Letter Sequence Other |
|---|
|
Results
Other: ML23172A262, ML23172A270, ML23172A275, ML23172A280, ML23172A281, ML23172A284, ML23173A013, ML23173A015, ML23173A016, ML23173A017, ML23173A020, ML23173A023, ML23173A029, ML23173A033, ML23173A037, ML23173A038, ML23173A040, ML23173A043, ML23173A045, ML23173A048, ML23173A049, ML23173A052, ML23173A055, ML23173A056, ML23173A057, ML23173A058, ML23173A059
|
MONTHYEARML23173A0292023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 8, Figures - Redacted Project stage: Other ML23173A0252023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix R, Second License Renewal UFSAR Supplement, Pages R-1 to R-89 - Redacted Project stage: Supplement ML23172A2622023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 7, Figures - Redacted Project stage: Other ML23172A2702023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System - Redacted Project stage: Other ML23172A2752023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix a, Table of Contents - Redacted Project stage: Other ML23172A2802023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 9, Figures - Redacted Project stage: Other ML23172A2812023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix C, Figures - Redacted Project stage: Other ML23172A2842023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix C, Table of Contents - Redacted Project stage: Other ML23173A0132023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 12, Structures and Shielding, Sections 1 Thru 4 - Redacted Project stage: Other ML23173A0152023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 14, Plant Safety Analysis, Sections 1 Thru 10 - Redacted Project stage: Other ML23173A0162023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 5, Figures - Redacted Rev1 Project stage: Other ML23173A0172023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 7, Sections 10 Thru 23 - Redacted Project stage: Other ML23173A0232023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 12, Figures - Redacted Project stage: Other ML23173A0202023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 6, Core Standby Cooling Systems - Redacted Project stage: Other ML23173A0592023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix J, Identification-Resolution of AEC-ACRS and Staff Concerns - Redacted Project stage: Other ML23173A0332023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 2, Site - Redacted Project stage: Other ML23173A0372023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix a, Pressure Integrity of Piping and Equipment Pressure Parts - Redacted Project stage: Other ML23173A0382023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix M Containment Report - Redacted Project stage: Other ML23173A0432023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 8, Electrical Power Systems - Redacted Project stage: Other ML23173A0402023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 7, Control and Instrumentation - Redacted Project stage: Other ML23173A0452023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 9, Table of Contents - Redacted Project stage: Other ML23173A0482023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 12, Table of Contents - Redacted Project stage: Other ML23173A0492023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix a, Figures - Redacted Project stage: Other ML23173A0522023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix J, Figures - Redacted Project stage: Other ML23173A0552023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix E, Station Atmospheric Release Limit Calculations - Redacted Project stage: Other ML23173A0562023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 10, Auxiliary Systems, Sections 1 Thru 24 - Redacted Project stage: Other ML23173A0572023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria - Redacted Project stage: Other ML23173A0582023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 10, Figures - Redacted Project stage: Other 2023-04-10
[Table View] |
Text
PBAPS UFSAR CHAPTER 09 9-i REV. 26, APRIL 2017 SECTION 9.0 - RADIOACTIVE WASTE SYSTEMS TABLE OF CONTENTS SECTION TITLE 9.1
SUMMARY
DESCRIPTION 9.2 LIQUID RADWASTE SYSTEM 9.2.1 Power Generation Objective 9.2.2 Power Generation Design Basis 9.2.3 Safety Design Basis 9.2.4 Description 9.2.4.1 General 9.2.4.2 Collection Subsystems 9.2.4.2.1 Equipment Drain Subsystem for Low Conductivity Radioactive Waste 9.2.4.2.2 Floor Drain Subsystem for Higher Conductivity Radioactive Waste 9.2.4.2.3 Chemical Waste Subsystem for Radioactive Chemical Wastes 9.2.4.2.4 Laundry Drain Subsystem for Liquid Waste Containing Cleaning Agents 9.2.4.3 Environmental Discharge Subsystem 9.2.4.4 Radiation Monitoring on Auxiliary Cooling Water Discharges 9.2.4.5 Non-Aqueous Liquid Radwastes 9.2.5 Quantity of Radioactive Wastes 9.2.6 Tritium in Liquid Wastes 9.2.6.1 General 9.2.6.2 Sources of Tritium in the Reactor 9.2.7 Limits of Release of Radioactive Wastes to the Environment 9.2.8 Power Generation Evaluation 9.2.9 Safety Evaluation 9.2.10 Inspection and Testing 9.3 SOLID RADWASTE SYSTEM 9.3.1 Power Generation Objective 9.3.2 Power Generation Design Basis 9.3.3 Description 9.3.3.1 General 9.3.3.2 Wet Solid Radwaste 9.3.3.3 Dry Wastes 9.3.3.4 Reactor Internal Parts 9.3.4 Power Generation Evaluation 9.3.5 Inspection and Testing
PBAPS UFSAR TABLE OF CONTENTS (cont'd)
SECTION TITLE CHAPTER 09 9-ii REV. 26, APRIL 2017 9.4 GASEOUS RADWASTE/OFF-GAS SYSTEM 9.4.1 Power Generation Objective (Common) 9.4.2 Power Generation Design Basis9.4.3 Safety Design Basis 9.4.4 Description 9.4.4.1 General 9.4.4.2 Steam Jet Air Ejector Subsystem 9.4.4.2.1 Component Description 9.4.4.3 Gland Seal Steam Exhauster Subsystem 9.4.4.4 Standby Gas Treatment System 9.4.4.5 Hydrogen Water Chemistry System 9.4.5 Safety Evaluation 9.4.6 Inspection and Testing
PBAPS UFSAR CHAPTER 09 9-iii REV. 26, APRIL 2017 SECTION 9.0 - RADIOACTIVE WASTE SYSTEMS LIST OF TABLES TABLE TITLE 9.2.1 Equipment Drain Sumps 9.2.2 Liquids Collected in Waste Collector Tank 9.2.3 Floor Drain Sumps 9.2.4 Collection of Radioactive Liquid Waste, Units 2 and 3 9.2.5 Expected Quantities of Liquid Radwaste Released from Units 2 and 3 9.2.6 Typical Relative Isotopic Concentrations of Significant Radioisotopes in Discharge Canal 9.2.7 DELETED 9.2.7a Maximum Inventory of Liquid Radwaste in Permanent Tankage 9.2.7b Maximum Permissible Concentration (MPC) of Radioactive Material in Undiked Liquid Holdup Tanks 9.2.8 Estimated Annual Curie Release in Liquid Effluent 9.2.8B Deleted 9.4.1 Off-Gas System Design Bases 9.4.2 Gaseous Radwaste Input to the Main Adsorber Bed 9.4.2B Deleted 9.4.3 Gaseous Radwaste Effluent Data Fission Product Noble Gases and Activation Gases 9.4.3B Deleted 9.4.4 Unit 2 Gaseous Radwaste Input and Inventory in the Main Adsorber Bed for Accident Analysis 9.4.4B Deleted
PBAPS UFSAR CHAPTER 09 9-iv REV. 26, APRIL 2017 SECTION 9.0 - RADIOACTIVE WASTE SYSTEMS LIST OF FIGURES FIGURE TITLE 9.2.1A Deleted 9.2.1B Deleted 9.2.2 Deleted 9.2.3 Deleted 9.2.4a Deleted 9.2.4b Equipment Location, Reactor and Radwaste Building Plan 9.2.4c Deleted 9.2.4d Equipment Location, Radwaste Building Plan 9.2.4e Equipment Location, Reactor and Radwaste Building Plan 9.2.5 Site Plan Showing Principal Liquid Radioactive Waste Facilities 9.2.6 Condensate and Refueling Water Storage Systems 9.2.7 Unit 2, Service Water System 9.2.8 Emergency Service Water and High Pressure Service Water Systems 9.3.1 Deleted 9.3.2 Deleted 9.4.1 Deleted Security-Related Information Withheld under 10 CFR 2.390 Security-Related Info Security-Related Information Withheld under 10 CFR 2.390