License Amendment Request for the Technical Specifications Conversion to NUREG-1431 Revision 5
ML21265A371
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/22/2021
From: Pearce M
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML21265A370 List:
References
L-2021-158
Download: ML21265A371 (3)


Text

September 22, 2021 L-2021-158 10 CFR 50.90 10 CFR 50.91(b)(1)

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Turkey Point Nuclear Plant, Units 3 and 4 Dockets 50-250 and 50-251 Subsequent Renewed Facility Operating Licenses DPR-31 and DPR-41 LICENSE AMENDMENT REQUEST FOR THE TECHNICAL SPECIFICATIONS CONVERSION TO NUREG-1431 REVISION 5

References:

1. NUREG 1431, Standard Technical Specifications - Westinghouse Plants, Revision 5
2. Notice of Availability for TSTF-500, Revision 2, "DC Electrical Rewrite - Update to TSTF-360,"

(76FR54510)

Pursuant to 10 CFR Part 50.90, Florida Power & Light Company (FPL) hereby requests amendments to Subsequent Renewed Facility Operating Licenses DPR-31 and DPR-41 for Turkey Point Nuclear Plant (PTN) Units 3 and 4, respectively. This license amendment request (LAR) would revise PTNs current Technical Specifications (CTS) to Improved Technical Specifications (ITS) consistent with the Improved Standard Technical Specifications (ISTS) (Reference 1).

This LAR is based on the draft version of the ISTS as of July 30, 2021. Consequently, updates to the ISTS (if any) after July 30, 2021 could not be incorporated in this LAR.

The following six enclosures are included in this this LAR:

  • Enclosure 1 describes the organization and content of the submittal, including each of the volumes in Enclosure 2.
  • Enclosure 2 contains 16 volumes that describe and justify the proposed changes. Included in Enclosure 2 are the Bases for the proposed ITS. However, the Bases are not part of the technical specifications but are maintained consistent with the PTN Updated Final Safety Analysis Report (UFSAR) in accordance the Technical Specification Bases Control Program.
  • Enclosure 3 lists and describes the changes included in the ITS submittal that differ from both the CTS and ISTS as described in Reference 1.

Florida Power & Light Company 9760 SW 344th Street, Homestead, FL 33035

Turkey Point Nuclear Plant, Units 3 and 4 Dockets 50-250 and 50-251 L-2021-158 Page 2 of 3

  • Enclosure 4 dispositions other docketed ITS LARs as they relate to this LAR.
  • Enclosure 5 lists licensee commitments associated with this LAR.
  • Enclosure 6 summarizes the UFSAR descriptions that support the review of the Battery Monitoring and Maintenance Program. This enclosure provides, in part, the information and verifications requested in the Notice of Availability for TSTF-500, Revision 2 (Reference 2).

Based on the information provided in Enclosure 2, FPL determined that the proposed license amendment does not involve a significant hazards consideration pursuant to 10 CFR 50.92(c) and that the changes are exempt from environmental review pursuant to the provisions of 10 CFR 51.22(c)(9). Further, the PTN Plant Onsite Review Group reviewed this LAR and determined that operation of PTN in accordance with the proposed changes will not endanger the health and safety of the public.

In accordance with 10 CFR 50.91 (b)(1 ), a copy of this LAR has been forwarded to the State of Florida designee.

FPL requests these proposed license amendments , if approved, be issued by September 15, 2022, to support ITS implementation prior to PTN Unit 3 refueling outage scheduled for Spring 2023. FPL further requests a 180-day delay period be allowed following LAR approval to complete implementation activities.

Should you have any questions regarding this submittal, please contact Mr. William Maher, Director of Licensing Project - Nuclear at Florida Power & Light Company, 15430 Endeavor Drive, Mail Stop NT3/JW, Jupiter, FL 33478 or (561) 304-6256 or William.Maher@fpl.com.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on the 22nd day of September 2021.

Michael Pearce Site Vice President Turkey Point Nuclear Power Plant cc: (w / o Enclosures)

Regional Administrator, USNRC, Region II Project Manager, USNRC, Turkey Point Nuclear Plant Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant Chief, Bureau of Radiation Control, Florida Department of Health

Turkey Point Nuclear Plant, Units 3 and 4 Dockets 50-250 and 50-251 L-2021-158 Page 3 of 3

Enclosures:

Enclosure 1 Contents of the Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications (ITS) Submittal Enclosure 2 Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications (ITS)

Submittal, Volumes 1 through 16 Enclosure 3 Licensee Identified Changes That May Require Technical Branch Review Enclosure 4 Disposition of Existing License Amendment Requests Enclosure 5 Regulatory Commitments Enclosure 6 List of Required Updated Final Safety Analysis Report (UFSAR) Descriptions For TSTF-500