PLA-7378, Proposed Amendment No. 317 to License NPF-14 and Proposed Amendment No. 289 to License NPF-22: Supplement to Change Milestone 8 Date

From kanterella
Jump to navigation Jump to search

Proposed Amendment No. 317 to License NPF-14 and Proposed Amendment No. 289 to License NPF-22: Supplement to Change Milestone 8 Date
ML15243A008
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/28/2015
From: Franke J
Susquehanna, Talen Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-7378
Download: ML15243A008 (2)


Text

Jon A. Franke Susquehanna Nuclear, LLC TALEN ~

Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 jon.franke@talenenergy.com ENERGY AUG 2 8 2015 U.S. Nuclear Regulatory Commission 10 CFR 50.90 Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NO. 317 TO LICENSE NPF-14 AND PROPOSED AMENDMENT NO. 289 TO LICENSE NPF-22: SUPPLEMENT TO CHANGE PROPOSED MILESTONE 8 DATE Docket Nos. 50-387 PLA-7378 and 50-388

Reference:

(1) PPL Letter (PLA-7169) (J. A. Franke) to NRC Document Control Desk, "Susquehanna Steam Electric Station Proposed Amendment No. 317 to License NPF-14 and Proposed Amendment No. 289 to License NPF-22:

Changes to Cyber Security Implementation Schedule, "dated December 2, 2014 (ML14336A246).

In Reference 1, PPL Susquehanna, LLC (now Susquehanna Nuclear, LLC) requested an amendment to the Facility Operating License (FOL) for Susquehanna Steam Electric Station (SSES) Unit 1 Operating License (NPF-14) and SSES Unit 2 Operating License (NPF-22) that proposed a change to the SSES Cyber Security Plan (CSP) Milestone 8 full implementation date as set forth in the SSES Cyber Security Plan Implementation Schedule. During discussion with the NRC Project Manager on August 19, 2015, Susquehanna Nuclear, LLC decided to revise the proposed CSP Milestone 8 completion date to December 31, 2017. The justification for the proposal and no significant hazards consideration evaluation are unaffected by this change.

There are no regulatory commitments contained in this letter. The full implementation of the CSP is an Operating License Condition.

If you have any questions regarding this report, please contact Mr. Jeffery N. Grisewood at 570-542-1330.

I declare under penalty of perjury that the foregoing is true and conect.

Document Control Desk PLA-7378 Copy: NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Mr. M. Shields, PA DEP/BRP Mr. J. A. Whited, NRC Project Manager