Category:Letter type:PLA
MONTHYEARPLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums PLA-8048, Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence2023-01-14014 January 2023 Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8038, Notification of Petition for Bankruptcy (PLA-8038)2022-12-14014 December 2022 Notification of Petition for Bankruptcy (PLA-8038) PLA-8036, Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-80362022-11-30030 November 2022 Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-8036 PLA-8035, Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-80352022-11-0808 November 2022 Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-8035 PLA-8031, Emergency Plan Revision 66 (PLA-8031)2022-11-0707 November 2022 Emergency Plan Revision 66 (PLA-8031) PLA-8032, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032)2022-10-28028 October 2022 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032) PLA-8026, Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026)2022-10-19019 October 2022 Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026) PLA-8015, Application for Order Approving Indirect Transfer of Control of Licenses2022-09-29029 September 2022 Application for Order Approving Indirect Transfer of Control of Licenses PLA-8030, Evacuation Time Estimate Report PLA-80302022-09-15015 September 2022 Evacuation Time Estimate Report PLA-8030 PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-8019, Nd Refueling Outage Owner'S Activity Report, PLA-80192022-07-13013 July 2022 Nd Refueling Outage Owner'S Activity Report, PLA-8019 PLA-8013, Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-80132022-06-27027 June 2022 Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-8013 PLA-8012, 10 CFR 50.46 Annual Report2022-06-10010 June 2022 10 CFR 50.46 Annual Report PLA-8005, Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005)2022-05-23023 May 2022 Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005) PLA-8001, Radiation Exposure Information and Reporting System - PLA-80012022-04-28028 April 2022 Radiation Exposure Information and Reporting System - PLA-8001 PLA-7987, Radioactive Effluent Release Report and Offsite Dose Calculation Manual - (PLA-7987)2022-04-26026 April 2022 Radioactive Effluent Release Report and Offsite Dose Calculation Manual - (PLA-7987) PLA-7986, 2021 Annual Environmental Operating Report (Nonradiological) Docket No. 50-387, PLA-79862022-04-26026 April 2022 2021 Annual Environmental Operating Report (Nonradiological) Docket No. 50-387, PLA-7986 PLA-7985, Annual Radiological Environmental Operating Report2022-04-22022 April 2022 Annual Radiological Environmental Operating Report PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) PLA-7995, Property Insurance Program (PLA-7995)2022-03-30030 March 2022 Property Insurance Program (PLA-7995) PLA-7998, Submittal of Unit 1 Cycle 23 Core Operating Limits Report and Reload Safety Analysis Report2022-03-29029 March 2022 Submittal of Unit 1 Cycle 23 Core Operating Limits Report and Reload Safety Analysis Report PLA-7991, Proof of Financial Protection and Guarantee of Payment of Deferred Premium2022-03-24024 March 2022 Proof of Financial Protection and Guarantee of Payment of Deferred Premium PLA-7984, Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 22022-03-0808 March 2022 Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 2024-01-04
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARPLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8015, Application for Order Approving Indirect Transfer of Control of Licenses2022-09-29029 September 2022 Application for Order Approving Indirect Transfer of Control of Licenses PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 PLA-7979, Supplement to License Amendment to Revise Reactor Steam Dome Pressure Low Instrumentation Function Allowable Value2021-12-16016 December 2021 Supplement to License Amendment to Revise Reactor Steam Dome Pressure Low Instrumentation Function Allowable Value PLA-7950, Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-7950)2021-10-0505 October 2021 Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-7950) PLA-7897, Proprosed Amendment to Licenses NPF-14 and NPF-22: License Amendment Request to Revise Technical Specification to Adopt Risk Informed Completion Times TSTF-505, Rev 2, Provide Risk Informed Extended Completion.2021-04-0808 April 2021 Proprosed Amendment to Licenses NPF-14 and NPF-22: License Amendment Request to Revise Technical Specification to Adopt Risk Informed Completion Times TSTF-505, Rev 2, Provide Risk Informed Extended Completion. ML20245E1922020-09-0101 September 2020 Talen Energy - Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements PLA-7880 PLA-7866, Electric Station Proposed Amendment Licenses NPF-14 and - NPF-22: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules PLA-78662020-06-25025 June 2020 Electric Station Proposed Amendment Licenses NPF-14 and - NPF-22: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules PLA-7866 PLA-7842, Proposed Amendment to Licenses NPF-14 and NPF-22: Revise Technical Specification 3.8.1 to Create a New Condition for an Inoperable Manual Synchronization Circuit PLA-72482020-05-26026 May 2020 Proposed Amendment to Licenses NPF-14 and NPF-22: Revise Technical Specification 3.8.1 to Create a New Condition for an Inoperable Manual Synchronization Circuit PLA-7248 PLA-7823, Proposed Amendment to Licenses NPF-014 and NPF-022: Revision to the Dose Consequence Analysis for a Loss of Coolant Accident2020-01-0202 January 2020 Proposed Amendment to Licenses NPF-014 and NPF-022: Revision to the Dose Consequence Analysis for a Loss of Coolant Accident PLA-7783, Proposed Amendment to Licenses: Application of Advanced Framatome Methodologies and TSTF-535 PLA-77832019-07-15015 July 2019 Proposed Amendment to Licenses: Application of Advanced Framatome Methodologies and TSTF-535 PLA-7783 PLA-7772, Application to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco.2019-03-28028 March 2019 Application to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco. PLA-7751, Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping2019-01-0909 January 2019 Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping PLA-7729, Technical Specifications Task Force Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2018-12-0404 December 2018 Technical Specifications Task Force Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. PLA-7605, Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A2017-05-17017 May 2017 Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A PLA-7528, Supplemental Information for License Amendment Request to Address Secondary Containment Access Openings2016-09-13013 September 2016 Supplemental Information for License Amendment Request to Address Secondary Containment Access Openings PLA-7486, Proposed Amendment Request to Address Secondary Containment Access Openings2016-07-27027 July 2016 Proposed Amendment Request to Address Secondary Containment Access Openings ML16181A4172016-06-29029 June 2016 Projected Income Statement and Calculation of Six-Month Fixed Costs (Redacted) ML16181A4152016-06-29029 June 2016 Request for Order Approving Indirect Transfer of Control - PLA-7500 ML16181A4192016-06-29029 June 2016 Capacity Factor Assumptions (Redacted) PLA-7441, Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-4252016-01-29029 January 2016 Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-425 PLA-7384, Proposed Amendment No. 292, Temporary Change to Allow Replacement on Unit 1 480 V Ess Load Center Transformers in Unit 2 Technical Specifications 3.8.7 and 3.7.12016-01-28028 January 2016 Proposed Amendment No. 292, Temporary Change to Allow Replacement on Unit 1 480 V Ess Load Center Transformers in Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-7378, Proposed Amendment No. 317 to License NPF-14 and Proposed Amendment No. 289 to License NPF-22: Supplement to Change Milestone 8 Date2015-08-28028 August 2015 Proposed Amendment No. 317 to License NPF-14 and Proposed Amendment No. 289 to License NPF-22: Supplement to Change Milestone 8 Date PLA-7360, Supplemental Information to License Amendment Request for Changes in RCS Pressure and Temperature (P/T) Limits2015-07-16016 July 2015 Supplemental Information to License Amendment Request for Changes in RCS Pressure and Temperature (P/T) Limits ML15091A6612015-03-19019 March 2015 Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme NEI 99-01, Susquehanna, Units 1 and 2 - Proposed License Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.2015-03-19019 March 2015 Susquehanna, Units 1 and 2 - Proposed License Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. NEI 99-01, Susquehanna, Units 1 and 2 - Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme2015-03-19019 March 2015 Susquehanna, Units 1 and 2 - Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme ML15091A6602015-03-19019 March 2015 Proposed License Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. PLA-7181, Submittal of Request for Amendment to the Technical Specification 3.4.10, RCS Pressure and Temperature (Pit) Limits.2014-08-11011 August 2014 Submittal of Request for Amendment to the Technical Specification 3.4.10, RCS Pressure and Temperature (Pit) Limits. ML14195A1132014-07-11011 July 2014 Enclosure to PLA-7191 Application for Order Approving Indirect Transfer of Control of Facility Operating License Nos. NPF-14 and NPF-22 and Conforming Amendments ML14042A1152014-01-29029 January 2014 License Amendment Request - Increase of the Allowable Gas Treatment System Maximum Flow Rates from Secondary Containment PLA-6977, Proposed Amendment No. 313 to License NPF-14 and Proposed Amendment No. 285 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.5.1.122013-06-0606 June 2013 Proposed Amendment No. 313 to License NPF-14 and Proposed Amendment No. 285 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.5.1.12 PLA-6915, Proposed Amendment No. 312 to Unit 1, and Proposed Amendment No. 284 to Unit 2 Low Pressure Safety Limit and Reference Changes2012-12-19019 December 2012 Proposed Amendment No. 312 to Unit 1, and Proposed Amendment No. 284 to Unit 2 Low Pressure Safety Limit and Reference Changes PLA-6825, Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage2012-09-18018 September 2012 Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage PLA-6817, Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1 4160 V Buses Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-68172012-03-0808 March 2012 Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1 4160 V Buses Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-6817 ML11152A0092011-07-21021 July 2011 Issuance of Amendment Approval of the PPL Susquehanna, LLC Cyber Security Plan PLA-6695, Amend. Request No. 308 to License NPF-14 & Amend. Request No. 279 to License NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-514, Rev. 3, Revise BWR Operability Requirements & Actions RCS Leakage Instrumentation2011-04-0808 April 2011 Amend. Request No. 308 to License NPF-14 & Amend. Request No. 279 to License NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-514, Rev. 3, Revise BWR Operability Requirements & Actions RCS Leakage Instrumentation PLA-6628, Proposed Amendment No. 306 to License NPF-14 & Proposed Amendment No. 277 to License NPF-22: Withdrawal & Resubmittal of Request for Approval of the Cyber Security Plan2010-07-22022 July 2010 Proposed Amendment No. 306 to License NPF-14 & Proposed Amendment No. 277 to License NPF-22: Withdrawal & Resubmittal of Request for Approval of the Cyber Security Plan PLA-6606, Submittal of NRC Notification of NPDES Permit Renewal Application2010-03-26026 March 2010 Submittal of NRC Notification of NPDES Permit Renewal Application PLA-6539, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information2009-07-10010 July 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information PLA-6520, Third Annual Amendment to the Application for Renewed Operating License Numbers NPF-14 and NPF-22 Pursuant to 10 CFR 54.21(b)2009-05-28028 May 2009 Third Annual Amendment to the Application for Renewed Operating License Numbers NPF-14 and NPF-22 Pursuant to 10 CFR 54.21(b) PLA-6509, Supplemental Electrical Information to License Amendment Request on the Technical Specifications2009-05-12012 May 2009 Supplemental Electrical Information to License Amendment Request on the Technical Specifications PLA-6505, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information2009-04-30030 April 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information PLA-6474, Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 262009-03-24024 March 2009 Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 PLA-6480, One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-64802009-03-24024 March 2009 One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-6480 PLA-6359, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (CLIIP) PLA-63592009-02-20020 February 2009 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (CLIIP) PLA-6359 2023-06-08
[Table view] Category:Technical Specification
MONTHYEARPLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 PLA-7892, Temporary Change to the Technical Specifications to Allow Replacement of Transformers 1X230 and 1X240 PLA-78922020-11-0505 November 2020 Temporary Change to the Technical Specifications to Allow Replacement of Transformers 1X230 and 1X240 PLA-7892 ML20129J9132020-04-23023 April 2020 Technical Specification Bases, Unit 1, Manual ML20036C9682020-01-29029 January 2020 Technical Specifications Bases, Manual ML20036C9732020-01-29029 January 2020 Technical Specification Bases, Manual ML19161A1372019-05-15015 May 2019 Technical Specification Bases Manual ML19078A1332019-03-0606 March 2019 Technical Requirements Manual ML19078A1342019-03-0606 March 2019 Technical Requirements Manual ML19078A2102019-03-0606 March 2019 Technical Specification Bases, Manual ML19078A2112019-03-0606 March 2019 Technical Specifications Bases, Manual PLA-7751, Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping2019-01-0909 January 2019 Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping ML19011A0572019-01-0707 January 2019 Technical Requirements Manual ML19011A0592019-01-0404 January 2019 Technical Specification Bases Manual ML19011A0582019-01-0404 January 2019 Technical Specifications Bases Manual ML18306A4882018-10-25025 October 2018 Revised Technical Specifications Manual ML18267A3792018-10-0303 October 2018 Correction to Technical Specification Page 3.6-37 for Error Introduced During the Issuance of Amendment Nos. 266 and 247 ML18201A1992018-07-11011 July 2018 Technical Specifications Bases, Manual ML18197A0782018-07-0909 July 2018 Revision 15 to Technical Specifications Bases Manual ML18128A2022018-04-25025 April 2018 Revision to Technical Specifications Bases Manual ML18128A2032018-04-25025 April 2018 Revision to Technical Specification Bases, Manual ML18072A1002018-02-28028 February 2018 Revision 11 to Technical Specifications Bases Manual ML18072A0992018-02-28028 February 2018 Technical Specification Bases Manual ML18033A3312018-01-24024 January 2018 Technical Specification Bases Manual ML18033A3342018-01-24024 January 2018 Technical Specifications Bases Manual PLA-7644, Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644)2017-12-14014 December 2017 Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644) ML17284A1772017-10-0202 October 2017 Technical Specification Bases Manual ML17265A4432017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 3 of 3) ML17265A4412017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 2 of 3) ML17270A0632017-09-18018 September 2017 Technical Specifications Bases, Manual ML17164A1772017-06-0101 June 2017 Revision to Technical Specifications Bases Manual ML17118A0762017-04-20020 April 2017 Revisions to Technical Specifications Bases Unit 2 Manual ML17118A0752017-04-20020 April 2017 Revision to Technical Specification Bases Manual PLA-7444, Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To...2017-02-0101 February 2017 Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To... ML16334A2652016-11-17017 November 2016 Technical Specification Bases Manual ML16110A3162016-04-14014 April 2016 Technical Specification Bases Manual ML16040A2032016-02-0303 February 2016 Technical Specification Bases Manual ML15329A1662015-11-11011 November 2015 Technical Requirements Manual ML15329A1652015-11-11011 November 2015 Technical Requirements Manual ML15317A0102015-11-0505 November 2015 Technical Specifications Bases Manual ML15317A0092015-11-0505 November 2015 Technical Specifications Bases Manual ML15077A4562015-03-0606 March 2015 Technical Requirements Manual ML15034A3102015-01-23023 January 2015 Technical Specification Bases Unit 1 Manual ML15034A3112015-01-23023 January 2015 Technical Specifications Bases, Unit 2 Manual PLA-7181, Submittal of Request for Amendment to the Technical Specification 3.4.10, RCS Pressure and Temperature (Pit) Limits.2014-08-11011 August 2014 Submittal of Request for Amendment to the Technical Specification 3.4.10, RCS Pressure and Temperature (Pit) Limits. ML14205A0132014-07-17017 July 2014 Technical Specification Bases, Manual, Revisions ML14196A0412014-07-0303 July 2014 Technical Specifications Bases, Manual 2023-11-02
[Table view] Category:Amendment
MONTHYEARPLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) ML18267A3792018-10-0303 October 2018 Correction to Technical Specification Page 3.6-37 for Error Introduced During the Issuance of Amendment Nos. 266 and 247 PLA-7644, Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644)2017-12-14014 December 2017 Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644) ML17265A4412017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 2 of 3) ML17265A4432017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 3 of 3) PLA-7444, Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To...2017-02-0101 February 2017 Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To... ML12242A2442012-08-14014 August 2012 Technical Specifications Bases Unit 2 Manual PLA-6539, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information2009-07-10010 July 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information PLA-6509, Supplemental Electrical Information to License Amendment Request on the Technical Specifications2009-05-12012 May 2009 Supplemental Electrical Information to License Amendment Request on the Technical Specifications PLA-6505, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information2009-04-30030 April 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information PLA-6235, Emergency Core Cooling System Instrumentation - Technical Specification (TS) Table 3.3.5.1+1 and Editorial Change to TS 3.10.8.f2009-03-24024 March 2009 Emergency Core Cooling System Instrumentation - Technical Specification (TS) Table 3.3.5.1+1 and Editorial Change to TS 3.10.8.f PLA-6480, One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-64802009-03-24024 March 2009 One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-6480 PLA-6474, Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 262009-03-24024 March 2009 Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 PLA-6359, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (CLIIP) PLA-63592009-02-20020 February 2009 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (CLIIP) PLA-6359 PLA-5604, Proposed Amendment No. 253 to License NPF-14 and Proposed Amendment No. 218 to License NPF-22: Request for Adoption of TSTF-460-A, Rev. 0, Control Rod Scram Time Test Frequency Using the CLIIP2008-07-0707 July 2008 Proposed Amendment No. 253 to License NPF-14 and Proposed Amendment No. 218 to License NPF-22: Request for Adoption of TSTF-460-A, Rev. 0, Control Rod Scram Time Test Frequency Using the CLIIP PLA-6304, Proposed Amendment No. 298 to Unit 1 License NPF-14 and Amendment No. 268 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specification 3.8.42008-03-28028 March 2008 Proposed Amendment No. 298 to Unit 1 License NPF-14 and Amendment No. 268 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specification 3.8.4 PLA-6306, Proposed License Amendments 285 and 253 - Constant Pressure Power Uprate Application - Supplement2007-11-30030 November 2007 Proposed License Amendments 285 and 253 - Constant Pressure Power Uprate Application - Supplement PLA-6266, Proposed License Amendment No. 285 for Unit 1, License No. NPF-14 & Proposed License Amendment No. 253 for Unit 2, License No. NPF-22, Extended Power Uprate Application Regarding Change to Technical Specification SR 3.7.1 - RHRSW and UHS2007-08-28028 August 2007 Proposed License Amendment No. 285 for Unit 1, License No. NPF-14 & Proposed License Amendment No. 253 for Unit 2, License No. NPF-22, Extended Power Uprate Application Regarding Change to Technical Specification SR 3.7.1 - RHRSW and UHS PLA-6172, Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-61722007-03-22022 March 2007 Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-6172 PLA-6114, Proposed Amendment Nos. 281 and 251 to Licenses NPF-22 and NPF-22, Application for License Amendment and Related Technical Specification Changes to Implement Full-Scope Alternative Source Term in Accordance with 10 CFR 50.67...2006-09-15015 September 2006 Proposed Amendment Nos. 281 and 251 to Licenses NPF-22 and NPF-22, Application for License Amendment and Related Technical Specification Changes to Implement Full-Scope Alternative Source Term in Accordance with 10 CFR 50.67... ML0619100912006-07-0707 July 2006 Technical Specifications Pages Re 3.0 Limiting Condition for Operation (LCO) Applicability PLA-6049, Proposed License Amendment Nos. 289 and 257, Standby Liquid Control System2006-04-28028 April 2006 Proposed License Amendment Nos. 289 and 257, Standby Liquid Control System ML0609603342006-03-31031 March 2006 Susquehanna - Proposed License Amendment Numbers 285 for Unit 1 and 253 for Unit 2, Constant Pressure Power Uprate, PLA-6002 ML0609004652006-03-30030 March 2006 Technical Specification 3.4.10 RCS Pressure and Temperature (P/T) Limits, October 5, 2005 ML0608007312006-03-20020 March 2006 Tech Spec for Susquehanna, Unit 1 - Issuance of Amendment Regarding Minimum Critical Power Ratio Safety Limit and Reference Changes ML0603306392006-02-0202 February 2006 Tech Spec Susquehanna Steam Electric Station, Unites 1 and 2 - Issuance of Amendment Revision to Specification Surveillance Requirement 3.6.4.1.4 and 3.6.4.1.5, Secondary Containment and Draw Down Testing PLA-5993, Proposed Amendment No. 284 to License NPF-14 & Proposed Amendment No. 252 to License NPF-22 to Revise Technical Specification 3.1.4, Control Rod Scram Times.2006-02-0101 February 2006 Proposed Amendment No. 284 to License NPF-14 & Proposed Amendment No. 252 to License NPF-22 to Revise Technical Specification 3.1.4, Control Rod Scram Times. ML0531803282005-11-10010 November 2005 Technical Specification Page Regarding Minimum Critical Power Ratio Safety Limit PLA-5967, Proposed Amendment No. 282 to Facility Operating License NPF-14: Proposed Change to Technical Specification 2.1.1.2 MCPR Safety Limit2005-10-14014 October 2005 Proposed Amendment No. 282 to Facility Operating License NPF-14: Proposed Change to Technical Specification 2.1.1.2 MCPR Safety Limit PLA-5888, Proposed Amendment Nos. 274 and 243 to License Nos. NPF-14 and NPF-22, Application for Technical Specification Improvement to Revise Technical Specifications to Eliminate Requirements for Monthly Operating Reports.2005-10-0505 October 2005 Proposed Amendment Nos. 274 and 243 to License Nos. NPF-14 and NPF-22, Application for Technical Specification Improvement to Revise Technical Specifications to Eliminate Requirements for Monthly Operating Reports. ML0521700382005-08-0404 August 2005 Technical Specification Pages Re Containment Purge Value Leak Rate Test Frequency PLA-5880, Proposed License Amendment Numbers 272 for Unit 1 Operating License No. NTF-14 and 241 for Unit 2 Operating License No. NPF-22, Power Range Neutron Monitor System Digital Upgrade PLA-58802005-06-27027 June 2005 Proposed License Amendment Numbers 272 for Unit 1 Operating License No. NTF-14 and 241 for Unit 2 Operating License No. NPF-22, Power Range Neutron Monitor System Digital Upgrade PLA-5880 PLA-5891, Proposed Amendment No. 275 to Unit 1 Facility Operating License NPF-14 and Proposed Amendment No. 244 to Unit 2 Facility Operating License NPF-22: Exigent Change to Technical Specification 3.8.4, PLA-58912005-04-27027 April 2005 Proposed Amendment No. 275 to Unit 1 Facility Operating License NPF-14 and Proposed Amendment No. 244 to Unit 2 Facility Operating License NPF-22: Exigent Change to Technical Specification 3.8.4, PLA-5891 ML0509000432005-03-29029 March 2005 Technical Specification Pages Re ADS-LPCI Discharge Pressure PLA-5869, Proposed Amendment No. 240 to License No. NPF-22 Regarding Revision to Technical Specifications 3.3.8.1 and 3.8.72005-03-18018 March 2005 Proposed Amendment No. 240 to License No. NPF-22 Regarding Revision to Technical Specifications 3.3.8.1 and 3.8.7 PLA-5850, Proposed Amendment No. 238 to Unit 2 License NFP-22: Editorial Change to Technical Specification Table 3.3.5.1-1 PLA-58502005-01-28028 January 2005 Proposed Amendment No. 238 to Unit 2 License NFP-22: Editorial Change to Technical Specification Table 3.3.5.1-1 PLA-5850 PLA-5840, Proposed Amendment: Revision to Technical Specification 5.5.6., PLA-58402005-01-28028 January 2005 Proposed Amendment: Revision to Technical Specification 5.5.6., PLA-5840 PLA-5825, Proposed Amendment No. 269 to Unit 1 License NPF-14 and Amendment No. 236 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specifications Rewrite PLA-58252004-11-0909 November 2004 Proposed Amendment No. 269 to Unit 1 License NPF-14 and Amendment No. 236 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specifications Rewrite PLA-5825 PLA-5764, Proposed License Amendment Numbers 267 for Unit 1 and 232 for Unit 2 Mode Change Limitations Using the Consolidated Line Item Improvement (CLIIP) Process PLA-57642004-09-22022 September 2004 Proposed License Amendment Numbers 267 for Unit 1 and 232 for Unit 2 Mode Change Limitations Using the Consolidated Line Item Improvement (CLIIP) Process PLA-5764 PLA-5811, Proposed Amendment No. 235 to License NFP-22: Changes to Reactor Pressure Vessel Pressure-temperature (P-T) Limits PLA-58112004-09-22022 September 2004 Proposed Amendment No. 235 to License NFP-22: Changes to Reactor Pressure Vessel Pressure-temperature (P-T) Limits PLA-5811 PLA-5755, Proposed Amendment No. 265 to License NPF-14 & Proposed Amendment No. 230 to License NPF-22: Application for Technical Specification Improvement to Revise Technical Specification 3.1.8 Scram Discharge Volume.2004-09-0808 September 2004 Proposed Amendment No. 265 to License NPF-14 & Proposed Amendment No. 230 to License NPF-22: Application for Technical Specification Improvement to Revise Technical Specification 3.1.8 Scram Discharge Volume. PLA-5785, Table of Contents Revisions Proposed Amendment No. 259 and Proposed Amendment No. 224 Revised Response to GL 94-02: Long-Term Stability Solution PLA-57852004-07-15015 July 2004 Table of Contents Revisions Proposed Amendment No. 259 and Proposed Amendment No. 224 Revised Response to GL 94-02: Long-Term Stability Solution PLA-5785 PLA-5739, Proposed Amendment Nos. 264 and 229, Respectively Regarding Resolution of URI 2001-04-03 Standby Liquid Control/Atws2004-05-11011 May 2004 Proposed Amendment Nos. 264 and 229, Respectively Regarding Resolution of URI 2001-04-03 Standby Liquid Control/Atws PLA-5726, Proposed License Amendment Regarding Secondary Containment Access Doors Surveillance Requirements 3.6.4.1.32004-03-0505 March 2004 Proposed License Amendment Regarding Secondary Containment Access Doors Surveillance Requirements 3.6.4.1.3 PLA-5722, Proposed License Amendments Regarding ADS-LPCI Discharge Pressure, TS 3.3.5.1-1, Function 4.f and 5.f2004-03-0404 March 2004 Proposed License Amendments Regarding ADS-LPCI Discharge Pressure, TS 3.3.5.1-1, Function 4.f and 5.f PLA-5686, Proposed Amendment No. 259 to License NPF-14, and Proposed Amendment No. 224 to License NPF-22, Revised Response to Gl 94-02: Long-term Stability Solution2003-12-22022 December 2003 Proposed Amendment No. 259 to License NPF-14, and Proposed Amendment No. 224 to License NPF-22, Revised Response to Gl 94-02: Long-term Stability Solution PLA-5694, Proposed Amendment Regarding Revised Main Turbine Bypass System Requirements2003-12-0505 December 2003 Proposed Amendment Regarding Revised Main Turbine Bypass System Requirements ML0330904032003-10-29029 October 2003 Tech Spec Pages for Amendments 215 & 190 Revised Response to Generic Letter 94-02 Long-Term Stability Solution 2023-11-02
[Table view] |
Text
Bryce L Shrtver PPL Susquehanna, LLC ' I j Senior Vice President and 769 Salem Boulevard ' & a I Chief Nuclear Officer Berivck, PA 18603 Tel. 570.542.3120 Fax 570.542.1504 * -
- blshriver pplweb.com m TM MAY I 1 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OPI-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NO. 264 TO LICENSE NFP-14 AND PROPOSED AMENDMENT NO. 229 TO LICENSE NFP-22:
RESOLUTION OF URI 2001-04-03 STANDBY LIQUID CONTROL /ATWS Docket Nos. 50-387 PLA-5739 and 50-388
References:
- 1) Response to Task Interface Agreement - TIA 2001-12 Regarding SusquehannaSteam Electric Station (SSES), Units I and 2, Design and Licensing Basesfor the Standby Liquid Control System (TAC NOS. MB2764 and MB2844), dated May 6, 2002.
Pursuant to 10 CFR 50.90, PPL Susquehanna, LLC (PPL), proposes to amend the Susquehanna Steam Electric Station Units 1 and 2 (SSES) Technical Specifications (TS).
The proposed change would revise the Standby Liquid Control (SLC) pump discharge pressure surveillance (SR 3.1.7.7) acceptance criteria from 1224 psig to 1395 psig in the SSES TS 3.1.7, "Standby Liquid Control (SLC) System."
This change to the SLC pump discharge pressure surveillance is necessary to resolve the conclusion in NRR's response to the Task Interface Agreement - TIA 2001-12 (Reference 1), that the current TS 3.1.7 requires the SLC system to be capable of meeting the Anticipated Transient Without Scram (ATWS) rule functional requirements to be considered operable.
The need for this amendment request has been discussed with the SSES NRC Project Manager.
- od
Document Control Desk PLA-5739 These proposed changes have been approved by the SSES Plant Operations Review Committee and reviewed by the Susquehanna Review Committee. In accordance with 10 CFR 50.91 (b)(1), PPL is sending a copy of this letter to the Pennsylvania Department of Environmental Protection.
If you have any questions, please contact Mr. Duane L. Filchner at (610)774-7819.
I declare under penalty of perjury that the foregoing is true and correct.
Sincerely, Executed on: 05hb*]0 BSL.VS in aer Sr. Vice-President and Chief Nuclear Officer
Enclosure:
PPL Evaluation of the Proposed Change Attachments:
Enclosure - PPL Evaluation of the Proposed Change Attachment A - Proposed Technical Specification Change for Surveillance Requirement SR 3.1.7.7 (Markup)
Attachment B - Proposed Technical Specification Change for Surveillance Requirement SR 3.1.7.7 (Camera Ready)
Attachment C - Information Only- Technical Specification Bases Changes for Section 3.1.7.7 Attachment D - List of Regulatory Commitments Attachment E - Standby Liquid Control System Licensing Basis and Design Evolution copy: NRC Region I Mr. S. L. Hansell, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Project Manager Mr. R. Janati, DEPIBRP
Enclosure to PLA - 5739 PPL Evaluation of the Proposed Change
1.0 DESCRIPTION
2.0 PROPOSED CHANGE
3.0 BACKGROUND
4.0 TECHNICAL ANALYSIS
5.0 REGULATORY ANALYSIS
5.1 No Significant Hazards Consideration 5.2 Applicable Regulatory Requirements/Criteria
6.0 ENVIRONMENTAL CONSIDERATION
S
7.0 REFERENCES
Enclosure to PLA-5739 Enclosure to PLA-5739 Page 1 of 10 PPL EVALUATION
1.0 DESCRIPTION
This is a request to amend Operating Licenses NPF-14 and NPF-22 for PPL Susquehanna, LLC (PPL), Susquehanna Steam Electric Station (SSES) Units 1 and 2. It represents a proposed revision to the SSES Technical Specification (TS) 3.1.7, "Standby Liquid Control (SLC) System" which changes the SLC pump discharge pressure currently specified in Surveillance Requirement (SR) 3.1.7.7.
2.0 PROPOSED CHANGE
PPL proposes a change to the SLC pump discharge pressure specified in the Susquehanna TS SR 3.1.7.7 to the following:
Verify each pump develops a flow rate 241.2 gpin at a discharge pressure Ž1395psig.
This change in pump discharge pressure establishes the functional requirements for assessing SLC pump operability under ATWS conditions in the SSES TS's.
The SSES TS Bases Section SR 3.1.7.7 is also revised to reflect the new SLC pump discharge pressure and to provide clarification regarding compliance with the ATWS Rule 10 CFR 50.62.
3.0 BACKGROUND
Issue Identification and Current Status During NRC Inspection 2001-004, NRC identified a concern (documented as an unresolved item number URI 05000387; 05000388/2001-004-03) with how PPL addresses the ATWS requirements in the design and licensing basis of SSES Units 1 and 2. As a result, NRC Region I issued Task Interface Agreement (TIA) 2001-12 on 8/30/01 to NRR to request technical assistance to evaluate the concern. NRR provided a response to the TIA on May 6, 2002 (Reference 1).
Enclosure to PLA-5739 Page 2 of 10 The response from NRR concluded that PPL must consider:
- 1. The ATWS rule functional requirements as part of the SSES Standby Liquid Control (SLC) system design bases.
- 2. The ATWS rule functional requirements for assessing SLC system operability.
This proposed change to SSES TS SR 3.1.7.7 resolves the SLC system operability concerns raised by the NRR response to the TIA. It provides a pump discharge pressure that is based on the maximum calculated ATWS pressure (which occurs with a loss of AC power). As such, the SSES SLC system operability will be based on successful completion of SR 3.1.7.7, along with the requirement to have 2 SLC subsystems operable and sodium pentaborate concentration greater than or equal to 13.6 weight percent.
PPL responded to TIA Item 1 by clarifying in the FSAR that the ATWS rule functional requirements are part of the SSES SLC system design basis.
PPL originally responded to TIA Item 2 by proposing changes to the TS bases for Section 3.1.7, in a letter to the NRC (Reference 2, dated 11/08/2002). This bases change provided clarification of the SLC system operability requirements by stating that they are based on original SLC design, not the ATWS rule. It was later determined, by the NRC, (Reference 3) that this bases change would not resolve the NRC concern and that functional capability of the SLC system to meet the ATWS requirements was necessary to demonstrate operability.
On November 26, 2003, NRC notified PPL (Reference 3), that the changes proposed by Reference 2 were not sufficient to resolve the concern.
Examination of the TIA response identifies that:
"Whether the SLC system capability to meet the ATWS rule requirements is a part of the SLC system's design basis, however, is not necessarily related to SLC system operability requirements. The standard technical specifications (STS), NUREG-1433, Specification 3.1.7 does not require meeting 10 CFR 50.62 functional requirements to meet LCO 3.1.7." (This appears to be a generic statement.)
However, the TIA continues by stating (specific to SSES):
"...in its application dated August 1, 1996, to adopt the improved TSs (ITS), which were based on the STS, the SSES Units 1 and 2 licensee proposed a deviation from STS 3.1.7, in that it modified STS LCO 3.1.7 Condition A, associated SR, and Bases to establish requirements for meeting 10 CFR 50.62 into the [SSES Units 1 and 2] ITS."
Enclosure to PLA-5739 Page 3 of 10 Therefore, the NRC has concluded (in the TIA response) that:
"...the Susquehanna current TS do require the capability to meet the ATWS rule functional requirements; that is meeting ATWS rule functional requirements is one of the SLC system's "specified safety functions," for current TS 3.1.7.
To resolve this Susquehanna specific issue, the SSES Units 1 and 2 TS SR 3.1.7.7 are proposed to be changed such that SLC system operability will be based on the operability of 2 SLC subsystems (current requirement), the concentration of sodium pentaborate (current requirement), and the capability of the SLC pumps to deliver sodium pentaborate at a 41.2 gpm flowrate at a discharge pressure of 1395 psig (the discharge pressure value is the new proposed requirement), which corresponds to the maximum calculated ATWS pressure.
Conclusion:
Licensing agreements (discussed in Attachment E) made during the time the ATWS rule was being implemented at SSES did not require ATWS rule SLC functional requirements to be addressed in the SSES SLC system TS's. These functional requirements were not addressed atfthe time of rule implementation because (1) the SLC system is a backup to a highly reliable safety system, (2) additional levels of defense are provided by backup scram valves and the ARI system, and (3) the incremental change in risk resulting from a change to the TS is very small.
Although SSES has been in compliance with the ATWS rule requirements, it is recognized that a conflict exists between the historical licensing basis and the NRR response to the TIA. Accordingly, this conflict is resolved by the proposed revision to the SLC TS Surveillance 3.1.7.7. This change has no impact on any aspect of current plant operation.
4.0 TECHNICAL ANALYSIS
4.1 Basis for the Proposed Change:
The proposed change in SLC pump discharge pressure from 1224 psig to 1395 psig is derived from: an RPV Dome Pressure of 1195 psig, which corresponds to the lowest main steam safety relief valve spring setpoint; an RPV Static head of 8 psig; a Core Delta-P of 6 psid; and two pump SLC System friction losses of 186 psig.
Enclosure to PLA-5739 Page 4 of 10 The SLC system friction losses were determined by a test that measured actual system line losses during two pump operation (82.4 gpm). The SSES worst case ATWS Analysis assumes two pump operation, therefore it is appropriate to use these friction losses to calculate the maximum injection pressure required for compliance with the ATWS Rule (10 CFR 50.62). Since these friction losses are used to establish the discharge pressure requirements and they are greater than they would be for one pump operation, they are acceptable and conservative to establish the 1395 psig test pressure in the surveillance.
4.2 Acceptability of the Change:
This change to SR 3.1.7.7 only impacts the current plant surveillance procedure by making the acceptance criteria for the SR the same as the current In Service Testing (IST) program acceptance criteria. Although the present TS value for acceptable pump discharge pressure is 2 1224 psig, the acceptance criteria (for TS Section 5.5.6 IST program requirements) in the quarterly SLC flow surveillance is 2 1395 psig. Therefore, the pumps are already being tested to demonstrate capability of producing the required flow (41.2 gpm each) at a pump discharge pressure representing maximum ATWS pressure conditions, i.e. 1395 psig.
Modifications to the SLC system were implemented to compensate for this higher pressure. The modifications, which were intended to preserve margin, increased the SLC pump discharge piping design pressure and pump discharge PSV setpoint to 1500 psi. Thus, a 105 psi'margin exists between the maximum required pump discharge pressure and the PSV setpoint. This 105 psi margin is greater than the original GE design requirement of 75 psig.
A review of the 2003 and 2004 Quarterly Surveillance test data for both Units 1 and 2 identified that the pumps met the acceptance criteria for discharge pressure
> 1395 psig and flow > 41.2 gpm in all surveillances performed.
4.3 Impact of the Change on Plant Operations:
This proposed change to SR 3.1.7.7 does not have any affect on current plant operations. As stated above, the IST program test requires each SLC pump to demonstrate capability to develop pressure sufficient to meet the injection requirements for ATWS. However, if the pump discharge pressure does not meet the new SR limit of 1395 psig, the pump would be declared inoperable and a 7 day LCO Action would be entered to correct the condition.
No special communication or training is required for Operations to implement this TS change.
Enclosure to PLA-5739 Page 5 of 10 4.4 Impact of the Change on Work Management:
This proposed change to SR 3.1.7.7 does not have any affect on the performance of any work or testing on the S.LC system. TS 3.1.7 LCO Conditions, Required Actions, and Completion Times are unaffected by this change. Previous concerns about SLC component ratings and relief valve settings at ATWS pressures have been resolved through completed modifications, therefore, the SLC system is capable of injecting boron into the RPV during an ATWS event. These changes do not create the need to revise any current work plans or the management of any other work on the SLC system 4.5 Acceptability of One Pump to Determine Operability:
The LCO statement for the SLC system requires two pumps to be operable, yet two pumps are not required to be tested together to demonstrate operability.
Under the current SR 3.1.7.7, each pump is tested individually and determined to be operable provided it produces 41.2 gpm at pump discharge pressure 2 1224 psig. Under the proposed TS change, each pump would be tested individually (as it currently is tested) and SLC system operability would be based on meeting 41.2 gpm at pump discharge pressure 2 1395 psig.
The acceptability of testing only one pump at a time is based on the following:
- The pumps are of the piston positive displacement design, which provides a constant flowrate. During the test the discharge test line is throttled to provide the backpressure expected during two pump operation. Although only one pump is tested at a time, the test conditions adequately simulate two pump operation.
- The practice of testing one pump at a time is inherently accepted in NUREG-1433 (Improved Tech Specs), since the current SLC flow SR specifies only a single pump flow rate.
Based on a review of other BWR Tech Specs, functional capability of the SLC system is determined by demonstrating single pump operation at a specified flow rate and pump discharge pressure. Grand Gulf I made a TS change in 1987 that included increasing the SLC pump discharge pressure for surveillance tests in order to demonstrate adequate SLC pump flow under ATWS conditions. By using the Grand Gulf 1 submittal as a precedent, this revision to SR 3.1.7.7 provides the assurance that the SLC system is capable of meeting the ATWS rule requirements.
Enclosure to PLA-5739 Page 6 of 10 4.6 Acceptability of the 7 day LCO for One Pump Inoperable Susquehanna TS 3.1.7 has a 7 day Completion Time specified for the Condition of one SLC pump inoperable. No change is proposed to this completion time. This is consistent with other BWR TS reviewed as discussed above.
5.0 REGULATORY SAFETY ANALYSIS 5.1 No Significant Hazards Consideration The Commission has provided standards in 10 CFR 50.92(c) for determining whether a significant hazards consideration exists. A proposed amendment to an operating license for a facility involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety.
PPL proposes to revise the Susquehanna Unit 1 and Unit 2 Technical Specification SR 3.1.7.7 for Limiting Condition of Operation (LCO) 3.1.7. These changes are based on 10 CFR 50.62 (ATWS Rule) requirements which are more stringent than the current Standby Liquid Control System (SLCS) Technical Specification operability requirements.
In accordance with the criteria set forth in 10 CFR 50.92, PPL has evaluated the proposed TS change and determined it does not represent a significant hazards consideration. The following is provided in support of this conclusion.
- 1. Does the proposed change involve a significant increase in the probability of occurrence or consequences of an accident previously evaluated?
No. The proposed change establishes the operability requirements for the SLC subsystem based on its functional capability to operate during an ATWS event. This proposed change to the surveillance for SLC pump discharge pressure does not affect the operation of any other SSES SSC's.
The SLC system is already being tested on a quarterly basis to the proposed new pump discharge pressure to demonstrate that the In Service Inspection Program requirements are met.
Enclosure to PLA-5739 Page 7 of 10 Consequently, the proposed change has no effect on the probability of any accident previously evaluated. Further, the consequences of any accident previously evaluated are not affected. Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
No. The proposed change to the surveillance for SLC pump discharge pressure does not involve any physical alteration of the plant (no new or different type of equipment is installed) or changes in methods governing normal plant operation. Since this change does not introduce any new accident initiators, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
No. The proposed change to the surveillance for SLC pump discharge pressure does not involve any physical alteration of the plant (no new or different type of equipment is installed) or changes in methods governing normal plant operation. The proposed change only affects determination of SLC system Technical Specification operability based on the functional capability of the SLC subsytems to inject boron during an ATWS event.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
5.2 Applicable Regulatory Requirements/Criteria The proposed revision to Technical Specification (TS) Surveillance Requirement (SR) 3.1.7.7 is in accordance with the requirements of 10 CFR 50.62. Revising the pump discharge pressure in the SLC system Surveillance SR 3.1.7.7 provides additional assurance that this system (which is a backup to other safety - related systems) is capable of safely shutting down the reactor should an ATWS event occur.
6.0 ENVIRONMENTAL CONSIDERATION
S 10 CFR 51.22(c)(9) identifies certain licensing and regulatory actions, which are eligible for categorical exclusion from the requirement to perform an environmental assessment. A proposed amendment to an operating license for a facility does not require an environmental
Enclosure to PLA-5739 Page 8 of 10 assessment if operation of the facility in accordance with the proposed amendment would not (1) involve a significant hazards consideration; (2) result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite; or (3) result in a significant increase in individual or cumulative occupational radiation exposure. PPL has evaluated the proposed change and has determined that the proposed change meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Accordingly, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with issuance of the amendment. This determination, using the above criteria, is:
- 1. As demonstrated in the No Significant Hazards Consideration Evaluation, the proposed amendment does not involve a significant hazards consideration.
- 2. There is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite. The proposed change does not involve any physical alteration of the plant (no new or different type of equipment will be installed) or change in methods governing normal plant operation.
7.0 REFERENCES
- 1. Response to Task Interface Agreement - TIA 2001-12 Regarding Susquehanna Steam Electric Station (SSES), Units 1 and 2, Design and Licensing Bases for the Standby Liquid Control System (TAC NOS. MB2764 and MB2844)
- 2. PLA-5538, R. L. Anderson (PPL) to USNRC, "Susquehanna Steam Electric Station Proposed Change to the SSES Unit 1 and Unit 2 Technical Specification Bases LCO 3.1.7," dated November 8,2002.
- 3. Letter, R. V. Guzman (USNRC) to B. L. Shriver (PPL),
"Susquehanna Steam Electric Station, Units 1 and 2 - Changes to Technical Specification Bases Pages (TAC NOS. MB6748 and MB6749)," dated November 26, 2003.
Attachment A to PLA-5739 Proposed Technical Specification Changes (Markups)
Surveillance Requirement (SR) 3.1.7.7 (Units -1 & 2)
AWeL 10. O SLC System 3..1.7 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.1.7.6 Verify each SLC subsystem manual and power 31 days operated valve inthe flow path that is not locked, sealed, or otherwise secured in position is inthe correct position. or can be aligned to the-correct position.
SR 3.1.7.7 Verify each pump develops a flow rate In accordance gpm at a discharge pressure with the
- /4~)psig. Inservice Testing Program SR 3.1.7;8 Verify flow through one SLC subsystem pump 24 months on a into reactor pressure vessel. STAGGERED TEST' BASIS SR 3.1;7.9 Verify. all heat traced piping between 24 months storage tank and pump suction is unblocked.
AND Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after solution temperature is restored within the limits of Figure 3.1.7-2 SUSQUEHANNA - UNIT 1 'FS; / 3.1.22 .Amendment -170
. P9L i&.O M
' . SLC System 3.1.7 SURVEILLANCEYREQUIREMENTS (continued)
SURVEILLANCE. FREQUENCY SR 3.1.7.6 Verify each SLC subsystem manual and power 31 days operated valve in the flow path that is not locked, sealed, or otherwise secured in Position is inthe correct position, or can be aligned to the correct position.
SR *3.1.7.7 Verify each pump develops a flow rate In accordance gpm at a discharge pressure with the.
2 4)psig. Inservice Testing-
- Program SR 3.1.7.8 Verify flow through 'one SLC subsystem pump 24 months'on a into reactor pressure vessel. STAGGERED TEST BASIS SR 3.1.7.9 Verify.all heat traced piping'between 24 months storage tank and pump suction is unblocked.
AND Once within' 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />' after solution temperature is restored within the limits of Figure 3.1.7-2 SUSQUEHANNA - UNIT 2 TS5 / 3.1:-22 Amendment 461-
Attachment B to PLA-5739 Proposed Technical Specification Changes (Camera Ready)
Surveillance Requirement (SR) 3.1.7.7 (Units 1 & 2)
PPL Rev. 0 SLC SYSTEM 3.1.7 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.1.7.6 Verify each SLC subsystem manual and power 31 days operated valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position, or can be aligned to the correct position.
SR 3.1.7.7 Verify each pump develops a flow rate 241.2 gpm In accordance with the at a discharge pressure > 1395 psig. Inservice Testing Program I SR 3.1.7.8 Verify flow through one SLC subsystem pump into 24 months on a reactor pressure vessel. STAGGERED TEST BASIS SR 3.1.7.9 Verify all heat traced piping between storage tank 24 months and pump suction is unblocked.
AND Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after solution temperature is restored within the limits of Figure 3.1.7-2 SUSQUEHANNA- UNIT 1 TS / 3.1-22 Amendment 17>
PPL Rev. 0 SLC System 3.1.7 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.1.7.6 Verify each SLC subsystem manual and power 31 days operated valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position, or can be aligned to the correct position.
SR 3.1.7.7 Verify each pump develops a flow rate 2 41.2 gpm In accordance with the at a discharge pressure > 1395 psig. Inservice Testing Program I SR 3.1.7.8 Verify flow through one SLC subsystem pump into 24 months on a reactor pressure vessel. STAGGERED TEST BASIS SR 3.1.7.9 Verify all heat traced piping between storage tank 24 months and pump suction is unblocked.
AND Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after solution temperature is restored within the limits of Figure 3.1.7-2 SUSQUEHANNA - UNIT 2 TS / 3.1-22 Amendment 1p/
Attachment C to PLA-5739 Information Only Proposed Technical-Specification Bases Changes (Markups)
Surveillance Requirement (SR) 3.1.7.7 (Units 1 & 2)
V PPL RevX SLC System B 3.1.7 BASESS SURVEILLANCE SR 3.1.7.7 onz ec u8 J REQUIREMENTS ,pm(6V (continued) Demonstrating that each S~yterSt p develops a flow rate 2.41.2 gpm at a discharge pressure a sfe sures that pump perfiormance has not deraded durn the fue is minimum pump flow rate requirement esures that, when combined with the sodium pentaborate solution concentration requirements, the rate of negative reactivity insertion from the SLC System will adequately compensate for the positive reactivity effects
/ r I Sencountered during power reduction, cooldown of the moderator, and xenon Q.$Cs.jreS J'r +ue decay. This test confirms one point on the pump design curve and is indicative of overall performance. Such inservice inspections confirm component OPERABILrlY, trend performance, and detect incipient failures Vo 4He SLC 5;yjJe. by indicating abnormal performance. The Frequency of this Surveillance is r ho ATWS neeh in accordance with the Inservice Testing Program.
/(hdc CtvcFR S SR 3.1.7.8 and SR 3.1.7.9 V d / These Surveillances ensure that there is a functioning flow path from the boron solution storage tank to the RPV, including the firing of an explosive valve. The replacement charge for the explosive valve shall be from the same manufactured batch as the one fired or from another batch that has been certified by having one of that batch successfully fired. The pump and explosive valve tested should be altemated such that both complete flow paths are tested every 48 months at alternating 24 month intervals. The Surveillance may be performed in separate steps to prevent injecting solution into the RPV. An acceptable method for verifying flow from the pump to the RPV is to pump demineralized water from atest tank through one SLC subsystem and into the RPV. The 24 month Frequency is based on the need to perform this Surveillance under the conditions that apply during a plant 6utage and the potential for an unplanned transient if the Surveillance were performed with the reactor at power. Operating experience has shown these components usually pass the Surveillance when performed at the 24 month Frequency; therefore, the Frequency was concluded to be acceptable from a reliability standpoint.
Demonstrating that all heat traced piping between the boron. solution storage tank and the suction inlet to the injection (continued)
SUSQUEHANNA- UNIT I AdS /B 3.1-4-5 Revision.W
I PPL Rev.Z SLC System B 3.1.7 BASES 2 So WI thongA CAR, "&e SURVEILLANCE SR 3.1.7.7 livlt OF' REQUIREMENTS (continu~ed) Demonstrating that each SUytm MP dvelops a flow rate 2: 41.2 gpm at a discharge pressure psig nsures that pump performance has not degraded during the fuel cycl This minimum pump flow rate requirement
, wencoMwith the sodium pentaborate solution concentration requirements, the rate of negative reactivity insertion from the SLC System will adequately compensate for the positive reactivity effects 5Tsb nw M ST wais IW encountered during power reduction, cooldown of the moderator, and xenon (e ( decay. This test confirms one point on the pump design curve and is indicative of overall performance. Such inservice inspections confirn component r,!&l
- L~ CwkeAv;8 I OPERABILITY, trend performance, and detect incipient failures by indicating abnormal performance. The Frequency of this Surveillance is in accordance of -fu SLC Sy Jo with the Inservice Testing Program.
ree-4, the A4TO J ('Le )
(10 F.4)sb,6C)?eeP.') SR 3.1.7.8andSR 3.1.7.9 t ~These /4A Surveillances ensure that there is a functioning flow path from the boron solution storage tank to the RPV, including the firing of an explosive valve.
The replacement charge for the explosive valve shall be from the same manufactured batch as the one fired or from another batch that has been certified by having one of that batch successfully fired. The pump and explosive valve tested should be alternated such that both complete flow paths are tested every 48 months at alternating 24 month intervals. The Surveillance may be performed in separate steps to prevent injecting solution into the RPV.
An acceptable method for verifying flow from the pump to the RPV is to pump demineralized water from a test tank through one SLC subsystem and into the RPV. The 24 month Frequency is based on the need to perform this Surveillance under the conditions that apply during a plant outage and the potential for an unplanned transient if the Surveillance were performed with the reactor at power. Operating experience has shown these components usually pass the Surveillance when performed at the 24 month Frequency; therefore, the Frequency was concluded to be acceptable from a reliability standpoint.
Demonstrating that all heat traced piping between the boron solubion storage tank and the suction inlet to the injection (continued)
SUSQUEHANNA - UNIT 2 TS / B3.1-45 Revisiornft
Attachment D to PLA-5739 List of Regulatory Commitments (Units 1 & 2)
Attachment D to PLA-5739 Page 1 of 1 LIST OF REGULATORY COMMITMENTS
,-; '. ;REGULATORY COMMITMENTS Due Date/Event'.:
None Identified. N/A
Attachment E to PLA-5739 Standby Liquid Control System Licensing Basis and Design Evolution (Units 1 & 2)
Attachment E to PLA-5739 Page 1 of 3 Standby Liquid Control System Licensing Basis and Design Evolution The Standby Liquid Control System (SLCS) is an independent, diverse backup system to the Control Rod Drive (CRD) System. The function of the SLCS is to inject a neutron absorbing solution into the Reactor Pressure Vessel (RPV) to achieve and maintain sub-criticality in the event that control rods cannot be manually inserted.
Sufficient solution is injected such that the reactor will be brought from maximum rated power conditions to cold sub-critical over the entire RPV temperature range from maximum operating to cold shutdown conditions. There is no requirement for the SLCS to be capable of operation when the reactor is shutdown by the CRD System.
The SLCS was originally classified by General Electric Company (GE) as a "Special Capability System" (a subset of the non-safety-related classification), designed with the ability to shutdown the reactor and bring it to the cold shutdown condition independent of the control rods. Because the SLCS is not required to respond and mitigate the consequences of a DBA, the SLCS is not required to meet all safety design basis requirements of Engineered Safety Feature Systems. However, in order for the system to have a high degree of reliability, the system was designed with many safety-related system features (e.g., components required for injection are designed to safety-related criteria).
The SLC system was provided with redundant pumps and isolation valves, with each pump capable of providing 100 percent of the flow required to bring the RPV from maximum rated power to cold shutdown conditions. To fulfill this need, one pump with a flowrate of 41.2 gpm at a pump discharge pressure of 1190 psig was originally required. This TS limit was not changed when the ATWS Rule (10 CFR 50.62) was implemented. This TS limit was later changed to 1224 psig when Power Uprate was implemented. The value of 1224 psig was based upon a 30 psi increase in the original SRV setpoint, and a 4 psig correction for increased core dp.
ATWS Rule (10 CFR 50.62) Compliance In response to the ATWS Rule, PPL chose to use two-pump operation to achieve the injection flow rate required by the rule (i.e., 82.4 gpm at an equivalent sodium pentaborate concentration of 13.6 weight %). To implement this change, PPL committed to follow the guidance provided in GE's NEDE-31096-P, "Licensing Topical Report:
Anticipated Transients without SCRAM Response to NRC ATWS Rule, 10 CFR 50.62."
Relevant aspects (to the SLC system) of the docketed licensing basis correspondence relative to PPL compliance to the ATWS rule and the SLC system are as follows:
Attachment E to PLA-5739 Page 2 of 3 August 19,1985 - Denton (NRC) to Fulton (BWROG)
- This letter describes that TS (changes for TS based on single pump operation) are not required if two pumps are required to meet the ATWS rule. The basis provided is that (1) the SLC system is a backup to a highly reliable safety system, (2) additional levels of defense are provided by backup scram valves and Alternate Rod Insertion (ARI) system and (3) the incremental change in risk which would derive from changing the LCO is very small.
December 1985 - NEDE-31096-P "Response to NRC ATWS Rule, 10 CFR 50.62"
- The existing SLC System TS are based on the original SLC System design. The ATWS rule provides additional requirements, however, since the ATWS function of SLC is a backup to other safety-related systems, new TS requirements are not needed.
This position was agreed to by NRC in the Denton (NRC) to Fulton (BWROG) letter of August 19, 1985. No change to the LCO was required.
October 21, 1986 - Safety Evaluation Of Topical Report (NEDE-31096-P)
Anticipated Transient Without Scram; Response To ATWS Rule 10 CFR 50.62"
- The NRC approved conceptual designs for compliance with the ATWS rule. The SER indicated that TS's would require plant specific submittals.
April 6,1987 - PLA-2833
- This PPL letter to NRC indicates endorsement of NEDE-31096-A. It states that PPL will implement design changes to make the SLC system a two pump system in accordance with the NEDE.
- PPL indicated that 41.2 gpm per pump with a minimum of 13.6 weight percent concentration of sodium pentaborate is required for Susquehanna to meet 10 CFR 50.62.
July 20,1987 - PLA-2890
- This PPL letter to NRC is a response to a Request for Additional Information (RAI).
PPL committed to performing a two-pump test to verify that NPSH and vibration are not problems with the two-pump configuration.
Attachment E to PLA-5739 Page 3 of 3 October 18,1988 - Letter from Mohan C. Thadani (NRC) to Harold W. Keiser (PPL) "Safety Evaluation Related to Compliance with ATWS Rule 10CFR50.62 (TAC NOS. 59149/59150).
- This SER by the NRC indicated that PPL's compliance to the ATWS rule is acceptable based on PLA-2833 and FSAR Rev 39, assuming sodium pentaborate concentration TS changes are subsequently proposed. NRC indicates that the SLC system incorporates two-pump operation in accordance with the requirements of 10 CFR 50.62 paragraph (C)(4).
- NRC indicated that PPL performed a "...a dual pump operation test" and that "Periodic single pump testing will continue to be performed in accordance with existing specifications."
March 20, 1989 - PLA-3171
- This PPL letter to NRC provided PPL's response to the October 18, 1988 NRC SER (described above). PPL indicated in this letter that the existing Technical Specifications provide an adequate level of protection to public health and safety.
Plant procedures were revised to include a requirement that limits the concentration to 13.6 weight percent.
TS Conversion to ITS Format:
SSES TS 3.1.7 for Units 1 and 2 was changed in 1998 to include the relevant sodium pentaborate concentration requirements during the ITS conversion. This was done to reflect existing plant procedures. Specific reference was provided in the sodium concentration SR TS Bases description, the applicable ACTION "A," and Safety Analysis section of the TS's. These changes to the standard NUREG 1433 wording were justified by Deviation P.3. This deviation indicates that the deviation from the standard was needed to account for the SSES design and the wording added to the TS Bases was needed to accurately identify that the sodium pentaborate concentration limit of 13.6 weight percent was based on ATWS event requirements. The ITS conversion did not propose to deviate from the original TS regarding the prescribed pump discharge pressure.