Letter Sequence Request |
---|
TAC:MD9301, Control Rod SCRAM Time Testing Frequency (Approved, Closed) |
|
|
|
---|
Category:Letter type:PLA
MONTHYEARPLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums PLA-8048, Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence2023-01-14014 January 2023 Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8038, Notification of Petition for Bankruptcy (PLA-8038)2022-12-14014 December 2022 Notification of Petition for Bankruptcy (PLA-8038) PLA-8036, Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-80362022-11-30030 November 2022 Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-8036 PLA-8035, Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-80352022-11-0808 November 2022 Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-8035 PLA-8031, Emergency Plan Revision 66 (PLA-8031)2022-11-0707 November 2022 Emergency Plan Revision 66 (PLA-8031) PLA-8032, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032)2022-10-28028 October 2022 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032) PLA-8026, Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026)2022-10-19019 October 2022 Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026) PLA-8015, Application for Order Approving Indirect Transfer of Control of Licenses2022-09-29029 September 2022 Application for Order Approving Indirect Transfer of Control of Licenses PLA-8030, Evacuation Time Estimate Report PLA-80302022-09-15015 September 2022 Evacuation Time Estimate Report PLA-8030 PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-8019, Nd Refueling Outage Owner'S Activity Report, PLA-80192022-07-13013 July 2022 Nd Refueling Outage Owner'S Activity Report, PLA-8019 PLA-8013, Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-80132022-06-27027 June 2022 Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-8013 PLA-8012, 10 CFR 50.46 Annual Report2022-06-10010 June 2022 10 CFR 50.46 Annual Report PLA-8005, Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005)2022-05-23023 May 2022 Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005) PLA-8001, Radiation Exposure Information and Reporting System - PLA-80012022-04-28028 April 2022 Radiation Exposure Information and Reporting System - PLA-8001 PLA-7987, Radioactive Effluent Release Report and Offsite Dose Calculation Manual - (PLA-7987)2022-04-26026 April 2022 Radioactive Effluent Release Report and Offsite Dose Calculation Manual - (PLA-7987) PLA-7986, 2021 Annual Environmental Operating Report (Nonradiological) Docket No. 50-387, PLA-79862022-04-26026 April 2022 2021 Annual Environmental Operating Report (Nonradiological) Docket No. 50-387, PLA-7986 PLA-7985, Annual Radiological Environmental Operating Report2022-04-22022 April 2022 Annual Radiological Environmental Operating Report PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) PLA-7995, Property Insurance Program (PLA-7995)2022-03-30030 March 2022 Property Insurance Program (PLA-7995) PLA-7998, Submittal of Unit 1 Cycle 23 Core Operating Limits Report and Reload Safety Analysis Report2022-03-29029 March 2022 Submittal of Unit 1 Cycle 23 Core Operating Limits Report and Reload Safety Analysis Report PLA-7991, Proof of Financial Protection and Guarantee of Payment of Deferred Premium2022-03-24024 March 2022 Proof of Financial Protection and Guarantee of Payment of Deferred Premium PLA-7984, Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 22022-03-0808 March 2022 Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 2024-01-04
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARPLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8015, Application for Order Approving Indirect Transfer of Control of Licenses2022-09-29029 September 2022 Application for Order Approving Indirect Transfer of Control of Licenses PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 PLA-7979, Supplement to License Amendment to Revise Reactor Steam Dome Pressure Low Instrumentation Function Allowable Value2021-12-16016 December 2021 Supplement to License Amendment to Revise Reactor Steam Dome Pressure Low Instrumentation Function Allowable Value PLA-7950, Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-7950)2021-10-0505 October 2021 Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-7950) PLA-7897, Proprosed Amendment to Licenses NPF-14 and NPF-22: License Amendment Request to Revise Technical Specification to Adopt Risk Informed Completion Times TSTF-505, Rev 2, Provide Risk Informed Extended Completion.2021-04-0808 April 2021 Proprosed Amendment to Licenses NPF-14 and NPF-22: License Amendment Request to Revise Technical Specification to Adopt Risk Informed Completion Times TSTF-505, Rev 2, Provide Risk Informed Extended Completion. ML20245E1922020-09-0101 September 2020 Talen Energy - Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements PLA-7880 PLA-7866, Electric Station Proposed Amendment Licenses NPF-14 and - NPF-22: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules PLA-78662020-06-25025 June 2020 Electric Station Proposed Amendment Licenses NPF-14 and - NPF-22: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules PLA-7866 PLA-7842, Proposed Amendment to Licenses NPF-14 and NPF-22: Revise Technical Specification 3.8.1 to Create a New Condition for an Inoperable Manual Synchronization Circuit PLA-72482020-05-26026 May 2020 Proposed Amendment to Licenses NPF-14 and NPF-22: Revise Technical Specification 3.8.1 to Create a New Condition for an Inoperable Manual Synchronization Circuit PLA-7248 PLA-7823, Proposed Amendment to Licenses NPF-014 and NPF-022: Revision to the Dose Consequence Analysis for a Loss of Coolant Accident2020-01-0202 January 2020 Proposed Amendment to Licenses NPF-014 and NPF-022: Revision to the Dose Consequence Analysis for a Loss of Coolant Accident PLA-7783, Proposed Amendment to Licenses: Application of Advanced Framatome Methodologies and TSTF-535 PLA-77832019-07-15015 July 2019 Proposed Amendment to Licenses: Application of Advanced Framatome Methodologies and TSTF-535 PLA-7783 PLA-7772, Application to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco.2019-03-28028 March 2019 Application to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco. PLA-7751, Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping2019-01-0909 January 2019 Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping PLA-7729, Technical Specifications Task Force Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2018-12-0404 December 2018 Technical Specifications Task Force Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. PLA-7605, Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A2017-05-17017 May 2017 Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A PLA-7528, Supplemental Information for License Amendment Request to Address Secondary Containment Access Openings2016-09-13013 September 2016 Supplemental Information for License Amendment Request to Address Secondary Containment Access Openings PLA-7486, Proposed Amendment Request to Address Secondary Containment Access Openings2016-07-27027 July 2016 Proposed Amendment Request to Address Secondary Containment Access Openings ML16181A4172016-06-29029 June 2016 Projected Income Statement and Calculation of Six-Month Fixed Costs (Redacted) ML16181A4152016-06-29029 June 2016 Request for Order Approving Indirect Transfer of Control - PLA-7500 ML16181A4192016-06-29029 June 2016 Capacity Factor Assumptions (Redacted) PLA-7441, Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-4252016-01-29029 January 2016 Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-425 PLA-7384, Proposed Amendment No. 292, Temporary Change to Allow Replacement on Unit 1 480 V Ess Load Center Transformers in Unit 2 Technical Specifications 3.8.7 and 3.7.12016-01-28028 January 2016 Proposed Amendment No. 292, Temporary Change to Allow Replacement on Unit 1 480 V Ess Load Center Transformers in Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-7378, Proposed Amendment No. 317 to License NPF-14 and Proposed Amendment No. 289 to License NPF-22: Supplement to Change Milestone 8 Date2015-08-28028 August 2015 Proposed Amendment No. 317 to License NPF-14 and Proposed Amendment No. 289 to License NPF-22: Supplement to Change Milestone 8 Date PLA-7360, Supplemental Information to License Amendment Request for Changes in RCS Pressure and Temperature (P/T) Limits2015-07-16016 July 2015 Supplemental Information to License Amendment Request for Changes in RCS Pressure and Temperature (P/T) Limits ML15091A6612015-03-19019 March 2015 Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme NEI 99-01, Susquehanna, Units 1 and 2 - Proposed License Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.2015-03-19019 March 2015 Susquehanna, Units 1 and 2 - Proposed License Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. NEI 99-01, Susquehanna, Units 1 and 2 - Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme2015-03-19019 March 2015 Susquehanna, Units 1 and 2 - Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme ML15091A6602015-03-19019 March 2015 Proposed License Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. PLA-7181, Submittal of Request for Amendment to the Technical Specification 3.4.10, RCS Pressure and Temperature (Pit) Limits.2014-08-11011 August 2014 Submittal of Request for Amendment to the Technical Specification 3.4.10, RCS Pressure and Temperature (Pit) Limits. ML14195A1132014-07-11011 July 2014 Enclosure to PLA-7191 Application for Order Approving Indirect Transfer of Control of Facility Operating License Nos. NPF-14 and NPF-22 and Conforming Amendments ML14042A1152014-01-29029 January 2014 License Amendment Request - Increase of the Allowable Gas Treatment System Maximum Flow Rates from Secondary Containment PLA-6977, Proposed Amendment No. 313 to License NPF-14 and Proposed Amendment No. 285 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.5.1.122013-06-0606 June 2013 Proposed Amendment No. 313 to License NPF-14 and Proposed Amendment No. 285 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.5.1.12 PLA-6915, Proposed Amendment No. 312 to Unit 1, and Proposed Amendment No. 284 to Unit 2 Low Pressure Safety Limit and Reference Changes2012-12-19019 December 2012 Proposed Amendment No. 312 to Unit 1, and Proposed Amendment No. 284 to Unit 2 Low Pressure Safety Limit and Reference Changes PLA-6825, Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage2012-09-18018 September 2012 Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage PLA-6817, Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1 4160 V Buses Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-68172012-03-0808 March 2012 Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1 4160 V Buses Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-6817 ML11152A0092011-07-21021 July 2011 Issuance of Amendment Approval of the PPL Susquehanna, LLC Cyber Security Plan PLA-6695, Amend. Request No. 308 to License NPF-14 & Amend. Request No. 279 to License NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-514, Rev. 3, Revise BWR Operability Requirements & Actions RCS Leakage Instrumentation2011-04-0808 April 2011 Amend. Request No. 308 to License NPF-14 & Amend. Request No. 279 to License NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-514, Rev. 3, Revise BWR Operability Requirements & Actions RCS Leakage Instrumentation PLA-6628, Proposed Amendment No. 306 to License NPF-14 & Proposed Amendment No. 277 to License NPF-22: Withdrawal & Resubmittal of Request for Approval of the Cyber Security Plan2010-07-22022 July 2010 Proposed Amendment No. 306 to License NPF-14 & Proposed Amendment No. 277 to License NPF-22: Withdrawal & Resubmittal of Request for Approval of the Cyber Security Plan PLA-6606, Submittal of NRC Notification of NPDES Permit Renewal Application2010-03-26026 March 2010 Submittal of NRC Notification of NPDES Permit Renewal Application PLA-6539, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information2009-07-10010 July 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information PLA-6520, Third Annual Amendment to the Application for Renewed Operating License Numbers NPF-14 and NPF-22 Pursuant to 10 CFR 54.21(b)2009-05-28028 May 2009 Third Annual Amendment to the Application for Renewed Operating License Numbers NPF-14 and NPF-22 Pursuant to 10 CFR 54.21(b) PLA-6509, Supplemental Electrical Information to License Amendment Request on the Technical Specifications2009-05-12012 May 2009 Supplemental Electrical Information to License Amendment Request on the Technical Specifications PLA-6505, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information2009-04-30030 April 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information PLA-6474, Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 262009-03-24024 March 2009 Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 PLA-6480, One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-64802009-03-24024 March 2009 One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-6480 PLA-6359, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (CLIIP) PLA-63592009-02-20020 February 2009 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (CLIIP) PLA-6359 2023-06-08
[Table view] Category:Technical Specification
MONTHYEARPLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 PLA-7892, Temporary Change to the Technical Specifications to Allow Replacement of Transformers 1X230 and 1X240 PLA-78922020-11-0505 November 2020 Temporary Change to the Technical Specifications to Allow Replacement of Transformers 1X230 and 1X240 PLA-7892 ML20129J9132020-04-23023 April 2020 Technical Specification Bases, Unit 1, Manual ML20036C9682020-01-29029 January 2020 Technical Specifications Bases, Manual ML20036C9732020-01-29029 January 2020 Technical Specification Bases, Manual ML19161A1372019-05-15015 May 2019 Technical Specification Bases Manual ML19078A1332019-03-0606 March 2019 Technical Requirements Manual ML19078A1342019-03-0606 March 2019 Technical Requirements Manual ML19078A2102019-03-0606 March 2019 Technical Specification Bases, Manual ML19078A2112019-03-0606 March 2019 Technical Specifications Bases, Manual PLA-7751, Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping2019-01-0909 January 2019 Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping ML19011A0572019-01-0707 January 2019 Technical Requirements Manual ML19011A0592019-01-0404 January 2019 Technical Specification Bases Manual ML19011A0582019-01-0404 January 2019 Technical Specifications Bases Manual ML18306A4882018-10-25025 October 2018 Revised Technical Specifications Manual ML18267A3792018-10-0303 October 2018 Correction to Technical Specification Page 3.6-37 for Error Introduced During the Issuance of Amendment Nos. 266 and 247 ML18201A1992018-07-11011 July 2018 Technical Specifications Bases, Manual ML18197A0782018-07-0909 July 2018 Revision 15 to Technical Specifications Bases Manual ML18128A2022018-04-25025 April 2018 Revision to Technical Specifications Bases Manual ML18128A2032018-04-25025 April 2018 Revision to Technical Specification Bases, Manual ML18072A1002018-02-28028 February 2018 Revision 11 to Technical Specifications Bases Manual ML18072A0992018-02-28028 February 2018 Technical Specification Bases Manual ML18033A3312018-01-24024 January 2018 Technical Specification Bases Manual ML18033A3342018-01-24024 January 2018 Technical Specifications Bases Manual PLA-7644, Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644)2017-12-14014 December 2017 Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644) ML17284A1772017-10-0202 October 2017 Technical Specification Bases Manual ML17265A4432017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 3 of 3) ML17265A4412017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 2 of 3) ML17270A0632017-09-18018 September 2017 Technical Specifications Bases, Manual ML17164A1772017-06-0101 June 2017 Revision to Technical Specifications Bases Manual ML17118A0762017-04-20020 April 2017 Revisions to Technical Specifications Bases Unit 2 Manual ML17118A0752017-04-20020 April 2017 Revision to Technical Specification Bases Manual PLA-7444, Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To...2017-02-0101 February 2017 Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To... ML16334A2652016-11-17017 November 2016 Technical Specification Bases Manual ML16110A3162016-04-14014 April 2016 Technical Specification Bases Manual ML16040A2032016-02-0303 February 2016 Technical Specification Bases Manual ML15329A1662015-11-11011 November 2015 Technical Requirements Manual ML15329A1652015-11-11011 November 2015 Technical Requirements Manual ML15317A0102015-11-0505 November 2015 Technical Specifications Bases Manual ML15317A0092015-11-0505 November 2015 Technical Specifications Bases Manual ML15077A4562015-03-0606 March 2015 Technical Requirements Manual ML15034A3102015-01-23023 January 2015 Technical Specification Bases Unit 1 Manual ML15034A3112015-01-23023 January 2015 Technical Specifications Bases, Unit 2 Manual PLA-7181, Submittal of Request for Amendment to the Technical Specification 3.4.10, RCS Pressure and Temperature (Pit) Limits.2014-08-11011 August 2014 Submittal of Request for Amendment to the Technical Specification 3.4.10, RCS Pressure and Temperature (Pit) Limits. ML14205A0132014-07-17017 July 2014 Technical Specification Bases, Manual, Revisions ML14196A0412014-07-0303 July 2014 Technical Specifications Bases, Manual 2023-11-02
[Table view] Category:Amendment
MONTHYEARPLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) ML18267A3792018-10-0303 October 2018 Correction to Technical Specification Page 3.6-37 for Error Introduced During the Issuance of Amendment Nos. 266 and 247 PLA-7644, Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644)2017-12-14014 December 2017 Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644) ML17265A4412017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 2 of 3) ML17265A4432017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 3 of 3) PLA-7444, Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To...2017-02-0101 February 2017 Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To... ML12242A2442012-08-14014 August 2012 Technical Specifications Bases Unit 2 Manual PLA-6539, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information2009-07-10010 July 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information PLA-6509, Supplemental Electrical Information to License Amendment Request on the Technical Specifications2009-05-12012 May 2009 Supplemental Electrical Information to License Amendment Request on the Technical Specifications PLA-6505, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information2009-04-30030 April 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information PLA-6235, Emergency Core Cooling System Instrumentation - Technical Specification (TS) Table 3.3.5.1+1 and Editorial Change to TS 3.10.8.f2009-03-24024 March 2009 Emergency Core Cooling System Instrumentation - Technical Specification (TS) Table 3.3.5.1+1 and Editorial Change to TS 3.10.8.f PLA-6480, One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-64802009-03-24024 March 2009 One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-6480 PLA-6474, Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 262009-03-24024 March 2009 Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 PLA-6359, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (CLIIP) PLA-63592009-02-20020 February 2009 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (CLIIP) PLA-6359 PLA-5604, Proposed Amendment No. 253 to License NPF-14 and Proposed Amendment No. 218 to License NPF-22: Request for Adoption of TSTF-460-A, Rev. 0, Control Rod Scram Time Test Frequency Using the CLIIP2008-07-0707 July 2008 Proposed Amendment No. 253 to License NPF-14 and Proposed Amendment No. 218 to License NPF-22: Request for Adoption of TSTF-460-A, Rev. 0, Control Rod Scram Time Test Frequency Using the CLIIP PLA-6304, Proposed Amendment No. 298 to Unit 1 License NPF-14 and Amendment No. 268 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specification 3.8.42008-03-28028 March 2008 Proposed Amendment No. 298 to Unit 1 License NPF-14 and Amendment No. 268 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specification 3.8.4 PLA-6306, Proposed License Amendments 285 and 253 - Constant Pressure Power Uprate Application - Supplement2007-11-30030 November 2007 Proposed License Amendments 285 and 253 - Constant Pressure Power Uprate Application - Supplement PLA-6266, Proposed License Amendment No. 285 for Unit 1, License No. NPF-14 & Proposed License Amendment No. 253 for Unit 2, License No. NPF-22, Extended Power Uprate Application Regarding Change to Technical Specification SR 3.7.1 - RHRSW and UHS2007-08-28028 August 2007 Proposed License Amendment No. 285 for Unit 1, License No. NPF-14 & Proposed License Amendment No. 253 for Unit 2, License No. NPF-22, Extended Power Uprate Application Regarding Change to Technical Specification SR 3.7.1 - RHRSW and UHS PLA-6172, Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-61722007-03-22022 March 2007 Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-6172 PLA-6114, Proposed Amendment Nos. 281 and 251 to Licenses NPF-22 and NPF-22, Application for License Amendment and Related Technical Specification Changes to Implement Full-Scope Alternative Source Term in Accordance with 10 CFR 50.67...2006-09-15015 September 2006 Proposed Amendment Nos. 281 and 251 to Licenses NPF-22 and NPF-22, Application for License Amendment and Related Technical Specification Changes to Implement Full-Scope Alternative Source Term in Accordance with 10 CFR 50.67... ML0619100912006-07-0707 July 2006 Technical Specifications Pages Re 3.0 Limiting Condition for Operation (LCO) Applicability PLA-6049, Proposed License Amendment Nos. 289 and 257, Standby Liquid Control System2006-04-28028 April 2006 Proposed License Amendment Nos. 289 and 257, Standby Liquid Control System ML0609603342006-03-31031 March 2006 Susquehanna - Proposed License Amendment Numbers 285 for Unit 1 and 253 for Unit 2, Constant Pressure Power Uprate, PLA-6002 ML0609004652006-03-30030 March 2006 Technical Specification 3.4.10 RCS Pressure and Temperature (P/T) Limits, October 5, 2005 ML0608007312006-03-20020 March 2006 Tech Spec for Susquehanna, Unit 1 - Issuance of Amendment Regarding Minimum Critical Power Ratio Safety Limit and Reference Changes ML0603306392006-02-0202 February 2006 Tech Spec Susquehanna Steam Electric Station, Unites 1 and 2 - Issuance of Amendment Revision to Specification Surveillance Requirement 3.6.4.1.4 and 3.6.4.1.5, Secondary Containment and Draw Down Testing PLA-5993, Proposed Amendment No. 284 to License NPF-14 & Proposed Amendment No. 252 to License NPF-22 to Revise Technical Specification 3.1.4, Control Rod Scram Times.2006-02-0101 February 2006 Proposed Amendment No. 284 to License NPF-14 & Proposed Amendment No. 252 to License NPF-22 to Revise Technical Specification 3.1.4, Control Rod Scram Times. ML0531803282005-11-10010 November 2005 Technical Specification Page Regarding Minimum Critical Power Ratio Safety Limit PLA-5967, Proposed Amendment No. 282 to Facility Operating License NPF-14: Proposed Change to Technical Specification 2.1.1.2 MCPR Safety Limit2005-10-14014 October 2005 Proposed Amendment No. 282 to Facility Operating License NPF-14: Proposed Change to Technical Specification 2.1.1.2 MCPR Safety Limit PLA-5888, Proposed Amendment Nos. 274 and 243 to License Nos. NPF-14 and NPF-22, Application for Technical Specification Improvement to Revise Technical Specifications to Eliminate Requirements for Monthly Operating Reports.2005-10-0505 October 2005 Proposed Amendment Nos. 274 and 243 to License Nos. NPF-14 and NPF-22, Application for Technical Specification Improvement to Revise Technical Specifications to Eliminate Requirements for Monthly Operating Reports. ML0521700382005-08-0404 August 2005 Technical Specification Pages Re Containment Purge Value Leak Rate Test Frequency PLA-5880, Proposed License Amendment Numbers 272 for Unit 1 Operating License No. NTF-14 and 241 for Unit 2 Operating License No. NPF-22, Power Range Neutron Monitor System Digital Upgrade PLA-58802005-06-27027 June 2005 Proposed License Amendment Numbers 272 for Unit 1 Operating License No. NTF-14 and 241 for Unit 2 Operating License No. NPF-22, Power Range Neutron Monitor System Digital Upgrade PLA-5880 PLA-5891, Proposed Amendment No. 275 to Unit 1 Facility Operating License NPF-14 and Proposed Amendment No. 244 to Unit 2 Facility Operating License NPF-22: Exigent Change to Technical Specification 3.8.4, PLA-58912005-04-27027 April 2005 Proposed Amendment No. 275 to Unit 1 Facility Operating License NPF-14 and Proposed Amendment No. 244 to Unit 2 Facility Operating License NPF-22: Exigent Change to Technical Specification 3.8.4, PLA-5891 ML0509000432005-03-29029 March 2005 Technical Specification Pages Re ADS-LPCI Discharge Pressure PLA-5869, Proposed Amendment No. 240 to License No. NPF-22 Regarding Revision to Technical Specifications 3.3.8.1 and 3.8.72005-03-18018 March 2005 Proposed Amendment No. 240 to License No. NPF-22 Regarding Revision to Technical Specifications 3.3.8.1 and 3.8.7 PLA-5850, Proposed Amendment No. 238 to Unit 2 License NFP-22: Editorial Change to Technical Specification Table 3.3.5.1-1 PLA-58502005-01-28028 January 2005 Proposed Amendment No. 238 to Unit 2 License NFP-22: Editorial Change to Technical Specification Table 3.3.5.1-1 PLA-5850 PLA-5840, Proposed Amendment: Revision to Technical Specification 5.5.6., PLA-58402005-01-28028 January 2005 Proposed Amendment: Revision to Technical Specification 5.5.6., PLA-5840 PLA-5825, Proposed Amendment No. 269 to Unit 1 License NPF-14 and Amendment No. 236 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specifications Rewrite PLA-58252004-11-0909 November 2004 Proposed Amendment No. 269 to Unit 1 License NPF-14 and Amendment No. 236 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specifications Rewrite PLA-5825 PLA-5764, Proposed License Amendment Numbers 267 for Unit 1 and 232 for Unit 2 Mode Change Limitations Using the Consolidated Line Item Improvement (CLIIP) Process PLA-57642004-09-22022 September 2004 Proposed License Amendment Numbers 267 for Unit 1 and 232 for Unit 2 Mode Change Limitations Using the Consolidated Line Item Improvement (CLIIP) Process PLA-5764 PLA-5811, Proposed Amendment No. 235 to License NFP-22: Changes to Reactor Pressure Vessel Pressure-temperature (P-T) Limits PLA-58112004-09-22022 September 2004 Proposed Amendment No. 235 to License NFP-22: Changes to Reactor Pressure Vessel Pressure-temperature (P-T) Limits PLA-5811 PLA-5755, Proposed Amendment No. 265 to License NPF-14 & Proposed Amendment No. 230 to License NPF-22: Application for Technical Specification Improvement to Revise Technical Specification 3.1.8 Scram Discharge Volume.2004-09-0808 September 2004 Proposed Amendment No. 265 to License NPF-14 & Proposed Amendment No. 230 to License NPF-22: Application for Technical Specification Improvement to Revise Technical Specification 3.1.8 Scram Discharge Volume. PLA-5785, Table of Contents Revisions Proposed Amendment No. 259 and Proposed Amendment No. 224 Revised Response to GL 94-02: Long-Term Stability Solution PLA-57852004-07-15015 July 2004 Table of Contents Revisions Proposed Amendment No. 259 and Proposed Amendment No. 224 Revised Response to GL 94-02: Long-Term Stability Solution PLA-5785 PLA-5739, Proposed Amendment Nos. 264 and 229, Respectively Regarding Resolution of URI 2001-04-03 Standby Liquid Control/Atws2004-05-11011 May 2004 Proposed Amendment Nos. 264 and 229, Respectively Regarding Resolution of URI 2001-04-03 Standby Liquid Control/Atws PLA-5726, Proposed License Amendment Regarding Secondary Containment Access Doors Surveillance Requirements 3.6.4.1.32004-03-0505 March 2004 Proposed License Amendment Regarding Secondary Containment Access Doors Surveillance Requirements 3.6.4.1.3 PLA-5722, Proposed License Amendments Regarding ADS-LPCI Discharge Pressure, TS 3.3.5.1-1, Function 4.f and 5.f2004-03-0404 March 2004 Proposed License Amendments Regarding ADS-LPCI Discharge Pressure, TS 3.3.5.1-1, Function 4.f and 5.f PLA-5686, Proposed Amendment No. 259 to License NPF-14, and Proposed Amendment No. 224 to License NPF-22, Revised Response to Gl 94-02: Long-term Stability Solution2003-12-22022 December 2003 Proposed Amendment No. 259 to License NPF-14, and Proposed Amendment No. 224 to License NPF-22, Revised Response to Gl 94-02: Long-term Stability Solution PLA-5694, Proposed Amendment Regarding Revised Main Turbine Bypass System Requirements2003-12-0505 December 2003 Proposed Amendment Regarding Revised Main Turbine Bypass System Requirements ML0330904032003-10-29029 October 2003 Tech Spec Pages for Amendments 215 & 190 Revised Response to Generic Letter 94-02 Long-Term Stability Solution 2023-11-02
[Table view] |
Text
Britt T. McKinney PPL Susquehanna, LLC Sr. Vice President & Chief Nucle~ar Officer 769 Salem Boulevard I
Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney@pplweb.com DD*' -
0 ppT IJUL M 11 7 20008
- TM U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP 1-17 Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NO. 253 TO LICENSE NPF-14 AND PROPOSED AMENDMENT NO. 218 TO LICENSE NPF-22: REQUEST FOR ADOPTION OF TSTF-460-A, REV. 0, "CONTROL ROD SCRAM TIME TEST FREQUENCY" USING THE CONSOLIDATED LINE ITEM IMPROVEMENT PROCESS (CLIIP) Docket No. 50-387 PLA-5604 and 50-388 In accordance with the provisions of Section 50.90 of Title 10 of the Code of Federal Regulations (10CFR), PPL Susquehanna, LLC (PPL) is submitting a request for an amendment to the Technical Specifications (TS) for Susquehanna Steam Electric Station (SSES) Units 1 and 2.
The proposed amendment would revise the TS testing frequency for the surveillance requirement (SR) in TS 3.1.4, "Control Rod Scram Times." These changes are based on TS Task Force (TSTF) change traveler TSTF-460 (Revision 0) that has been approved generically for the boiling water reactor (BWR) Standard TS, NUREG-1433 (BWR/4),
by revising the frequency of SR 3.1.4.2, control rod scram time testing, from "120 days cumulative operation in Mode 1" to "200 days cumulative operation in Mode 1" A notice announcing the availability of this proposed TS change using the consolidated line item improvement process was published in the Federal Register on August 23, 2004 (69 FR 51864).
This proposed change has been reviewed by the SSES Plant Operations Review Committee and by the Susquehanna Review Committee. provides a description of the proposed change and confirmation of applicability. Attachment 2 provides the existing TS pages marked-up to show the proposed change. Attachment 3 provides a regulatory commitment to incorporate the revised acceptance criterion value of 7.5 percent of the control rods in the sample tested into the TS Bases for SSES Unit 1 and Unit 2 in accordance with the Bases Control ku
Document Control Desk PLA-5604 Program described in TS 5.5.10. Attachment 4 provides the corresponding TS Bases pages marked-up for information.
The NRC has previously approved similar amendment requests to the TS for Columbia Generating Station (September 29, 2005), Fermi 2 (October 25, 2005), Cooper Nuclear Station (January 5, 2006), Browns Ferry Nuclear Plant, Units 2 and 3 (January 9, 2006),
Pilgrim Nuclear Power Station (November 5, 2007), and Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 (November 26, 2007). The proposed amendment for Susquehanna Steam Electric Station Units 1 and 2 is similar to those approved for these other plants.
PPL requests approval of the proposed License Amendment by January 15, 2009 with the amendment, and regulatory commitment, being implemented within 60 days following approval.
In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the designated Commonwealth of Pennsylvania Official.
If you have any questions regarding this submittal, please contact Mr. C. E. Manges at (570) 542-3089.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on: 7 "? O -
B. T. McKinney Attachments:
Attachment 1 - Description and Assessment Attachment 2 - Proposed Technical Specification Changes SSES Units 1 & 2 (Mark-up)
Attachment 3 - Regulatory Commitment Attachment 4 - Technical Specification Bases (Mark-Up) (For Information) cc: NRC Region I Mr. R. R Janati, DEP/BRP Mr. F. W. Jaxheimer, NRC Sr. Resident Inspector Mr. B. K. Vaidya, NRC Project Manager to PLA-5604 Description and Assessment
Attachment 1 to PLA-5604 Page 1 of 4 DESCRIPTION AND ASSESSMENT
1.0 INTRODUCTION
The proposed license amendment revises the required testing frequency for the surveillance requirement (SR) in Technical Specification (TS) 3.1.4, "Control Rod Scram Times." A notice announcing the availability of this proposed TS change using the consolidated line item improvement process (CLIIP) was published in the Federal Register on August 23, 2004 (69 FR 51864).
2.0 PROPOSED CHANGE
These changes are based on TS Task Force (TSTF) change traveler TSTF-460 (Revision 0) that has been approved generically for the boiling water reactor (BWR)
Standard TS, NUREG-1433 (BWR/4). The required frequency of SR 3.1.4.2, control rod scram time testing, is changed from "120 days cumulative operation in MODE 1" to "200 days cumulative operation in MODE 1."
3.0 BACKGROUND
The background for this application is adequately addressed by the CLIIP Notice of Availability published on August 23, 2004 (69 FR 51864) and TSTF-460.
4.0 REGULATORY REQUIREMENTS AND GUIDANCE The applicable regulatory requirements and guidance associated with this application are adequately addressed by the CLIIP Notice of Availability published on August 23, 2004 (69 FR 51864) and TSTF-460.
5.0 TECHNICAL ANALYSIS
PPL Susquehanna, LLC (PPL) has reviewed the safety evaluation (SE) published on August 23, 2004 (69 FR 51864) as part of the CLIIP Notice of Availability. This verification included a review of the NRC staff's SE and the supporting information provided to support TSTF-460. PPL has concluded that the justifications presented in the TSTF proposal and the SE prepared by the NRC staff are applicable to Susquehanna
Attachment 1 to PLA-5604 Page 2 of 4 Steam~~~
ElcrcStto(SSES), Units 1 and 2, and justify this amendment for incorporation of the changes to the SSES, Units 1 and 2 TSs.
As described in the CLIIP model SE, part of the justification for the change in surveillance frequency is the high reliability of the SSES Units 1 and 2 control rod drive systems. As requested in the notice of availability published on August 23, 2004 (69 FR 51864), the historical performance of the control rod drive systems at SSES Units 1 and 2 is as follows:
Scram time testing results from 1993 to early 2008 were reviewed. This data represents at least seven operating cycles for each unit and reflects a combined total of more than 9 100 individual control rod scram time tests (>5 000 on Unit 1 and >41 00 on Unit 2),
each measuring the scram time at four insertion positions (Positions 45, 39, 25, and 05).
The review determined that three control rods exceeded the "slow" control rod scram time criteria at Position 05 during the evaluated period as a result of control cell interference caused by fuel channel bow. No rods exceeded the criteria at Positions 45, 39, or 25. Further information associated with each failure is provided below.
Control Rod Date "Slow" Scram Time to Position 05 U2 Rod 26-31 March 8, 2003 3.59 seconds Ul Rod 18-35 October 2, 2005 3.45 seconds Ul Rod 30-31 April 22, 2007 3.52 seconds June 16, 2007 4.39 seconds Each case exceeded the TS "slow" limit of 3.44 seconds to Position 05 specified in LCO 3.1.4, and each was ultimately corrected by addressing the "bowed" fuiel channels that were creating the interference condition. As indicated above, Unit 1 Control Rod 30-31 exceeded the "slow" criterion on two occasions. This rod was initially declared "cslow" on April 22, 2007 and remained "slow" when tested again on June 16, 2007. This rod was ultimately inserted to Position 00 and declared inoperable on July 14, 2007 based on a projection that the scram time would potentially exceed 6.0 seconds prior to the next scheduled test. An accelerated scram time testing schedule was implemented to trend control rod performance and to ensure continued operability of control rods that were experiencing excessive friction due to channel bow.
In addition to the three control rods that exceeded the "slow" criterion, between 2005 and 2007 (inclusive), nine rods were declared inoperable based upon operational performance resulting from elevated control cell friction that was not sufficient to cause "slow" scram times (i.e., the rod could not be withdrawn, the rod was extremely difficult to insert, or the rod failed the insert stall test). These rods were declared inoperable, not as a result of exceeding any TS criteria, but as a result of conservative, non-TS criteria established in
Attachment 1 to PLA-5604 Page 3 of 4 response to the control cell friction phenomena. These rods were fully inserted to Position 00 and declared inoperable prior to exceeding the "slow" criteria.
During the evaluation period from 1993 to early 2008, no control rod exceeded any scram time testing criteria for a reason other than control cell interference caused by fuel channel bow. Although scram time testing of affected control rods was used to ensure operability in accordance with GE channel bow monitoring recommendations, control cell friction was not identified through the normal scram time surveillance. PPL understands the control cell friction phenomena, and actions have been implemented to eliminate the susceptibility to fuel channel bow interference (i.e., no expected bow of a magnitude that would impact scram times). PPL intentionally delayed the submission of this TS change request until the channel friction corrective actions had been completed.
PPL has determined that the three "slow" control rods resulting from channel friction between 2003 and 2007 (inclusive) are not indicative of the current condition of the control cells in the SSES Units 1 and 2 cores, and current and future scram time performance is expected to be consistent with the performance observed prior to the occurrence of fuel channel bow induced control cell interference. The historical database therefore substantiates the highly reliable control rod scram time performance at SSES.
Each performance of TS SR 3.1.4.2 (every 120 days in Mode 1) requires 10 percent of the control rods to be tested. This currently results in five (on the current 24-month cycle) mid-cycle tests within an operating cycle. Therefore, half of the control rods are not tested during these mid-cycle tests, but are only tested after refueling during the initial cycle testing of each of the 185 control rods. As such, the historical test data shows that a substantial population of individual rods meets the scram time requirements with up to 24 months between tests and provides a basis to conclude that the more frequent testing does not provide any conditioning necessary for adequate performance of the control rod scram function. Future reliability of the SSES scram time performance is expected to remain,at the historically high levels as a result of implementing the proposed change to the mid-cycle periodic testing frequency. Therefore, an extension from 120 to 200 days in Mode 1, and the associated reduction in the number of rods tested mid-cycle, will not introduce an increased risk of having "slow" control rods.
6.0 COMMITMENTS As discussed in the CLIIP model SE published in the Federal Register on August 23, 2004 (69 FR 51864) for this TS improvement, PPL is making the following regulatory commitment with the understanding that the NRC will include it as a condition for issuance of the requested amendment:
PPL Susquehanna, LLC will incorporate the revised acceptance criterion value of 7.5 percent into the TS Bases for Susquehanna Steam Electric Station Unit 1 and Unit 2 in accordance with the Bases Control Program described in TS 5.5.10.
Attachment 1 to PLA-5604 Page 4 of 4 7.0 NO SIGNIFICANT HAZARDS DETERMINATION PPL has reviewed the proposed no significant hazards consideration determination published on August 23, 2004 (69 FR 51864) as part of the CLIIP. PPL has concluded that the proposed determination presented in the notice is applicable to SSES Units 1 and 2 and the evaluation is hereby incorporated by reference to satisfy the requirements of 10 CFR 50.91(a).
8.0 ENVIRONMENTAL EVALUATION PPL has reviewed the environmental evaluation included in the model SE published on August 23, 2004 (69 FR 51864) as part of the CLIIP. PPL has concluded that the staffs findings presented in that evaluation are applicable to SSES and the evaluation is hereby incorporated by reference for this application.
9.0 PRECEDENT This application is being made in accordance with the CLIIP. PPL is not proposing variations or deviations from the TS changes described in TSTF-460 or the NRC staff's model SE published on August 23, 2004 (69 FR 51864).
10.0 REFERENCES
Federal Register Notice: Notice of Availability of Model Application Concerning Technical Specifications Improvement Regarding Revision to the Control Rod Scram Time Testing Frequency in STS 3.1.4, "Control Rod Scram Times" for General Electric Boiling Water Reactors Using the Consolidated Line Item Improvement Process, published August 23, 2004 (69 FR 51864).
Attachment 2 to PLA-5604 Proposed Technical Specification Changes SSES Units 1 & 2 (Mark-up)
PPL Rev. 1-Control Rod Scram Times 3.1.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.1.4.2 Verify, for a representative sample, each tested 41-2-200 days cumulative control rod scram time is within the limits of operation in MODE 1 Table 3.1.4-1 with reactor steam dome pressure
Ž>800 psig.
SR 3.1.4.3 Verify each affected control rod scram time is Prior to declaring control rod within the limits of Table 3.1.4-1 with any reactor OPERABLE after work on steam dome pressure. control rod or CRD System that could affect scram time SR 3.1.4.4 Verify each affected control rod scram time is Prior to exceeding 40% RTP within the limits of Table 3.1.4-1 with reactor after fuel movement within steam dome pressure > 800 psig. the affected core cell AND Prior to exceeding 40% RTP after work on control rod or CRD System that could affect scram time SUSQUEHANNA - UNIT 1 .TS / 3.1-13 Amendment 1/8-,237
PPL Rev. 1-Control Rod Scram Times 3.1.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.1.4.2 Verify, for a representative sample, each tested 42-0-200 days cumulative control rod scram time is within the limits of operation in MODE 1 Table 3.1.4-1 with reactor steam dome pressure
> 800 psig.
SR 3.1.4.3 Verify each affected control rod scram time is Prior to declaring control rod within the limits of Table 3.1.4-1 with any reactor OPERABLE after work on steam dome pressure. control rod or CRD System that could affect scram time SR 3.1.4.4 Verify each affected control rod scram time is Prior to exceeding 40% RTP within the limits of Table 3.1.4-1 with reactor after fuel movement within steam dome pressure > 800 psig. the affected core cell AND Prior to exceeding 40% RTP after work on control rod or CRD System that could affect scram time SUSQUEHANNA - UNIT 2 ...
'- ': TS / 3.1-13 Amendment 41,*1,2414 1 to PLA-5604 Regulatory Commitment
The following table identifies those actions c6mmitted to by PPL Susquehanna, LLC in this document. Any other statements in this submittal are provided for information purposes and are not considered regulatory commitments.
REGULATORY COMMITMENT, Due Date/Event ,'.
PPL Susquehanna, LLC will incorporate the revised To be implemented in acceptance criterion value of 7.5 percent into the TS Bases conjunction with the for Susquehanna Steam Electric Station Unit 1 and Unit 2 implementation of the in accordance with the Bases Control Program described in approved Technical TS 5.5.10. Specification amendment.
Attachment 4 to PLA-5604 Technical Specification Bases (Mark-Up for Information)
PPL Rev. 3 Control Rod Scram Times B 3.1.4 BASES SURVEILLANCE SR 3.1.4.2 REQUIREMENTS (continued) Additional testing of a sample of control rods is required to verify the continued performance of the scram function during the cycle. A representative sample contains at least 10% of the control rods. The sample remains representative if no more than 2-07.5% of the control rods in the sample tested are determined to be "slow." With more than 207.5% of the sample declared to be "slow" per the criteria in Table 3.1.4-1, additional control rods are tested until this 207.5% criterion (e.g., 2G7.5% of the entire sample size) is satisfied, or until the total number of "slow" control rods (throughout the core, from all surveillances) exceeds the LCO limit. For planned testing, the control rods selected for the sample should be different for each test. Data from inadvertent scrams should be used whenever possible to avoid unnecessary testing at power, even if the control rods with data may have been previously tested in a sample. The 420-200 day Frequency is based on operating experience that has shown control rod scram times do not significantly change over an operating cycle. This Frequency is also reasonable based on the additional Surveillances done on the CRDs at more frequent intervals in accordance with LCO 3.1.3 and LCO 3.1.5, "Control Rod Scram Accumulators."
SR 3.1.4.3 When work that could affect the scram insertion time is performed on a control rod or the CRD System, testing must be done to demonstrate that each affected control rod retains adequate scram performance over the range of applicable reactor pressures from zero to the maximum permissible pressure. The scram testing must be performed once before declaring the control rod OPERABLE. The required scram time testing must demonstrate the affected control rod is still within acceptable limits.
The limits for reactor pressures < 800 psig are established based on a high probability of meeting the acceptance criteria at reactor pressures > 800 psig. Limits for >_800 psig are found in Table 3.1.4-1. If testing demonstrates the affected control rod does not meet these limits, but is within the 7-second limit of Table 3.1.4-1, Note 2, the control rod can be declared OPERABLE and "slow."
(continued)
SUSQUEHANNA - UNIT 1 T.IS / B 3.1-26 Revision 0
PPL Rev. 3 Control Rod Scram Times B 3.1.4 BASES SURVEILLANCE SR 3.1.4.2 REQUIREMENTS (continued) Additional testing of a sample of control rods is required to verify the continued performance of the scram function during the cycle. A representative sample contains at least 10% of the control rods. The sample remains representative if no more than 2-07.5% of the control rods in the sample tested are determined to be "slow." With more than 2-07.5% of the sample declared to be "slow" per the criteria in Table 3.1.4-1, additional control rods are tested until this 207.5% criterion (e.g., 207.5% of the entire sample size) is satisfied, or until the total number of "slow" control rods (throughout the core, from all surveillances) exceeds the LCO limit. For planned testing, the control rods selected for the sample should be different for each test. Data from inadvertent scrams should be used whenever possible to avoid unnecessary testing at power, even if the control rods with data may have been previously tested in a sample. The 12-0-200 day Frequency is based on operating experience that has shown control rod I
scram times do not significantly change over an operating cycle. This Frequency is also reasonable based on the additional Surveillances done on the CRDs at more frequent intervals in accordance with LCO 3.1.3 and LCO 3.1.5, "Control Rod Scram Accumulators."
SR 3.1.4.3 When work that could affect the scram insertion time is performed on a control rod or the CRD System, testing must be done to demonstrate that each affected control rod retains adequate scram performance over the range of applicable reactor pressures from zero to the maximum permissible pressure. The scram testing must be performed once before declaring the control rod OPERABLE. The required scram time testing must demonstrate the affected control rod is still within acceptable limits. The limits for reactor pressures < 800 psig are established based on a high probability of meeting the acceptance criteria at reactor pressures >_800 psig. Limits for >_800 psig are found in Table 3.1.4-1. If testing demonstrates the affected control rod does not meet these limits, but is within the 7-second limit of Table 3.1.4-1, Note 2, the control rod can be declared OPERABLE and "slow."
(continued)
SUSQUEHANNA - UNIT 2 TS / B 3.1-26 Revision 0 1