PLA-7441, Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-425

From kanterella
Jump to navigation Jump to search

Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-425
ML16032A324
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/29/2016
From: Franke J
Susquehanna, Talen Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-7441
Download: ML16032A324 (5)


Text

TALEN ~

Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 ENERGY JAN 2 9 2016 jon .franke@talenenergy.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION SUPPLEMENTAL INFORMATION ON TECHNICAL SPECIFICATION CHANGES TO ADOPT TRAVELER TSTF-425 Docket Nos. 50-387

References:

I. Letter PLA-7119, [Proposed Amendments to License NPF-14 and NPF-22} Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Task Force (RITSTF) Initiative 5, "dated October 27, 2014 (Accession ML14317A052).

The purpose of this letter is for Susquehanna Nuclear, LLC to provide selected revised marked-up pages to the Technical Specifications (TS), supplementing the original proposal in Reference 1. The revised marked-up pages are within the enclosure to this letter. By Reference 1, Susquehanna Nuclear, LLC submitted the license amendment request (LAR) to modify Susquehanna Steam Electric Station, Units 1 and 2 (SSES) TS by relocating specific surveillance frequencies to a licensee-controlled program. This is an administrative change in the marked-up pages. Infmmation and the basis supporting a finding of no significant hazards consideration previously provided to the NRC in Reference 1 remain unaffected.

There are no new regulatory commitments associated with this response.

If you have any questions or require additional information, please contact Mr. Jason Jennings (570) 542-3155.

I declare under penalty of pe1jury that the foregoing is hue and conect.

Executed on:

Document Control Desk PLA-7441

Enclosure:

New Revised Marked-up TS Pages Copy: NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M . Shields, P A DEP/BRP Mr. J. A. Whited, NRC Project Manager

Enclosure to PLA-7441 New Revised Marked-up TS Pages Unit 1, TS page 3.4-11 Unit 2, TS page 3.4-11

PPL Rev . 0 RCS Operational LEAKAGE 3.4.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) 8 .2 Verify source of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> unidentified LEAKAGE increase is not service sensitive type 304 or type 316 austenitic stainless steel.

C. Required Action and C.1 Be in MODE3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion I

~

Time of Condition A AND orB not met. >

C.2 Be in MODE4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (

OR Pressure boundary LEAKAGE exists.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.4.1 Verify RCS unidentified and total LEAKAGE 12 hOl:IFS and unidentified LEAKAGE increases are within limits.

t In accordance with the Surveillance Frequency Control Program J ITS /3.4-11 SUSQUEHANNA- UNIT 1 c:::: ~.4 11 Amendment Vs

PPL Rev . 0 RCS Operational LEAKAGE 3.4.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.2 Verify source of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> unidentified LEAKAGE increase is not service sensitive type 304 or type 316 austenitic stainless steel.

C. Required Action and C.1 Be in MODE3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A AND orB not met.

C.2 Be in MODE4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR Pressure boundary LEAKAGE exists.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.4.1 Verify RCS unidentified and total LEAKAGE ~2 ~-leurs and unidentified LEAKAGE increases are within limits.

I In accordance with the Surveillance Frequency Control Program J ITS / 3.4-11 SUSQUEHANNA- UNIT 2 J.4 11 Amendment ys'1

TALEN ~

Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 ENERGY JAN 2 9 2016 jon .franke@talenenergy.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION SUPPLEMENTAL INFORMATION ON TECHNICAL SPECIFICATION CHANGES TO ADOPT TRAVELER TSTF-425 Docket Nos. 50-387

References:

I. Letter PLA-7119, [Proposed Amendments to License NPF-14 and NPF-22} Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Task Force (RITSTF) Initiative 5, "dated October 27, 2014 (Accession ML14317A052).

The purpose of this letter is for Susquehanna Nuclear, LLC to provide selected revised marked-up pages to the Technical Specifications (TS), supplementing the original proposal in Reference 1. The revised marked-up pages are within the enclosure to this letter. By Reference 1, Susquehanna Nuclear, LLC submitted the license amendment request (LAR) to modify Susquehanna Steam Electric Station, Units 1 and 2 (SSES) TS by relocating specific surveillance frequencies to a licensee-controlled program. This is an administrative change in the marked-up pages. Infmmation and the basis supporting a finding of no significant hazards consideration previously provided to the NRC in Reference 1 remain unaffected.

There are no new regulatory commitments associated with this response.

If you have any questions or require additional information, please contact Mr. Jason Jennings (570) 542-3155.

I declare under penalty of pe1jury that the foregoing is hue and conect.

Executed on:

Document Control Desk PLA-7441

Enclosure:

New Revised Marked-up TS Pages Copy: NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M . Shields, P A DEP/BRP Mr. J. A. Whited, NRC Project Manager

Enclosure to PLA-7441 New Revised Marked-up TS Pages Unit 1, TS page 3.4-11 Unit 2, TS page 3.4-11

PPL Rev . 0 RCS Operational LEAKAGE 3.4.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) 8 .2 Verify source of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> unidentified LEAKAGE increase is not service sensitive type 304 or type 316 austenitic stainless steel.

C. Required Action and C.1 Be in MODE3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion I

~

Time of Condition A AND orB not met. >

C.2 Be in MODE4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (

OR Pressure boundary LEAKAGE exists.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.4.1 Verify RCS unidentified and total LEAKAGE 12 hOl:IFS and unidentified LEAKAGE increases are within limits.

t In accordance with the Surveillance Frequency Control Program J ITS /3.4-11 SUSQUEHANNA- UNIT 1 c:::: ~.4 11 Amendment Vs

PPL Rev . 0 RCS Operational LEAKAGE 3.4.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.2 Verify source of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> unidentified LEAKAGE increase is not service sensitive type 304 or type 316 austenitic stainless steel.

C. Required Action and C.1 Be in MODE3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A AND orB not met.

C.2 Be in MODE4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR Pressure boundary LEAKAGE exists.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.4.1 Verify RCS unidentified and total LEAKAGE ~2 ~-leurs and unidentified LEAKAGE increases are within limits.

I In accordance with the Surveillance Frequency Control Program J ITS / 3.4-11 SUSQUEHANNA- UNIT 2 J.4 11 Amendment ys'1