Submittal of the Updated Final Safety Analysis Report (Revision 28), Fire Protection Program (Revision 23), and Reference Drawings
ML21110A639
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/08/2021
From: David Helker
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML21110A638 List: ... further results
References
Download: ML21110A639 (24)


Text

200 Exelon Way Exelon Generation Kennett Square, PA 19348 www.exeloncorp.com 10 CFR 50.71(e){4) 10 CFR 54.37(b)

April 8, 2021 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-2TT and 50-278

SUBJECT:

Submittal of the Updated Final Safety Analysis Report (Revision 28},

Fire Protection Program (Revision 23), and Reference Drawings In accordance with 10 CFR 50.71(eX4) and 10 CFR 50.4(b)(6), enclosed is Revision 28 of the Updated Final Safety Analysis Report (UFSAR) and Revision 23 of the Fire Protection Program (FPP) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The enclosed UFSAR and FPP revision copies are being provided to the U.S. Nuclear Regulatory Commission (NRC) in electronic format on a DVD (Enclosure). The electronic versions of the UFSAR and FPP are being submitted in their entirety and are total replacement copies.

10 CFR 50.71(e)(2) requires that changes made under the provisions of 10 CFR 50.59 but not previously submitted to the NRC be included in UFSAR updates. Changes to the FPP are to be evaluated in accordance with PBAPS, Units 2 and 3, License Condition 2.C.(4). Attachment 1 to this letter Identifies UFSAR changes made under the provisions of 10 CFR 50.59 not previously submitted and included in Revision 28 of the UFSAR. Attachment 1 also identifies those changes to the FPP evaluated In accordance with License Condition 2.C.(4) and Included In Revision 23 of the FPP.

10 CFR 50.71(e)(4) stipulates that revisions to the UFSAR and associated FPP must reflect changes made up to a maximum of six months prior to the submittal. As a result, Revision 28 of the UFSAR and Revision 23 of the FPP for PBAPS, Units 2 and 3, reflect changes at least up to February 28, 2021.

Also included on the enclosed DVD are copies of drawings currently referenced but not Included in the PBAPS, Units 2 and 3, UFSAR or FPP. includes file directory structure Information identifying directory path, filename, and size of the lndlvldual electronic files contained on the enclosed DVD.

U.S. Nuclear Regulatory Commission Submittal of PBAPS UFSAR Revision 28 FPP Revision 23 Reference Drawings April 8, 2021 Page2 In addition, pursuant to the requirements of 10 CFR 54.37(b) and the guidance specifted in Regulatory Issue Summary 2007-16, Revision 1, *implementation of the Requirements of 10CFR 54.37(b) for Holders of Renewed Licenses, n the UFSAR update required by 10 CFR 50.71 (e) must Include any Structures, Systems, or Components (SSCs) newly Identified that would have been subject to an aging management review or evaluation of Time-Limited Aging Analyses (TLM) in accordance with 10 CFR 54.21. The UFSAR update must describe how the licensee will manage the effects of aging In order to effectively maintain the intended function(s) of newly-identified SSCs. An evaluation was completed to detennlne whether any newly-identified SSCs existed in support of submitting UFSAR Revision 28 and FPP Revision 23 for PBAPS, Units 2 and 3. This evaluation Involved reviewing pertinent documentation for the period subsequent to the last PBAPS biennial UFSAR / FPP revisions.

AB a result of this review, there were no newly-Identified SSCs for which aging management reviews or TLAA would apply.

As required by 10CFR50.71(e)(2)(I), I certify that to the best of my knowledge, Revision 28 of the UFSAR and Revision 23 of the FPP accurately reflect information and analyses submitted to the NRC, or prepared pursuant to NRG requirements as described above.

If you have any questions or require further information, please contact Richard Gropp at (610) 765-5557.

Respectfully, 9: t:? ~~

David P. Helker Sr. Manager, Licensing Exelon Generation Company, LLC Attachments:

1) Changes Made Under the Provisions of 10 CFR 50.59 and License Condition 2.C.(4)
2) Electronic FIie Directory Structure

Enclosure:

PBAPS, Units 2 and 3, UFSAR Revision 28 / FPP Revision 23 and Supporting Reference Drawing Files cc: w/ Attachments and Enclosure Regional Administrator, Region I, USNRC USNRC Senior Resident Inspector, PBAPS USNRC Project Manager NRR, PBAPS W. DeHaas, Commonwealth of Pennsylvania, Bureau of Radiation Protection S. Seaman, State of Maryland Page 1 of 3 Changes Made Under the Provisions of 10 CFR 50,59 and License Condition 2.C,(4}

10 CFR 50.71(e)(2)(11) requires that revisions to the Updated Final Safety Analysis Report (UFSAR) include changes made under the provisions of 10 CFR 50.59, but not previously submitted to the NRC. Changes to the Fire Protection Program (FPP) are to be evaluated In accordance with Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, License Condition 2.C.(4). Accordingly, the list below Identifies changes Included in Revision 28 of the PBAPS, Units 2 and 3, UFSAR or Revision 23 of the PBAPS FPP that were not previously submitted to the NRC. Some exceptions have been noted.

UFSAR Change Revision Desalptlon 2016-028 Update UFSAR Chapter 7 and Chapter 14 to reflect a Reactor Pressure 00 EC 556400, Rev. 0 Vessel (RPV) Level 3 water level analytical limit change.

2016-030 Update UFSAR Chapter 5, Chapter 7, Chapter 10, and Appendix C to ECR 15-00232 00 reflect changes with downgrading the Containment Atmosphere Dilution EC 556082, Rev. 0 (CAD) and Hydrogen/Oxygen Monitoring systems.

Update UFSAR Chapter 4 to reflect changes related to the Main Steam 2017-017 Isolation Valve (MSIV) extended poppet design. This change was partially 00 EC 618900, Rev. 0 incorporated and changes were further addressed under UFSAR Change 2021-007.

2017-037 Update UFSAR Chapter 3, Chapter 6, and Chapter 14 reflect changes In 00 EC 619027, Rev. 1 support of the PB3C22 Reload Global Nuclear Fuels (GNF) review.

2018-001 Updated UFSAR Appendix Q to reflect changes related to Fuse Holder 00 IR4074076 Aging Management Activities.

2018-005 Updated UFSAR Chapter 1 and Chapter 8 to reflect changes associated EC 622606, Rev. 0 00 with the alternate battery charger installation In support of implementing EC 621353, Rev. 0 TSTF-500 changes.

Updated UFSAR Chapter 12 to reflect changes regarding the removal of 2018-017 00 the Transporter Storage Building and the addition of the new Dry Cask/

EC 618373, Rev. 0 ISFSI Storage Building.

Updated UFSAR Chapter 12 to reflect changes related to the description 2018-018 00 of Independent Spent Fuel Storage Installation {ISFSI) to mention both EC 618375, Rev. 0 ISFSI pads.

Updated UFSAR Chapter 7 to reflect changes related to the replacement 2018-020 00 of Containment Atmospheric Control (CAC) sample Inner isolation valves EC 623756, Rev. 0 (SV-3-07D-3671B(D/E/F).

2018-022 Updated UFSAR Chapter 7 to reflect changes related to upgrades with the 00 EC 556370, Rev. 0 Unit 2 Plant Monitoring System (PMS).

Updated UFSAR Chapter 10 to reflect changes associated with upgrading 2018-027 00 the Main Control Room (MCR) lighting to Light Emitting Diodes (LED) and EC 622078, Rev. 0 to remove light diffuser panels.

2018-030 Updated FPP Section 2 and Section 3 to reflect the removal of fire hoses 00 EC 626469, Rev. 0 from interior hose stations.

Updated UFSAR Chapter 5 and Chapter 7 to reflect changes associated 2018-032 00 with updates to Emergency Core Cooling System (ECCS) room EC 624999, Rev. 0 temperature calculation.

2018-033 Updated UFSAR Chapter 8 to reflect changes associated with changes to 00 EC 621002, Rev. 0 Emergency Diesel Generator (EDG) Loading cases.

Updated UFSAR Chapter 5, Chapter 12, and Appendix C to reflect changes 2019-004 00 related to tornado missile event requirements and associated tornado missile protection.

Page 2 of 3 UFSAR Change Revision Description 2019-005 Updated UFSAR Chapter 3 to reflect changes associated with darifyfng Jet 00 IR 4171921 Pump wedge replacement activities.

Updated UFSAR Chapter 4, Chapter 14, Appendix K to reflect changes 2019-006 00 related to implementation of the two {2) Safety Relief Valve {SRV) Out-of-EC 623771, Rev. 0 Service (OOS) license amendments (i.e., Amendment Nos. 323 / 326).

Updated FPP Appendix A tables to reflect changes regarding the removal 2019-007 00 of the grease lubrication system for the Inner Screen Trash Pit sump EC 622634, Rev. 0 pumps.

Updated UFSAR Chapter 14 (i.e., Table 14.10-3, Special Event Containment Response Key Analysis Input Values) to make corrections in 2019-008 00 the "Comments" column for Initial Torus water and air temperature and High Pressure Service Water {HPSW) temperature values.

Updated UFSAR Appendix Q to reflect updates by adding additional 2019-009 00 discussion In the Condensate Storage Piping and Valves section (I.e.,

IR4186787 Q.2.5).

Updated UFSAR Section 5 and Chapter 7 to reflect the abandonment of 2019-010 00 the Unit 2 "C" CAC sample line due to sample valve replacement requiring EC 625668, Rev. 0 changes to the list of Primary Containment Isolation Valves (PCIVs).

2019-013 Updated UFSAR Section 5 and Chapter 7 to reflect the abandonment of 00 EC 625628, Rev. 0 the Unit 3 "A"/ "C" / "G" CAC sample lines.

2019-014 Updated UFSAR Chapter 9, Chapter 10, Appendix C, and Appendix H to 00 EC 618376, Rev. 0 reflect changes associated with Peach Bottom ISFSI expansion efforts.

Updated UFSAR Chapter 8 to reflect changes related to the installation of 2019-015 00 the alternate battery charger and implementation of License Amendments Nos. 320 / 323.

2019-016 Updated FPP Appendix B to reflect changes related to correcting a 00 IR4266624 calculation reference.

2019-017 Updated UFSAR Chapter 14 to reflect changes In support of the PB3 C23 00 EC 625731, Rev. 1 Reload evaluation.

2019-018 Updated UFSAR Chapter 7 to reflect the use of a higher fuel Ifft setpolnt 00 EC 629252, Rev. 0 for fuel cleaning maneuvers.

2019-019 Updated UFSAR Chapter 5 and Chapter 7 to reflect changes with 00 EC 625545, Rev. 0 abandonment of the Unit 2 "A"/ "C" / "G" CAC sample lines.

Updated UFSAR Chapter 2 to reflect changes associated with 2019-020 00 Meteorological Tower calibration frequency to align with Regulatory Guide 1.23 guidance.

2019-023 Updated UFSAR Chapter 9 to reflect changes Involving contaminated oll in 00 IR 4293363 the auxiliary boilers.

2019-024 Updated UFSAR Chapter 1, Chapter 4, and Chapter 14 to reflect changes 00 IR4063615 to clearly define event frequency categories.

2019-025 11> Updated UFSAR Appendix C to reflect changes in describing the Tornado 00 EC 629642, Rev. 0 Missile Protection licensing basis.

2020-001 Updated UFSAR to add the new Appendix R related to Subsequent 00 License Renewal.

Updated UFSAR Chapter 14 to reflect changes to correct an Inaccurate 2020-002 00 statement In the "Slow Flow Increase" section associated with reactor IR4254203 recirculation pump trip events.

Page 3 of 3 UFSAR Change Revision Description Updated UFSAR Chapter 4 and Chapter 6 to reflect changes associated 2020-003 00 with the elimination of the High Pressure Coolant Injection (HPO) /

EC 630114, Rev. 0 Reactor Core Isolation Cooling (RCIC) low pump suction automatic trip.

Updated UFSAR Chapter 1 to reflect changes in support of Implementing 2020-007 00 the 10 CFR 50.69 changes as approved by the NRC per Amendment Nos.

321/324.

2020-009 Updated UFSAR Chapter 13 to revise commitment from ANSI NlS.1-1971 00 IR4327637 to ANSI/AN I 3.1-2014 2020-010 Updated UFSAR Appendix Q to reflect changes related to implementation 00 of 10 CFR 50.69 at Peach Bottom.

2020-011 Updated UFSAR Chapter 4 to reflect changes associated with the Dryweli ECR 09-00339 00 Equipment Drain Sump Pump logic modification.

IR 2656156 2020-012 Updated UFSAR Appendix Q to reflect changes related to selective 00 IR 4342679 leaching as discussed in Section Q.3.7.

2020-016 Updated FPP Appendix A tables to reflect changes related to Refuel Floor 00 EC 623031, Rev. 0 equipment staging.

Updated UFSAR Chapter 7 to reflect changes related to the temporary 2020-017 00 elimination of the "3C Reactor Feedwater Pump (RFP) low suction EC 623780, Rev. 0 pressure trip.

2020-018 Updated UFSAR Chapter 14 to reflect changes associated with the PB2 00 EC 629659, Rev. 0 C24 Reload evaluation.

2020-019 Updated UFSAR Chapter 2 and Chapter 12 to reflect changes related to 00 IR4066929 clarifying cathodic protection structural piles.

2020-020 Updated UFSAR Chapter 4 to reflect changes associated with the Unit 2 00 EC 632907, Rev. 0 N-16A nozzle repair work and material composition.

2021-004 Updated UFSAR Chapter 7 to reflect changes associated with the EC 623524, Rev. 0 00 Abandonment of Area Radiation Monitors (ARMs) 2-4 and 6-5 Channel EC 621941, Rev. 0 13, and ARMs 2-10 and 6-12 Channel 20.

2021-005<1> Updated UFSAR Chapter 10 to reflect changes associated wfth the 00 IR4294084 Auxiliary Steam System during unit startup.

Updated UFSAR Chapter 10 to reflect changes related to correcting a 2021-006 00 reference cited In the section describing dry cask storage rigging and IR4360039 handling.

2021-007 Updated UFSAR Chapter 4 to reflect changes associated with the partial 00 EC 618900, Rev. 0 implementation of changes related to MSIV extended poppet design.

2021-011 Updated UFSAR Chapter 2 to reflect changes associated with the 00 EC 555944, Rev. 0 Meteorological Tower - Hill Pole Instrumentation relocation.

111 - The changes Identified were described In the PBAPS Blennlal 10 CFR 50.59 and 10 CFR 72.48 Report submitted by letter dsled February 8, 2021.

ATTACHMENT 2 Peach Bottom Atomic Power Station Units 2 and 3 Updated Final Safety Analysis Report, Revision 28 Fire Protection Report, Revision 23 Supporting Reference Drawings Electronic File Directory Structure

ATTACHMENT 2 Electronic File Directory Structure Page 1 of 17 I Directo!l Path I UFSAR / FPP File Names II File Size (Bvtes)

UFSAR File Names c:\01 PBAPS UFSAR REV 28 00 PEA Chapter 00 (000) Cover Page and General Table of Contents.pdf 313,704 c:\01 PBAPS UFSAR REV 28 01 PEA Chapter 01 (001) Table of Contents.pdf 112,061 c:\01 PBAPS UFSAR REV 28 02 PEA Chapter 01 (002) Sections 1 thru 15.pdf 703,538 c:\01 PBAPS UFSAR REV 28 03 PEA Chapter 01 (003) Figures.pdf 7,129,367 c:\01 PBAPS UFSAR REV 28 04 PEA Chapter 02 (001) Table of Contents.pdf 72,559 c:\01 PBAPS UFSAR REV 28 OS PEA Chapter 02 (002) Sections 1 thru 9.pdf 11,319,168 c:\01 PBAPS UFSAR REV 28 06 PEA Chapter 02 (003) Tables 2.2.17 thru 2.2.24.1.pdf 1,285,539 c:\01 PBAPS UFSAR REV 28 07 PEA Chapter 02 {004) Figures.pdf 9,678,564 c:\01 PBAPS UFSAR REV 28 08 PEA Chapter 03 (001) Table of Contents.pdf 65,510 c:\01 PBAPS UFSAR REV 28 09 PEA Chapter 03 (002) Sections 1 thru 8.pdf 526,467 c:\01 PBAPS UFSAR REV 28 10 PEA Chapter 03 (003) Figures.pdf 8,369,864 c:\01 PBAPS UFSAR REV 28 11 PEA Chapter 04 (001) Table of Contents.pdf 46,968 c:\01 PBAPS UFSAR REV 28 12 PEA Chapter 04 (002) Sections 1 thru 11.pdf 641,579 c:\01 PBAPS UFSAR REV 28 13 PEA Chapter 04 (003) Figures.pdf 520,674 c:\01 PBAPS UFSAR REV 28 14 PEA Chapter 05 (001) Table of Contents.pdf 43,540 c:\01 PBAPS UFSAR REV 28 15 PEA Chapter OS {002) Sections 1 thru 3.pdf 768,302 c:\01 PBAPS UFSAR REV 28 16 PEA Chapter 05 (003) Figures.pdf 3,353,970 c:\01 PBAPS UFSAR REV 28 17 PEA Chapter 06 (001) Table of Contents.pdf 55,012 c:\01 PBAPS UFSAR REV 28 18 PEA Chapter 06 (002) Sections 1 thru 7.pdf 275,555 c:\01 PBAPS UFSAR REV 28 19 PEA Chapter 06 (003) Figures.pdf 1,346,096 c:\01 PBAPS UFSAR REV 28 20 PEA Chapter 07 (001) Table of Contents.pdf 150,200 c:\01 PBAPS UFSAR REV 28 21 PEA Chapter 07 (002) Sections 1 thru 9.pdf 913,569 c:\01 PBAPS UFSAR REV 28 22 PEA Chapter 07 (003) Sections 10 thru 23.pdf 466,842 c:\01 PBAPS UFSAR REV 28 23 PEA Chapter 07 (004) Figures.pdf 5,538,474 c:\01 PBAPS UFSAR REV 28 24 PEA Chapter 08 (001) Table of Contents.pdf 78,384 c:\01 PBAPS UFSAR REV 28 25 PEA Chapter 08 {002) Sections 01 thru 08.pdf 6,513,516 c:\01 PBAPS UFSAR REV 28 26 PEA Chapter 08 (003) Figures.pdf 111,426 c:\01 PBAPS UFSAR REV 28 27 PEA Chapter 09 (001) Table of Contents.pdf 43,889 c:\01 PBAPS UFSAR REV 28 28 PEA Chapter 09 (002) Sections 1 thru 4.pdf 336;814 c:\01 PBAPS UFSAR REV 28 29 PEA Chapter 09 (003) Figures.pdf 394,775 c:\01 PBAPS UFSAR REV 28 30 PEA Chapter 10 (001) Table of Contents.pdf 50,528 c:\01 PBAPS UFSAR REV 28 31 PEA Chapter 10 (002) Sections 1 thru 24.pdf 548,646

ATTACHMENT 2 Electronic File Directory Structure Page 2 of 17 I DirectO!} Path I UFSAR / FPP File Names File Size (Bytes) c:\01 PBAPS UFSAR REV 28 32 PEA Chapter 10 (003) Figures.pdf 2,489,975 c:\01 PBAPS UFSAR REV 28 33 PEA Chapter 11 {001) Table of Contents.pdf 18,694 c:\01 PBAPS UFSAR REV 28 34 PEA Chapter 11 {002) Sections 1 thru 8.pdf 143,869 c:\01 PBAPS UFSAR REV 28 35 PEA Chapter 11 {003) Figures.pdf 43,873 c:\01 PBAPS UFSAR REV 28 36 PEA Chapter 12 (001) Table of Contents.pdf 19,523 c:\01 PBAPS UFSAR REV 28 37 PEA Chapter 12 {002) Sections 1 thru 4.pdf 232,370 c:\01 PBAPS UFSAR REV 28 38 PEA Chapter 12 {003) Figures.pdf 1,423,576 c:\01 PBAPS UFSAR REV 28 39 PEA Chapter 13 {001) Table of Contents.pdf 73,437 c:\01 PBAPS UFSAR REV 28 40 PEA Chapter 13 {002) Sections 1 thru 8.pdf 438,491 c:\01 PBAPS UFSAR REV 28 41 PEA Chapter 13 {003) Figures.pdf 268,099 c:\01 PBAPS UFSAR REV 28 42 PEA Chapter 14 (001) Table of Contents.pdf 114,099 c:\01 PBAPS UFSAR REV 28 43 PEA Chapter 14 {002) Sections 1 thru 10.pdf 1,228,151 c:\01 PBAPS UFSAR REV 28 44 PEA Chapter 14 {003) Figures UFSAR.pdf 17,350,167 c:\01 PBAPS UFSAR REV 28 45 PEA Appendix A (001) Table of Contents.pdf 23,691 c:\01 PBAPS UFSAR REV 28 46 PEA Appendix A (002).pdf 256,433 c:\01 PBAPS UFSAR REV 28 47 PEA Appendix A {003) Figures.pdf 1,825,458 c:\01 PBAPS UFSAR REV 28 48 PEA Appendix B.pdf 14,637 c:\01 PBAPS UFSAR REV 28 49 PEA Appendix C (001) Table of Contents.pdf 47,440 c:\01 PBAPS UFSAR REV 28 50 PEA Appendix C {002).pdf 637,480 c:\01 PBAPS UFSAR REV 28 51 PEA Appendix C (003) Figures.pdf 4,559,807 c:\01 PBAPS UFSAR REV 28 52 PEA Appendix D {001) Table of Contents.pdf 16,203 c:\01 PBAPS UFSAR REV 28 53 PEA Appendix D (002).pdf 51,284 c:\01 PBAPS UFSAR REV 28 54 PEA Appendix D (003) Figures.pdf 29,624 c:\01 PBAPS UFSAR REV 28 55 PEA Appendix E (001) Table of Contents.pdf 21,602 c:\01 PBAPS UFSAR REV 28 56 PEA Appendix E (002).pdf 116,821 c:\01 PBAPS UFSAR REV 28 57 PEA Appendix E (003) Figures.pdf 226,536 c:\01 PBAPS UFSAR REV 28 58 PEA Appendix F {001) Table of Contents.pdf 17,931 c:\01 PBAPS UFSAR REV 28 59 PEA Appendix F {002).pdf 56,787 c:\01 PBAPS UFSAR REV 28 60 PEA Appendix G {001) Table of Contents.pdf 49,230 c:\01 PBAPS UFSAR REV 28 61 PEA Appendix G {002).pdf 138,820 c:\01 PBAPS UFSAR REV 28 62 PEA Appendix G (003) Matrixs.pdf 5,795,058 c:\01 PBAPS UFSAR REV 28 63 PEA Appendix G {004) Figures.pdf 1,209,229 c:\01 PBAPS UFSAR REV 28 64 PEA Appendix H (001) Table of Contents.pdf 48,968

ATTACHMENT 2 Electronic File Directory Structure Page 3 of 17 Directory Path UFSAR / FPP File Names I File Size {Bytes) I c:\01 PBAPS UFSAR REV 28 65 PEA Appendix H (002).pdf 387,573 c:\01 PBAPS UFSAR REV 28 66 PEA Appendix I (001) Table of Contents.pdf 17,723 c:\01 PBAPS UFSAR REV 28 67 PEA Appendix I (002).pdf 16,832 c:\01 PBAPS UFSAR REV 28 68 PEA Appendix J (001) Table of Contents.pdf 23,593 c:\01 PBAPS UFSAR REV 28 69 PEA Appendix J (002).pdf 285,585 c:\01 PBAPS UFSAR REV 28 70 PEA Appendix J (003) Figures.pdf 412,154 c:\01 PBAPS UFSAR REV 28 71 PEA Appendix K (001) Table of Contents.pdf 63,046 c:\01 PBAPS UFSAR REV 28 72 PEA Appendix K (002) Exhibit l.pdf 3,887,819 c:\01 PBAPS UFSAR REV 28 73 PEA Appendix K {003) Exhibit 11.pdf 1,494,049 c:\01 PBAPS UFSAR REV 28 74 PEA Appendix K (004) Exhibit 111.pdf 1,621,289 c:\01 PBAPS UFSAR REV 28 75 PEA Appendix K (005) Exhibit IV.pdf 24,026 c:\01 PBAPS UFSAR REV 28 76 PEA Appendix K (006) Exhibit V.pdf 39,959 c:\01 PBAPS UFSAR REV 28 77 PEA Appendix K (007) Exhibit VI.A Unit 2.pdf 6,480,017 c:\01 PBAPS UFSAR REV 28 78 PEA Appendix K (008) Exhibit VI.B Unit 3.pdf 25,538 c:\01 PBAPS UFSAR REV 28 79 PEA Appendix K (009) Exhibit Vll.pdf 22,598 c:\01 PBAPS UFSAR REV 28 80 PEA Appendix K (010) Figures.pdf 289,561 c:\01 PBAPS UFSAR REV 28 81 PEA Appendix L.pdf 16,504 c:\01 PBAPS UFSAR REV 28 82 PEA Appendix M (001) Table of Contents.pdf 48,028 c:\01 PBAPS UFSAR REV 28 83 PEA Appendix M (002).pdf 218,221 c:\01 PBAPS UFSAR REV 28 84 PEA Appendix M (003) Figures.pdf 1,668,938 c:\01 PBAPS UFSAR REV 28 85 PEA Appendix N (001) Table of Contents.pdf 17,374 c:\01 PBAPS UFSAR REV 28 86 PEA Appendix N (002).pdf 21,164 c:\01 PBAPS UFSAR REV 28 87 PEA Appendix N (003) Tables.pdf 5,479,318 c:\01 PBAPS UFSAR REV 28 88 PEA Appendix O (001) Table of Contents.pdf 14,339 c:\01 PBAPS UFSAR REV 28 89 PEA Appendix O (002).pdf 39,436 c:\01 PBAPS UFSAR REV 28 90 PEA Appendix P.pdf 16,447 c:\01 PBAPS UFSAR REV 28 91 PEA Appendix Q (001) Table of Contents.pdf 122,827 c:\01 PBAPS UFSAR REV 28 92 PEA Appendix Q (002).pdf 276,289 c:\01 PBAPS UFSAR REV 28 93 PEA Appendix Q (003) Figure.pdf 30,676 c:\01 PBAPS UFSAR REV 28 94 PEA Appendix R (001) Table of Contents Pages R-i to R-iv.pdf 137,405 c:\01 PBAPS UFSAR REV 28 95 PEA Appendix R (002) Pages R-1 to R-89 (4-22-20).pdf 657,116 c:\01 PBAPS UFSAR REV 28 96 PEA Appendix R (003) Commitment List Pages R-90 to R-124.pdf 358,514

ATTACHMENT 2 Electronic File Directory Structure Page 4 of 17 Directory Path UFSAR / FPP FIie Names II File Size (Bvtes)

FPP File Names c:\02 PBAPS FPP REV 23 PEA FPP {001) Table of Contents.pdf 19,599 c:\02 PBAPS FPP REV 23 PEA FPP {002) Sections 1 thru 4 - UFSAR Change 2018-030.pdf 643,029 c:\02 PBAPS FPP REV 23 PEA FPP (003) Sections S thru 7 UFSAR Change 2019-007.pdf 686,581 c:\02 PBAPS FPP REV 23 PEA FPP (004) Appendix A- Tables UFSAR 2020-016 & UFSAR 2019-007.pdf 994,287 c:\02 PBAPS FPP REV 23 PEA FPP {005) Appendix B - Figures - UFSAR Change 2019-016.pdf 4,532,945 c:\02 PBAPS FPP REV 23 PEA FPP (006) Appendix C.pdf 18,359

ATTACHMENT 2 Electronic File Directory Structure Page 5 of 17 Directory Path II UFSAR Drawing File Names UFSAR Drawing File Names c:\03 PBAPS UFSAR REV 28 REF DWGS A-SO, Sheet 0001, Rev 004, RADIATION ZONING BOTH UNITS IN OPERATION EL 91FT - 06IN.pdf 307,288 c:\03 PBAPS UFSAR REV 28 REF DWGS A-55, Sheet 0001, Rev 004, RADIATION ZONING BOTH UNITS IN OPERATION EL 234FT - OOIN.pdf 212,503 c:\03 PBAPS UFSAR REV 28 REF DWGS C-2, Sheet 0001, Rev 020, PLOT PLAN WALL-FLOW-DEFLECTORS AS-BUILT DWG.pdf 678,402 c:\03 PBAPS UFSAR REV 28 REF DWGS C-2, Sheet 0002, Rev 000, PLOT PLAN.pdf 68,604 c:\03 PBAPS UFSAR REV 28 REF DWGS C-84, Sheet 0001, Rev 007, PUMP STRUCTURE ARRANGEMENT DRAWING BLOCK-OUT A-15.pdf 217,401 c:\03 PBAPS UFSAR REV 28 REF DWGS E-1, Sheet 0001, Rev 056, TCCP 13-00204, 14-00251 SINGLE LINE DIAGRAM ST.pdf 760,273 c:\03 PBAPS UFSAR REV 28 REF DWGS E-10, Sheet 0001, Rev 036, SINGLE LINE METER, RELAY DIAGRAM STARTUP, EMERGENCY POWER SYSTEMS.pdf 171,260 c:\03 PBAPS UFSAR REV 28 REF DWGS E-12, Sheet 0001, Rev 011, SINGLE LINE METER, RELAY DIAG STANDBY DIESEL GENS, 4160 VOLT.pdf 236,578 c:\03 PBAPS UFSAR REV 28 REF DWGS E-1615, Sheet 0001, Rev 083 SINGLE LINE METER AND RELAY DIAGRAM E124 AND E224 EMERG . L.C.pdf 694,872 c:\03 PBAPS UFSAR REV 28 REF DWGS E-1617, Sheet 0001, Rev 076, SINGLE LINE METER AND RELAY DIAGRAM E-324 AND E424 EMERG.pdf 149,935 c:\03 PBAPS UFSAR REV 28 REF DWGS E-1619, Sheet 0001, Rev 037, SINGLE LINE METER AND RELAY DIAGRAM E124-D-A, E324-D-A AND 434-D-A.pdf 229,546 c:\03 PBAPS UFSAR REV 28 REF DWGS E-1621, Sheet 0001, Rev 071, SINGLE LINE METER AND RELAY DIAGRAM E324-T-B AND 424-T-B TURB MCC.pdf 143,499 c:\03 PBAPS UFSAR REV 28 REF DWGS E-1717, Sheet 0001, Rev 072, SINGLE LINE METER AND RELAY DIAGRAM E334 AND E434 EMERG LC AND E334-R.pdf 159,222 c:\03 PBAPS UFSAR REV 28 REF DWGS E-1715, Sheet 0001, Rev 084, SINGLE LINE METER AND RELAY DIAGRAM E134, E234 EMER LC., E134-W-A, .pdf 586,386 c:\03 PBAPS UFSAR REV 28 REF DWGS E-24, Sheet 0001, Rev 018, SINGLE LINE DIAGRAM 24 V DC POWER SYSTEM.pdf 361,410 c:\03 PBAPS UFSAR REV 28 REF DWGS E-26, Sheet 0001, Rev 088, SINGLE LINE DIAGRAM 125 250 VDC SYSTEM.pdf 652,208 c:\03 PBAPS UFSAR REV 28 REF DWGS E-26, Sheet 0002, Rev 063, SINGLE LINE DIAGRAM 125 250 VDC SYSTEM.pdf 119,199 c:\03 PBAPS UFSAR REV 28 REF DWGS E-26, Sheet 0003, Rev 007, 125 250 VDC SYSTEM UNIT 2.pdf 76,178 c:\03 PBAPS UFSAR REV 28 REF DWGS E-27, Sheet 0001, Rev 080, SINGLE LINE DIAGRAM 125 2SO VDC SYSTEM UNIT 3.pdf 549,855 c:\03 PBAPS UFSAR REV 28 REF DWGS E-27, Sheet 0002, Rev 044, SINGLE LINE DIAGRAM 125 250 VDC SYSTEM.pdf 94,835 c:\03 PBAPS UFSAR REV 28 REF DWGS E-27, Sheet 0003, Rev 008, 125V 250v DC SWITCHBOARD 30D00S LAYOUT DIAGRAM .pdf 594,946 c:\03 PBAPS UFSAR REV 28 REF DWGS E-28, Sheet 0001, Rev 091, SINGLE LINE DIAGRAM INSTRUMENTATION UNINTERRUPTIBLE AC SYS.pdf 567,145 c:\03 PBAPS UFSAR REV 28 REF DWGS E-28, Sheet 0002, Rev 051, SINGLE LINE DIAGRAM INSTRUMENTATION UNINTERRUPTBLE AC SYS.pdf 68,072 c:\03 PBAPS UFSAR REV 28 REF DWGS E-29, Sheet 0001, Rev 067, SINGLE LINE DIAGRAM INSTRUMENTATION UNINTERRUPTIBLE AC SYS.pdf 495,222 c:\03 PBAPS UFSAR REV 28 REF DWGS E-4, Sheet 0001, Rev 036, SINGLE LINE METER AND RELAY DIAGRAM.pdf 182,329 c:\03 PBAPS UFSAR REV 28 REF DWGS E-5, Sheet 0001, Rev 018, SINGLE LINE METER RELAY DIAGRAM 13.8KV AUX POWER SYSTEM.pdf 145,340 c:\03 PBAPS UFSAR REV 28 REF DWGS E-5010, Sheet 0001, Rev 008, SINGLE LINE METER, RELAY DIAGRAM COOLING TOWERS D,E OAE-177, OBE-17.pdf 343,046 c:\03 PBAPS UFSAR REV 28 REF DWGS E-6, Sheet 0001, Rev 034, SINGLE LINE METER AND RELAY DIAGRAM.pdf 900,445 c:\03 PBAPS UFSAR REV 28 REF DWGS M-13, Sheet 0001, Rev 013, EQUIPMENT LOCATION REACTOR AND RADWASTE BUILDING UNIT NO 2 PLAN AT EL.pdf 233,067 c:\03 PBAPS UFSAR REV 28 REF DWGS M-15, Sheet 0001, Rev 029, EQUIPMENT LOCATION REACTOR AND RADWASTE BLDG UNIT NO 2 PLAN AT EL 135.pdf 410,094 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-11, Sheet 0001, Rev 008, FUNCTL CONTROL DIAG AREA RADIATION MONITORING SYSTEM .pdf 197,823 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-11, Sheet 0002, Rev 008, FUNCTL CONTROL DIAG AREA RADIATION MONITORING SYSTEM .pdf 221,266

ATTACHMENT 2 Electronic File Directory Structure Page 6 of 17 Directory Path UFSAR Drawing File Names File Size (Bytes) c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC- 13, Sheet 0001, Rev 022, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEM.pdf 322,856 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l -CC-13, Sheet 0002, Rev 016, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf 241,551 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC- 13, Sheet 0003, Rev 021, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC. SYSTEMS.pdf 58,250 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-13, Sheet 0004, Rev 014, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEM.pdf 150,013 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l -CC-13, Sheet 0005, Rev 016, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC. SYSTEMS.pdf 62,524 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-13, Sheet 0006, Rev 016, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC. SYSTEMS.pdf 71,144 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-13, Sheet 0007, Rev 015, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEM.pdf 243,828 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-13, Sheet 0008, Rev 014, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEM.pdf 108,045 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-13, Sheet 0009, Rev 014, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEM.pdf 120,817 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-13, Sheet 0010, Rev 016, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEM.pdf 149,119 c:\03 PBAPS UFSAR REV 28 REF DWGS M - l-CC-13, Sheet 0011, Rev 016, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEM.pdf 183,076 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l-CC-13, Sheet 0012, Rev 017, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEMS.pdf 175,882 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-13, Sheet 0012A, Rev 018, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf 213,092 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC- 13, Sheet 0013, Rev 020, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf 253,687 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-13, Sheet 0014, Rev 015, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf 107,323 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC- 13, Sheet 0015, Rev 021, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEMS.pdf 42,507 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l-CC- 13, Sheet 0016, Rev 014, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf 146,666 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l-CC- 13, Sheet 0017, Rev 019, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEMS.pdf 83,971 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC- 13, Sheet 0018, Rev 016, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEMS.pdf 72,639 c:\03 PBAPS UFSAR REV 28 REF DWGS M - l-CC-13, Sheet 0019, Rev 016, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC. SYS.pdf 140,406 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-13, Sheet 0020, Rev 014, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf 103,314 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-13, Sheet 0021, Rev 014, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf 112,467 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-13, Sheet 0022, Rev 017, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf 155,267 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-13, Sheet 0023, Rev 017, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf 287,892 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l-CC-13, Sheet 0024, Rev 019, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEMS.pdf 527,939 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-23, Sheet 0001, Rev 009, FUNCTL CONTROL DIAG NEUTRON MONITORING SYSTEM.pdf 336,845 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l-CC-23, Sheet 0014, Rev 008, FUNCTL CONTROL DIAG NEUTRON MONITORING SYS.pdf 347,395 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l-CC-35, Sheet 0001, Rev 016, FUNCTL CONTROL DIAG REACTOR WATER CLEAN-UP SYSTEM .pdf 210,006 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-35, Sheet 0002, Rev 017, FUNCTIONAL CONTROL DIAGRAM FOR REACTOR WATER CLEANUP.pdf 57,562 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-35, Sheet 0003, Rev 016, FUNCTIONAL CONTROL DIAGRAM FOR REACTOR WATER CLEANUP.pdf 257,525 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-35, Sheet 0004, Rev 018, FUNCTIONAL CONTROL DIAGRAM FOR REACTOR WATER CLEANUP.pdf 170,822 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-38, Sheet 0001, Rev 011, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE.pdf 64,230 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l-CC-38, Sheet 0002, Rev 006, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE .pdf 58,829

ATTACHMENT 2 Electronic File Directory Structure Page 7 of 17 Directory Path c:\03 PBAPS UFSAR REV 28 REF DWGS UFSAR Drawing FIie Names M-l-CC-38, Sheet 0003, Rev 009, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE .pdf

~

59,256 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l-CC-38, Sheet 0004, Rev 007, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE ISOLATION COOLING SY5TEM.pdf 178,561 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-38, Sheet 0005, Rev 004, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE ISOLATION COOLING SYSTEM.pdf 171,335 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-38, Sheet 0006, Rev 006, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTING SYSTEM.pdf 158,467 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-38, Sheet 0007, Rev 006, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTING SYSTEM.pdf 496,332 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-38, Sheet 0008, Rev 007, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE ISOLATION COOLING SYSTEM.pdf 75,180 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-38, Sheet 0009, Rev 009, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE ISOLATION COOLING SYSTEM.pdf 87,248 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-38, Sheet 0010, Rev 007, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE ISOLATION COOLING SYSTEM.pdf 116,502 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-38, Sheet 0011, Rev 005, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE ISOLATION COOLING SYSTEM.pdf 234,908 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l -CC-38, Sheet 0012, Rev 006, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE ISOLATION COOLING SYSTEM.pdf 170,769 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-39, Sheet 0001, Rev 012, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTING SYSTEM .pdf 96,486 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-39, Sheet 0001A, Rev 004, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTING SYSTE.pdf 146,787 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l-CC-39, Sheet 0002, Rev 003, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM .pdf 177,290 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-39, Sheet 0002A, Rev 005, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COLLANT INJECTION SYSTE.pdf 132,334 c:\03 PBAPS UFSAR REV 28 REF DWGS M - l-CC-39, Sheet 0003, Rev 006, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM .pdf 146,827 c:\03 PBAPS UFSAR REV 28 REF DWGS M - l-CC-39, Sheet 0004, Rev 004, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTING SYSTEM.pdf 173,753 c :\03 PBAPS UFSAR REV 28 REF DWGS M -l-CC-39, Sheet 0005, Rev 007, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTING SYSTEM .pdf 174,414 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-39, Sheet 0006, Rev 006, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 181,818 c :\03 PBAPS UFSAR REV 28 REF DWGS M -l -CC-39, Sheet 0007, Rev 007, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM .pdf 956,676 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-39, Sheet 0007A, Rev 004, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 50,402 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-39, Sheet 0008, Rev 007, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 55,378 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-39, Sheet 0008A, Rev 005, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 229,466 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-39, Sheet 0009, Rev 004, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM .pdf 146,520 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l-CC-39, Sheet 0010, Rev 004, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 172,309 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-39, Sheet 0011, Rev 007, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 147,696 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-39, Sheet 0012, Rev 005, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 181,514 c :\03 PBAPS UFSAR REV 28 REF DWGS M CC-4, Sheet 0001, Rev 022, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 37,384 c:\03 PBAPS UFSAR REV 28 REF DWGS M CC-4, Sheet 0003, Rev 015, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYS.pdf 65,593 c:\03 PBAPS UFSAR REV 28 REF DWGS M-1-CC-4, Sheet 0004, Rev 015, WIRING DIAGRAM FUNC CONTROL DIAGRAM RECIRC FLOW CONTROL S.pdf 292,379 c:\03 PBAPS UFSAR REV 28 REF DWGS M-1-CC-4, Sheet 0006, Rev 020, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 28,776 c:\03 PBAPS UFSAR REV 28 REF DWGS M-1-CC-4, Sheet 0007, Rev 021, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 53,567 c:\03 PBAPS UFSAR REV 28 REF DWGS M-1-CC-4, Sheet 0008, Rev 017, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 53,872 c:\03 PBAPS UFSAR REV 28 REF DWGS M CC-4, Sheet 0009, Rev 015, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM .pdf 58,465

ATTACHMENT 2 Electronic File Directory Structure Page 8 of 17 I Directory Path I UFSAR Drawing File Names File Size (Bytes) c:\03 PBAPS UFSAR REV 28 REF DWGS M-1-CC-4, Sheet 0010, Rev 016, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 114,270 c:\03 PBAPS UFSAR REV 28 REF DWGS M-1-CC-4, Sheet 0011, Rev 017, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 55,206 c:\03 PBAPS UFSAR REV 28 REF DWGS M-1-CC-4, Sheet 0012, Rev 019, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 184,564 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-40, Sheet 0001, Rev 011, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOAL SYSTEM.pdf 209,503 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-40, Sheet 0002, Rev 014, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM .pdf 76,522 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-40, Sheet 0003, Rev 009, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM .pdf 50,299 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-40, Sheet 0004, Rev 011, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT.pdf 45,336 c:\03 PBAP5 UFSAR REV 28 REF DWGS M-l-CC-40, Sheet 0005, Rev 006, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 123,947 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-40, Sheet 0006, Rev 007, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT.pdf 503,231 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-40, Sheet 0007, Rev 009, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 161,946 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-40, Sheet 0008, Rev 009, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 181,525 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-40, Sheet 0009, Rev 010, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT.pdf 188,267 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-40, Sheet 0010, Rev 009, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 181,295 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-40, Sheet 0011, Rev 009, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 71,612 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-40, Sheet 0012, Rev 005, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 145,416 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-40, Sheet 0013, Rev 010, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 49,855 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-40, Sheet 0014, Rev 010, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 72,842 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-41, Sheet 0002, Rev 001, FUNCTIONAL CONTROL DIAG CORE SPRAY SYSTEM.pdf 109,915 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-41, Sheet 0003, Rev 006, FUNCTIONAL CONTROL DIAGRAM CORE SPRAY SYSTEM.pdf 79,831 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-41, Sheet 0004, Rev 005, FUNCTIONAL CONTROL DIAG CORE SPRAY SYSTEM .pdf 159,406 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-41, Sheet 0005, Rev 007, FUNCTIONAL CONTROL DIAG CORE SPRAY SYSTEM.pdf 409,363 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-41, Sheet 0006, Rev 004, FUNCTIONAL CONTROL DIAG CORE SPRAY SYSTEM .pdf 91,567 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-41, Sheet 0007, Rev 005, FUNCTIONAL CONTROL DIAGRAM CORE SPRAY SYSTEM .pdf 61,716 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-41, Sheet 0008, Rev 005, FUNCTIONAL CONTROL DIAG CORE SPRAY SYSTEM.pdf 104,420 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-42, Sheet 0001, Rev 011, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 256,945 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-42, Sheet 0002, Rev 003, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 175,978 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-42, Sheet 0003, Rev 006, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYRDRAULIC SYSTEM.pdf 195,671 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-42, Sheet 0004, Rev 002, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 187,035 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-42, Sheet 0005, Rev 003, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 127,602 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-42, Sheet 0006, Rev 004, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 193,241 c:\03 PBAPS UFSAR REV 28 REF DWGS M - l-CC-42, Sheet 0007, Rev 002, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 102,892 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-42, Sheet 0009, Rev 001, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 93,927 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l -CC-42, Sheet 0009A, Rev 005, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 54,976

ATTACHMENT 2 Electronic File Directory Structure Page 9 of 17 Directory Path UFSAR Drawing File Names c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-42, Sheet 0010, Rev 011, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM .pdf 300,897 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-42, Sheet 0011, Rev 003, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM .pdf 168,919 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-42, Sheet 0012, Rev 006, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 207,636 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-42, Sheet 0013, Rev 003, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 23S,213 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l -CC-42, Sheet 0014, Rev 003, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 133,730 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l -CC-42, Sheet 0015, Rev 004, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM .pdf 141,528 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-42, Sheet 0016, Rev 003, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM .pdf 42, 100 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l -CC-42, Sheet 0018, Rev 001, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 99,812 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-CC-42, Sheet 0018A, Rev 003, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 109,899 c:\03 PBAPS UFSAR REV 28 REF DWGS M CC-S, Sheet 0001, Rev 010, FUNCTL CONTROL DIAG STAND-BY LIQUID CONTROL SYSTEM,0001.pdf 203,960 c:\03 PBAPS UFSAR REV 28 REF DWGS M DD-3, Sheet 0001, Rev 006, PROCESS DIAGRAM STANDBY LIQUID CONTROL SYSTEM.pdf 119,735 c:\03 PBAPS UFSAR REV 28 REF DWGS M DD-5 Sheet 0001 Rev 008 PROC DIAGRAM REACTOR WATER CLEAN -UP SYSTEM HIGH PRESSURE.pdf 139,596 c:\03 PBAPS UFSAR REV 28 REF DWGS M DD-6, Sheet 0001, Rev 006, PROCESS DIAG HIGH PRESS COOLANT INJECTION SYS CONTROL RO.pdf 158,233 c:\03 PBAPS UFSAR REV 28 REF DWGS M DD-8, Sheet 0002, Rev 013, RADWASTE PROCESS DIAGRAM.pdf 462,165 c:\03 PBAPS UFSAR REV 28 REF DWGS M DD-9, Sheet 0001, Rev 009, PROCESS DIAG RESIDUAL HEAT REMOVAL (RHR) CONTROL ROD DRl.pdf 519, 186 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-T-20, Sheet 0001, Rev 014, INSTRUMENT ENGINEERING DIAGRAM NEUTRON MOUNTING SYSTEM.pdf 322,595 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l -T-20, Sheet 0002, Rev 012, NEUTRON MONITORING SYSTEM.pdf 765,973 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l -T-20, Sheet 0003, Rev 014, NEUTRON MONITORING SYSTEM INSTRUMENT ENGINEERING DIAGRAM .pdf 241,281 c :\03 PBAPS UFSAR REV 28 REF DWGS M -l-T-20, Sheet 0004, Rev 013, INSTRUMENT ENGINEERING DIAGRAM NEUTRON MONITORING SYSTEM.pdf 386,788 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l-T-25, Sheet 0001, Rev 016, INSTRUMENT ENGINEERING DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM PIO - HISTORY.pdf 57,896 c :\03 PBAPS UFSAR REV 28 REF DWGS M -l-T-25, Sheet 0002, Rev 018, INSTRUMENT ENGINEERING DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM - HISTORY.pdf 47,842 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l -T-25, Sheet 0003, Rev 016, INSTRUMENT ENGINEERING DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM PID.pdf 79,068 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l-T-25, Sheet 0004, Rev 018, INSTRUMENT ENGINEERING DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 67,531 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-T-29, Sheet 0001, Rev 012, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC. SYSTEMS.pdf 5S,213 c:\03 PBAPS UFSAR REV 28 REF DWGS M -l -T-29, Sheet 0002, Rev 012, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC. SYSTEMS.pdf 51,383 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-T-49, Sheet 0001, Rev 012, REACTOR PROTECTION SYSTEM JED PID.pdf 296,977 c :\03 PBAPS UFSAR REV 28 REF DWGS M - l-T-49, Sheet 0002, Rev 007, REACTOR PROTECTION SYSTEM JED PID.pdf 181,884 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-T-49, Sheet 0003, Rev 015, INSTRUMENT ENGINEERING DIAGRAM REACTOR PROTECTION SYSTEM.pdf 93,668 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-T-49, Sheet 0004, Rev 006, INSTRUMENT ENGINEERING DIAGRAM REACTOR PROTECTION SYS P AND ID.pdf 221,109 c:\03 PBAPS UFSAR REV 28 REF DWGS M - l -T-49, Sheet 0005, Rev 012, INSTRUMENT ENGINEERING DIAGRAM REACTOR PROTECTION SYSTEM.pdf 174,803 c:\03 PBAPS UFSAR REV 28 REF DWGS M-l-T-49, Sheet 0006, Rev 014, INSTRUMENT ENGINEERING DIAGRAM REACTOR PROTECTION SYS P AND ID.pdf 101,770 c:\03 PBAPS UFSAR REV 28 REF DWGS M-2, Sheet 0001, Rev 020, GENERAL ARRANGEMENT PLAN AT EL 116-0 .pdf 363,572 c:\03 PBAPS UFSAR REV 28 REF DWGS M -2406, Sheet 0001, Rev 009, 2-12 YEAR ONSITE RADWSTE STORAGE FACILITY PLAN EL 135FT-061N AND SEC.pdf 358,798

ATTACHMENT 2 Electronic File Directory Structure Page 10 of 17 I Directory Path I UFSAR Drawing File Names I FIie Size (Bytes)

I c:\03 PBAPS UFSAR REV 28 REF DWGS M -2430, Sheet 0001, Rev 011, DRAIN AND SUMP SYSTEM.pdf 278,977 c:\03 PBAPS UFSAR REV 28 REF DWGS M-3, Sheet 0001, Rev 021, GENERAL ARRANGEMENT PLAN AT EL 135FT - 0 IN .pdf 597,339 c:\03 PBAPS UFSAR REV 28 REF DWGS M-300, Sheet 0001, Rev 048, DIAGRAM LEGEND.pdf 686,986 c:\03 PBAPS UFSAR REV 28 REF DWGS M-300, Sheet 0002, Rev 046, P AND I DIAGRAM LEGEND.pdf 114,167 c:\03 PBAPS UFSAR REV 28 REF DWGS M -303, Sheet 0001, Rev 076, MAIN STEAM BYPASS AND CROSSAROUND.pdf S64,378 c:\03 PBAPS UFSAR REV 28 REF DWGS M-303, Sheet 0002, Rev 060, MAIN STEAM BYPASS AND CROSSAROUND.pdf 174,876 c:\03 PBAPS UFSAR REV 28 REF DWGS M -303, Sheet 0003, Rev 070, MAIN STEAM, BYPASS AND CROSSAROUND.pdf 425,926 c:\03 PBAPS UFSAR REV 28 REF DWGS M -303, Sheet 0004, Rev 064A, MAIN STEAM, BY-PASS AND CROSSAROUND.pdf 291,383 c:\03 PBAPS UFSAR REV 28 REF DWGS M-304, Sheet 0001, Rev 054, TURBINE AND EXTRACTION STEAM.pdf 200,579 c:\03 PBAPS UFSAR REV 28 REF DWGS M-304, Sheet 0002, Rev 056, TURBINE AND EXTRACTION STEAM.pdf 198,742 c:\03 PBAPS UFSAR REV 28 REF DWGS M -307, Sheet 0001, Rev 066, CONDENSATE SYSTEM.pdf 110,201 c:\03 PBAPS UFSAR REV 28 REF DWGS M-307, Sheet 0002, Rev 076, CONDENSATE SYSTEM.pdf 120,731 c:\03 PBAPS UFSAR REV 28 REF DWGS M-307, Sheet 0003, Rev 040, CONDENSATE SYSTEM .pdf 150,559 c:\03 PBAPS UFSAR REV 28 REF DWGS M -307, Sheet 0004, Rev 064, CONDENSATE SYSTEM.pdf 108,607 c:\03 PBAPS UFSAR REV 28 REF DWGS M-307, Sheet 0005, Rev 078, CONDENSATE SYSTEM.pdf 363,161 c:\03 PBAPS UFSAR REV 28 REF DWGS M -307, Sheet 0006, Rev 043, CONDENSATE SYSTEM,0006.pdf 155,819 c:\03 PBAPS UFSAR REV 28 REF DWGS M-308, Sheet 0001, Rev 067, FEEDWATER AND FEED PUMPS.pdf 172,926 c:\03 PBAPS UFSAR REV 28 REF DWGS M-308, Sheet 0002, Rev 045, FEEDWATER AND FEED PUMPS.pdf 459,535 c:\03 PBAPS UFSAR REV 28 REF DWGS M -308, Sheet 0003, Rev 063, FEEDWATER AND FEED PUMPS.pdf 537,398 c:\03 PBAPS UFSAR REV 28 REF DWGS M-308, Sheet 0004, Rev 046, FEEDWATER AND FEED PUMPS {2).pdf 550,996 c:\03 PBAPS UFSAR REV 28 REF DWGS M -308, Sheet 0004, Rev 046, FEEDWATER AND FEED PUMPS.pdf 497,994 c :\03 PBAPS UFSAR REV 28 REF DWGS M-308, Sheet 0005, Rev 043, FEEDWATER AND FEED PUMPS.pdf 55,743 c:\03 PBAPS UFSAR REV 28 REF DWGS M-308, Sheet 0006, Rev 006, FEEDWATER AND FEED PUMPS.pdf 55,296 c:\03 PBAPS UFSAR REV 28 REF DWGS M-310, Sheet 0001, Rev 068, AIR EJECTION AND OFF GAS.pdf 532,314 c:\03 PBAPS UFSAR REV 28 REF DWGS M-310, Sheet 0002, Rev 063, AIR EJECTOR AND OFF GAS.pdf 205,886 c:\03 PBAPS UFSAR REV 28 REF DWGS M -310, Sheet 0003, Rev 070, AIR EJECTION AND OFF GAS.pdf 105,435 c:\03 PBAPS UFSAR REV 28 REF DWGS M -310, Sheet 0004, Rev 051, AIR EJECTION AND OFF GAS.pdf 125,392 c:\03 PBAPS UFSAR REV 28 REF DWGS M -310, Sheet 0005, Rev 004, AIR EJECTION AND OFF GAS.pdf 94,746 c:\03 PBAPS UFSAR REV 28 REF DWGS M -311, Sheet 0001, Rev 050, CONDENSATE FILTER DEMINERALIZER SYSTEM .pdf 123,179 c:\03 PBAPS UFSAR REV 28 REF DWGS M -311, Sheet 0003, Rev 039, CONDENSATE FILTER DEMINERALIZER SYSTEM .pdf 479,594 c:\03 PBAPS UFSAR REV 28 REF DWGS M-311, Sheet 0004, Rev 039, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf 474,369 c:\03 PBAPS UFSAR REV 28 REF DWGS M -311, Sheet 0005, Rev 039, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf 464, 120 c:\03 PBAPS UFSAR REV 28 REF DWGS M -311, Sheet 0006, Rev 040, CONDENSATE FILTER DEMINERALIZER SYSTEM .pdf 365,327

ATTACHMENT 2 Electronic File Directory Structure Page 11 of 17 J.::

~

,, :;. *~~,-1'lrect6,v,ptth :. $,cl';_,** \t{!;:; :;{h~t; ~t~  ;-~. ,/~~#1";*~~{.., ;; tj?:'* ~-;.~: ~.  :::-. *_;, .,.,_;.:,"';.,..;*

.,.,,.9J.SAR

'~ .

  • l ,ifie,:NY-a!f!,'S';'

~, o@~*Jll . * . ~., ,JPs.vf-;*:

~¥,;,- , ,;r . ~~~;.i 11e'.'Siiir{Byt;e~l*,

c:\03 PBAPS UFSAR REV 28 REF DWGS M-311, Sheet 0007, Rev 055, CONDENSATE FILTER DEMINERALIZER SYSTEM .pdf 134,811 c:\03 PBAPS UFSAR REV 28 REF DWGS M-311, Sheet 0008, Rev 038, CONDENSATE FILTER DEMINERALIZER SYSTEM .pdf 116,095 c:\03 PBAPS UFSAR REV 28 REF DWGS M-311, Sheet 0009, Rev 040, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf 112,514 c:\03 PBAPS UFSAR REV 28 REF DWGS M-311, Sheet 0010, Rev 039, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf 112,581 c:\03 PBAPS UFSAR REV 28 REF DWGS M-311, Sheet 0011, Rev 038, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf 114,210 c :\03 PBAPS UFSAR REV 28 REF DWGS M-311, Sheet 0012, Rev 039, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf 88,941 c:\03 PBAPS UFSAR REV 28 REF DWGS M-312, Sheet 0001, Rev 060, CIRCULATING WATER SYSTEM .pdf 623,104 c:\03 PBAPS UFSAR REV 28 REF DWGS M-312, Sheet 0002, Rev 058, CIRCULATING WATER SYSTEM.pdf 869,255 c:\03 PBAPS UFSAR REV 28 REF DWGS M-314, Sheet 0001, Rev 076, SERVICE WATER SYSTEM.pdf 533,633 c:\03 PBAPS UFSAR REV 28 REF DWGS M-314, Sheet 0002, Rev 064, SERVICE WATER SYSTEM.pdf 94,814 c:\03 PBAPS UFSAR REV 28 REF DWGS M-314, Sheet 0003, Rev 071, SERVICE WATER SYSTEM.pdf 85,846 c:\03 PBAPS UFSAR REV 28 REF DWGS M-314, Sheet 0004, Rev 069, SERVICE WATER SYSTEM.pdf 108,092 c:\03 PBAPS UFSAR REV 28 REF DWGS M -314, Sheet 0005, Rev 071, SERVICE WATER SYSTEM.pdf 516,239 c:\03 PBAPS UFSAR REV 28 REF DWGS M-314, Sheet 0006, Rev 067, SERVICE WATER SYSTEM.pdf 427,154 c:\03 PBAPS UFSAR REV 28 REF DWGS M-314, Sheet 0007, Rev 063, SERVICE WATER SYSTEM.pdf 241,958 c:\03 PBAPS UFSAR REV 28 REF DWGS M-314, Sheet 0008, Rev 067, SERVICE WATER SYSTEM.pdf 114,419 c:\03 PBAPS UFSAR REV 28 REF DWGS M-314, Sheet 0009, Rev 045, SERVICE WATER SYSTEM.pdf 49,316 c:\03 PBAPS UFSAR REV 28 REF DWGS M-315, Sheet 0001, Rev 090, EMERGENCY SERVICE WATER AND HIGH PRESSURE SERVICE WATER SYSTEM.pdf 438,609 c :\03 PBAPS UFSAR REV 28 REF DWGS M-315, Sheet 0001, Rev 092, EMERGENCY SERVICE WATER AND HIGH PRESSURE SERVICE WATER SYSTEM.pdf 12,594,563 c:\03 PBAPS UFSAR REV 28 REF DWGS M-315, Sheet 0002, Rev 057, EMERGENCY SERVICE WATER AND HIGH PRESSURE SERVICE WATER SYSTEMS.pdf 101,813 c:\03 PBAPS UFSAR REV 28 REF DWGS M-315, Sheet 0003, Rev 066, EMERGENCY SERVICE WATER AND HIGH PRESSURE SERVICE WATER SYSTEM.pdf 112,327 c:\03 PBAPS UFSAR REV 28 REF DWGS M -315, Sheet 0004, Rev 056, EMERGENCY SERVICE WATER AND HIGH PRESSURE.pdf 670,538 c:\03 PBAPS UFSAR REV 28 REF DWGS M -315, Sheet 0005, Rev 059, EMERG SERV WTR, HIGH PRESS SERV WTR SYSTEM.pdf 121,006 c:\03 PBAPS UFSAR REV 28 REF DWGS M-315, Sheet 0006, Rev 003, PIO EMERGENCY SERVICE WATER AND HIGH PRESS SERVICE WATER SY.pdf 129,719 c:\03 PBAPS UFSAR REV 28 REF DWGS M-315, Sheet 0007, Rev 003, PID EMERGENCY SERVICE WATER AND HIGH PRESS SERVICE WATER SY.pdf 117,609 c:\03 PBAPS UFSAR REV 28 REF DWGS M -316, Sheet 0001, Rev 062, COOLING WATER REACTOR BUILDING .pdf 505,838 c:\03 PBAPS UFSAR REV 28 REF DWGS M-316, Sheet 0002, Rev 064, COOLING WATER-TURBINE BUILDING.pdf 620,969 c:\03 PBAPS UFSAR REV 28 REF DWGS M -316, Sheet 0003, Rev 053, COOLING WATER REACTOR BUILDING.pdf 487,164 c:\03 PBAPS UFSAR REV 28 REF DWGS M -316, Sheet 0004, Rev 057, COOLING WATER - TURBINE BLDG .. pdf 146,084 c:\03 PBAPS UFSAR REV 28 REF DWGS M -317, Sheet 0001, Rev 083, RAW WATER SYSTEM.pdf 270,161 c:\03 PBAPS UFSAR REV 28 REF DWGS M-317, Sheet 0002, Rev 054, RAW WATER SYSTEM.pdf 307,920 c:\03 PBAPS UFSAR REV 28 REF DWGS M-319, Sheet 0001, Rev 036, MAKE-UP DEMINERALIZER WATER.pdf 151,189 c:\03 PBAPS UFSAR REV 28 REF DWGS M -319, Sheet 0002, Rev 053, MAKE-UP DEMINERALIZER WATER.pdf 675,425

ATTACHMENT 2 Electronic File Directory Structure Page 12 of 17 Directory Path UFSAR Drawing File Names I File Size (Bytes)

I c:\03 PBAPS UFSAR REV 28 REF DWGS M-319, Sheet 0003, Rev 011, MAKEUP DEMINERALIZER WATER.pdf 60,070 c:\03 PBAPS UFSAR REV 28 REF DWGS M-319, Sheet 0004, Rev 020, MAKE UP DEMINERALIZER WATER.pdf 78,334 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0001, Rev 039, COMPRESSED AIR - NOTES AND INDEX TITLE SHEET.pdf 105,608 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0002, Rev 044, AIR COMPRESSOR 2AK001 AND DRYERS.pdf 333,795 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0003, Rev 044, AIR COMPRESSOR 2BK001 AND DRYERS.pdf 407,196 c :\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0004, Rev 041, AIR COMPRESSORS 2CK001 AND 2DK001.pdf 366,392 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0005, Rev 040, RW AIR COMPRESSORS 00K308 AND 00K309 AND RESPIRATORY AIR CO.pdf 168,919 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0006, Rev 044, CONDENSATE BACKWASH SYS AIR COMPRESSOR 2AK315 AND LOW PRESS AIR BLOWER.pdf 294,522 c:\03 PBAPS UFSAR REV 28 REF DWGS M -320, Sheet 0007, Rev 037, INSTRUMENT AIR TURBINE BUILDING.pdf 278,968 c:\03 PBAPS UFSAR REV 28 REF DWGS M -320, Sheet 0008, Rev 034, INSTRUMENT AIR TURBINE BUILDING EL. 102.pdf 160,742 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0009, Rev 043, COMPRESSED AIR SYSTEM INSTRUMENT AIR TURBINE BUILDING EL. 116.pdf 364,115 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0010, Rev 034, INSTRUMENT AIR TURBINE BUILDING EL. 116.pdf 104,109 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0011, Rev 036, INSTRUMENT AIR TURBINE BUILDING EL. 116.pdf 365,740 c :\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0012, Rev 048, COMPRESSED AIR SYSTEM INSTRUMENT Al TURBlNE.pdf 232,689 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0012, Rev 048, COMPRESSED AIR SYSTEM INSTRUMENT Al TURINE .pdf 78,256 c:\03 PBAPS UFSAR REV 28 REF DWGS M -320, Sheet 0013, Rev 040, INSTRUMENT AIR REACTOR BUILDING EL. 91-6.pdf 157,725 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0014, Rev 036, INSTRUMENT AIR REACTOR BUILDING EL. 116.pdf 60,091 c:\03 PBAPS UFSAR REV 28 REF DWGS M -320, Sheet 0015, Rev 039, INSTRUMENT AIR REACTOR BUILDING EL. 135.pdf 291,039 c:\03 PBAPS UFSAR REV 28 REF DWGS M -320, Sheet 0016, Rev 042, INSTRUMENT AIR REACTOR BUILDING EL. 165.pdf 137,522 c:\03 PBAPS UFSAR REV 28 REF DWGS M -320, Sheet 0017, Rev 039, COMPRESSED AIR SYSTEM INSTRUMENT AIR REACTOR BLDG EL. 195.pdf 138, 167 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0018, Rev 036, INSTRUMENT AIR REACTOR BUILDING EL. 234.pdf 73,144 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0019, Rev 048, COMPRESSED AIR SYSTEM SERVICE AIR TURBINE BUILDING EL. 102, 116, 135 AND 165.pdf 257,898 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0020, Rev 040, SERVICE AIR REACTOR BUILDING EL. 91-6 AND 116.pdf 116,949 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0021, Rev 038, SERVICE AIR REACTOR BUILDING EL. 135.pdf 90,269 c :\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0022, Rev 037, SERVICE AIR REACTOR BLDG EL. 165, 195 AND 234.pdf 124,870 c:\03 PBAPS UFSAR REV 28 REF DWGS M -320, Sheet 0023, Rev 039, AIR COMPRESSOR 3AK001 AND DRYERS.pdf 159,732 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0024, Rev 039, AIR COMPRESSOR 3BK001 AND DRYERS.pdf 367,627 c:\03 PBAPS UFSAR REV 28 REF DWGS M -320, Sheet 0025, Rev 041, AIR COMPRESSOR 3CK001 AND 3DK001.pdf 270,090 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0026, Rev 046, CONDENSATE BACKWASH SYS AIR COMP 3AK315 AND LOW PRESS AIRBLOWER 30Kll.pdf 267,775 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0027, Rev 035, INSTRUMENT AIR TURBINE BUILDING EL. 102.pdf 56,164 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0028, Rev 035, INSTRUMENT AIR TURBINE BUILDING EL. 102.pdf 144,725 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0029, Rev 042, COMPRESSED AIR SYSTEM INSTRUMENT AIR TURBINE BUILDING EL. 116.pdf 108,682 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0030, Rev 036, COMPRESSED AIR SYSTEM INSTRUMENT AIR TURBINE BUILDING EL. 116.pdf 102,525

ATTACHMENT 2 Electronic File Directory Structure Page 13 of 17 I Directory Path I UFSAR Drawing File Names c:\03 PBAPS UFSAR REV 28 REF DWGS M -320, Sheet 0031, Rev 036, INSTRUMENT AIR TURBINE BUILDING EL. 135.pdf 326,967 c:\03 PBAPS UFSAR REV 28 REF DWGS M -320, Sheet 0032, Rev 047, INSTRUMENT AIR TURBINE BUILDING EL. 165.pdf 78,440 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0033, Rev 038, INSTRUMENT AIR REACTOR BUILDING EL. 91-6.pdf 222,833 c:\03 PBAPS UFSAR REV 28 REF DWGS M -320, Sheet 0034, Rev 037, COMPRESSED AIR SYSTEM INSTRUMENT AIR REACTOR BUILDING EL 116.pdf 71,668 c:\03 PBAPS UFSAR REV 28 REF DWGS M -320, Sheet 0035, Rev 038, COMPRESSED AIR SYSTEM INSTRUMENT AIR REACTOR BUILDING EL135.pdf 80,035 c :\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0036, Rev 039, COMPRESSED AIR SYSTEM INSTRUMENT AIR REACTOR BLDG EL. 165,0.pdf 117,929 c :\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0037, Rev 040, INSTRUMENT AIR REACTOR BUILDING EL. 195.pdf 117,223 c:\03 PBAPS UF5AR REV 28 REF DWGS M -320, Sheet 0038, Rev 036, INSTRUMENT AIR REACTOR BUILDING EL. 234.pdf 179,052 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0039, Rev 046, COMPRESSED AIR SYSTEM SERVICE AIR TURBINE BLDG EL 102,116,135 AND 165.pdf 83,396 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0040, Rev 037, SERVICE AIR REACTOR BUILDING EL. 91-6 AND 116.pdf 85,593 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0041, Rev 036, SERVICE AIR REACTOR BUILDING EL. 135,0041.pdf 90,836 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0042, Rev 037, SERVICE AIR REACTOR BUILDING EL. 165, 195 AND 234.pdf 143,975 c:\03 PBAPS UFSAR REV 28 REF DWGS M -320, Sheet 0043, Rev 043, INSTRUMENT AIR RADWASTE BLDG EL 135 AND 165.pdf 164,711 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0044, Rev 035, INSTRUMENT AIR RADWASTE BUILDING EL.pdf 173,538 c :\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0045, Rev 037, INSTRUMENT AIR RADWASTE BUILDING EL. 91-6.pdf 102,107 c:\03 PBAPS UFSAR REV 28 REF DWGS M -320, Sheet 0046, Rev 037, SERVICE AIR RADWASTE BLDG EL 91-6, 116, 135 AND 165.pdf 109,910 c:\03 PBAPS UFSAR REV 28 REF DWGS M -320, Sheet 0047, Rev 043, COMPRESSED AIR SYSTEM SERVICE AIR COMMON AREAS AND OFF GAS TUNNEL.pdf 180,366 c:\03 PBAPS UFSAR REV 28 REF DWGS M -320, Sheet 0048, Rev 040, SERVICE AIR ADMIN.pdf 132,252 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0049, Rev 045, COMPRESSED AIR SYSTEM INSTRUMENT AIR AUXILIARY BOILER BUILDING .pdf 191,939 c:\03 PBAPS UFSAR REV 28 REF DWGS M -320, Sheet 0050, Rev 038, COMPRESSED AIR SYSTEM INSTRUMENT AIR RECOMBINER BLDG.pdf 130,200 c:\03 PBAPS UFSAR REV 28 REF DWGS M-320, Sheet 0051, Rev 041, AIR COMPRESSORS 2AK001, 2BK001, 2CK001, 2DK001.pdf 236,907 c:\03 PBAPS UFSAR REV 28 REF DWGS M -320, Sheet 0052, Rev 002, AIR COMPRESSORS 3AK001, 3BK001, 3CK001, 3DK001.pdf 241,483 c:\03 PBAPS UFSAR REV 28 REF DWGS M-322, Sheet 0001, Rev 035, COOLING TOWERS.pdf 329,945 c:\03 PBAPS UFSAR REV 28 REF DWGS M -322, Sheet 0002, Rev 030, COOLING TOWERS - COMMON INSTRUMENT LIST.pdf 166, 121 c:\03 PBAPS UFSAR REV 28 REF DWGS M -324, Sheet 0001, Rev 064, AUXILIARY STEAM SYSTEM.pdf 609,065 c:\03 PBAPS UFSAR REV 28 REF DWGS M -324, Sheet 0002, Rev 060, AUXILIARY STEAM SYSTEM .pdf 387,150 c:\03 PBAPS UFSAR REV 28 REF DWGS M-324, Sheet 0003, Rev 044, AUXILIARY STEAM SYSTEM .pdf 274,883 c:\03 PBAPS UFSAR REV 28 REF DWGS M -327, Sheet 0002, Rev 057, CHILLED WATER SYSTEM DRYWELL COOLING.pdf 129,511 c:\03 PBAPS UFSAR REV 28 REF DWGS M -327, Sheet 0003, Rev 046, CHILLED WATER SYSTEM DRYWELL COOLING.pdf 268,565 c:\03 PBAPS UFSAR REV 28 REF DWGS M-327, Sheet 0004, Rev 051, CHILLED WTR. SYS. DRYWELL COOLING.pdf 135,389 c :\03 PBAPS UFSAR REV 28 REF DWGS M-330, Sheet 0001, Rev 038, EMERGENCY COOLING SYSTEM .pdf 562,333 c:\03 PBAPS UFSAR REV 28 REF DWGS M-331, Sheet 0001, Rev 075, OFF-GAS RECOMBINER SYSTEM.pdf 547,949 c:\03 PBAPS UFSAR REV 28 REF DWGS M-331, Sheet 0002, Rev 054, P AND ID OFF-GAS RECOMBINER SYSTEM.pdf 108,854

ATTACHMENT 2 Electronic File Directory Structure Page 14 of 17 c:\03 PBAPS UFSAR REV 28 REF DWGS M-331, Sheet 0003, Rev 076, OFF-GAS RECOMBINER SYSTEM.pdf 561,760 c:\03 PBAPS UFSAR REV 28 REF DWGS M-331, Sheet 0004, Rev 058, P AND ID OFF-GAS RECOMBINER SYSTEM.pdf 140,704 c:\03 PBAPS UFSAR REV 28 REF DWGS M-331, Sheet 0005, Rev 061, OFF-GAS RECOMBINER SYSTEM.pdf 263,952 c:\03 PBAPS UFSAR REV 28 REF DWGS M-331, Sheet 0006, Rev 061, OFF-GAS RECOMBINER SYSTEM.pdf 136,143 c:\03 PBAPS UFSAR REV 28 REF DWGS M-331, Sheet 0007, Rev 063, OFF-GAS RECOMBINER SYSTEM.pdf 103,840 c:\03 PBAPS UFSAR REV 28 REF DWGS M-333, Sheet 0001, Rev 059, P AND ID INSTRUMENT NITROGEN.pdf 725,087 c:\03 PBAPS UFSAR REV 28 REF DWGS M-333, Sheet 0002, Rev 060, INSTRUMENT NITROGEN.pdf 692,261 c:\03 PBAPS UFSAR REV 28 REF DWGS M-334, Sheet 0001, Rev 046, VENTILATION RAD MONITORING SYS-U2 AND COMMON .pdf 169,444 c:\03 PBAPS UFSAR REV 28 REF DWGS M-334, Sheet 0002, Rev 033, VENTILATION RADIATION MONITORING SYSTEM.pdf 98,892 c:\03 PBAPS UFSAR REV 28 REF DWGS M-351, Sheet 0001, Rev 081, NUCLEAR BOILER.pdf 499,000 c:\03 PBAPS UFSAR REV 28 REF DWGS M-351, Sheet 0002, Rev 073, NUCLEAR BOILER.pdf 371,320 c:\03 PBAPS UFSAR REV 28 REF DWGS M-351, Sheet 0003, Rev 076, NUCLEAR BOILER.pdf 534,788 c:\03 PBAPS UFSAR REV 28 REF DWGS M-351, Sheet 0004, Rev 071, NUCLEAR BOILER.pdf 423,149 c:\03 PBAPS UFSAR REV 28 REF DWGS M-352, Sheet 0001, Rev 065, NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 310,944 c:\03 PBAPS UFSAR REV 28 REF DWGS M-352, Sheet 0002, Rev 069, NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 466,248 c:\03 PBAPS UFSAR REV 28 REF DWGS M-352, Sheet 0003, Rev 055, NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 449,108 c:\03 PBAPS UFSAR REV 28 REF DWGS M-352, Sheet 0004, Rev 065, NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 329,714 c:\03 PBAPS UFSAR REV 28 REF DWGS M-352, Sheet 0005, Rev 046, NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 250,091 c:\03 PBAPS UFSAR REV 28 REF DWGS M-352, Sheet 0006, Rev 039, NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 292,842 c:\03 PBAPS UFSAR REV 28 REF DWGS M-352, Sheet 0007, Rev 000, PIO NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 103,712 c:\03 PBAPS UFSAR REV 28 REF DWGS M-352, Sheet 0008, Rev 000, PIO - NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 97,802 c:\03 PBAPS UFSAR REV 28 REF DWGS M-353, Sheet 0001, Rev 062, REACTOR RECIRCULATION PUMP SYSTEM.pdf 134,250 c:\03 PBAPS UFSAR REV 28 REF DWGS M-353, Sheet 0002, Rev 059, REACTOR RECIRCULATION PUMP SYSTEM.pdf 244,874 c:\03 PBAPS UFSAR REV 28 REF DWGS M-353, Sheet 0003, Rev 065, REACTOR RECIRCULATION PUMP SYSTEM.pdf 396,083 c:\03 PBAPS UFSAR REV 28 REF DWGS M-353, Sheet 0004, Rev 061, REACTOR RECIRCULATION PUMP SYSTEM .pdf 251,654 c:\03 PBAPS UFSAR REV 28 REF DWGS M-354, Sheet 0001, Rev 078, REACTOR WATER CLEAN-UP SYSTEM.pdf 582,278 c:\03 PBAPS UFSAR REV 28 REF DWGS M-355, Sheet 0001, Rev 034, CLEAN-UP FILTER AND DEMINERALIZER SYSTEM.pdf 104,131 c:\03 PBAPS UFSAR REV 28 REF DWGS M-355, Sheet 0002, Rev 032, CLEAN-UP FILTER AND DEMINERALIZER SYSTEM.pdf 70,594 c:\03 PBAPS UFSAR REV 28 REF DWGS M-355, Sheet 0003, Rev 035, CLEAN-UP FILTER AND DEMINERALIZER SYSTEM.pdf 99,335 c:\03 PBAPS UFSAR REV 28 REF DWGS M-355, Sheet 0004, Rev 033, CLEAN-UP FILTER AND DEMINERALIZER SYSTEM.pdf 71,465 c:\03 PBAPS UFSAR REV 28 REF DWGS M-356, Sheet 0002, Rev 076, CONTROL ROD DRIVE HYDRAULIC SYSTEM PART A.pdf 122,692 c:\03 PBAPS UFSAR REV 28 REF DWGS M-357, Sheet 0001, Rev 037, CONTROL ROD DRIVE HYDRAULIC SYSTEM - PART B.pdf 233,935 c:\03 PBAPS UFSAR REV 28 REF DWGS M-357, Sheet 0002, Rev 036, CONTROL ROD DRIVE HYDRAULIC SYSTEM - PART B.pdf 110,910

ATTACHMENT 2 Electronic File Directory Structure Page 15 of 17 I Directory Path II UFSAR Drawing File Names I File Size (Bytes)

I c:\03 PBAPS UFSAR REV 28 REF DWGS M-358, Sheet 0001, Rev 039, STANDBY LIQUID CONTROL SYSTEM.pdf 127,621 c:\03 PBAPS UFSAR REV 28 REF DWGS M-358, Sheet 0002, Rev 039, STANDBY LIQUID CONTROL SYSTEM.pdf 164,342 c:\03 PBAPS UFSAR REV 28 REF DWGS M-359, Sheet 0001, Rev 050, REACTOR CORE ISOLATION COOLING SYSTEM.pdf 330,708 c:\03 PBAPS UFSAR REV 28 REF DWGS M-359, Sheet 0002, Rev 048, REACTOR CORE ISOLATION COOLING SYSTEM.pdf 409,507 c:\03 PBAPS UFSAR REV 28 REF DWGS M-360, Sheet 0001, Rev 056, R.C.I.C. PUMP TURBINE DETAILS.pdf 193,410 c:\03 PBAPS UFSAR REV 28 REF DWGS M-360, Sheet 0002, Rev 054, R.C.I.C. PUMP TURBINE DETAILS.pdf 194,005 c:\03 PBAPS UFSAR REV 28 REF DWGS M-360, Sheet 0003, Rev 047, R.C.I.C. PUMP-TURBN DETAILS LUBE Oil AND CONTROL SYSTEM UNl.pdf 269,226 c:\03 PBAPS UFSAR REV 28 REF DWGS M-360, Sheet 0004, Rev 039, R.C.I .C. PUMP-TURBN DETAILS LUBE Oil AND CONTROL SYS UNIT 3.pdf 9S,902 c:\03 PBAPS UFSAR REV 28 REF DWGS M-361, Sheet 0001, Rev 087, RESIDUAL HEAT REMOVAL SYSTEM.pdf 691,070 c:\03 PBAPS UFSAR REV 28 REF DWGS M-361, Sheet 0002, Rev 071, RESIDUAL HEAT REMOVAL SYSTEM.pdf 319,778 c:\03 PBAPS UFSAR REV 28 REF DWGS M-361, Sheet 0003, Rev 073, RESIDUAL HEAT REMOVAL SYSTEM.pdf 184,122 c:\03 PBAPS UFSAR REV 28 REF DWGS M-361, Sheet 0004, Rev 074, RESIDUAL HEAT REMOVAL SYSTEM.pdf 496,392 c:\03 PBAPS UFSAR REV 28 REF DWGS M-362, Sheet 0001, Rev 064, CORE SPRAY COOLING SYSTEM.pdf 126,193 c:\03 PBAPS UFSAR REV 28 REF DWGS M-362, Sheet 0002, Rev 064, P AND ID CORE SPRAY COOLING SYSTEM.pdf 405,166 c:\03 PBAPS UFSAR REV 28 REF DWGS M-363, Sheet 0001, Rev 044, FUEL POOL COOLING AND CLEAN-UP.pdf 334,681 c:\03 PBAPS UFSAR REV 28 REF DWGS M-363, Sheet 0002, Rev 045, FUEL POOL COOLING AND CLEAN-UP.pdf 451,930 c:\03 PBAPS UFSAR REV 28 REF DWGS M-364, Sheet 0001, Rev 028, FUEL POOL FILTER DEMINERALIZER SYS.. pdf 92,826 c:\03 PBAPS UFSAR REV 28 REF DWGS M-364, Sheet 0002, Rev 025, FUEL POOL FILTER DEMINERALIZER SYS.pdf 540,273 c:\03 PBAPS UFSAR REV 28 REF DWGS M-365, Sheet 0001, Rev 064, HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 403,750 c:\03 PBAPS UFSAR REV 28 REF DWGS M-365, Sheet 0002, Rev 066, HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 131,351 c:\03 PBAPS UFSAR REV 28 REF DWGS M-366, Sheet 0001, Rev 058, HPCI PUMP TURBINE DETAILS.pdf 436,603 c:\03 PBAPS UFSAR REV 28 REF DWGS M-366, Sheet 0002, Rev 050, HPCI PUMP TURBINE DETAILS LUBE OIL AND CONTROL SYSTEMS.pdf 79,137 c:\03 PBAPS UFSAR REV 28 REF DWGS M-366, Sheet 0003, Rev 045, H.P.C.I. PUMP-TURBINE DETAILS LUBE Oil AND CONTROL SYSTEMS.pdf 500,483 c:\03 PBAPS UFSAR REV 28 REF DWGS M-366, Sheet 0004, Rev 053, HPIC PUMP TURBINE DETAILS.pdf 130,136 c:\03 PBAPS UFSAR REV 28 REF DWGS M-367, Sheet 0001, Rev 095, CONTAINMENT ATMOSPHERIC CONTROL SYSTEM.pdf 830,077 c:\03 PBAPS UFSAR REV 28 REF DWGS M-367, Sheet 0002, Rev 082, CONTAINMENT ATMOSPHERIC CONTROL SYSTEM.pdf 470,806 c:\03 PBAPS UFSAR REV 28 REF DWGS M-367, Sheet 0003, Rev 078, CONTAINMENT ATMOSPHERIC CONTROL SYSTEM.pdf 108,354 c:\03 PBAPS UFSAR REV 28 REF DWGS M-367, Sheet 0004, Rev 003, P AND I DIAG CNTNMNT ATMOSPHERIC CONTROL SYSTEM.pdf 85,176 c:\03 PBAPS UFSAR REV 28 REF DWGS M-368, Sheet 0001, Rev 036, P AND ID RADWASTE LIQUID COLLECTION SYSTEM.pdf 213,554 c:\03 PBAPS UFSAR REV 28 REF DWGS M-369, Sheet 0001, Rev 030, RADWASTE LIQUID COLLECTION SYSTEM.pdf 170,209 c:\03 PBAPS UFSAR REV 28 REF DWGS M-372, Sheet 0001, Rev 065, CONTAINMENT ATMOSPHERE DILUTION SYSTEM.pdf 123,880 c:\03 PBAPS UFSAR REV 28 REF DWGS M-372, Sheet 0002, Rev 054, CONTAINMENT ATMOSPHERE DILUTION SYSTEM.pdf 165,483 c:\03 PBAPS UFSAR REV 28 REF DWGS M-372, Sheet 0003, Rev 004, P AND I DIAG CNTNMNT ATMOSPHERE DILUTION SYS.pdf 193,868

ATTACHMENT 2 Electronic File Directory Structure Page 16 of 17 Directory Path UFSAR Drawing File Names File Size (Bytes) c:\03 PBAPS UFSAR REV 28 REF DWGS M-372, Sheet 0003, Rev 005, P AND I DIAG CNTNMNT ATMOSPHERE DILUTION SYS.pdf 283,439 c:\03 PBAPS UFSAR REV 28 REF DWGS M-372, Sheet 0004, Rev 004, CONTAINMENT ATMOSPHERE DILUTION SYSTEM.pdf 177,795 c:\03 PBAPS UFSAR REV 28 REF DWGS M-374, Sheet 0001, Rev 018, POST ACCIDENT SAMPLING SYSTEM INSTRUMENT AND EQUIPMENT LIST.pdf 212,605 c:\03 PBAPS UFSAR REV 28 REF DWGS M-374, Sheet 0002, Rev 020, POST ACCIDENT SAMPLING SYSTEM.pdf 192,503 c:\03 PBAPS UFSAR REV 28 REF DWGS M-377, Sheet 0001, Rev 044, DIESEL GEN AUX SYSTEMS STARTING AIR SYSTEM.pdf 239,317 c:\03 PBAPS UFSAR REV 28 REF DWGS M-377, Sheet 0002, Rev 047, DIESEL GENERATOR AUXILIARY SYSTEMS AIR COOlANT, JACKET COOLANT SYSTEM.pdf 82,415 c:\03 PBAPS UFSAR REV 28 REF DWGS M-377, Sheet 0003, Rev 045, DIESEL GENERATOR AUXILIARY SYSTEMS LUBE OIL SYSTEM.pdf 76,530 c:\03 PBAPS UFSAR REV 28 REF DWGS M-377, Sheet 0004, Rev 041, DIESEL GENERATOR AUXILIARY SYSTEMS DIESEL FUEL OIL SYSTEM .pdf 109,220 c:\03 PBAPS UFSAR REV 28 REF DWGS M-377, Sheet 0005, Rev 009, DIESEL GENERATOR AUX SYSTEMS COMB AIR INTAKE EXHAUST SYSTEM.pdf 56,377 c:\03 PBAPS UFSAR REV 28 REF DWGS M-384, Sheet 0001, Rev 040, P AND ID - CONTROL ROOM HVAC.pdf 196,389 c:\03 PBAPS UFSAR REV 28 REF DWGS M-384, Sheet 0002, Rev 006, P AND ID - CONTROL ROOM HVAC.pdf 137,845 c:\03 PBAPS UFSAR REV 28 REF DWGS M-384, Sheet 0003, Rev 006, P AND ID - CONTROL ROOM HVAC.pdf 126,283 c:\03 PBAPS UFSAR REV 28 REF DWGS M-385, Sheet 0001, Rev 030, EMER. DIESEL BLD,BOILER BLD, SHOP, WAREHOUSE BLDG TEMP CONTROL DIAG ..pdf 225,657 c:\03 PBAPS UFSAR REV 28 REF DWGS M-387, Sheet 0001, Rev 017, TURBINE BLDG. VENTILATION FLOW DIAGRAM.pdf 118,766 c:\03 PBAPS UFSAR REV 28 REF DWGS M-388, Sheet 0001, Rev 037, REACTOR BUILDING VENTILATION FLOW DIAGRAM .pdf 104,235 c :\03 PBAPS UFSAR REV 28 REF DWGS M-389, Sheet 0001, Rev 028, RADWASTE BUILDING VENTILATION FLOW DIAGRAM 2.pdf 89,091 c:\03 PBAPS UFSAR REV 28 REF DWGS M-390, Sheet 0001, Rev 028, DRYWELL COOLING FLOW DIAGRAM.pdf 326,913 c:\03 PBAPS UFSAR REV 28 REF DWGS M-391, Sheet 0001, Rev 034, PRIMARY AND SECONDARY CNTNMNT ISOLATION CONTROL DIAG.pdf 241,275 c:\03 PBAPS UFSAR REV 28 REF DWGS M-391, Sheet 0002, Rev 031, PRIMARY AND SECONDARY CNTNMNT ISOLATION CONTROL DIAG.pdf 188,165 c:\03 PBAPS UFSAR REV 28 REF DWGS M -397, Sheet 0001, Rev 061, STANDBY GAS TREATMENT CONTROL DIAGRAM.pdf 185,250 c:\03 PBAPS UFSAR REV 28 REF DWGS M-397, Sheet 0002, Rev 046, STANDBY GAS TREATMENT CONTROL DIAGRAM.pdf 100,243 c:\03 PBAPS UFSAR REV 28 REF DWGS M-397, Sheet 0003, Rev 003, STANDBY GAS TREATMENT CONTROL DIAGRAM.pdf 93,890 c:\03 PBAPS UFSAR REV 28 REF DWGS M-399, Sheet 0001, Rev 032, EMERGENCY SWITCHGEAR, BATTERY RM, LABORATORY SUPPLY AND EXH.pdf 165,418 c:\03 PBAPS UFSAR REV 28 REF DWGS M-399, Sheet 0002, Rev 004, EMERGENCY SWITCHGEAR, BATTERY RM, LABORATORY SUPPLY, EXHAUS.pdf 109,150 c:\03 PBAPS UFSAR REV 28 REF DWGS M -399, Sheet 0003, Rev 003, EMERGENCY SWITCHGEAR, BATTERY ROOM, LABORATO.pdf 148,765 c:\03 PBAPS UFSAR REV 28 REF DWGS M-399, Sheet 0004, Rev 005, EMERGENCY SWITCHGEAR, BATTERY RM, LABORATORY SUPPLY AND EXH.pdf 129,280 c:\03 PBAPS UFSAR REV 28 REF DWGS M-4, Sheet 0001, Rev 025, GENERAL ARRANGEMENT PLAN AT EL 165-0 3AE07, 3BE07, 3CE07.pdf 318,677 c:\03 PBAPS UFSAR REV 28 REF DWGS M-5, Sheet 0001, Rev 013, GENERAL ARRANGEMENT PLAN AT EL 195FT-OOIN AT EL135-0 AND EL.165-0.pdf 186,061 c:\03 PBAPS UFSAR REV 28 REF DWGS M-6, Sheet 0001, Rev 012, GENERAL ARRANGEMENT PLAN AT EL 234-0 PUMPS TAG NO 2AP01, 2BP01.pdf 187,175 c:\03 PBAPS UFSAR REV 28 REF DWGS M-7, Sheet 0001, Rev 013, GENERAL ARRANGEMENT SECTIONS A-A, B-B APPL TURB DRIVES FOR REACTOR FE.pdf 194,022 c:\03 PBAPS UFSAR REV 28 REF DWGS M-86, Sheet 0001, Rev 024, PIPING AND MECHANICAL REACTOR BLDG UNIT NO 2 PLAN AT EL 165-0 AREA 7.pdf 437,005 c:\03 PBAPS UFSAR REV 28 REF DWGS M-96, Sheet 0001, Rev 019, PIPING AND MECHANICAL REACTOR BLDG UNIT NO 2 PLAN AT EL 165T-OOIN ARE.pdf 331,585 c:\03 PBAPS UFSAR REV 28 REF DWGS M-I-CC-41, Sheet 0001, Rev 009, FUNCTIONAL CONTROL DIAGRAM CORE SPRAY SYSTEM.pdf 148,225

ATTACHMENT 2 Electronic File Directory Structure Page 17 of 17 I Directory Path I UFSAR Drawing File Names File Size (Bytes) c:\03 PBAPS UFSAR REV 28 REF DWGS S-54, Sheet 0001, Rev 030, CONTAINMENT VESSELS - REQUIREMENTS SUPPRESSION CHAMBER - UNITS 2, 3 .pdf 633,306 Directory Path FPP Drawing File Names File Size (Bytes)

FPP Drawing File Names c:\04 PBAPS FPP REV 23 REF DWGS M-318, Sheet 0001, Rev 070, FIRE PROTECTION SYSTEM.pdf 102,181 c:\04 PBAPS FPP REV 23 REF DWGS M-318, Sheet 0002, Rev 107, FIRE PROTECTION SYSTEM.pdf 482,197 c:\04 PBAPS FPP REV 23 REF DWGS M-318, Sheet 0003, Rev 071, FIRE PROTECTION SYSTEM.pdf 244,270 c:\04 PBAPS FPP REV 23 REF DWGS M-318, Sheet 0004, Rev 069, FIRE PROTECTION SYSTEM.pdf 110,186 c:\04 PBAPS FPP REV 23 REF DWGS M-318, Sheet 0005, Rev 007, FIRE PROTECTION SYSTEM.pdf 98,693 c:\04 PBAPS FPP REV 23 REF DWGS M-318, Sheet 0006, Rev 005, FIRE PROTECTION SYSTEM.pdf 57,003 c:\04 PBAPS FPP REV 23 REF DWGS M -318, Sheet 0007, Rev 014, FIRE PROTECTION SYSTEM.pdf 64,142 c:\04 PBAPS FPP REV 23 REF DWGS M-318, Sheet 0008, Rev 021, FIRE PROTECTION SYSTEM.pdf 254,045 c:\04 PBAPS FPP REV 23 REF DWGS M-318, Sheet 0009, Rev 048, FIRE PROTECTION SYSTERM.pdf 826,205 c:\04 PBAPS FPP REV 23 REF DWGS M-318, Sheet 0010, Rev 016, FIRE PROTECTION SYSTEM.pdf 80,304 c:\04 PBAPS FPP REV 23 REF DWGS M-318, Sheet 0011, Rev 000, FIRE PROTECTION SYSTEM.pdf 36,774

ENCLOSURE Peach Bottom Atomic Power Station Units 2 and 3 UFSAR, Revision 28 / FPP, Revision 23 and Supporting Reference Drawing Files DVD CAUTION DO NOT BEND OR FOLD AVOID EXPOSURE TO ALL MAGNETIC FIELDS