor System Digital Upgrade PLA-5880 PLA-5891, Proposed Amendment No. 275 to Unit 1 Facility Operating License NPF-14 and Proposed Amendment No. 244 to Unit 2 Facility Operating License NPF-22: Exigent Change to Technical Specification 3.8.4, PLA-58912005-04-27027 April 2005 Proposed Amendment No. 275 to Unit 1 Facility Operating License NPF-14 and Proposed Amendment No. 244 to Unit 2 Facility Operating License NPF-22: Exigent Change to Technical Specification 3.8.4, PLA-5891 ML0509000432005-03-29029 March 2005 Technical Specification Pages Re ADS-LPCI Discharge Pressure PLA-5869, Proposed Amendment No. 240 to License No. NPF-22 Regarding Revision to Technical Specifications 3.3.8.1 and 3.8.72005-03-18018 March 2005 Proposed Amendment No. 240 to License No. NPF-22 Regarding Revision to Technical Specifications 3.3.8.1 and 3.8.7 PLA-5850, Proposed Amendment No. 238 to Unit 2 License NFP-22: Editorial Change to Technical Specification Table 3.3.5.1-1 PLA-58502005-01-28028 January 2005 Proposed Amendment No. 238 to Unit 2 License NFP-22: Editorial Change to Technical Specification Table 3.3.5.1-1 PLA-5850 PLA-5840, Proposed Amendment: Revision to Technical Specification 5.5.6., PLA-58402005-01-28028 January 2005 Proposed Amendment: Revision to Technical Specification 5.5.6., PLA-5840 PLA-5825, Proposed Amendment No. 269 to Unit 1 License NPF-14 and Amendment No. 236 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specifications Rewrite PLA-58252004-11-0909 November 2004 Proposed Amendment No. 269 to Unit 1 License NPF-14 and Amendment No. 236 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specifications Rewrite PLA-5825 PLA-5764, Proposed License Amendment Numbers 267 for Unit 1 and 232 for Unit 2 Mode Change Limitations Using the Consolidated Line Item Improvement (CLIIP) Process PLA-57642004-09-22022 September 2004 Proposed License Amendment Numbers 267 for Unit 1 and 232 for Unit 2 Mode Change Limitations Using the Consolidated Line Item Improvement (CLIIP) Process PLA-5764 PLA-5811, Proposed Amendment No. 235 to License NFP-22: Changes to Reactor Pressure Vessel Pressure-temperature (P-T) Limits PLA-58112004-09-22022 September 2004 Proposed Amendment No. 235 to License NFP-22: Changes to Reactor Pressure Vessel Pressure-temperature (P-T) Limits PLA-5811 PLA-5755, Proposed Amendment No. 265 to License NPF-14 & Proposed Amendment No. 230 to License NPF-22: Application for Technical Specification Improvement to Revise Technical Specification 3.1.8 Scram Discharge Volume.2004-09-0808 September 2004 Proposed Amendment No. 265 to License NPF-14 & Proposed Amendment No. 230 to License NPF-22: Application for Technical Specification Improvement to Revise Technical Specification 3.1.8 Scram Discharge Volume. PLA-5785, Table of Contents Revisions Proposed Amendment No. 259 and Proposed Amendment No. 224 Revised Response to GL 94-02: Long-Term Stability Solution PLA-57852004-07-15015 July 2004 Table of Contents Revisions Proposed Amendment No. 259 and Proposed Amendment No. 224 Revised Response to GL 94-02: Long-Term Stability Solution PLA-5785 PLA-5739, Proposed Amendment Nos. 264 and 229, Respectively Regarding Resolution of URI 2001-04-03 Standby Liquid Control/Atws2004-05-11011 May 2004 Proposed Amendment Nos. 264 and 229, Respectively Regarding Resolution of URI 2001-04-03 Standby Liquid Control/Atws PLA-5726, Proposed License Amendment Regarding Secondary Containment Access Doors Surveillance Requirements 3.6.4.1.32004-03-0505 March 2004 Proposed License Amendment Regarding Secondary Containment Access Doors Surveillance Requirements 3.6.4.1.3 PLA-5722, Proposed License Amendments Regarding ADS-LPCI Discharge Pressure, TS 3.3.5.1-1, Function 4.f and 5.f2004-03-0404 March 2004 Proposed License Amendments Regarding ADS-LPCI Discharge Pressure, TS 3.3.5.1-1, Function 4.f and 5.f PLA-5686, Proposed Amendment No. 259 to License NPF-14, and Proposed Amendment No. 224 to License NPF-22, Revised Response to Gl 94-02: Long-term Stability Solution2003-12-22022 December 2003 Proposed Amendment No. 259 to License NPF-14, and Proposed Amendment No. 224 to License NPF-22, Revised Response to Gl 94-02: Long-term Stability Solution PLA-5694, Proposed Amendment Regarding Revised Main Turbine Bypass System Requirements2003-12-0505 December 2003 Proposed Amendment Regarding Revised Main Turbine Bypass System Requirements ML0330904032003-10-29029 October 2003 Tech Spec Pages for Amendments 215 & 190 Revised Response to Generic Letter 94-02 Long-Term Stability Solution 2023-11-02
[Table view] |
Text
I I' Britt T. McKlnney PPL Susquehanna, LLC . % S aa f Vice President-Nuclear Site Operations 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 * # I btmckinney@pplweb.com JAN 2 8 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NO. 238 TO UNIT 2 LICENSE NFP-22: EDITORIAL CHANGE TO TECHNICAL SPECIFICATION TABLE 3.3.5.1-1 PLA-5850 Docket No. 50-388 The purpose of this letter is to propose an editorial/administrative revision to the PPL Susquehanna Unit 2 Technical Specification (TS) Table 3.3.5.1-1 "Emergency Core Cooling System Instrumentation." This change only involves revising Unit 2 TS Table 3.3.5.1-1 to correct a typographical error related to HPCI System Function 3.e "Manual Initiation." The change is not technical, has no safety significance, and does not involve any new commitments.
In accordance with Administrative Letter 98-10, "Dispositioning Specifications that are Insufficient to Assure Plant Safety," revised Technical Specification Bases have also been developed to remove administrative direction previously provided to plant operators for their use until this proposed TS change is approved by NRC.
The proposed change has been approved by the Susquehanna SES Plant Operations Review Committee and reviewed by the Susquehanna Review Committee. In accordance with 10 CFR 50.91 (b)(1), PPL is sending a copy of this letter to the Pennsylvania Department of Environmental Protection.
If you have any questions, please contact Mr. Duane L. Filchner at (610) 774-7819.
Document Control Desk PLA-5850 I declare under penalty of perjury that the foregoing is true and correct.
Executed on:
B. T. McKinney
Enclosure:
PPL Evaluation of the Proposed Change Attachments:
Attachment A - Proposed Technical Specification Change for Table 3.3.5.1-1 (Mark-up)
Attachment B - Proposed Technical Specification Bases Change for Section 3.3.5.1 (Mark-up for Information Only) copy: NRC Region I Mr. A. J. Blarney, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Project Manager Mr. D. J. Allard, PA DEP
Enclosure to PLA-5850 PPL Evaluation of the Proposed Change
1.0 DESCRIPTION
2.0 PROPOSED CHANGE
3.0 BACKGROUND
4.0 TECHNICAL ANALYSIS
5.0 REGULATORY SAFETY ANALYSIS 5.1 No Significant Hazards Consideration 5.2 Applicable Regulatory Requirements/Criteria
6.0 ENVIRONMENTAL CONSIDERATION
S
7.0 REFERENCES
Enclosure to PLA-5850 Page 1 of 5 PPL EVALUATION
1.0 DESCRIPTION
This is a request to amend Operating License NPF-22 for PPL Susquehanna, LLC (PPL),
Susquehanna Steam Electric Station (SSES) Unit 2.
The proposed change is to the Unit 2 Technical Specification Table 3.3.5.1-1. This is an editorial revision to correct a typographical error that has been present since PPL converted to the Improved Technical Specifications in 1998. This change is not technical in nature and has no safety significance.
In addition, interim administrative direction previously added to the Technical Specification Bases Section 3.3.5.1, Subsections for Actions C.1 and C.2, and Actions D. 1, D.2.1, and D.2.2, will be removed upon approval of this change.
2.0 PROPOSED CHANGE
Unit 2 TS Table 3.3.5.1-1 is revised to change Function 3.e "HPCI System," Conditions Referenced from Required Action A.1 from "D" to "C." The Unit 2 Technical Specification Bases were previously revised to provide interim administrative direction to plant operators that Action C is the correct action relative to this typographical error and should be controlled as such until the NRC approves this proposed TS as a license amendment.
3.0 BACKGROUND
The typographical error in Unit 2 TS Table 3.3.5.1-1 is documented in the PPL Corrective Action Process. The corrective action is to change the table and process a license amendment request for this Technical Specification deficiency under Administrative Letter 98-10 "Dispositioning Specifications that are Insufficient to Assure Plant Safety." In accordance with Administrative Letter 98-10, the Technical Specification Bases have also been revised to provide administrative direction to plant operators until this proposed TS change is approved as a license amendment.
Enclosure to PLA-5850 Page 2 of 5
4.0 TECHNICAL ANALYSIS
The proposed change to the Unit 2 TS Table 3.3.5.1 corrects a typographical error that occurred when preparing the response to an NRC Request for Additional Information during the review of documents PPL submitted to the NRC for the conversion to the Improved Technical Specifications. This proposed change is administrative in nature.
PPL's original Improved Technical Specification submittal to the NRC established that Action C was the appropriate Action for the Technical Specification Table 3.3.5.1-1 HPCI Manual Initiation Function on both Units 1 and 2. A subsequent submittal (to correct the table regarding Unit 2 Suppression Pool Water - High Level) resulted in an inadvertent change to make the required Action "D" for the HPCI Manual Initiation function in Unit 2 Table 3.3.5.1-1.
A review of the change history to Unit 2 TS Table 3.3.5.1-1 confirms that Action "C" is the correct Action to be referenced for HPCI Function 3.e Manual Initiation. Upon a loss of Manual Initiation capability for HPCI, Unit 2 Table 3.3.5.1-1 should direct that Action C is applicable, consistent with Unit I Table 3.3.5.1-1. This is consistent with the original intent of the Technical Specifications and also with the NUREG 1433 Standard Technical Specifications that were the basis for conversion to the Improved Technical Specifications. Although Action C.1 is not applicable to HPCI Manual Initiation, Action C.2 allows for the loss of HPCI manual initiation capability up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> whenever reactor steam dome pressure is greater than 150 psig.
Action D.1 is related to the Condensate Storage Low Level function and is only applicable if the HPCI pump suction is not aligned to the Suppression Pool. When HPCI is aligned to the Suppression Pool, the Condensate Storage Tank Level is not an issue for HPCI operation. Actions D.2.1, and D.2.2 are intended to allow up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to realign HPCI to the suppression pool. Therefore, none of the Actions "D" are concerned with HPCI system manual initiation.
Based on the above, it is concluded that Action C is the appropriate reference for HPCI Function 3.e, Manual Initiation, in Unit 2 Technical Specification Table 3.3.5.1-1.
The Technical Specification Bases Section 3.3.5.1, Subsections for Actions C.1 & C.2, and Actions D. 1, D.2. 1, and D.2.2 have also been revised to provide interim administrative direction to plant operators until the proposed Technical Specification change to TS Table 3.3.5.1-1 is approved by the NRC. There are no changes to plant design or operation as a result of this direction. The intent of the direction is to rectify a discrepancy between Unit 1 and Unit 2 Technical Specifications via administrative control in accordance with Administrative Letter 98-10, "Dispositioning of Technical Specification that are Insufficient to Assure Plant Safety."
Enclosure to PLA-5850 Page 3 of 5 5.0 REGULATORY SAFETY ANALYSIS 5.1 No Significant Hazards Consideration PPL Susquehanna, LLC (PPL) has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
- 1. Does the proposed change involve a significant increase in the probability of occurrence or consequences of an accident previously evaluated?
Response: No.
The proposed change to the Unit 2 TS Table 3.3.5.1 provides a correction to a typographical error that occurred when preparing a change to Unit 2 Technical Specification Table 3.3.5.1-1 in the response to an NRC Request for Additional Information (RAI). The request was initiated during NRC review of documents submitted by PPL for the conversion to the Improved Technical Specifications. This proposed change is considered to be administrative in nature because it was originally submitted correctly and was inadvertently changed in response to the RAI.
Therefore, this change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
As stated above, the proposed change to the Unit 2 TS Table 3.3.5.1 provides a correction to a typographical error that occurred when preparing the response to an NRC Request for Additional Information. The request was initiated by the NRC during its review of documents submitted by PPL for the conversion to the Improved Technical Specifications. This proposed change is administrative in nature.
Therefore, these proposed changes do not create the possibility of a new or different kind of accident from any previously evaluated.
Enclosure to PLA-5850 Page 4 of 5
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
Again, the proposed change to the Unit 2 TS Table 3.3.5.1 provides a correction to a typographical error that occurred when preparing the response to an NRC Request for Additional Information. The request was initiated by the NRC during its review of documents submitted by PPL for the conversion to the Improved Technical Specifications. This proposed change is administrative in nature.
Therefore, these proposed changes do not involve a significant reduction in a margin of safety.
Based on the above, PPL concludes that the proposed changes present no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
5.2 Applicable Regulatory Requirements/Criteria SSES FSAR Sections 3.1 and 3.13 provide detailed discussion of SSES compliance with the applicable regulatory requirements and guidance. The proposed TS amendment:
(a) Does not alter the design or function of any system; (b) Does not result in any change in the qualifications of any component; and (c) Does not result in the reclassification of any component's status in the areas of shared, safety-related, independent, redundant, and physically or electrically separated.
Based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Enclosure to PLA-5850 Page 5 of 5
6.0 ENVIRONMENTAL CONSIDERATION
S 10 CFR 51.22(c)(9) identifies certain licensing and regulatory actions, which are eligible for categorical exclusion from the requirement to perform an environmental assessment.
A proposed amendment to an operating license for a facility does not require an environmental assessment if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant hazards consideration; (2) result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite; or (3) result in a significant increase in individual or cumulative occupational radiation exposure. PPL Susquehanna, LLC has evaluated the proposed changes and has determined that the proposed change meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Accordingly, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with issuance of the amendment. The basis for this determination, using the above criteria, follows:
Basis As demonstrated in the No Significant Hazards Consideration Evaluation, the proposed amendment does not involve a significant hazards consideration.
There is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite. The proposed change does not involve any physical alteration of the plant (no new or different type of equipment will be installed) or change in methods governing normal plant operation.
There is no significant increase in individual or cumulative occupational radiation exposure. The proposed changes do not involve any physical alteration of the plant (no new or different type of equipment will be installed) or change in methods governing normal plant operation.
7.0 REFERENCES
- 1. US NRC Administrative Letter 98-10, "Dispositioning of Technical Specifications that are Insufficient to Assure Plant Safety."
Attachment A to PLA-5850 Proposed Technical Specification Change TS Table 3.3.5.1-1 (Mark-up)
(Unit 2)
ECCS Instrumentation 3.3.5.1
. _ . Table 3.3.5.1-1 (page 3 of 5)
Emergency Core Coolring System Instrumentation APPLICABLE CONDlTIONS MODES OR REFERENCED OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE 3.- High Pressure Coolant IrJection (HPCI)
System
- a. ReactorVessel 1, 4 B SR 3.3S.1.1 2 45Inches Water LeveJ-Low 2', 3(') SR 3.3.5.12 Low. Level 2 SR 3.3.5.1A SR 3.3.5.1.5
- b. DrywellPressure- 1, 4 B SR 3.3.5.12 s1.88psiig High 2) SR 3.3.5.1.3 SR 3.3.5.1.5
- c. Reactor Vessel 1 2 C SR 3.3.5.1.2 . 55.5inches Water Level- 2l 3(4) SR 3.3.5.1.3 High, Level 8 SR 3.3.5.1.5
- d. Condensate : 2 D SR 3.3.5.12 236.0Inches Storage Tank 21 ), 3- SR 3.3.5.1.3 above tank bottom Level-o SR 3.3.5.1.5 I
- e. Manual Initiation 1, SR 3.3.5.1.5 NA I 2 t(cn3nud
( (continued)
(a) When the associated subsystem(s) are required to be OPERABLE.
(e) With reactor steam dome pressure > 150 psig. C.-
SUSQUEHANNA- UNIT 2 TS / 3.3-45 Amendment'VK
Attachment B to PLA-5850 Proposed Technical Specification Bases Changes (Mark-ups for Information Only)
TS Section 3.3.5.1 (Unit 2)
PPL Rev. 0 ECCS Instrumentation B 3.3.5.1 BASES ACTIONS C.1 and C.2 (continued) I ERI . MINIRAT"DIRON C~iieeihifro Actioh 1" okS'a'f-+! -^t\
gioi r 2w0< The rfrwso le'.J Required Action C.1 is intended to ensure that appropriate actions are taken if multiple, inoperable channels within the same Function result in redundant automatic initiation capability being lost for the feature(s).
Required Action C.1 features would be those that are initiated by Functions 1.d, 2.d, and 2.e (i.e., low pressure ECCS). Redundant automatic initiation capability is lost if either (a)two or more Function 1.d channels are inoperable such that the trip system loses initiation capability, (b) two or more Function 2.d channels are inoperable in the same trip system such that the trip system loses initiation capability, or
.(c) two or more' Function 2.e channels are inoperable affecting LPCI pumps in different subsystems. In this situation (loss of redundant automatic initiation capability), the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> allowance of Required
--Action C.2 is not appropriate and the feature(s) associated-with the------
inoperable channels must be declared inoperable within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Since each inoperable channel would have Required Action C.1 applied separately (refer to ACTIONS Note), each inoperable channel would only require the affected portion of the associated system to be declared inoperable. However, since channels for both low pressure ECCS subsystems are inoperable (e.g., both CS subsystems), and the Completion Times started concurrently for the channels in both subsystems, this results in the affected portions in both subsystems being concurrently declared inoperable. For Functions 1.d, 2.d, and 2.e, the affected portions are the associated low pressure ECCS pumps. As noted (Note 1), Required Action C.1 is only applicable in MODES 1, 2, and 3. In MODES 4 and 5, the specific initiation time of the ECCS is not assumed and the probability of a LOCA is lower. Thus, a total loss of automatic initiation capability for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (as allowed by Required Action C.2) is allowed during MODES 4 and 5.
Note 2 states that Required Action C.1 is only applicable for Functions 1.d, 2.d, and 2.e. Required Action C.1 is not applicable to Functions l.e,'2.f, and 3.e (which also require entry into this Condition if a channel in these Functions is inoperable), since they are the Manual Initiation Functions and are not assumed in any accident or transient analysis. Thus, a total loss of manual initiation capability for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (as allowed by Required Action C.2) is allowed. Required Action C.1 is also not applicable to (continued)
SUSQUEHANNA - UNIT 2 TS / B 3.3-126 Revision I
PPL Rev. 0 ECCS Instrumentation B 3.3.5.1 BASES ACTIONS C.1 and C.2 (continued)
Function 3.c (which also requires entry into this Condition if a channel in this Function is inoperable), since the loss of one channel results in a loss of the Function (two-out-of-two logic). This loss was considered during the development of Reference 3 and considered acceptable for the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> allowed by Required Action C.2.
The Completion Time is intended to allow the operator time to evaluate and repair any discovered inoperabilities. This Completion Time also allows for an exception to the normal "time zero" for beginning the allowed outage time 'clock." For Required Action C.1, the Completion Time only begins upon discovery that the same feature in both subsystems (e.g., both CS subsystems) cannot be automatically initiated due to inoperable channels within the same Function as described in the paragraph above. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time from discovery of loss of initiation capability is acceptable because it minimizes risk while allowing time for restoration of channels.
-Because of the diversity-of sensors available to provide initiation signals and the redundancy of the ECCS design, an allowable out of service time of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> has been shown to be acceptable (Ref. 3) to permit restoration of any inoperable channel to OPERABLE status. If the inoperable channel cannot be restored to OPERABLE status within the allowable out of service time, Condition G must be entered and its Required Action taken. The Required Actions do not allow placing the channel in trip since this action would either cause the initiation or it would not necessarily result in a safe state for the channel in all events.
D.1 D.2.1 and D.2.2 m7 v,>2IN11ADMI TAY~iDRCTQ '.,;-::-lt4; ;-
1T ni ec catlo abli Cl --
n ns RJ6n frRequ ctio'A.10 tainr typo ap I erR 08.The" hbli" efer ceduld b 'Cr ac rdan eAdm trati er 10 ecton pv ed 1
- pro'pos'ed TS6e(D~ 98'p'vdr OB; :,A:; v Required Action D.1 is intended to ensure that appropriate actions are taken if multiple, inoperable, untripped channels within the same Function result in a complete loss of automatic component initiation capability for the HPCI System. Automatic component initiation capability is lost if two Function 3.d channels are inoperable and untripped. In this situation (loss of automatic suction swap), the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> allowance of Required Actions D.2.1 and D.2.2 is not appropriate and the HPCI
-(continued)
SUSQUEHANNA - UNIT 2 TS / B3.3-127 Revision 2