Technical Specification Pages Re Containment Purge Value Leak Rate Test Frequency
ML052170038
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/04/2005
From:
NRC/NRR/DLPM
To:
References
TAC MC4427, TAC MC4428
Download: ML052170038 (2)


Text

PPL Rev. 1 PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.1.3.6 ---- -------- NOTE---------------------

Only required to be met in MODES 1, 2 and 3.

Perform leakage rate testing for each primary 24 months containment purge valve with resilient seals. I SR 3.6.1.3.7 Verify the isolation time of each MSIV is In accordance

> 3 seconds and

  • 5 seconds. with the Inservice Testing Program SR 3.6.1.3.8 Verify each automatic PCIV actuates to the 24 months isolation position on an actual or simulated isolation signal.

SR 3.6.1.3.9 Verify a representative sample of reactor 24 months instrumentation line EFCVs actuate to check flow on a simulated instrument line break.

(continued)

SUSQUEHANNA - UNIT 1 TS /3.6-14 Amendment 1/3,223

PPL Rev. 1 PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.1.3.6 --------------------------NOTE------------------------

Only required to be met in MODES 1, 2 and 3.

Perform leakage rate testing for each primary 24 months I containment purge valve with resilient seals.

SR 3.6.1.3.7 Verify the isolation time of each MSIV is In accordance 23 seconds and < 5 seconds. with the Inservice Testing Program SR 3.6.1.3.8 Verify each automatic PCIV actuates to the 24 months isolation position on an actual or simulated isolation signal.

SR 3.6.1.3.9 Verify a representative sample of reactor 24 months instrumentation line EFCVs actuate to check flow on a simulated instrument line break.

SR 3.6.1.3.10 Remove and test the explosive squib from each 24 months on a shear isolation valve of the TIP System. STAGGERED TEST BASIS (continued)

SUSQUEHANNA - UNIT 2 TS /3.6-14 Amendment 17, 200