Category:Drawing
MONTHYEARML23110A1762023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix E, Figures ML23173A0582023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 10, Figures - Redacted ML23173A0522023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix J, Figures - Redacted ML23173A0292023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 8, Figures - Redacted ML23173A0162023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 5, Figures - Redacted Rev1 ML23172A2812023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix C, Figures - Redacted ML23172A2622023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 7, Figures - Redacted ML23110A2602023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 3, Figures ML23110A2412023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix Q, Figure ML23110A2212023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 1, Figures ML23172A2802023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 9, Figures - Redacted ML21109A0692021-04-0808 April 2021 8 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.2.1 Through 1.6.3 ML21109A1102021-04-0808 April 2021 8 to Updated Final Safety Analysis Report, Chapter 3, Figures 3.3-1 Through 3.8-5 ML21109A0912021-04-0808 April 2021 8 to Updated Final Safety Analysis Report, Appendix Q, Figure Q.5.1, Revision 24, Clamps Installed on the Replacement Core Spray Sparger Pipes Structurally Replacing Welds at Each of the Four ML21109A0592021-04-0808 April 2021 8 to Updated Final Safety Analysis Report, Chapter 11, Figures 11.2-1 Through 11.8-3 ML21109A0282021-04-0808 April 2021 8 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.4-1 Through 14.10-14 ML21109A0302021-04-0808 April 2021 8 to Updated Final Safety Analysis Report, Appendix E, Figures E.1.1 Through E.2.5 ML21109A0402021-04-0808 April 2021 8 to Updated Final Safety Analysis Report, Appendix D, Figures D.7.1 Through D.10.1 ML21109A0742021-04-0808 April 2021 8 to Updated Final Safety Analysis Report, Chapter 13, Figures 13.2.1 Through 13.5.2 ML21109A1012021-04-0808 April 2021 8 to Updated Final Safety Analysis Report, Chapter 6, Figures 6.3.1 Through 6.7.20 ML19114A1412019-04-0808 April 2019 Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Figures ML19114A1252019-04-0808 April 2019 Revision 27 to Updated Final Safety Analysis Report, Chapter 1.0, Figure 1.2.1 Through Figure 1.6.3 ML19114A1322019-04-0808 April 2019 Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1 Through Figure 3.8.5 ML19114A1572019-04-0808 April 2019 Revision 27 to Updated Final Safety Analysis Report, Chapter 11, Figures ML19281A0522019-04-0808 April 2019 Revision 27 to Updated Final Safety Analysis Report, Appendix a, Figures ML19281A0512019-04-0808 April 2019 Revision 27 to Updated Final Safety Analysis Report, Appendix M Figures ML19281A0502019-04-0808 April 2019 Revision 27 to Updated Final Safety Analysis Report, Chapter 10, Figures ML19281A0492019-04-0808 April 2019 Redacted - Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 12, Figures ML19281A0472019-04-0808 April 2019 Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figures ML19281A0462019-04-0808 April 2019 Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figures ML19281A0452019-04-0808 April 2019 Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figures ML19281A0432019-04-0808 April 2019 Revision 27 to Updated Final Safety Analysis Report, Chapter 9, Figures ML19114A2202019-04-0808 April 2019 Revision 27 to Updated Final Safety Analysis Report, Appendix Q, Figure - Part 3 of 3 ML19114A1662019-04-0808 April 2019 Revision 27 to Updated Final Safety Analysis Report, Chapter 14, Figures ML19114A1632019-04-0808 April 2019 Revision 27 to Updated Final Safety Analysis Report, Chapter 13, Figures ML19007A3302019-01-0707 January 2019 Final Report PBAPS Thermal Study ML19007A3352019-01-0707 January 2019 Map of Conowingo Pond Showing Location of Stations in Trawl Zones 405, 406 and 408 - Figures ML18354B0662018-12-20020 December 2018 Summary of Monitoring Well Installation Details ML18275A0232018-09-28028 September 2018 License Amendment Request to Reduce High Pressure Service Water System Design Pressure and Revise Technical Specifications 3.6.2.3, 3.6.2.4, 3.6.2.5, and 3.7.1 for Temporary Extension of ... ML17130A2162017-04-0606 April 2017 Revision 26 to Updated Final Safety Analysis Report, Section 2.0 Site Characteristics, Figures, Part 2 of 2 ML17233A2822017-04-0606 April 2017 Redacted - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 21 to Fire Protection Program, Appendix B, Figures B-1 Through B-31 ML17233A2772017-04-0606 April 2017 Redacted - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Appendix M, Containment Report, Figures M.1.1 Through M.3.5 ML17130A3212017-04-0606 April 2017 Revision 26 to Updated Final Safety Analysis Report, Appendix M, Containment Report, Figures M.1.1 Through M.3.5 ML17130A2332017-04-0606 April 2017 Revision 26 to Updated Final Safety Analysis Report, Section 6.0, Core Standby Cooling Systems, Figures, Part 2 of 2 ML17130A3322017-04-0606 April 2017 Revision 26 to Updated Final Safety Analysis Report, Appendix Q, License Renewal Aging Management UFSAR Supplement, Figure Q.5.1 ML17130A2242017-04-0606 April 2017 Revision 26 to Updated Final Safety Analysis Report, Section 4.0, Reactor Coolant System, Figures, Part 2 of 2 ML17233A2522017-04-0606 April 2017 Redacted - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Section 7.0, Control and Instrumentation, Figures, Part 2 of 2 ML0310102862003-03-21021 March 2003 Drawing, Erosion and Sediment Control Plan of Units 2 and 3 Intake Basin Sediment Removal, Rev 4 ML0310102952003-03-21021 March 2003 Drawing, North Substation Option Erosion and Sediment Control Plan of Units 2 and 3 Intake Basin Sedment Removal, Rev 4 2023-04-10
[Table view] Category:Graphics incl Charts and Tables
MONTHYEARML23110A1742023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 13, Figures ML23110A1752023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix N, Tables ML23110A1912023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 14, Figures ML23110A2212023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 1, Figures ML23110A2512023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, PEA Chapter 6, Figures ML23172A2812023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix C, Figures - Redacted ML23173A0232023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 12, Figures - Redacted ML23173A0492023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix a, Figures - Redacted ML20339A3972020-12-10010 December 2020 Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident ML19114A1962019-04-0808 April 2019 Revision 27 to Updated Final Safety Analysis Report, Appendix J, Figures ML18354B0662018-12-20020 December 2018 Summary of Monitoring Well Installation Details ML16089A3532016-03-31031 March 2016 MSFHI Tables, Public, 3-29-2016 ML16091A1362016-03-31031 March 2016 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request- Flood-causing Mechanism Reevaluation (CAC Nos. MF6598 and MF6599) ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T ML13338A1702013-11-22022 November 2013 Assistance in Obtaining Information on Dams ML13255A3772013-09-16016 September 2013 MACCS2 Runs to Source Term Crosswalk ACRS Sep 2013 RA-13-081, Proposed Resolution for Completion of the Seismic Walkdowns Associated with NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term.2013-09-16016 September 2013 Proposed Resolution for Completion of the Seismic Walkdowns Associated with NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term. RA-13-075, Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS Sites2013-09-12012 September 2013 Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS Sites ML11255A3522011-08-25025 August 2011 Soarca Project Document List for the Peach Bottom Site NEI 08-09, Re-Submittal of the Exelon Cyber Security Plan2010-07-23023 July 2010 Re-Submittal of the Exelon Cyber Security Plan ML12124A2972010-03-11011 March 2010 Soarca Documents Review/Approval Process ML0822604012008-08-0707 August 2008 Transmittal of Supplemental Response to Request for Additional Information License Amendment Request - Application of Alternative Source Term ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists 2023-04-10
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23110A2402023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix K, Table of Contents ML23173A0132023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 12, Structures and Shielding, Sections 1 Thru 4 - Redacted ML23110A2462023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, PEA Chapter 00, Cover Page and General Table of Contents ML23110A2472023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix E, Table of Contents ML23110A2372023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary, Table of Contents ML23110A2422023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 7, Control and Instrumentation, Table of Contents ML23110A2592023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix N, Peach Bottom Site Meteorology ML23110A2392023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix D, Table of Contents ML23110A2532023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Sections 1 Thru 8 ML23110A2202023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix K, Exhibit IV, Vessel Fabrication and Assembly ML23173A0552023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix E, Station Atmospheric Release Limit Calculations - Redacted ML23110A2232023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix G, Plant Nuclear Safety Operational Analysis ML23173A0402023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 7, Control and Instrumentation - Redacted ML23173A0382023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix M Containment Report - Redacted ML23172A2812023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix C, Figures - Redacted ML23173A0582023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 10, Figures - Redacted ML23110A2312023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 11, Table of Contents ML23110A2602023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 3, Figures ML23173A0162023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 5, Figures - Redacted Rev1 ML23173A0172023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 7, Sections 10 Thru 23 - Redacted ML23172A2802023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 9, Figures - Redacted ML23110A2652023-04-10010 April 2023 Submittal of Revision 29 to Updated Final Safety Analysis Report and Rev. 24 to Fire Protection Program ML23173A0452023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 9, Table of Contents - Redacted ML23172A2752023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix a, Table of Contents - Redacted ML23173A0332023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 2, Site - Redacted ML23172A2622023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 7, Figures - Redacted ML23173A0482023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 12, Table of Contents - Redacted ML23110A2562023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary ML23110A2322023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix P, Environmental Technical Specifications ML23173A0232023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 12, Figures - Redacted ML23110A2242023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix K, Exhibit Vi.B Unit 3, Deleted ML23110A2612023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix O, Table of Contents ML23173A0592023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix J, Identification-Resolution of AEC-ACRS and Staff Concerns - Redacted ML23173A0492023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix a, Figures - Redacted ML23110A2512023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, PEA Chapter 6, Figures ML23173A0572023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria - Redacted ML23173A0562023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 10, Auxiliary Systems, Sections 1 Thru 24 - Redacted ML23173A0292023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 8, Figures - Redacted ML23173A0432023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 8, Electrical Power Systems - Redacted ML23172A2842023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix C, Table of Contents - Redacted ML23173A0372023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix a, Pressure Integrity of Piping and Equipment Pressure Parts - Redacted ML23110A2482023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix K, Exhibit III, Summary Stress Report ML23110A2452023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix H, Table of Contents ML23110A2502023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 8, Table of Contents ML23110A2292023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 10, Table of Contents ML23110A2572023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 5, Containment ML23110A2212023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 1, Figures ML23110A2282023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix F, Interaction of Units 2 and 3 ML23110A2412023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix Q, Figure ML23110A2622023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 13, Table of Contents 2023-04-10
[Table view] |