ML19114A267

From kanterella
Jump to navigation Jump to search
Submittal of Revision 27 to Updated Final Safety Analysis Report and Revision 22 to Fire Protection Program and Reference Drawings
ML19114A267
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/08/2019
From: David Helker
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML19114A265 List: ... further results
References
Download: ML19114A267 (20)


Text

Exelon Generation April 8, 2019 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp.com 10 CFR 50.71(e)(4) 10 CFR 54.37(b)

Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRG Docket Nos. 50-277 and 50-278

SUBJECT:

Submittal of the Updated Final Safety Analysis Report (Revision 27),

Fire Protection Program (Revision 22), and Reference Drawings In accordance with 1 O CFR 50.71 (e)(4) and 10 CFR 50.4(b)(6), enclosed is Revision 27 of the Updated Final Safety Analysis Report (UFSAR) and Revision 22 of the Fire Protection Program (FPP) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The enclosed UFSAR and FPP revision copies are being provided to the U.S. Nuclear Regulatory Commission (NRG) in electronic format on CD-ROM. The electronic versions of the UFSAR and FPP are being submitted in their entirety and are total replacement copies.

1 O CFR 50.71 (e)(2) requires that changes made under the provisions of 10 CFR 50.59 but not previously submitted to the NRG be included in UFSAR updates. Changes to the FPP are to be evaluated in accordance with PBAPS, Units 2 and 3, License Condition 2.C.(4). to this letter identifies UFSAR changes made under the provisions of 1 O CFR 50.59 not previously submitted and included in Revision 27 of the UFSAR. Attachment 1 also identifies those changes to the FPP evaluated in accordance with License Condition 2.C.(4) and included in Revision 22 of the FPP.

1 O CFR 50.71 (e)(4) stipulates that revisions to the UFSAR and associated FPP must reflect changes made up to a maximum of six months prior to the submittal. As a result, Revision 27 of the UFSAR and Revision 22 of the FPP for PBAPS, Units 2 and 3, reflect changes at least up to December 31, 2018.

Also enclosed is a CD-ROM containing copies of drawings currently referenced but not included in the PBAPS, Units 2 and 3, UFSAR.

jl-pf; 3 The following enclosures contain the CD-ROMs with the updated files for the UFSAR, FPP, fr ~tJ(p and Reference Drawings in PDF format.

jJI~

  • - PBAPS, Units 2 and 3, UFSAR Revision 27 / FPP Revision 22 (files) - PBAPS, Units 2 and 3, UFSAR / FPP Reference Drawings (files)

U.S. Nuclear Regulatory Commission Submittal of PBAPS UFSAR Revision 27 FPP Revision 22 Reference Drawings April 8, 2019 Page 2 In addition, pursuant to the requirements of 1 O CFR 54.37(b) and the guidance specified in Regulatory Issue Summary 2007-16, Revision 1, "Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses," the UFSAR update required by 1 O CFR 50.71 (e) must include any Structures, Systems, or Components (SSCs) newly identified that would have been subject to an aging management review or evaluation of Time-Limited Aging Analyses (TLAA) in accordance with 10 CFR 54.21. The UFSAR update must describe how the licensee will manage the effects of aging in order to effectively maintain the intended function(s) of newly-identified SSCs. An evaluation was completed to determine whether any newly-identified SSCs existed in support of submitting UFSAR Revision 27 and FPP Revision 22 for PBAPS, Units 2 and 3. This evaluation involved reviewing pertinent documentation for the period subsequent to the last PBAPS biennial UFSAR / FPP revisions.

As a result of this review, there were no newly-identified SSCs for which aging management reviews or TLAA would apply. includes file directory structure information identifying directory path, filename, and size of the individual files on the enclosed CDs.

As required by 1 OCFR50. 71 ( e )(2)(i), I certify that to the best of my knowledge, Revision 27 of the UFSAR and Revision 22 of the FPP accurately reflect information and analyses submitted to the NRC, or prepared pursuant to NRC requirements as described above.

If you have any questions or require further information, please contact Richard Gropp at (610) 765-5557.

Respectfully, David P. Helker Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: 1. Changes Made Under the Provisions of 1 O CFR 50.59 and License Condition 2.C.(4)

2. Electronic File Directory Structure

Enclosures:

1.
2.

PBAPS, Units 2 and 3, UFSAR Revision 27 / FPP Revision 22 UFSAR / FPP Reference Drawings cc:

w/ Attachment and Enclosures Regional Administrator, Region I, USNRC USNRC Senior Resident Inspector, PBAPS USNRC Senior Project Manager NRR, PBAPS R. R. Janati, Commonwealth of Pennsylvania D. A. Tancabel, State of Maryland Page 1 of 3 Changes Made Under the Provisions of 10 CFR 50.59 and License Condition 2.C.(4) 10 CFR 50.71 (e)(2)(ii) requires that revisions to the Updated Final Safety Analysis Report (UFSAR) include changes made under the provisions of 10 CFR 50.59, but not previously submitted to the NRC. Changes to the Fire Protection Program (FPP) are to be evaluated in accordance with Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, License Condition 2.C.(4). Accordingly, the list below identifies changes included in Revision 27 of the PBAPS, Units 2 and 3, UFSAR or Revision 22 of the PBAPS FPP that were not previously submitted to the NRC. Some exceptions have been noted.

Change Number Revision Descrietion Revised UFSAR Chapter 8 to address the addition of the six (6) 2016-001 protective SEL-487E relays to monitor the U2 Emergency Auxiliary (ECs 556071, 556072, and 00 Transformer, the U2 Startup Transformer, the U3 Emergency Auxiliary 556073)

Transformer, the 343 Startup Transformer, and U3 Startup Transformer.

2016-013<1>

Revised UFSAR Chapters 7 and 11 to reflect changes related to (ECR 15-00170, EC 556054) 00 upgrades in the Unit 3 Pressure Regulator and Turbine-Generator Control System (Diqital Electro-Hydraulic Control).

2016-023 00 Revised UFSAR Chapter 3, 6, 7, and 14 to reflect changes associated (ECR 15-00373) with the Unit 2 Cycle 22 reload.

2016-034 00 Revised UFSAR Chapter 10 to reflect changes related to the (EC 556076) description for the Fuel Pool Cooling pump trips for Unit 2.

2017-001 00 Revised UFSAR Chapter 7 to update the analytical limit associated (ECs 618676 and 617721) with the low Condenser vacuum scram.

2017-005 00 Revised UFSAR Chapter 8 to reflect changes related to the (EC 556330) replacement of the Unit 3 Auxiliary Transformer.

Revised UFSAR Chapters 5, 8, 12, Appendix C, and Appendix H to 2017-007 00 reflect changes to further clarify the orientation of turbine generated missiles.

2017-009 Revised UFSAR Chapter 1 per approved license amendment to (EC 556357) 00 reflect changes related to Measurement Uncertainty Recapture (MUR) uprate implementation.

2017-010 01 Revised UFSAR Chapter 14 per approved license amendment to (EC 556357) reflect changes related to MUR uprate implementation.

2017-011 00 Revised UFSAR Appendix Q per approved license amendment to (EC 556357) reflect changes related to MU R uprate implementation Revised UFSAR Chapters 3 and 7 per approved license amendment 2017-012 00 to reflect changes related to Average Power Range Monitor (APRM)

(ECs 618350 and 618351) setpoints and power/flow map in support of MUR uprate implementation.

2017-014 00 Revised UFSAR Chapter 7 to reflect changes to further clarify testing of the Reactor Protection System (RPS).

2017-015 00 Revised FPP Chapter 3 to reflect changes regarding removal of the (EC 619391)

Motor Generator (MG) Set Room curbing and dikes.

2017-016 Revised UFSAR Chapter 7 to reflect changes related to surveillance 00 test interval extension for Main Steam Isolation Valves' (MSIVs')

partial closure and RPS input functional test.

2017-018 00 Revised UFSAR Appendix Q to reflect administrative changes regarding the crane inspection interval.

2017-019 Revised UFSAR Chapters 5 and 7 to reflect changes in support of the (EC 618957) 00 implementation of the Hardened Containment Vent System (HCVS)

Fukushima modification for Unit 3.

Revised UFSAR Chapter 8 per approved license amendment to 2017-020 00 reflect changes pertaining to Operator actions related to the operation of the Emerqency Diesel Generator (EOG) fuel oil transfer pumps.

2011-021<1>

Revised UFSAR Chapter 7 to reflect changes related to the (EC 556341) 00 implementation of the Digital Feedwater Level and Speed Control System for Unit 3.

2017-022 00 Revised UFSAR Chapter 5 per approved license amendment to (EC 556357) reflect changes related to MUR uprate implementation.

2017-023 00 Revised UFSAR Chapter 6 per approved license amendment to Page 2 of 3 Change Number (EC 556357) 2017-024 (EC 556357) 2017-025 2017-027 (EC 556357) 2017-028

/EC 556357) 2017-029 (EC 556357) 2017-030 (EC 556357) 2017-031

/EC 556357) 2017-032 (EC 620431) 2017-033 (EC 556357) 2017-034

/EC 556357) 2017-035 (EC 555638) 2017-036 (EC620411) 2017-038 2017-039 (ECs 618350 and 618351) 2017-040 2017-041 2018-002 2018-004<1>

(EC 617531) 2018-006 2018-007

/EC 622484) 2018-008 2018-009 2018-010<1>

(EC 556261) 2018-011

/EC 623237)

Revision 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 Descri12tion reflect changes related to MUR uprate implementation.

Revised UFSAR Chapter 4 per approved license amendment to reflect changes related to MUR uprate implementation.

Revised UFSAR Chapter 10 to reflect changes associated with removing the requirement for keeping and maintaining portable pumps in the Site Manaqement Buildinq (SMB) shop.

Revised UFSAR Chapter 7 per approved license amendment to reflect changes related to MUR uprate implementation.

Revised UFSAR Chapter 3 per approved license amendment to reflect changes related to MUR uprate implementation.

Revised UFSAR Chapter 10 per approved license amendment to reflect changes related to MUR uprate implementation.

Revised UFSAR Appendix K, Exhibits Ill and VIA, per approved license amendment to reflect changes related to MUR uprate implementation.

Revised UFSAR Appendix M per approved license amendment to reflect changes related to MUR uprate implementation.

Revised UFSAR Chapters 5 and 7 to reflect changes in support of the implementation of the Hardened Containment Vent System (HCVS)

Fukushima modification for Unit 2.

Revised UFSAR Chapter 13 per approved license amendment to reflect changes related to MUR uprate implementation.

Revised UFSAR Chapter 11 per approved license amendment to reflect changes related to MUR uprate implementation.

Revised UFSAR Chapter 10 to reflect changes related to the Fuel Pool Cooling heat exchanger replacement project.

Revised UFSAR Chapter 14 to reflect clarifying changes regarding the removal of ancillary design input information for the Fuel Handling Accident.

Revised UFSAR Chapter 4 and Appendix J to correct inconsistency related to the Reactor Pressure Vessel (RPV) design code.

Revised UFSAR Chapter 7 per approved license amendment t6 reflect changes in the Main Steam Line (MSL) high-flow isolation setooint value.

Revised UFSAR Chapter 3 to address life extension concerns related to the core plate oluqs.

Revised UFSAR Appendix C to address discrepancy when referencinq the use of ANSI B31. 7 for fatique analysis.

Revised UFSAR Chapters 5 and 7 to clarify and address discrepancy related to maximum permissible Containment Purge value closure time consistent with Alternate Source Term (AST) methodology as previously aooroved.

Revised UFSAR Chapter 7 to reflect changes related to the implementation of the Digital Feedwater Level and Speed Control System for Unit 2.

Revised UFSAR Chapters 4 and 6 to reflect changes to provide a brief description of the Gas Management Program for the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) systems.

Revised FPP, Appendix A, Table A-4, to provide clarifying information for valves HV-2-32-516A and HV-3-32-5168.

Revised UFSAR Chapter 4 to reflect changes regarding transients tracked and counted by the Fatigue Monitoring Program.

Revised UFSAR Chapter 3 to address a minor discrepancy in the discussion in Section 3.7.7 regarding the new core plate plugs installed for Unit 2.

Revised UFSAR Chapter 7 to reflect changes related to the installation of the new Seismic Monitoring System.

Revised UFSAR Chapter 8 to reflect changes related to the replacement of the Unit 2 Auxiliary Transformer.

Page 3 of 3 Change Number 2018-012 2018-013 2018-014 2018-015 (EC 617531) 2018-016 (EC 622998) 2018-021 (EC 623738) 2018-023 2018-024 (EC 556357) 2018-025 2018-026 (EC 556298) 2018-028 2018-031 Revision 00 00 00 00 00 00 00 00 00 00 00 DescriQtion Revised UFSAR Appendix C to delete an inaccurate reference in Section C.4.6 describing the sacrificial shield.

Revised UFSAR Appendix Q to remove the statement about the Condensate Storage Tank (CST) from the discussion in Section Q.2.5 related to outdoor, buried, and submerged component inspection activities.

Revised UFSAR Chapter 6 to clarify the description regarding the capacity of the Automatic Deoressurization System (ADS) valves.

Revised FPP, Appendix A, Table A-3 to reflect changes related to the implementation of the Digital Feedwater Level and Speed Control System for Unit 2.

Revised UFSAR Chapter 9 to add the Recombiner outlet high temperature to the low inlet steam flow control and alarm logic for Unit

2.

Revised FPP, Appendix A, Tables A-3 and A-5, to add M0-2(3) 2(3)663 and M0-2(3)-06-0388 as "Hi-Lo" interface valves.

Revised UFSAR Chapter 6 to update the maximum expected activity concentration values for the Refuelina Water Storage Tank.

Revised UFSAR Chapter 4 per approved license amendment to reflect changes related to MUR uprate implementation.

Revised UFSAR Chapter 9 to update the discussion regarding the liquid and solid radwaste system related to the drainage of outside tank moats to radwaste, Revised UFSAR Chapter 1 Oto reflect changes related to the description for the Fuel Pool Cooling pump trips for Unit 3.

Revised UFSAR Chapter 4 to update the discussion to include the reference to BWRVIP-86-R1-A and required years of surveillance capsule removal.

Revised FPP Chapter 5 to reflect removal of the reference to the automatic CO2 system that was included in the Fire Area 02 discussion.

<1> - The changes identified were described in the PBAPS Biennial 10 CFR 50.59 and 10 CFR 72.48 Report submitted by letter dated February 11, 2019.

ATTACHMENT 2 Peach Bottom Atomic Power Station Units 2 and 3 Updated Final Safety Analysis Report, Revision 27 Fire Protection Report, Revision 22 File Directory Structure Electronic File Directory Structure Page 1 of 14 II Directory Path n

UFSAR File Names II File Size (Bytes)

II

~ :\\PB UFSAR REV 27 10.1 PEA Chapter 01 {001) Table of Contents.pdf 86,544 -

~c:\\PB ~

SAR REV 27

~~

PEA Chae!~r 01 (qo2) ~ect~ ns 1 thru 13.pdf

-- --~----

548, 7~

c:\\PB UFSAR REV 27 ___

~ 3 PEA Chapter 01 {003) Figures.pdf

?,129,367 c:\\PB UFSAR REV 27

__, o4 PEA Chapter 02 {001) Table of Contents.pdf 72,559 c:\\PB UFSAR REV 27

,05 PEA Chapter 02 (002) Sections 1 thru 9.pdf 18,307,461 c:\\PB UFSAR REV 27 *

- 0~ PEA Chapter 02 (003l Tables 2.2.17 thru ~.2.24.1.pd_c tf,285,539-

,_£\\P~~FSAR REV 27

__!!!__ PEA Cha_eter 02 (004) Figures.pdf _

8,010,478 c:\\PB UFSAR REV 27 08 PEA Chapter 03 (001) Table of Contents.pdf 65,510

[ \\_£>8 UFSAR RE'{_ 27 09 PEA Chapter 03 (002) Sections 1 t-~~.pdf 403,?38 _

c:\\PB UFSAR REV 27 10 PEA Chapter 03 {003) Figures.pdf 14,111,425 1

c:\\PB UFSAR REV 27 11 PEA Chapter 04 (001) Table of Contents.pdf 46,968 1

1 c:\\PB_UFSARREV--27_ -**-- ---

1 2PEAC~apter04(002)Sections lt

,_ hr~

l.pdf

___ -------=----- -

-_- __ -_-=--

529,56§ __

-~

  • ~

lc:\\PB UFSAR REV 27 13 PEA Chapter 04 (003) Figures.pdf 520,674 c:\\PB UFSAR REV 27

- - *-1 4 PEA Chapter 05 (001) Table of Contents.pdf 43,540 - -

ci\\PB.UF_~AE REV_2z_

15 PEA Chapter (002) Sectio~ 1-th;u i:P

-- df

--1674,764 - --~-

c:\\PB UFSAR ~!~

16 PEA Chapter 05 (003) Figures.pdf 13,353,970 c:\\PB UFSAR REV 27 17 PEA Chapter 06 (001) Table of Contents.pdf 55,012 c:\\PB UFSAR REV 27 18-PEA Chapter 06 (002) Sections 1 thru 7.pdf -

--* 208,844-c:\\PB UFSAR REV 27 19 PEA Chapter 06 (003) Figures.pdf 1,346,096 c:\\PB UFSAR REV 27 20 PEA Chapter 07 (001) Table of Contents.pdf 115,432 1

~

-B-UFSAR REV 27


21 PEA Chapter 07 (002) Sections 1 thru 9.pdf

~-----------*


659,9I __ 6_--_-_-_*_--_-__ _

_£:\\PB ~.£SA~ REV 27 22 PEA Chapter 07 {003) Sections 10 thru 23.pdf..

357,25~-

c:\\PB UFSAR REV 27 23 PEA Chapter 07 (004) Figures.pdf 5,391,790 I

c:\\PB UFSAR REV 27 24 PEA Chapter 08 (001) Table of Contents.pdf 63,146

~~:: ~:~:: tf~ ~;-*-_ --~--=-~~ ::: ~~:~::~ ~: )~~!l !~c~~::~p~i thru 08.pdf

___ ~ *- ___

~~2~

--=.::-:-:~

c:\\PB UFSAR REV 27 2_? __ ~EA Chaeter 09 (001) Table of Contents.pdf 143,889

[c:\\PB UFSAR REV 27 - ____,. ____ 2~PEAChypter~

(002) Secticms 1 thru 4.pdf


13~---- ---

c:\\PB UFSAR REV 27 29 PEA Chapter 09 (003) Figures.pdf 394,775 c:\\Pj UFSA~ REV 27 j3 0~ EA _Chapter 10 (00!:) Tab~

f-~ontentSJ?~C==~ ------~-=-

50,528 _____ --

-i

(£:\\P-B u_ FSAR REV 27 _____ 4 31 PE~ Ch--ap_ ter 10- {002)-Sections 1 thru 24.pdf

_ _ ---- ~ _

400,387 _

c:\\PB UFSAR REV 27 32 PEA Chapter 10 (003) Figures.pdf 2,489,975 0

PB UFSAR }~ 27

_ -=-= 33 PEA Chapter l!i_OOl) J:able of Conte_nt~ e_df 18,62~

_ j fc:\\PB UFSAR REV 27 34 PEA Chapter 11 (002) Sections 1 thru 8.pdf 143,851 I

c:\\PBUFSARREV 27 _---

3-5_PEAChapter"°ll{003)_Figures.pdf ------

59,89

  • 1 1c:\\P_B _UFSA~ ~-EV_ 2_7 36 PEA Chapter 12 (001) Table of Contents.pdf 19,523 _

~

c:\\PB UFSAR REV 27 _

37 PEA Chapter 12 (002) Sections 1 thru 4.pdf 15i,724 lc:\\PB UFSAR REV 27 138 PEA Chapter 12 (003) Figures.pdf 1,423,576 rc:\\PB UFSAR REV27 ----- 39 PEAChapter 13 {001) Table ofCont~

pdf 7~ 437--

Electronic File Directory Structure Page 2 of 14 I

Directory Path II UFSAR File Names II File Size (Bytes)

I

____ ~

-- -~i -------

E \\PB~

SA~~~V 27 40 PEA Chae!er_13 (OO~ Sections 1 thru 8.pdf 346,4I ~ --

1c:\\PB UFSAR REV 27 41 PEA Chapter 13 (003) Figures.pdf

_ ___ ___ 268,099 _

c:\\PB UFSAR REV 27 42 PEA Chapter 14 (001) Table of Contents.pdf 95,967 t-


*------ --~----

_\\PB ~ FSAR_REV 27 43 PEA Chapter 14 {002t Sections 1 thru 10.pdf


, =lir------

c:\\PB UFSAR REV 27

~ -PEA Chapter 14 {003} Figures.pdf c:\\PB UFSAR REV 27 45 PEA Appendix A (001) Table of Contents.pdf -

c:\\PB UFSAR REV 27 ------ 46 PEA Appendix A {002).pdf lc:\\PB UFSAR REV 27

--47 PEA Appendix A {003) Figures.pdf 1,825,458

§ i>~ ~LJFSAR RE~ 27 48 PEA Appendix B.pdf

  • -==-

14,637 -----**--

  • c:\\PB UFSAR REV 27 49 PEA ~P.pendix C_tOOl) Table of Contents.pdf 47,440 c:\\PB UFSAR REV 27 50 PEA Appendi~ C (0021£~

490,496 c:\\PB UFSAR REV 27 51 PEA Appendix C _(003)£igures.pdf _

4,559,807 *-3

~ \\ PB UFSAR REV 27 52 PEA Appendix D (001) Table of Contents.p~

114,544 lc:\\PB UFSAR REV 27 --~ -

53 PEA Appendix D (002).pdf

--~

c:\\PB UFSAR REV 27 54 PEA Appendix D (003} Figures.pdf

--*-- ------ - - ~-.. -

~ :\\PB UFSAR REV 27 55 PEA Appendix E (001) Table of Contents.pdf ---

120,210

-1 c:\\PB UFSAR REV 27 56 PEA A 1c:\\PB UFSAR REV 27 57 PEA Appendix E (003) Figures.pdf

_t~;~:161 - --- ~

c:\\PB UFSAR REV 27 ----

58 PEA Appen~i,x F (001) Ta ~~~ of Contents.p_~_f _

116,26_3 ____ -_-_-_-_-_ -- *

~~: ~f~~: :~~ ~-;-

~~ :~~ ~~~:~~:: ~ Wioi j~~:le _of Contents.pdf


- - -- *--- - -*---------~;-~

c:\\PB UFSAR REV 27 61 PEA Appendix G (002).pdf 149,233 I

£:\\PBUFSAR REV27 ___ ----

62PEAAppendlxGJ003)Matrixs:Pdf

-- 5;792,983 -~-

c:\\PB UFSAR REV 27 63 PEA Appendix G (004) Figures.pdf 1,189,900 cXPB UFSAR REV 27 64 PEA A*;;*p~-; ciix H {001) Table of Contents.pdf 48,968 c:\\PB UFSAR REV 27 ---

64 PEA Appendix H {002).pdf 327,524

--- - ~--

c:\\PBUFSAR REV 27 -

65 PEA Appendix I {001) Table of_Contents.pdf 16,239

.c:\\PB UFSAR REV 27 66 PEA Appendix I (002).pdf 15,116 r-------

c:\\PB UFSAR REV 27 67 PEA Appendix J (001) Table of Contents.pdf 22,325

~c:\\PB UFSAR REV 27 ---

68 PEA Appendix J (002).pdf ----

2 85,579 c:\\PB UFSAR REW. ---

69 PEA Appendix J (003) Figures.pdf 411,11:1*

c:\\PB UFSAR REV 27 - -----

70 PEA Appendix K (001) Table of Contents.pdf ---

37,1*~ - -

ppene11x E {0021.e_ __

c:\\PB °QFSAR REV ?-_7 _

_ __ ?11 EA Ap pendix K (002) Exhi~it l.pdf

~,88?,~~

c:\\PB UFSAR REV 27 72 PEA Appendix K (003) Exhibit 11.pdf 1,494,049 c:\\PBUFSAR REV27-7~..!'.~A App~ -~~~~_(004)E_xhibit 111.pdf 1,621,289 -==-----

c:\\PB UFSAR REV 27 74 PEA Appendix K {005) Exhibit IV.pdf 24,026 c:\\PB UFSAR REV 27 -

75 PEA Appendix K {006) Exhibit V.pd{ -------------

39,959 c:\\PB UFSAR REV 27

- - --76 PEA Appendix K (007) Exhibit VI.A Unit 2.pd-T


9:391,390

[ c:\\PB UFSAR REV 27 _ _

2I~-~ -~ pendix_K (008) Exhibit VI.B Unit 3.pdf

  • -- - - 25,538- - -----~-- ---

Electronic File Directory Structure Page 3 of 14 I

Directory Path n

UFSAR File Names n

File Size (Bytes) c:\\P_B_U-FS-AR.REV -27 ___ ""'" ______ 73'"j)E'A'-

Ap-pendix K (009) Exhibit vii:';;'cfr_"_,.,_,__

122,59_8 ___ -

c:\\PB UFSAR REV 27 79.PEA Ap~

K (010) Figures.pdf

--- !289,561 --

c:\\PB UFSAR REV 27 _ ----

  1. 0 PEA Appendix L.pdf. --

F 4,805- ----- -

lc:\\PB UFSAR REV 27 181 PEA A_epen9ix M l QQ.l L~-~!~--of Contents.pdf

/44,132_ _________ _

~ :\\PB UFSAR REV 27

'82 PEA Appendix M (002).pdf 1218,214

,c:\\PB UFSAR REV 27 83 PEA Appendix M (003) Figures.pelf

  • 1,667,554 c:\\PB UFSAR REV 27 84 PEA Appendix N {001) Table ofcontents.pdf fa5,789-Z:\\PB UFSAR REV 27 -._:

85 PEA Appendix N (002)_.pdf


! 19,662 c:\\PB UFSAR REV 27 86 PEA Appendix N (003) Tables.pdf 5,519,884 ffi*uFSAR !35V] 7

-- -- ~ ITTEA Appendix O (00! } Table of Conte~

pdf

-- -~------* -

~

_ !_?.~663--

1 c:\\PB UFSAR REV 27 88 PEA Appendix O (002).pdf 36,360 c:\\PB UFSAR REV 27 89 PEA Appendix P.pdf

-- 14,750 c:\\PB UFSAR REV 27 90 PEA Appendix Q (001) Table of Contents.pelf 93,597 -

c:\\PB UFSAR REV 27 191 PEA Appendix Q (002).pdf 244,927 9

PB UFSAR REV.27 __ --

92 PEAA,ppendix Q 0

{003) Figure.pdr--~

30,676 ----

w

__ :_--=_--l 11 Directory Path II FPP File Names II File Size (Bytes)

II

~~ REV22 PEA FPP (001) Table of Contents.pdf 19,599 C.\\PB FPP REV 22 PEA FPP (002) Sections 1 thru 4.pdf 485,634 -*-----

[£\\PB FPP REV 22

~~

PEA FPP (003) Sections 5 thru 7.pdf

-.395,57_!

C:\\PB FPP REV 22 PEA FPP (004) Appendix A - Tables.pdf 846,696 C:\\PB FPP REV 22 PEA FPP (005) Appendix B - Figures.pdf

.~:~099 -* - --

1 C:\\PB FPP REV 2_~ --- - - -- - PEA FPP (006) Appendix C~..

Electronic File Directory Structure Page 4 of 14 Directory Path II UFSAR DraYJin~ File Names JI File Size (Bytes) I

'c:\\PB UFSAR R27 Ref Dwgs jA-50, Sheet 0001, Rev 004, RADIATION ZONING BOTH UNITS IN OPERATION EL 91FT- 061N.pdf 307,288

!c:\\PB UFSAR R27 Ref Dwgs ~

55, Sheet 0001, Rev0 04, RADIATION ZONING BOTH UNITS IN OPERATION EL 234FT-OOIN.pdf 212,503 i.0~B UFSAR R27 Ref Dwgs _ 1c-2;-si1eetooo1~-R~ 0 20, PLOT PLAN WALL-FLOW-DEFLECTORS AS-BUILT DWG.pd{-~ ___

__ 678,402 =

~j

,c:\\PB UFSAR R27 Ref Dwgs !C-2, Sheet 0002, Rev 000, PLOT PLAN.pdf 68,604 j lc:\\PB UFSAR R27 Ref Dwg~ jc-84, Shee*t 0001, Rev 007,j UMP STRUCT-URE ARRANGEMENT DRAWING BLOCK~OOTA-15.pci*f---. -

217,401 _ *-=

lc:\\PB UFSAR R27 Ref Dwgs E-1, Sheet 0001, Rev 056, TCCP 13-00204, 14-00251 SINGLE LINE DIAGRAM ST.pdf 760,272 fu:\\PB uFS*AA R27.R.ef Dw~~ IE-lO,-She~

.0001~36, SING. LE LINE METER, RELAY DIAGRAMSTARTUP, EMERGE

.. NC~ POWER SYSTEMS.pdf_ *--

169,731 =-.

lc:\\PB UFSAR R27 Ref Dwgs E-12, Sheet 0001, Rev 011, SINGLE LINE METER, RELAY DIAG STANDBY DIESEL GENS, 4160 VOLT.pdf 234,941

~

l.c:\\PB UFSAR R27 Ref Dwgs..[fi]_15, Sheet 0001,Rev083 SINGLE LINE ME!E~ AND RELAY DIAGRAM E124 AND E224 EMERG. L.C.pdf

__ ----- 683,QS~

ic:\\PB UFSAR R27 Ref Dwgs r

-1617, Sheet 0001, Rev 076, SING LE UN E METER AND RELAY DIAGRAM E-324 AND E424 EM ERG.pd!

149,934 c:\\PB U~SAR R27 Ref Dwgs E-1619, Sheet 0001, Rev 937, SINGLE LINE METER AND RELAY DIAGRAM E124-D-A, E324-D-A AND 434-D-A.pdf 250.!382 c:\\PB UFSAR R27 Ref Dwgs E-1621, Sheet 0001, Rev 071, SINGLE LINE METER AND RELAY DIAGRAM E324-T-B AND 424-T-B TURB MCC.pdf 119,474

>--'------------t-------

1c:\\PB UFSAR R27 Ref Dwgs tE-1715, Sheet 0001, Rev 083, SINGLE LINE METER AND RELAY DIAGRAM El34, E234 EMER L.C., El34-W-A,.pdf 167,207 l.c:\\pB UFSAR R27 RefDwgs i!E~1717,_Sheet 0001, Rev 072, SINGLE LINE METER AND RELAY DIAGRAM E334,AND E434 EMERG LC AND E334-R.pdf ----~ - 159,223 ic:\\PB UFSAR R27 Ref Dwgs E-24, Sheet 0001, Rev 018, SINGLE LINE DIAGRAM 24 V DC POWER SYSTEM.pdf 1365,286 rZ:°\\ PB UFSAR R27 Ret"o;gs IE-26, Sheet 0001, R~

SINGLE LINE DIAGRAM 125 250 VDC SYST~-f ---* -

  • ~

194,33i

'C:\\PB UFSAR R27 Ref Dwgs l E-26, Sheet 0002, Rev 063~ SINGLE LINE DIAGRAM 125 250 VDC SYSTEM.pdf.

_ 120,205 lc:\\PB UFSAR R27 Ref Dwgs j_§-26, Sheet 0003, Rev 007, 125 250 VDC SYSTEM UNIT 2.pdf 78,049 ic :\\PB UFSARR2rRef D-;gs- !E~~OOl, Rev 079, SINGLE LINE DIAGRAM 125 250VDC: SYSTEMUNIT 3.pdf 160:-665 WB UFSAR R27 Refowgs !E-27, Sheet 0002, Rev 044, SINGLE LINE DIAGRAM 125 250 VDC SYSTEM.pdf 93,689-k \\ PB UFSAR R27Ret Dwgs Tf~;n, Sheet 0003, Rev 008, 125V 250v DC SWITCHBOARD 30D00SLAYOUrnAGRArvtpdf - ---

597,529-- 1

~.c:~~B UFSAR R2_7 ~f Dwgs l E-28, Sheet 0001, Rev 090, SINGLE LINE DIAGRAM INSTRUMENTATION UN INTERRUPTIBLE AC SYS.pdf -

- _ --~

2,058,65~. _

lc:\\PB UFSAR R27 Ref Dwgs IE-28, Sheet 0002, Rev 051, SINGLE LINE DIAGRAM INSTRUMENTATION UNINTERRUPTBLE AC SYS.pdf 67,994

~ PBUFSAR R27. Ref Dw_~~ i E-292 Sheet 0001, Rev 066, SINGLE LINE DIA~ RAM INSTRUMENTATION UNINTERRUPTIBLE AC SY~:pdf. -*

~- 583,822

-1 jc:\\PB UFSAR R27 Ref Dwgs I E-4, Sheet 0001, Rev 036, SINGLE LINE METER AND RELAY DIAGRAM.pdf 182,857

[£:\\fB ~ FSAR R27 Ref Dwgs-1E-5, Sheet 0001, Rev 018, SINGLE LINE METER RELAY DIAGRAM 13.8KV AUX POWE85YSTEM.pdf 145,339 ic:\\PB UFSAR R27 Ref Dwgs ~=5010, Sheet 0001, Rev 008, SINGLE LINE METER, RELAY DIAGRAM COOLING TOWERS D,E OAE-177, OBE-17.pdf 343,046 lc:\\PB UFSAR R27 Ref Dwgs 'fE~6, Sheet 0001, Rev 034, SINGLE LINE METER AND RELAY DIAGRAM.pdf 890,702

!c:\\PB-UFSARR27-ReTo;'gs-M-1-CC-11, Sheet oooi;"R~ooS:-ruNCTLCONTROL DIAG AREA RADIATION MONITORING SYSTEM~df.

197)Q3--~

ic:\\PB ~ FSAR R27 Ref_D_w_g~

M-_1_-_cc_-_1_1,_S_h_e_et_O_OQ~_Re_v008, FUNCTL CONTROL DIAG AREA RADIATION MONIT_O_R!N~. SYSTEM.pdf 221,266 __

,c:\\PB UFSAR R27 Ref Dwgs M-l-CC-13, Sheet 0001, Rev 022, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEM.pdf 324,261

~

PB UFSA~ R27 Ref Dwgs M-l-CC: 13,.Sheet 0002, Rev 016,_ FUNCTIONAL_CONT~f)L DIAGRAM NUCLEAR BOILER MISC SYS.pdf 241,551 lc:\\PB UFSAR R27 Ref Dwgs M-l-CC-13, Sheet 0003, Rev 021, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC. SYSTEMS.pdf 72,390 t-:-'-*--

-~-

~

-~-

ic:\\PB UFSAR R27 Ref Dwgs M-l-CC-13, Sheet 0004, Rev 014, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEM.pdf 150,422 f

'Z \\PB,UFSAR R27 Ref Dwg~ M-l~CC-13, Sheet 0005, Rev 016, FUNCTIONAL CONTROL DIAGRAM NUCLEARBOILERMISc.SYSTIMS~

59,592 c:\\PB UFSAR R27 RefDwgs !M-l-CC-13,Sheet 0006, Rev 016, FUNCTIONAL CONTRCil DIAGRAM NUCLEAR BOILER MISC~SYSTEMS.pdf ___ -

85,493 1

F\\PB Ut SAR~27 Ref Dwgs ~ CC-B, Sheet 0007, Rev 015, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC-SYSTEM.pdf. =-~

268,75~ - ---,

§ PB UFSAR R27 Ref Dwgs IM-l-CC-13, Sheet 0008, Rev 014, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEM.pdf 107,636 1

lc:\\PB UFSAR R27 Ref Dwgs _l~+CC-13, Sheet 0009, Rev 014, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEM.pdf 121,66_!_ *-

j Electronic File Directory Structure

~ \\PB U~~:~~:~~ ~~t6~gs -~

~i -CC-13, Sheet-0010, Rev 016, FUNCTIONAL CONTRO~F~l~~~~~~n~:~~::,:~~:ER M -----

Jc:\\PB lJFSARR27 Ref Dwgs fr.:1-1-CC-13, Sheet 0011, Rev 016, FUNCTIONAL CONTROL DIAGRAM NUCLEAR-BOILER MISC SYSTEM.pdf ic:\\PB UFSAR R27 Ref Dwgs I M-l -CC-13, S~

00 12, Rev 017 ;-i=LJNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER Misc:SYSTEMS~

f

!c:\\PB UFSAR R27R~g; °fM-l-CC-13, Sheet 0012A, Rev 018, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf lc:\\PB UFSAR R27 Ref Dwgs.* M-l-CC-13, SheetOOLl,R~~UNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf--.

c\\PB UFSAR R27 ~~

M-l-CC-13, Sheet 0014, Rev 015, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER M ISCSYs.pdf -

fc:\\PBUFSAR R27 Ref Dwgs M-l-CT-13, Sheet 0015, Rev 021, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEMS.pdf

~

UFSAR R27 Ref o;gs M-l -CC-13,Sheet 0016, Rev 014, FUNCTIONAL CONTROL DIAGRAM NUCLEAR-BOILER MISC SYS.pdf

~

UFSAR R27 Ref Dwgs M-l-CC-13, Sheet 0017, Rev 019, FUN C.TIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEMS.pdf ------ ___ _

~ \\. PB UFSAR R27 ~ef.Dwgs M-l-CC-13, Sheet 0018, Rev 016, FU.NCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEMS.pdf c:\\PB UFSAR R27 Ref Dwgs M-l-CC-13, Sheet 0019, Rev 016, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC. SYS.pdf

,c:\\PB UFSAR R27 Ref 'Dwgs M-1-CC-13~-Sheet0020, Rev-014, FUNCTIONAL CONTROL DIAGRAMNUCLEARBOILER-MISC SYS.pdf _

fc:\\PB UFSAR R27 Ref Dwgs 'M-=-i.~CC-l (Sheet 0021, Rev 014, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf _

!c:\\PB UFSAR R27 Ref Dwgs M -l-CC-13, Sheet 0022, Rev 0_17,_!:UNC_TIONAL CONTROL DIAGRAM NUCLEAR Bq_lLER MISC SYS.pd! _

ic:\\PB UFSAR R27 Ref Dwgs M-l-CC-13, Sheet 0023, Rev 017, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf lc~FSAR R27 Ref Dwgs 1M CGU,Sheet 0024, Rev 019, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEMS.pdf --

ic:\\PB UFSAR R27 Ref Dwgs M-l-CC-23, Sheet 0001, Rev 009, FUNCTL CONTROL DIAG NEUTRON MONITORING SYSTEM.pdf ic:\\PB UFSAR R27 Ref-Dwgs M-l-CC-23, Sheet 0014, Rev 008, FUNCTL CONTROL DIAG NEUTRON MONITORING SYS.pdf lc:\\PB UFSAR R27 Ref Dwgs tM-l-CC-35, Sheet 0001, Rev 016, FUNCTL CONTROL DIAG REACTOR WATER CLEAN-UP SYSTEM.pdf

~

B UFSAR R27 Ref Dwgs. !M -l -CC-35, _?._heet 0002, Rev 01~ FUNCTIONAL CONTROL DIAGRA!'Jl FOR REACTOR WATER CLEANUP.pdf_

jc:\\PB UFSAR R27 Ref Dwgs M-l-CC-35, Sheet 0003, Rev 016, FUNCTIONAL CONTROL DIAGRAM FOR REACTOR WATER CLEANUP.pdf k:\\PB UFSAR R27 Ref Dwgs M -l-CC-35, Sheet 0004: Rev 018, FUNCTIONAL CONTROL DIAGRAM FOR REACTOR WATER CLEANUP.pdf

(£~ B ~~SAR R27 Ref D~ gs M-l-S:C:38, jfi'eet 0()()1, Rev 011, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE.~~f ic:\\PB UFSAR R27 Ref Dwgs M -l -CC-38, Sheet 0002, Rev 006, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE.pdf lc:\\PB UFSAR R27 Ref Dwgs M-l-CC-38, Sheet 0003, Rev 009, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE.pdf L..- _ _ _ _ _ _."

r-:-:-

c:\\PB UFSAR R27 Ref Dwgs M-l-CC-38, Sheet 0004, Rev 007, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE ISOLATION COOLING SYSTEM.pdf

!c:\\PB UFSAR R27 Ref Dwgs M-l -CC-38, Sheet 0005, Rev 004, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE ISOLATION COOLING SYSTEM.pdf lc:\\~B UFSAR R27 Ref Dwgs

_, M-l-CC-38, ~-heet 0006!_Rev 006!_FUNCTIONAL CONTROL DIAGRAM HIGH PRE?._SURE COOLANT INJECTINGS YS! EM.pdf_ -::_ ___ ~ __

fc:\\PB_ UFSAR R27 Ref Dwgs j M-l-CC-38, Sheet 0007, Rev 006, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTINGS YSTEM.pdf

!c:\\PB ~ FSA~E27 Ref Dwgs,M -l -CC-38, Sheet 0008, Rev 007, _FUNCTIONAL CONTROL DIAGRAM REACTOR CORE ISOLATION COOLING SY?_°!!M.pdf

c:\\PB UFSAR R27 Ref Dwgs M -l -CC-38, Sheet 0009, Rev 009, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE ISOLATION COOLING SYSTEM.pdf jc:\\PB UFSAR R27 Ref Dw~,~

~ -:.t~,C-38, Sheet 0010, Rev 007, FUNCTIONAL CONTROL DIAGRAM REACTORC,C>RE ISOLATION ~OOLING, SYSTEM.p_d_f -----*

IC:\\PB UFSAR R~Z ~ef Dwgs I M-l-CC-38, Sheet 0011, Rev 005, FUNCTIONAL CONTROL DIAGRAM REACTOR COR~ ISOLATION COOLING SYSTEM.pdf

,c:\\PB UFSAR R27 Ref Dwgs

'j M-l-CC-38, Sheet 0012, Rev 006, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE ISOLATION COOLING SYSTEM.pdf lc:\\PBUFSARR27 Ref Dwgs,M-l-CC-39, Sheet oooi, Rev 012, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOL.ANT-INJECTING s vifrEM.pdf:

>-----**--* ----~~.. -~

ic:\\PB UFSAR R27 Ref Dwgs M-l-CC-39, Sheet 0001A, Rev 004, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTING SYSTE.pdf

!c:\\PB UFSAR R27 Refowgs M-1-CT~3fSheet0002,Rev 003, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJ ECTION SYSTEM.pdf 1£ \\PB UFSAR R27 Reffiwgs M-l-CC-39, Sheet 0002A, Rev 005,£ UNCTIONAL CONT~OL DIAGRAM HIGH PRESSURE COLLANTIN.JECOONSYSTE.pdf_

[£\\ PB UFSAR R27 Ref Dwgs M-l-CC-39, Sheet 0003, Rev 006, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf Page 5 of 14 JI File Size (Bytes) I]

149J1~ - - ~

182,553 ---4 175,882

~08,452 __

25~,31L_

1091833 ---

46,866 144,704 _

83,971 i85,782 806,871 105,331 112,271 127,757_

262,940 527~939 33§,845 347,395 __

210,00§_ _

67,007 257,52~

_170,~~?.

669,250 423,157 457,905 168,86~

175,96!_

~28,_659

~96} 32 __

73,47q_

~00,222 118,332 351,436 --1 168,063 94,202 _

490,241

!~9,725 130!~73 146,822_

J Electronic File Directory Structure Page 6 of 14 ll Directory Path U

UFSAR Drawing File Names H File Size (Bytes) I f

\\PB Uf_SAR R27 Ref Dwgs. M-1-CC~ ~! Sheet 0004, Rev 004, FUNCTIONAL C.ONTROL DIAGRAM f-! IGH PRESSURE C_<?OLANT INJECTING SYSTEM.pdf 137,03~

!c:\\PB UFSAR R27 Ref Dwgs M-l-CC-39, Sheet 0005, Rev 007, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTING SYSTEM.pdf 174,414 ic:\\PB UFSAR R27 Ref Dwgs M-l-CC:-39, Sheet 0006, Rev 006, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf - --

181,818 --

ic:\\PB UFSAR R27 R~f D wgs M -l -CC-39, Sheet 0007, Rev 007, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf -

956,675 ----

lc:\\PB UFSAR RDRefc5;gs-M-1-cc:'.'39, Sheet 0007A, Rev 004, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf --

50,4~

  • -N-,

l9fB UFSAR R27 Ref Dwgs M-..!_-CC-39, Sheet 0008, Rev 007, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 55,378 -- -

iC:\\PB UFSAR R27 Ref Dwgs M -l-CC-39, Sheet 0008A, Rev 005, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTE.pdf 229,466 fc:\\PB UFSAR R27 RefDwgs M-1-CC-39,-siieet0009, Rev 004, FUNCTIONAL CONTROL DIAGRAM HiGH PRESSURE COOLANT INJECTION SYSTEM.pdf 146,520

[

\\PB ~ FSAR R2? Ref Dwi~ !'v1-1-CC~ 9~ Sheet 0010, Rev 004, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANTINJECTION SYSTEM.p_~_( *==- *=-~ -137,455. -

- j lc:\\PB UFSAR R27 RefD wgs M-l-CC-39, Sheet 0011, Rev 007, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 147,696

~

i'"c-\\PB UFSARR27Ref 5;gs M-l-CC-39, Sheet 0012, Rey:005,F UNCTIONAL CONTROL DIAGRAM HIG~HRESSURE COOLANT INJECTIONS

. YsTIM.pdt _

_. 181,514--

\\PB UFSAR R27 Ref Dwgs M-1-CC-4, Sheet 0001, Rev 022, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 44,003

,c.\\PB UFSAR R27 RefDwgs l M CC-4, Sheet 0003,.Reval.s*, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYS.pelf _______ ---- - 66,8~

'E~P~ UFS~R R27.Ref Dwgs 1M-1-CC-4, Sheet 0004,* Rev 015, WIRi NGDIAGRAM FUNC CONTROL DIAGRAM RECIRC FLO_W CONTROL S.p.df --=-=-- -- - - - 29[379 - ___ -

I c:\\PB UFSAR R27 Ref Dwgs m CC-4, Sheet D006, Rev 020, FUNCTIONAL CONTROL DIAGRAM RECI RCUlA TION FLOW CONTROL SYSTEM.pdf 34,386 lc:\\PB UFSARR27Ref D;,gs M-1-CC-4, SheetOOO~

e~m: i=uNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pill 51,125 **--


~

c:\\PB UFSAR R27 Ref Dwgs M-1-CC-4, Sheet 0008, Rev 017, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 62,227

!c:\\PB-UFSARR27 Ref~ IM-1-CC-4, Sheet ooci9,Rev"ois: FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf

.59,334 r

+---* ---,,__

c
\\PB UFSAR R27 Ref Dwgs M-1-CC-4, Sheet 0010, Rev 016, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 114,270

'c:\\PB UFSAR R27 Ref Dwgs M-1-CC-4, SheetOOll,~

017, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 55,033 -

r-:----*

lc-\\PB UFSAR Rp Ref Dwgs tv!: l-CC-4, Sheet 0012, Rev 019, FUNCTIONAL CONTROL Q~AGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf

. 184,564

,c.\\PB UFSAR R27 Ref Dwgs M -l-CC-40, Sheet 0001, Rev 011, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOAL SYSTEM.pdf 478,692

c
\\PB UFSAR R27 Ref Dwgs M-l-CC-40, Sheet 0002, Rev 014, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 74,008 t'c:\\ PB UFSAR R27 Ref D; gs* M -l-CC-40, Sheet 0003, Rev 009, FUNCTiONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 4 9,938

~-

,c:\\PB UFSAR R27 Ref Dwgs M-l-CC-40, Sheet 0004, Rev 011, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT.pdf 714,554 t--


*- ~ -

ic:\\PB UFSAR R27 Ref Dwgs !M-l-CC-40, Sheet 0005, Rev 006, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 123,947 f c:\\PB UFSAR R27 Ref Dwgs !M-l-CC-40, Sheet 0006, Rev 007, FUNCTIONAL CONTROL DIAGRAM RESIDUALH EAT.pdf 503,224

~~~

UFS_AR R.27 Ref Dwgs I M~!::.SE~i:sheet0007:-Rev009~FUNCTIONAL CONTROL DIAGRAM RESIDUAL HE~T R§.~ OVAL SYST EM.pdf **--------=----- --

} 61,94~ --

~:_ll'~ UFSAR R27 Ref Dwgs I M-l-CC-40, Sheet q_oo8, Rev 009, FUNCTI~

-~ CONTROL DIAGRAM RESIDU_AL HEAT REMOVAL SYSTEM.pdf 18_!,52_5 1c:\\PB UFSAR R27 Ref Dwgs M-l-CC-40, Sheet 0009, Rev 010, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT.pdf

!507,776 ~-

Z\\PB UFSAR R27 Ref Dwgs IM-l-CC-40, Sh-;;t 0010, Rev 009, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 181,295 rZ:\\PB UFSAR R27 Ref Dwgs iM-l-CC-40, Sheet 0011, Rev 009, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEATREMOVALSYSTEM.pdf 71,612

!c:\\PB UFSAR R27 Ref.Dwg7° f M-1-CC-40, Sheet 0012, Rev 005: FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM:pdf 145,416

!. c:\\PB UFSA~ R27 Ref ~

.. M -l-C_s:-40, Sheet 00_1.3, Rev 010, FUNCTIONAL ~ONTROL DIAGRAM RESIDUAL HEAT REM~

SYSTEM.pdf_ -----

49,854

--** i 1c:\\PB UFSAR __ R27 Ref Dwgs M-l-CC-40, Sheet 0014, Rev 010, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 72,842 E \\PB UFSAR R27 Ref Dwgs j M -l -CC-41, Sheet 0001,~ev 007,_FUNCTIONAL CONTROL DIAG CORE SPRAY SYSTEM.pdf

_ ~14,270

c:\\PB UFSAR R27 Ref Dwgs !M-l-CC-41, Sheet 0001, Rev 008, FUNCTIONAL CONTROL DIAGRAM CORE 5t>RAY SYSTEM.pdf 1100,716

]

!c:\\PB UFSAR R27 Ref Dwgs iM-l-CC-41, Sheet0002,Rev 001, FUNCTIONAL CONTROL DIAG CORE SPRAY SYSTEM.pdf *-

io9,915 ic:\\PB UFSAR R27 Refl);g; !M-l-~C-41!. Sheet ooq3, Rev 006, FUNCTIONAL CONTROL DIAGRAM CORE SPRAY SYSTEM.pd.f -* _ _ _ _

I 9,832 -=

Electronic File Directory Structure Page 7 of 14 Directory Path II UFSAR Drawing File Names II File Size (Bytes) !I lc:iB UFSAR-R27 ~e(6~gs*- M~1-:.cc-::41, Sheet 0004, Rev 005, FUNCTIONAL CONTROL DIAG CORE.SPRAY SYSTEM_:P.df --

~-

130,008 *-

-- -1 1c:t B UFSAR R27 Ref _Dwgs M-l -CC-41, Sheet 0005, Rev 007! FUNCTIONAL CONTROL DIAG CORE.SPRAY SYSTEM.pdf.

863!~.!_ _ -J lc:\\PB UFSAR R27 Ref Dwgs M-l-CC-41, Sheet 0006, Rev 004, FUNCTIONAL CONTROL DIAG CORE SPRAY SYSTEM.pdf 91,567 fc:\\PB UFSAR R27 Ref Dw,i~,_~ _! ::f.~~~eet 0007, Rev 005, FUNCTIONAL CONTROL ~IAG~

M_CO.RT SPRAY SYSTE~pdf -==----=---=~ : __ -=_

~~~

61,717 _-

]

!c:\\PB UFSAR R27 Ref Dwgs M-l-CC-41, Sheet 0008, Rev 005, FUNCTIONAL CONTROL DIAG CORE SPRAY SYSTEM.pdf 104,420 l

!c\\PB UFSAR R27 Ref D wgs ~-CC-42, She~t 0001, Rev 011, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf - ---

256,945..

..... ~--

-f.-,.*--- *-

1c:\\PB UFSAR R27 Ref Dwgs M-l-CC-42, Sheet 0002, Rev 003, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 175,978

~ :\\PB UFSAR R27 Ref _Dwgs __,M-1-CC-4_L ?heet 0003, Rev 006, FUNCTIONAL Cs_)NTROL DIAGRAM CONTROL ROD DRIVE HYRDRAULIC SYSTEM.pdf -

- - - *=-~ *-

195,671 1c:\\PB UFSAR R27 Ref Dwgs M-l-CC-42, Sheet 0004, R1:v 00~, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf ___ -*

__,.!~_7!Q?2_ _

-~

c:\\PB UFSAR R27 Ref Dwgs M-l-CC-42, Sheet 0005, Rev 003, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 127,602 k X"PB UFSAR R27 Ref Dwgs M-l-CC-42:Sheet 0006, Rev 004, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf ------

'i'§3) 41

~~_:\\PB UFSAR R27 Ref Dwgs M-1-CC-4~(.. Sheet 0007,-Rev 002, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.p df ____ --*-* -- 1 ~2,898

,c:\\PB UFSAR R27 Ref Dwgs M-l -CC-42, Sheet 0009, Rev 001, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 93,927 l* -

~ --

!c:\\PB UFSAR R27 Ref Dwgs M-l-CC-42, Sheet 0009A, Rev 005, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 54,978 i*

jc:\\PB UFSAR R27 Ref Dwgs 4-M-l-CC-42, Sheet 0010, Rev 011, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 300,897 k \\PB UFSAR R27Ref Dwgs IM-l-CC-42, Sheet 0011, Rev 003, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf -

168,919 l

[Z:\\PB UFSAR R27 Ref D.,,.;gs l M-=1-CC-42, Sheet 0012, Rev 006, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM:pdf _____ -----* 2.Q7,636 _ =--

c:\\PB UFSAR R27 Ref Dwgs M-l-CC-42, Sheet 0013, Rev 003, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 235,213 fc:\\PB UFSARR2*7 Ref D~ $S M-~.::~C-42!...~~eet 0014, Rev 003, FUN~IIONAL CONT~OL Q!~GRAM CONTROL ROD DRIVE !:i_YDRAULIC SYSTEM.pdf **--* - -

26s:3~~

i F 'fB UFSAR -~27 Re!_~~ [ ~. M-1-CC-4~! Sheet 0015, Rev 004, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC ~Y?TEM.pdf ____

l i~.!528 ----

lc:\\PB UFSAR R27 Ref Dwgs M-l-CC-42, Sheet 0016, Rev 003, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 42,102 l fc:\\PB UFSAR R27 Ref Dwgs M-l-CC-42, Sheet 0018, Rev 001,.FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pd( -- -

99,812

~ :\\PB UFSAAR27 Ref Dwgs M-l-CC-42, Sheet 0018A~

03, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULICSYSTEM.pclf ____ --

1cii,"899-

__ J f c:\\P~~fSAR R--~-7 Ref !)W:E __ f M-1-CC-5, Sheet 0001, Rev 010, FUNCTL CONTROL DIAG-STAND-BY LIQUID CONTROL SYSTEM,0001.pdf __ _

209,7-26 _

---_*-_ -j

.c:\\PB UFSAR R27 Ref Dwgs iM-1-DD-3, Sheet 0001, Rev 006, PROCESS DIAGRAM STANDBY LIQUID CONTROL SYSTEM.pdf 119,735

!£:\\PB UFSAR R1 7 R-;;f ~

s-iM-1-DD-5 Sheet 0001 Rev 008 PROC DIAGRAM REACTOR WATER CLEAN-UP SYSTEM HIGH PRESSURE.p.df==-- *-

139~598 --

lc:\\PB UFSAR R27 Ref Dwgs ~ DD-5, Sheet 0001, Rev 008, PROCESS DIAG REACTOR WATER CLEAN-UP SYSTEM HIGH PRESS CO.pdf 196,863 lc:~~~!:!_fSAR R2~Hef_Dw~ # DD-6, Sheet 0001, Rev 006.!_PROCESS DIAG HIGH PRESS COO~ NT INJECTION SYS CONTROL RO.pdf

__ -=--=----

__ 15~,~ 33---=- i

!c:\\PB UFSAR R27 Ref Dwgs 1M-1-DD-8, Sheet 0002, Rev 013, RADWASTE PROCESS DIAGRAM.pdf 462,166 i

k :\\PB UFSAR R27 Ref Dwgs M-1-DD-9, Sheet 0001, Rev 009, PROCESS DIAG RESIDUAL HEAT REMOVAL,(RHR) CONTRO L ROD DRl.pdf 519:*186 ic:\\P~ uFSAR.,, Ref Dw~-20, Sheet 000!, Rev 014, INST~UMEi'H ENGINEERING DIAGRAM NEUTRON MOUNTING SVSTEM.pdf --

Jii2,s"95 ---,

[c:\\PB UFSAR R27 Ref Dwgs _ !M-l-T-20, Sheet 0002, Rev 012, NEUTRON MONITORING SYSTEM.pdf 1,160,947 ___ -t

!c:\\PB UFSAR R27 Ref Dwgs ~

-l-T-20, Sheet 0003, Rev 014, NEUTRON MONITORING SYSTEM INSTRUMENT ENGINEERING DIAGRAM.pdf 241,281

~

fc:\\PB UFSARR27 Ref Dwgs M-l -T-20, Sheet 0004, Rev 013:TNsTRLiM"ENT ENGINEERING DIAGRAM NEUTRON MONITORINC;SYSTEM.pdf -

~---~-~--~-- -

386,788 ------i

[£ \\PB UFSAR -~

Ref Dwgs -_. M-!-T-2S, Sheet 0001_, Rev 016, INSTRUMENT ENGIN EER1i<_c;_ DIAGRAM REC, RCULA TION FLOW C()NTROL svsi-EM P!e._-_':IISTO~V.pd

__ -~_!..

_-- -.. =-is 7,_897-

~ *1

!c:\\PB UFSAR R27 Ref Dwgs IM-l -T-25, Sheet 0002, Rev 018, INSTRUMENT ENGINEERING DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM - HISTORY.pdf 47,843 lc\\ PB UFSAR Ri7 R'efc);;gs lM-1-T ~25, Sheet 0003, Rev 016, INSTRUMENT ENGINEERING DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM PID.pdf

  • 79~068

~ \\ PB UFSAARi7 Ref Dwgs r

-T-25, Sheet 0004, Rev 01~ INSTRUMENT ENGINEERING DIAGRAM_ RECIRCULATION FLOW CONTROL SYSTEM.pdf

  • n 7,54~~ ~--

(£:\\PB UFSAR R27_J}:f Dwgs __ M-1-T-2~, Sheet 0001, Rev 012, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC. SYSTEMS.pdf 55,215 ___ J Electronic File Directory Structure Page 8 of 14 I

Directory Path II UFSAR Drawing File Names II File Size (Bytes) !

C:\\PB UFSAR 'R2_? _R; T owgs T M-=~~T_::29: Sheet 0062, ~e;oi2, FUNCTIONAL CONTROL DIAGRAM r*iUCLEAR BOILER MISC: SYST EMS.pdf

_ f 51,l~

--~

f"Z:\\PB UFSAR R27 Ref Dwgs 1M-1-T-49, Sheet 0001, Rev 012, REACTOR PROTECTION SYSTEM IED PID.pdf fa45,411


---- -t--

1.c:\\PB UFSAR R27 Ref Dwgs l M-l -T-49, Sheet 0002, Rev 007, REACTOR PROTECTION SYSTEM IEDX l~.pdf 155,356

c:\\PB UFSAR R27 Ref Dwgs !M-l-T-49, Sheet 0003, Rev 015, INSTRUMENT ENGINEERING DIAGRAM REACTOR PROTECTION SYSTEM.pdf 93,670 j

~ :.\\PB UFSAR R27 Ref Dwgs I M-l-T-49, Sheet 0004, Rev 006, INSTRUMENT ENGINEERING DIAGRA~ REACTOR PROTECTION SYS P ANDID.pdf

_ _____ J 324,3~§_ *-=---=

,c:\\PB UFSAR R27 Ref Dwgs l ri-l-T-49, Sheet 0005, Rev 012, INSTRUMENT ENGINEERING DIAGRAM REACTOR PROTECTION SYSTEM.pdf 174,799 k:\\PBU FSAR.R27 Ref Dwgs IM-l -T-49, Sheet 0006, Rev 014, INSTRUMENT ENGINEERING DIAGRAM REACTOR PROTECTION SYS P ANDID.pdf


H Ol,772 lc:\\PB UFSAR R27 R*ef Dwgs ~~13-:S1ieet0001;Tev 013, EQUIPMENT LOCATION REACTOR AND RADWASTE BUILDING UNIT NO 2 PLAN AT EL.pdf -----

~ 33,066

-1

~c:\\PB UFSAR R27 RE:f Dwg~ ~

15, Sheet 0001, Rev 029, EQUIPME~! LOCATION REACTOR AND_RA~WASTE BLDG UNIT NO_~_ PLAN AT EL 135_.pdf

-_-r365,97i

- __ J

!E:\\PB UFSAR R27 Ref Dwgs M-2, Sheet 0001, Rev 020, GENERAL ARRANGEMENT PLAN AT EL 116-0.pdf 363,572 k:\\PB UFSAR R27 Ref ~ s M-2406, Sheet 0001, Rev 009, 2-12 YEAR ONSITE RADWSTE STORAGEFACILITY PLAN EL 135FT-06'"i'N"AND SEC.pdf 355,360

!c:\\PB UFSAR R27 Ref Dwgs M-2430, Sheet 0001, Rev 011, DRAIN AND SUMP SYSTEM.pdf 284,192 t-*.


-~-- -

--~ - ---

1,£:\\PB UFSAR R27 Ref Dwgs M-3, Shee_t 0001, Rev 021, GENERAL ARRANGEMENT PLAN AT ELB5FT - 0 IN.pdf 562,594 lc,\\P8-U.fSAR R27 Ref Dwg~. M-300, ~et 0001, Re, 048~ DIAGRAM LEGEND.pd! _

1"86,988 Jc:\\PB UFSAR R27 Ref Dwgs M-300, Sheet 0002, Rev 046, P AND I DIAGRAM LEGEND.pdf 114,167 lc\\ PB UFSAR R27 Ref Dwgs M-303, Sheet 0001, Rev 076, MAIN STEAM BYPASS AND CROSSAROUND.pdf

  • -* 564,374 I

i~ :\\PBUFSARR27RefDwgs _ 1MToisheet0002, Rev059,MAINSTEAMBY~~

ANDCROSSAROJ:JND.pdf ____

_. _____ §ti?_. _ _J

\\. c:\\PB UFSAR R27 Ref Dwgs M-303, Sheet 0003,. Rev 069, MAIN STEAM, BYPASS AND CROSSAROUND.pdf

. 530,352 1 1

ic:\\PB UFSARR27 Ref Dwgs M~303, Sheet 0004, Rev 063,-MAIN STEAM, BY-PASS AND CROSSAROUND.pdf lGsi"Ji,g -

ic:\\PB UFSAR R27 Ref Dwgs M-304, Sheet 0001, Rev 053, TURBINE AND EXTRACTION STEAM.pdf 166,479 jC:\\PB UFSAR R27 Ref Dwgs M-304, Sheet 0002, Rev 055, TURBINE AND EXTRACTION STEAM.pdf

___ _ 758,335 1

ic:\\PB UFSAR R27 Ref Dwgs. M-307, Sheet 0001, Rev 065, CONDENSATE SYSTEM.pdf 439,080 k :\\PB UFSAR R27 Ref Dwgs I M-307,.Sheet 0002, Rev 075, CONDENSATE SYSTEM.pd-f -

~---------

1()(),622

~ \\ PBUFSAR R27 Ref Dwgs IM-307, Sheet 0003,_ Rev 040,.CONDENSATE SYSTEM.pdf *--------==-=-=-~ ------*-* _ ---.~ ---

150,559 ---=-~*

~ :\\PB ~FSAR R27 Ref Dwgs iM-307, Sheet 0004, Rev 064, CONDENSATE SYSTEM.pd!__ ___

_ 108,607 1c:\\PB UFSAR R27 Ref Dwgs IM-307, Sheet 0005, Rev 077, CONDENSATE SYSTEM.pdf 511,490 k \\PB UFSARR27 Ret5;gs frvl-307, Sheet 0006, Rev 043, CONDENSATE SYSTEM,0006~

f 155,819 lc:\\PB UFSAR R27 Ref Dwgs tM-308, Sheet 0001, Rev 065, FEEDWATER AND FEED PUMPS.pdf 564,971 (c:\\ PBUFSARR27RefDwgs Fl08,Sheet0002,Rev04~,FEEDWATERANDFEEDPUMPS.pdf..

~- ----- -----~-

46~,~94 -

l_c:\\~~ ~

SAR R27 Ref Dwgs ~

-308, Sheet 0003, Rev 061, FEEDWATER AND FEE~~~MPS:f~~!-

~6,737

~ :\\P~ UFSAR R27 ~ ef Dwg~ IM_-:308, Sheet 0004, Rev 046, FEEDWATER AND FEED PUMPS {2).pdf 539,765

~ :\\PB UFSAR R27 Ref Dwgs M-3q~

_heet 0004, Rev 046, FEEDWATER AND FEED PUMPS.pdf 486,055

--..i f£\\PB UFSAR R27 Ref Dwgs M-308, Sbeet 0005, Rev 043, FEEDWATER AND FEED PUMPS.pdf ______,

55,741 1c:\\PB UFSAR R27 Ref Dwgs M-308, Sheet 0006, Rev 006, FEEDWATER AND FEED PUMPS.pdf 55,295 fc:\\PB UFSAR R27 R ef Dwgs. M-310, Sheet 0001, Rev 068, AIR EJECTION AN D OFF GAS.pdf

    • -- 532,~

,c:\\PB UFSAR R27 Ref Dwgs,M-310, Sheet 0002, Re~ 063, AIR EJECTOR AND OFF GAS:pdf 205,885 -

. c:\\PB UFSAR R27 Ref Dwgs JM-310, Sheet 0003, Rev 070, AIR EJECTION AND OFF GAS~pdf ----*-*-

105,436 J

[c:\\PB UFSAR R27 Ref Dwgs !M-310, Sheet 0004, Rev 051, AIR EJECTION AND OFF GAS.pdf 286: 681 ___ _

f'cXPB UFSAR R27 Ref o"; gs IM-310, Sh~~t 0005~ Rev 004, AIR EJECTION AND OFF GAS.pdf

- --- --~---

i81,878-

-- *-----~---~--

='

Electronic File Directory Structure Directory Path l

UFSAR Drawing File Names

r. <::\\!'B UFSAR R27 Ref Dwgs ~

-311, Sh~toooi;' ~~ oso~ 6NDENSATE !=!~!ER DEMI N ERA~IZER_SYSTE*M~df ic:\\PB UFSAR R27 Ref Dwgs frv1"~3U, Sheet 0003, Rev 039, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf lc:\\_P_B lJFSAR R27 Ref Dwgs M-3~1, Sheet 0004, Rev 039,C:ONDENSATE FILTE~ DEMINERALIZER SYSTEM.pdf ic:\\PB UFSAR R27 Ref Dwgs M-311, Sheet 0005, Rev 039, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf

~ -

Jc:\\PB UFSAR R27 Ref Dwgs M-31LSheet0006;*Rev 040, CONDENSATE FILTER DEMINERALIZER SYSTEM:pdf ---

lc:\\PB UFSAR Ri 7 Ref Dwgs - M~311, Sheet 0007, ~ 055, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf - --.. -

k\\PB UFSAR R27 Ref ~

M-311, Sheet 0008,_ Rev 038, CONDENSATE FILTER DEMINERALIZERSYSTEM.Pdf_ ~

ic:\\PB UFSAR R27 Ref Dwgs M-311, Sheet 0009, Rev 040, CONDENSATE FILTER DEMINERALIZER SYS_TE_M_.~pd

__ f ___

!c:\\PB UFSAR R27 Ref Dwgs M-311, Sheet 0010, Rev 039, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf

[c:\\Ps UFSAR R27 Ref Dwgs M-311, Sheet 0011, Rev 038, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf jc:\\PB UFSAR R27 Ref Dwgs M-311, She_et 0012, Rev 039, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf -==--.

~c:t!3_ UFSAR R27 Ref Dwgs M-312, Sheet 0001, Rev 060, CIRCULATING WATER SYSTEM.pdf Page 9 of 14 JL File Size (Bytes) I f-24,412 479(593_

474,368 464,120 *-

365,327 134,813 UG'.o96 -* =-:::._j 112,514 112,581 114!209

( \\PB UFSAR R27 Ref Dwgs M-312, Sheet 0002, Rev 058, CIRCULATING W~!ER S_Y_S.T __

EM_.p_d_f _________ _

,c.\\PB UFSAR R27 Ref Dwgs M-314, Sheet 0001, Rev 076, SERVICE WATER SYSTEM.pdf 88,941 617,946 869,255

-* --t---

533,107

__,. ___ --i 83,644 Fc c:\\P. B UFSAR R27 Ref_. Dwgs IM-3i~ Sheet 0003, Rev 070, SERVIC_E WATER SYSTEM.pdf _

--~-* ---=~-------. -* ~,393,29~ ---*--1*

k } PB UFSAR R27£lef Dw~ *

-314, Sheet 0004, Rev 068, SERVICE WATER.?JSTEM.pdf 507,362

!c:\\PB UFSAR R27 Ref Dwgs M-314, Sheet 0004, Rev 069, SERVICE WATER SYSTEM.pdf 105,835

'c:\\PB UFSAR R27Ref D;gs.M-314, Sheet 0005, Rev 071, SERVICE WATER SYSTEM.pdf

. 512;309 --

fc0 PB UFSAR R27 Ref Dwgs j M-314, Sheet 0006,. Rev 067, SERVICE WATER SYSTEM.pdf = -

~-- __ -- ---*- ---~--=-----:- _

42~!5! ~:-=-1

~

B ~ SAR R27 Ref Dwgs M-314, Sheet 0007, Rev 061, SERVICE WATER SYSTEM.pdf 320,684 1c\\PB UFSAR R27 Ref Dwgs M-314, Sheet 0008, Rev 067, SERVICE WATER SYSTEM.pdf 114,420 c:\\PB UFSAR R27 Ref Dwgs M-314, Sheet 0009, Rev 045, SERVICEWATER SYST'.pdf --

49)*16-fc:\\PB UFSAR R27 Ref -Dw_g_s M-314, Sheet 0002, Rev 063, SERVICE WATER SYSTEM.pd'f--

c:\\PB UFSAR R27 Ref Dwgs M~31S,~t0001, R~

EMERGENCY SERVICE WATER AND HIGH PRESSURE SERVICE WATER SYSTEM.pdf-*

438,237

{c'\\PB UFSAR R27 Ref Dwgs. M-315, Sheet 0002~-Rev 057, EMERGENCYSERVICE WATER AND HIGHPRESSURES ERVICE WATER SYSTEMS~ df ~-------*- ioiai4

~c:\\PB u ~2A~ R27 Ref Dwg~

M-315, Sb_eet 0003, Rev 062, EMERGENCY SERVICE WATER AND HIGH PRESSURE SERVI~ WAT~ SYSTEM:pdf _ _ _ _

429,l~.~------l 1c:\\PB UFSAR R27 Ref Dwgs M-315, Sheet 0004, Rev 056, EMERGENCY SERVICE WATER AND HIGH PRESSURE.pdf 670,539

[c:\\PB _~

R27 Ref Dwgs M=315, Sheet 0 005, Rev 059, EMERG SERV WTR, HIGH PRESS SERV WTR SYSTEM.pdf


--~ -===

121,007 _

l

~ :\\PB UFSAR R27 Ref Dwgs M-315, Sheet 0006, Rev 003., PID EMERGENCY SERVICE WATE~_AND HIGH PRESS SERVI~~ WATER SY.pdf 129,719 _.. *-- ~

E \\PB UFSAR R27 Ref Dwgs M-315, Sheet 0007, Rev 003, PID EMERGENCY SERVICE WATER AND HIGH PRESS SERVICE WATER SY.pdf 117,609 c:\\PB UFSAR R27 Ref Dwgs IM-316, Sheet 0001, Re; 062: COOLING WATER REACTOR BUILDING.pdf 505,834 -

lc~PBUFSAR R27 Ref Dwgs M-316, Sheet 0002, Rev 064, COOLING WATER-TURBINE BUILDING.pdf 62(),969

~

~ :\\PB UFSAR R27 R~ Dwgs 1M-316, Sheet 0003, Rev 053, COOLING WATE~ ~EACTOR BUILDING.pdf

_ ~---

-~- ----~--- __ 47~~6-=---

Jc:\\PB UFSAR ~27 ~ ef Dwgs. M-316, Sheet 0004, Rev 057, CQ.Q!:!,NG WATER - TURBINE BLDG.. pdf 1i~!.Q85

,c:\\PB UFSAR R27 Ref Dwgs M-317, Sheet 0001, Rev 083, RAW WATER SYSTEM.pdf 274,267 fc:\\PB UFSAR R27 Ref Dwgs M-317: She~-OO-Oi,".Rev 054, RAW WATER SYSTEM.pdf.

307,920

~ -

_.... -----t--'---

c:\\PB UFSAR R27 Ref Dwgs M-319, Sheet 0001, Rev 036, MAKE-UP DEMINERALIZER WATER.pdf 151,189 iC;\\~~ UFSAR R27 ~ef p wgs !M-319, Sheet 0002, Re~ 053, MAKE-UP DEMINERALIZER ~ ATER.pdf -~-

- -.=.==---.

675,434 jc:\\PB UFSAR R27 Ref Dwgs "f&019, Sheet 0003, Rev 0! 1, MAKEUP DEMINERALIZER WATER.pdf -------

160,0Z.!:_

Electronic File Directory Structure Page 10 of 14 JI File Size (Bytes) I]

IL _

Directory Path II UFSAR Drawing File Names lc:\\PB UFSAR R27 Ref~

M-319, Sheet 0004, Rev 020, MAKE. UP DEMINERALIZER WATER.pdf 1c:\\PB UFSAR R27 Ref Dwgs M-320, Sheet 0001, Rev 039, COMPRESSED AIR - NOTES AND INDEX TITLE SHEET.pdf I-

    • ..*.* _:~3~8 _]

ic:\\PB UFSAR R27 Ref Dwgs M-320, Sheet 0002, Rev 044, AIR COMPRESSOR 2AK001 AND DRYERS.pdf I

k\\PBUFSARR27Ref o;'g's M:320~0004, Rev 04( AIR COMPRESSORS 2CK001 AND 2DK001.pdf 333,795.

-- -~

1407,195 1~:::tJ-=-=-

Jc:\\PB UFSAR R27 Ref Dwgsi

-320, Sheet 0003, Rev 044, AIR COMPRESSOR 2BK001 AND DRYERS.pdf Jc:\\PB UFSAR R27 Ref Dwgs M-320, Sheet 0005, Rev 040, RW AIR COMPRESSORS OOK308 AND OOK309 AND RESPIRATORY AIR CO.pdf

[i:\\ PBUF5AR.R27 Ref D~gs,~ _-320, Sheet 0006, Re~_.944~ COND~r-:!SATEBAEKWASHSYS AIR COMPRESSOR 2AK315 AND L_QW PR-ESS AIR B-LOWERJJdf

c
\\PB UFSAR R27 Ref Dwgs,M-320, Sheet 0007, Rev 037, INSTRUMENT AIR TURBINE BUILDING.pdf

+¥7,731 --

.278,968 jc:\\PB UFSAR R2~~f Dwgs M-320, Sheet 0008, Rev 034, INSTRUMENT AIR TURBINE BUILDING EL. 102.pdf ic:\\PB UFSAR R27 Ref Dwgs M-320, Sheet 0009, Rev 043, COMPRESSED AIR SYSTEM INSTRUMENT AIR TURBINE BUILDING EL. 116.pdf ic:"\\PB UFSAR R27 Ref Dwgs M-320, Sheet 0010, Rev 034, INSTRUMENT AIR TURBINE BUILDiNG EL. 116.pdf ic:\\PB UFSAR R27 Ref Dwgs w

-320, Sheet 0011, Rev 036, INSTRUMENT AIR TURBINE BUILDING EL. 116.pdf

[

!c:\\f'B UFSA R R27 ~ ef Dwg;- *M-320, Sh~~~!._Rev 047 !.COMPRESSED AIR SYSTEM INSTRUMENT Al TURINE.pdf

___ ~- -*

\\PB UFSAR R27 Ref Dwgs _ M-320, Sheet 0013, Rev 040, INSTRUMENT AIR REACTOR BUILDING EL. 91-6.pdf
\\PB UFSAR R27 Ref Dwgs M-320, Sheet 0014, Rev 036, INSTRUMENT AIR REACTOR BUILDING EL. 116.pdf ic:\\PB UFSAR R27 Ref D_;;g~-

rvi'Tio~Sh.eet~Rev 039, INSTRUMENT AIR REACTOR BUILDING EL. 135.pdf

!(:\\PB UFSAR R27 Re(D;gs M-320, Sheet 0016, Rev 04':2:INSTRUMENT AIR REACTOR BUILDING EL. 165.p~-

b \\ ~B UFSAR R27 Ref Dw&s !M-320, Sheet 0017, Rev 039, COMPRESSED AIR SYSTEM INSTRUMENT AIR REACTOR BLDG E 0

L. 195.pdf ic:\\PB UFSAR R27 Ref Dwgs IM-320, Sheet 0018, Rev 036, INSTRUMENT AIR REACTOR BUILDING EL. 234.pdf lc:\\PB UFSAR R27 Ref Dwgs IM-320, Sheet 0019, Rev 048, COMPRESSED AIR SYSTEM SERVICE AIR TURBINE BUILDiNGEL.102,116T3SAND 165.pdf

~ 160,742 364,1_.!.6_

104!_!09 354,646

-i 320,270

]512~~ _

60,091 290,936 137,522 138,167 73,144 261,138

~1

'. c:\\PB UFSAR R27 Ref Dwgs M-320, Sheet 0020, Rev 040, SERVICE AIR REACTOR BUILDING EL. 91-6 AND 116.pdf 116,728 rZ:\\PB UFSAR R27 Ref Dwgs M~320,-Sheet 0021, Rev 038, SERVICE AIR REACTOR BUILDING EL. 135.pdf 90,058-

,,_, ___ ~--

1c:\\PB UFSAR R27 Re!_Dw&.~ !M-32(?.L?~~~! 0022, Rev 037, SERVICE AIR REACTOR B_~DG EL. 165, 195 AND 234.pdf *-- ___ ----- --- _ __

124,536 E_:\\PBJ!FSAR R27 ~~L~~~-5-~ M:~it?_~eet 0023, Rev _Q_39_0~~gMPRE??OR 3AK001 AND DRYERS.pdf

~ 9,7~§_--~-

_c:::\\PB UFSAR_ R27 Ref Dwg~ +M--320, Sh~et 0024, Rev 039, AIR COMPRESSOR 3BK001 AND DRYERS.pdf

_ ~-

__ ___ 3?7,62~ _ _

c:\\PB UFSAR R27 Ref Dwgs 1 M-320, Sheet 0025, Rev 041, AIR COMPRESSOR 3CK001 AND 3DK001.pdf 270,091 Z:\\PB UFSARR27 Ref Dwgs ~ _:-320, Sheet 0026, Rev 046, CONDENSATE BACKWASHSYSAIRCOMP3AK315 A ND LOW PRESS AIRBLOWER 30K11.pdf __________ 269,673 --*--

,c:\\PB UFSAR R27 Ref Dwgs,M-320, Sheet 0027, Rev 035, INSTRUMENT AIR TURBINE BUILDING EL. 102.pdf 58,010 1c:\\PB UFSAR R27 Ref Dwgs M-320, Sheet 0028, Rev 035, INSTRUMENT AIR TURBINE BUILDING EL. 102.pdf ffi

' 144,725 lc ~ B UFSAR R27 ~~f.Dwgs

~ -32~ Sheet 00*. 29, Rev 042, COMPRESSED AIR SYSTEM INSTRUMENT AIR TURBINE BUILDIN~!_L.. U 6.pdf

!~,682 lClf'B UFSAR R27 Ref Dwgs Tfvl-_3_?_0, Sheet oq_~9,!~ev 03§!.. COMPRESSED AIR SYSTEM INSTRUMENT AIR TUR_BINE BUILDING EL. !_16.pdf _ _

96,528 _

!c:\\PB UFSAR R27 Ref Dwgs fM-320, Sheet 0031, Rev 036, INSTRUMENT AIR TURBINE BUILDING EL. 135.pdf 326,960 i'::.'\\.P~ U~SAR R27 Ref Dwgs !M~m:-sheet 0032, Rev 045, INSTRUMENT AIR TURBINE BUILDING EL. 165.pdf

-* ~4,524 -

~ \\~~UFSA~ _R2_7_R_ef _Q~~-

M-~_20_, ?_he_e_t 0_0_3_3, Rev 038, INSTRUME!'JT AIR REACTOR ~\\JJ!:Q!~~-g:~1_-6_.pdf

. 2~?,833 lc:\\PB UFSAR_R27 Ref D"':'._gs

~ :}.?.9.!..?~~~!g.Q~4, Rev 037, COMPRESSED AIR SYSTEM l~ STRUM~-~I.!'.!.~~EA~TO~ §~ ILDl~:!:,+/-6.pdf 71,668 fc:\\P. ~

.. UFSAR R27 Ref Dwg~ M-32~. Sheet.0.035, Rev 038,. COMPRESSED AIR SYS! EM_ INSTRUMENT_AIR.. REACTOR BUILDING EL135.pdf

__ 80,0.3) ___ -.*j.

1c:\\P~ ~FSAR R27 Ref Dwgs M-320, Sheet qQ}~ Rev 039, COMPRESSED AIR SYSTEM INSTRUMENT AIR_~~~~!Q~~LD~ EL. 165,0.pdf_

117,927 _

c
\\PB UFSAR R27 Ref Dwgs M-320, Sheet 0037, Rev 040, INSTRUMENT AIR REACTOR BUILDING EL. 195.pdf 117,223 k}PB UFSAR R27 Ri f o"; g~

M-32Q,Sheet__Q038, Rev 03§!l~STRU.M ENT AIR REACTORB UILDl ~-~i_!::_234.pdf_-=- _ -=----=--~--: - **-- --

179,047 - --~-

Electronic File Directory Structure Page 11 of 14 Directory Path U

UFSAR Drawing File Names J File~ize (Bytes) 11 83,397.

ic:\\PB UFSAR R27 Ref Dwgs IM-320, Sheet 0039, Rev 046, COMPRESSED AIR SYSTEM SERVICE AIR TURBINE BLDG EL 102,116,135 AND 165.pdf

~

tc:\\PB UFSAR R27 Re f Dwgs !M-3i0, Sheet 0040, Rev 037, SERVICE AIR REACTOR BUILDING-EL. 91-6 AND 116.pdf

- -- 85,592

-l Jc:\\PB UFSAR R27 Ref Dwgs M-320, Sheet 0041, Rev 036, SERVICE AIR REACTOR BUILDING EL. 135,0041.pdf 95,600 fc:\\PB UFSAR R27 Ref D;gs M-320,Sheet 0042, Rev 037, SERVICE AIR REACTOR BUILDING.EL.165,19S)\\N-D234.pdf -

345,363 k :\\PB UFSAR R27 Ref Dwgs - M-320, Sheet 0043, Rev 043, INSTRUMENT AIR RADWASTE BLDG EL 135 AND 165.pdf


* ~

357,955*-*

ic:~B UFSARR27 RefD~"s°rvi-="iio: Sheet 0044, Rev 035, INSTRUMENT AIR RADWASTEBU ILDING EL.pdf -====--=****---------. -* -- *=-

38i 24{ "

ic:\\PB UFSAR R22.Bernwgs M-320, Sheet 0045,_Rev 037, INSTRUMENT AIR RADWASTE BUILDING EL. 91-6.pdf 105,470 lc:\\PB UFSAR R27 Ref Dwgs M-320, Sheet 0046, Rev 037, SERVICE AIR RADWASTE BLDG EL. 91-6, 116, 135 AND 165.pdf 106,153 l

ic:\\PBUFSARR27RefDwgs M-320~Sheet 0047, Rev 043, COMPRESSED AIR SYSTEM SERVICE AIR COMMON AREAS AND.OFF_GAS TUNNEL.pdf-

    • ------- 189,214 __

c~PB UFSAR B_27 Ref Dwgs_ 1M-320, Sheet 0048, Rev 040, SERVICE AIR ADMIN.pdf 305,478 jc:\\PB UFSAR R27 Ref_~wgs,M-320, Sheet 0049, _!{ev 045, COMPRESSED AIR SYSTEM INSTRUMENT AIR AUXILIARY BOILER BUILDING.pdf

~90,401

  • c:\\PB UFSAR R27 Ref Dwgs, M-320, ~heet 0050, Rev 038, COMPRESSED AIR SYSTEM INSTRUMENT AIR RECOMBINER BLDG.pdf

_ ___ 129,098

'c:\\PB __ UFSAR R~_7 Ref Dwgs M-320, Sheet 0051, Rev 0.i~!~!_R CO_MPB~?SOR_S 2AK001, 2BK001, 2CK001, 2DK001.pd( __

234,605 __ _ _

c:\\PB UFSAR R27 Ref Dwgs M-320, Sheet 0052, Rev 002, AIR COMPRESSORS 3AK001, 3BK001, 3CK001, 3DK001.pdf 242,752 r-,--

1c:\\PB UFSAR R27 Ref Dwgs, M-322, Sheet 0001, Rev 034, COOLING TOWERS.pdf 524,447

C:\\PB UFSAR R27 Ref D111igsftii~22,*Sh~t -0002,-Rev 030, COOLING TOWERS - COMMON INSTRUMENT LIST.pdf 371,106 --

~

PB UFSAR R2~~ef D~gs IM-:_324, Sheet 0001, Rev 064, AUXILIARY STEAfv'.1 SYSTEM.pdf

--~---

1596,891

,cj _PB UFSAR R?_? Ref Dwg~ IM-324, Sheet 0002, Rev 060, AUXILIARY STEAM SYSTEM.pdf

  • 387,544 _

,c:\\PB UFSAR R~n~ef Dw.~.s M-324, S~~-et 0003~ ev 04\\ __ AUXILIARY STEAM SYSTEM.Pd..! ___

.269,652 1c:\\PB UFSAR R27 Ref Dwgs M-324, Sheet, 0002, Rev 060, AUXILIARY STEAM SYSTEM.pdf 285,242

~ PB UFSAR.R27 RefD-;g; i M-ill,Sheet 0002, Rev 056, CHILLED WATER _SYSTEM DRYWELL COOLING.pdf --

1108,384

c:\\PB UFSAR R27 Ref Dwgs M-327, Sheet 0003, Rev 046, CHILLED WATER SYSTEM DRYWELL COOLING.pdf 665,637 r-;-

j.<:.:\\PB UFSAR R27 Ref Dwgs M-327, Sheet 0004, Rev 049, CHILLED WTR. SYS. DRYWELL COOLING.pdf 206,345 lc:\\PB UFSAR R27 Ref Dwgs M-330, Sheet 0001, Rev 038, EMERGENCY COOLING SYSTEM.pdf 556,826

[c:\\PB UFSAR R27 Ref Dwgs M-331:;Sheet 0001, Rev 075, OFF-GAS RECOMBINER SYSTEM.'pdf 539j76--

~

jc:\\PB UFSAR R27 Ref Dwgs - ~-331, Sheet 0002, Rev 054, P AND ID OFF-GAS RECOMBINrn SYSTEM.pdf 111,080 ic:\\PB UFSAR R27 Ref Dwgs M-331, Sheet 0003, Rev 076, OFF-GAS RECOMBINER SYSTEM.pdf 554,285 lc:\\PB UFSAR R27 Ref Dwgs M~331, Sheet 0004, Rev 058, P AND ID OFF-GAS RECOMBINER SYSTEM.pdf 0

315,485

~:\\~B UFSARR27 Ref Dwgs I M-331, Sheet 0005, ~ev 06°i: OFF-GAS REC9 MBINER SYSTEM.pell--=-

_ ~ _ _ --=---_ =-~~ _ ---*- ----*-* __ __

~~- _

( 1 B UFSAR 827 Ref Dwgs ~ -33!, Sheet 0006, Rev 061, OFF-GAS RECOMBINER SYSTE~:f~df

~

139,9?Z._

~ \\ PB UFSAR R27 Ref Dwgs M-331, Sheet 0007, Rev 063, OFF-GAS RECOMBINER SYSTEM.pdf 105,926 __

jc:\\PB UFSAR R27 Ref Dwgs M-333, Sheet 0001, Rev 059, P AND ID INSTRUMENT NITROGEN.pdf 706,353 ic:\\PB UFSAR R27 Ref Dw~

M-333, Sheet 0002, Rev 060, INSTRUMENT NITROGEN.pdf

=--:-_______ ___ _ _ __

~

682,114

~c:\\PB UFSAR R27 Ref Dwgs M-334, Sheet 0001, Rev 046, VENTILATIO~ RAD MONITORIN~ SYS-U2 J:.~D COMMON.pdf.

171,840

c:\\PB UFSAR R27 Ref Dwgs M-334, Sheet 0002, Rev 033, VENTILATION RADIATION MONITORING SYSTEM.pdf 99,596

~c:\\PB UFSAR R27 Ref Dwgs-M~heet000!,Rev080, NUCLEAR BOILER.pdf

-- --=- 146,557

!c:\\PB UFSAR R27 Ref Dwgs l M-351, Sheet 0002, Rev 072, NUCLEAR BOILER.pdf 391,425

[£\\PB ~ FS~R R27 Rer owgs ~

-351! Sheet 0003, Rev 075, NUCLEAR BOILER.pdf

- --===-

i ~0,2~7-: -

[c:\\~B UFSAR R27 Ref Dwgs IM-35!2he~!Q9_Q_~L~~".'..Q70, NUCLEAR BOILER.pdf_

  • --*-*-----**-- -***----- -- -- ____.. 13~ 694 __

Electronic File Directory Structure Page 12 of 14 jl Direc.tory Path _ _ II ___

.. _ --* UFSAR Drawing File Names II File Size (Bytes) lj

~ :\\PB UFSAR R27 Ref Dwgs f M-352, Sheet 0001, Rev 064, NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 363,746 jc:\\PB UFSAR R27 ~ef Dwgs [M-352, Sheet_0002, Rev.Q68, !:!~C~ AR BOILER ~.ESSEL INSTRUMENTATION.pdf _

__m.

413,395_.

c:\\PB UFSAR R27 Ref Dwgs m

-352, Sheet 0003, Rev 055, NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 441,170 ic:\\PB UFSAR R27 Ref Dwgs-M-352, Sheet ooof Rev 064, NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf --. ---

532,896

~

[c:\\PB UFSAR R27 _~ef Dwgs jM-352, Shee! 0005, Rev 046! NUCLEAR ~OILE~ VESS~~_!!:!ST~UMENTATION.pdf 246,995 _ *--

lc:\\PB UFSAR R27 Ref Dwgs !M-352, Sheet 0006, Rev 039, NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 284,159

c
\\PB UFSAR R27 Ref Dwgs !M-352, Sheet 0007, Rev 000, PID NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 1 10,302 1c:\\PB UFSAR R27 Ref Dwgs ~

352, Sheet 0008, Rev 000, PID - NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 91,274

[c:\\ PB UFSAR R27 Ref Dwgs !M-353: Sheet 0001, Rev 061, -REACTOR RECIRCULATION PUMP SYSTEM.pdf 391,365

~ :\\PB UF?AR R27 Ref Dwg~ J~ 353, Sheet.0002, Rev 058, REACTOR RECIRCULATION PUMP SYSTEM:,P~ _ _. :=~

~ _- -

-- _ *~---= 334,480

~c:\\PB UFSAR R27 Ref Dw~~ i M-35~, Sheet 0003, Rev 065, REACTOR RECIRCULATION PUMP SYSTEM.pdf

_ __ 387,957

~ :\\PB UFSAR R27 Ref Dwgs !M-353, Sheet 0004, Rev 061, REACTOR RECIRCULATION PUMP SYSTEM.pdf 318,092

( *\\PB UFSAR R27 Ref Dwgs iM-354, Sheet 0001, Rev 078, REACTOR WATER CLEAN-UP SYSTEM.pdf 580,905 i.c.\\P.BUFSARR27 Ref~

.s..

M-355, SheetOOOl, R~

CLEAN-UPFILTERANDDEMINERALIZERSYST.. EM-:--

.pdf ___ -... --

_I04,84f.- -1 lc:\\PB UFSAR R27 Ref Dwgs IM-355, Sheet 0002, Rev 032, CLEAN-UP FILTER AND DEMINERALIZER SYSTEM.pdf 70,179 G]i UFSAR ~~~-Ref D"A'._i~

M-355,_Sheet 0003, Rev 03~L.fLEf,N-UP FILTER AND DEMINERALIZER SYSTEM.pdf

! 00,0~ -=--~-

c:\\PB UFSAR R27 Ref Dwgs M-355, Sheet 0004, Rev 033, CLEAN-UP FILTER AND DEMINERALIZER SYSTEM.pdf 69,544 1 c:\\PB UFSAR R27 Ref Dwg~- ~

56, Sheet 0002, Rev 076, CONTROL ROD DRIVE HYDRAULIC SYSTEM PART A.pdf

- -- ~----

123,629.

k:\\PB UFSAR R27 Ref Dwgs - M-357, Sheet 0001, Rev 037, CONTROL ROD DRIVE HYDRAULIC SYSTEM - PART-B~df - --*--- - ---

496,420 lc:\\PB UFSAR R27 Ref Dwgs M-357, Sheet 0002, Rev 036, CONTROL ROD DRIVE HYDRAULIC SYSTEM - PART B.pdf 108,613 lc:\\PB UFSAR R27 Ref Dwgs '"ivi'=35s, Sheet 0001, Rev 039, STANDBY LIQUID CONTROL SYSTEM.pdf 126,960 1£\\PB UFSAR R27 Ref Dw~

IM-358, Sheet 0002, Rev 03~.STANDBY LIQUID CONTROL SYSTEM:pdf_.

-- - ---~ -- - ~ **-*= -- ~ ------..:==- __ 1:§7,941

!c:\\PB UFSAR R27 Ref Dwgs M-359, Sheet 0001, Rev 050, REACTOR CORE ISOLATION COOLING SYSTEM.pdf 335,573 jc;\\ PB UFSAR R27 Reif Dwgs M ~359, Sheet 0002, Rev 048~ REACTOR CORE ISOLATION COOLING SYSTEM:pdf ---

1415,331 lc:\\PB UFSAR R2z._Ref Dw~s ~ :~60, Sheet 0001iRev 056~B-C.I.C. PUMP TURBINE DETAILS.pdf

-~---

446,714 1c:\\PB UFSAR R27 Ref Dwgs M-360, Sheet 0002, Rev 054, R.C.I.C. PUMP TURBINE DETAILS.pdf 448,729 fc:\\PBUFSARR27Ref Dwgs M~

Sheet 0003, Rev 047 ;R.C.I.C. PUMP-TURBN DETAILS LUBE OIL AND CONTROL SYSTt M U-Nl.pdf 270,234. -

r jc:\\PB UFSAR R27 Ref Dwgs

  • M-360, Sheet 0004, Rev 039, R.C.I.C. PUMP-TURBN DETAILS LUBE OIL AND CONTROL SYS UNIT 3.pdf 96,114

'c"\\PB UFSAR R27 Ref Dwgs M-361, Sheet oooi, Rev 087, RESIDUAL HEAT REMOVAL SYSTEM.pdf 67-5,590 -

jc:\\ PB UFSAR R27 Ref Dwgs M-361, Sheet 0002, Rev 071, RESIDUAL HEAT REMOVAL SYSTEM.pdf 640,673

c
\\PB UFSARR27RefDwg~ IM~361, Sheet_g_Q03,Rev073! _RESIDUALHEATREMOVALSYSTEM:pdf -

_ --~

182,820

'c:\\PB UFSAR R27 Ref Dwgs M-361, Sheet 0004, Rev 074, RESIDUAL HEAT REMOVAL SYSTEM.pdf 495,667

!c:\\PB UFSAR R27 Ref Dwgs m -362, Sheet 0001,-R~064, CORE SPRAY COOLING SYSTEM.pdf 127,392

'c:\\PB UFSAR R27 Re f D~

s. M-362, Sheet 0002, Rev 062, P AND ID CORE SPRAYCooi:iNGSYSTEM.pdf

. _*--- --- - --* -=}26,388_,,_

i c:\\PB UFSAR R~ Ref Dwg~ ~.:?.~2! _?~-~~t 0001, Rev 043, FUEL POOL COOLING AND CLEA~-UP.p~

104,985 lc:\\PB UFSAR R27 Ref Dwgs M-363, Sheet 0002, Rev 045, FUEL POOL COOLING AND CLEAN-UP.pdf 452,202

c:\\PB UFSAR R27 Ref Dwgs M-364:*sh~

Ol,Rev028: FuELPO-OL FILTER DEMINERALIZER SYS.. pdf 195,247

!c:\\PB UFSAR R27 Ref Dwgs t M-364, Sheet 0002, Rev 02s: FUEL POOL FILTERDEMINERALIZER SYS.pdf ---* - -

-- - --- 540~272 l£:\\PBUFSAR R27 Ref Dwgs M-365, s~_eet_ 0001, riev" 063, HiG°HPRESSURE COOLANT INJ ECTIONSYSTEM.E_d{~ -

=

t s68,o2i Electronic File Directory Structure Page 13 of 14 II Directory Path II UFSAR Drawing File Names n File Size (Bytes) I Jc:\\PB ui=s.li:i~ R27 Ref Dwgs IM -365, Sheetoooi,"Fiev 066, HIGH PRESSUREC:OOLANTINJECTION SYSTEM.pdf 122,227 r- -- -

!c:\\PB UFSAR R27 Ref Dwgs M-366, Sheet 0001, Rev 058, HPCI PUMP TURBINE DETAILS.pdf 437,269

!c:\\PB U FSARR27 Ref Dwgs M-366, Sheet 0002, Rev 050, HPCI PUMP TURBINE DETAILS LUBE OIL AND CONTROL SYSTEMS.pdf 7 8,226

---1 lc:\\PB UFSAR R27 Ref Dwg~

M-366,5~

0003, Rev 045, H.P.C.I. PUM-P-TURBINE DETAILS LUBEOILANDCONTifr)L SYSTEMS.pdf 500,483 _ *--

ic:\\PB UFSAR R27 Ref Dw gs.M-366, Sheet 0004, Rev 053, HPIC PUMP TURBINE DETAILS.pdf

-- - 125,303 -----

~ \\PB UFSAR R27 Ref Dwgs M-3~,_She etOOOl: Rev 087, CONTAINMENT ATMOSPHERICCONTROLSYSTEM.pdf -------- -

757,595 1s_:'f!3 UFSAR R27 Ref Dwgs M-367, Sheet 0002, Rev 081, CONTAINMENT ATMOSPHERIC CONTROL SYSTE~:£~

512,602

~ \\PB UFSAR R27 Ref Dwgs M-~67, Sheet 0003, Rev 078, CONTAINMENT ATMOSPHERIC CONTROL SYSTEM.pdf __ __

_.!QI_,705 ic:\\PB UFSAR R27 Ref Dwgs M -367, Sheet 0004, Rev 003, P AND I DIAG CNTNMNT ATMOSPHERIC CONTROL SYSTEM.pdf 86,233 tc:\\PB UFSAR R27 Ref Dwgs M-368, Sheet 0001, Rev 036, p AND ID RAD WASTE-L.10.UID COLLECTION SYSTEM.pdf 205,416

~ \\ PB UFSAR R27 Ref Dwgs M-369, Sheet 0001, Rev 030, RADWASTE LIQUID COLLECTION SYSTEM.pdf 170,074 lc:\\PB_ UFSAR R27 Ref Dwgs M=37i, Sheet oo_~ Rev 065.!. CONTAINMENT ATMOSPHERE DILUTION SYSTEM.pdf 123,318 iC:.l_l'~ UFSAR R27 Ref Dwgs M -372, Sheet 0002, Rev 054, CONTAINMENT ATMOSPHERE DILUTION SYSTEM.pd!._

165,728 lc:\\PB UFSAR R27 Ref Dwgs M-372, Sheet 0003, Rev 004, P AND I DIAG CNTNMNT ATMOSPHERE DILUTION SYS.pdf 191,856 fc:\\PB UFSAR R27 Ref OvJgs _ fM-'31~:s~~t 000(

~~~ 004,_CONTAINMENT ATMOSPHERE DILUTION SYSTEM.pdf.

176,643==

'c:\\PB UFSAR R27 Ref Dwgs,M -374, Sheet 0001, Rev 018, POST ACCIDENT SAMPLING SYSTEM INSTRUMENT AND EQUIPMENT LIST.pdf 200,125 lc:\\PB UFSAR R27 Ref Dwgs M-374, Sheet 0002, Rev 020, POST ACCIDENT SAMPLING SYSTEM.pdf 177,150 f~\\PB UFSAR R27 Ref~

M -377, Sheet 0001, Rev 044, DIESEL GEN AUX SYSTEMS STARTING AIR SYSTEM.pdf -- --

242,417 - ----

fr:\\P.§. UFSAR R27 Ref Dw~s M-377, Shee! 000_?_~ Rev 047.! DIESEL GENERATOR AUXILIARY SYSTEMS AIR_~ OOLANT,JACK-ET COOLANT SYSTEM.pd-f 84,369

~--

lc:\\PB UFSAR R27 Ref Dwgs M-377, Sheet 0003, Rev 045, DIESEL GENERATOR AUXILIARY SYSTEMS LUBE OIL SYSTEM.pdf 76,376 fc:\\ PB UFSAR R27 Ref Dwgs IM-377, Sheet 0004, Rev 041, DIESEL GENERATOR AUXILIARY SYSTEMS DIESEL FUEL OIL SYSTEM.pelf 11i2'40 - -

@rs u FSAR R27 Ref Dwgs I M-3 77, Sheet ODDS, Rev D09, DIESEL GEN ERA TO~ AUX SYSTEMS COMB Al R INT AKE EXHAUST svsTE M.pdf 52,.........- 1 lc:\\PB UFSAR R27 Ref Dwgs M-384, Sheet 0001, Rev 040, P AND ID - CONTROL ROOM HVAC.pdf 478,598

!c{ PB UFSAR R27-Ret"o;gs M-384: Sheet 0002, Rev 006, P AND ID - CONTROL ROOM HVAC.pdf 129,218 r----

~.., ____,.,

~-,..... "--~------ -----*~

~ \\PB UFSAR R27 Ref Dwgs M-384, Sheet 0003, Rev 006, P AND ID - CONTROL ROOM HVAC.pdf 127,533 UFSAAR27Ret Dwgs. M-385, Sheet 0001, Rev 030, EMER. DIESEL BLD,BOILER BLD, SHOP, WAREHOUSE BLDG T-EMP CO

-- NTROL DIAG.. pdf -

550,699 - ~

c:\\PB UFSAR R27 Ref Dwgs M-387, Sheet 0001, Rev 017, TURBINE BLDG. VENTILATION FLOW DIAGRAM.pdf 114,096

!Z:\\PB UFSAR R27 Ref Dwgs M-388,Sheet 0001, Rev 037, REACTOR BUILDING VENTILATION FLOW DIAGRAM.pdf 105,960 r-VO._______

IE:\\PB UFSAR R27 Ref Dwgs M-389, Sheet 0001, Rev 028, RADWASTE BUILDING VENTILATION FLOW DIAGRAM 2.pdf 87,932

[c:\\P~ l!_F~AR R2'7 Ref Dwgs Jhl-390, Sheet 0001,Rev028,DRYWELL COOLING FLOW DIAGRAM.pdf


=--:~

~-~--

1 22:429

_c:\\PB UFSAR R27 Ref Dwgs.!M:-391,_Sheet 0001, Rev 034, PRIMARY AND SECONDARY CNTNMNTJSOLATION CONTROL DIAG.pdf___

241,275 ic:\\PB UFSAR R27 Ref Dwgs iM-391, Sheet 0002, Rev 031, PRIMARY AND SECONDARY CNTNMNT ISOLATION CONTROL DIAG:pdf 187,392

[s_:\\PB UFSAR R27 Ref Dwgs_ 1M-397, Sh_eet 0001, Rev 061, STANDBY GAS TREATMENT CONTROL DIAGRAM.,e_df


~-------

179,034

!c:\\PB UFSAR R27 Ref Dwgs M-397, Sheet 0002, Rev 046, STANDBY GAS TREATMENT CONTROL DIAGRAM.pdf 101,883 fc:\\PB UFSAR R27 Ref Dwgs M-397, Sheet 0003, Rev 003,,STANDBY GAS TREATMENT CONTROL DIAGRAM.pdf --------

- 91,l ~

lc:\\PB UFSAR R27Ref'o.:Vgs M -399, Sheeto'oo-i;"'Rev- 032, EMERGENCY SWITCHGEAR, BATIERY RM, LABORATORY SUPPLYA NDEXH.pdf ---- --

-160~331 rc:\\~AAR27 Ref Dwgs iM-399, Sheet 0002!_ Rev 004,l_MERGENCY SWITCHGEAR, BATIERY RM, LABORATORYSUPPLY, EXHAUS.pdf ---

_g0,6Q8 ic:\\PB UFSAR R27 Ref Dwgs, M -399, Sheet 0003, Rev 003, EMERGENCY SWITCHGEAR, BATIERY ROOM, LABORATO.pdf TI:29,108 iE~\\PB UFSARR27_~E:fQ;g~ Tu:.3..~~J_

Shee! _0004, Rev 005, EMERGENCY SWl!~HGEAR, BATIERY RM, LABORATORY SUPPLY AND EXH~

f --_:

__ -- ___ 130,268 --

Electronic File Directory Structure Page 14 of 14 It -

Directory ~~!~

__ JL -------- ----

UFSAR Drawing F~=-~

n File Size ~1]

ic:\\PB UFSAR R27 Ref Dwgs IM-4, Sheet 0001, Rev 025, GENERAL ARRANGEMENT PLAN AT EL 165-0 3AE07, 3BE07, 3CE07.pdf 317,853 I

ic:\\PBUFSAR R27 ~ ef Dwgs _ tM-5, Sheet 0001, Rev OB, GENERAL ARRANGEM ENT PLAN AT EL 195FT-OOIN AT EL135-0 AND EL.165-0.pdf 294,249 -~ -1 1c:\\PB UFSAR R27 Ref Dwgs 1 M-6, Sheet 0001, Rev 012, GENERAL ARRANGEMENT PLAN AT EL 234-0 PUMPS TAG NO 2AP01, 2BP01.pdf 187,175

~-c\\PB UFSARR27 Ref Dwgs IM:7, Sheet D00h R~GENERAL ARRAN-GEMENT SECTIONS A-~~~ -=-~AP~ TURB DRIVES FOR REACTOR __FE~ df

-194-,022 =_: __

1_£:\\P~-~ -~AR R27 Ref pwgs !M-86, Sheet 0001, Rev 024, PIPING AND M~CHANICAL REACTOR BLDG UNIT NO 2 PLAN A!!!:_ 165-0 AREA 7.pdf 437,005 ---

c:\\PB UFSAR R27 Ref Dwgs M-96, Sheet 0001, Rev 019, PIPING AND MECHANICAL REACTOR BLDG UNIT NO 2 PLAN AT EL 165T-OOIN ARE.pdf 331,579

[9!'B UFSARR27Rcli5;gs. S-54, Sheet 0001, Rev 030,WNTAINMENT VESSELS - R.EQUIREMENTS SUPPRESSION CH~MBER - UNITS 2, 3.pdf

-=:r614,457

- J 11 Directory Path II FPP Drawing File Names II File Size (Bytes) I

!c:\\PB FPP R22 RefDwgs j_M-318, Sheet 0001, Rev 070, FIRE PROTECTION SYSTEM.pdf 102,181 W,pp R22 Ref Dwgs M-318, Sheet 0002, Rev 107, FIRE PROTECTION SYSTEM.pdf _

483,346 c:\\PB FPP R22 Ref Dwgs M-318, Sheet 0003, Rev 071, FIRE PROTECTION SYSTEM.pdf 246,501 rc:\\PB F~~-R22 Ref Dwgs M-318, Sheet_QQ.~ ~ Re~ 069: FIRE PROTECTION SYSTEM.pdf 111,700 ic:\\PB FPP R22 Ref Dwgs M-318, Sheet 0005, Rev 007, FIRE PROTECTION SYSTEM.pdf 98,692*--*-

!c:\\PB FPP_R22 RefDwgs rM~-is, Sheet 0 006, Rev 005, FIRE PROTE~TION SYfrEM~pdf

_ ---- ---~ -------*

57,003 - *----

1c:\\P~

PP R22 Ref Dwgs 31~~.Q..Q07, Rev 014, FIRE PROTECTION sysTEM.pdf

_ 64,141

~

c:\\PB FPP R22 Ref Dwgs M-318, Sheet 0008, Rev 021, FIRE PROTECTION SYSTEM.pdf 3~3,551_-=

r *-

-+--*-

~~~ p ~ ~22 _Re~~~ -

' M-318, Sheet 0009, Rev 048, FIRE PROTECTION SYST~RM.pdf__

_ 826,311 ic:\\PB FPP R22 Ref Dwgs iM-318, Sheet 0010, Rev 016, FIRE PROTECTION SYSTEM.pdf 77,155

!c:\\PB FPP R22 Ref Dwgs

_ jM-318, Shee~ OOH,Hev 000, FIRE PROTECTION SYSTEM.pdf 3 7,343. --=-J