PPL Rev. 1 PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.1.3.6 NOTE---------------------

Only required to be met in MODES 1, 2 and 3.

Perform leakage rate testing for each primary 24 months containment purge valve with resilient seals.

SR 3.6.1.3.7 Verify the isolation time of each MSIV is In accordance

> 3 seconds and

  • 5 seconds.

with the Inservice Testing Program SR 3.6.1.3.8 Verify each automatic PCIV actuates to the 24 months isolation position on an actual or simulated isolation signal.

SR 3.6.1.3.9 Verify a representative sample of reactor 24 months instrumentation line EFCVs actuate to check flow on a simulated instrument line break.

(continued)

I SUSQUEHANNA - UNIT 1 TS /3.6-14 Amendment 1/3,223

PPL Rev. 1 PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.1.3.6


NOTE------------------------

Only required to be met in MODES 1, 2 and 3.

Perform leakage rate testing for each primary 24 months containment purge valve with resilient seals.

SR 3.6.1.3.7 Verify the isolation time of each MSIV is In accordance 23 seconds and < 5 seconds.

with the Inservice Testing Program SR 3.6.1.3.8 Verify each automatic PCIV actuates to the 24 months isolation position on an actual or simulated isolation signal.

SR 3.6.1.3.9 Verify a representative sample of reactor 24 months instrumentation line EFCVs actuate to check flow on a simulated instrument line break.

SR 3.6.1.3.10 Remove and test the explosive squib from each 24 months on a shear isolation valve of the TIP System.

STAGGERED TEST BASIS I

(continued)

Amendment 1 7, 200 SUSQUEHANNA - UNIT 2 TS /3.6-14