ML23110A265

From kanterella
Jump to navigation Jump to search
Submittal of Revision 29 to Updated Final Safety Analysis Report and Rev. 24 to Fire Protection Program
ML23110A265
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/10/2023
From: David Helker
Constellation Energy Generation
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML23110A266 List: ... further results
References
Download: ML23110A265 (1)


Text

April 10, 2023 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 200 Exelon Way

, Kennett Square, PA 19348 www.ConstellationEnergy.com 10 CFR 50.71(e)(4) 10 CFR 54.37(b)

Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278

SUBJECT:

Submittal of the Updated Final Safety Analysis Report {Revision 29),

Fire Protection Program (Revision 24), and Reference Drawings In accordance with 10 CFR 50.71(e)(4) and 10 CFR50.4(b)(6), enclosed is Revision 29 of the Updated Final Safety Analysis Report (UFSAR) and Revision 24 of the Fire Protection Program (FPP) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The enclosed UFSAR and FPP revision copies are being provided to the U.S. Nuclear Regulatory Commission (NRC) in electronic format on a digital versatile disk (DVD). The electronic versions of the UFSAR and FPP are being submitted in their entirety and are total replacement copies.

10 CFR 50.71(e)(2) requires that changes made under the provisions of 10 CFR50.59 but not previously submitted to the NRC be included in UFSAR updates. Changes to the FPP are to be evaluated in accordance with PBAPS, Units 2 and 3, License Condition 2.C.(4). Attachment 1 to this letter identifies UFSAR changes made under the provisions of 1 O CFR 50.59 not previously submitted and included in Revision 29 of the UFSAR. Attachment 1 also identifies those changes to the FPP evaluated in accordance with License Condition 2.C.(4) and induded in Revision 24 of the FPP.

1 O CFR 50. 71 (e)(4) stipulates that revisions to the UFSAR and associated FPP must reflect changes made up to a maximum of six months prior to the submittal. As a result, Revision 29 of the UFSAR and Revision 24 of the FPP for PBAPS, Units 2 and 3, reflect changes at least up to February 28, 2023.

Also contained on the endosed DVD are copies of drawings currently referenced but not included in the PBAPS, Units 2 and 3, UFSAR or FPP.

The DVD contains the following enclosures with the updated files for the UFSAR, FPP, and Reference Drawings in PDF format.

  • - PBAPS, Units 2 and 3, UFSAR Revision 29 / FPP Revision 24 (files)

U.S. Nuclear Regulatory Commission Submittal of PBAPS UFSAR Revision 29 FPP Revision 24 Reference Drawings April 10, 2023 Page2 In addition, pursuant to the requirements of 10 CFR 54.37(b) and the guidance specified in Regulatory Issue Summary 2007-16, Revision 1, "Implementation of the Requirements of 1 O CFR 54.37(b) for Holders of Renewed Ucenses, "the UFSAR update required by 10 CFR 50.71(e) must include any Structures, Systems, or Components (SSCs) newly identified that would have been subject to an aging management review or evaluation of Time-Limited Aging Analyses (TLAA) in accordance with 1 O CFR 54.21. The UFSAR update must describe how the licensee will manage the effects of aging in order to effectively maintain the intended function(s) of newly-identified SSCs. An evaluation was completed to determine whether any newly-identified SSCs existed in support of submitting UFSAR Revision 29 and FPP Revision 24 for PBAPS, Units 2 and 3. This evaluation involved reviewing pertinent documentation for the period subsequent to the last PBAPS biennial UFSAR / FPP revisions.

As a result of this review, there were no newly-identified SSCs for which aging management reviews or TLAA would apply. indudes file directory structure information identifying directory path, filename, and size of the individual files on the enclosed DVD.

As required by 10CFR50.71(e)(2)(i), I certify that to the best of my knowledge, Revision 29 of the UFSAR and Revision 24 of the FPP accurately reflect information and analyses submitted to the NRC, or prepared pursuant to NRC requirements as described above.

If you have any questions or require further information, please contact Richard Gropp at Richard.Gropp@constellation.com.

Respectfully, t.:>

/.*.J

~--~-~ C,?fa:J,

  • V,.

{::?,.

../J _.;x..A..,,,/V'""?

David P. Helker Sr. Manager, Licensing Constellation Energy Generation, LLC Attachments: 1. Changes Made Under the Provisions of 1 O CFR 50.59 and License Condition 2.C.(4}

2. Electronic File Directory Structure

Enclosures:

1.

PBAPS, Units 2 and 3, UFSAR Revision 29 / FPP Revision 24

2.

UF:SAR / FPP Reference Drawings cc:

w/ Attachments and Enclosures Regional Administrator, Region I, USNRC USNRC Senior Resident Inspector, PBAPS USNRC Project Manager NRR, PBAPS W. DeHaas, Commonwealth of Pennsylvania, Bureau of Radiation Protection S. Seaman, State of Maryland Page 1 of 3 Changes Made Under the Provisions of 1 0 CFR 50.59 and License Condition 2. C. (4) 10 CFR 50.71 (e)(2)(ii) requires that revisions to the Updated Final Safety Analysis Report {UFSAR) include changes made under the provisions of 10 CFR 50.59, but not previously submitted to the ~RC. Changes to the Fire Protection Program (FPP) are to be evaluated in accordance with Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, License Condition 2.C.(4}. Accordingly, the list below identifies changes included in Revision 29 of the PBAPS, Units 2 and 3, UFSAR or Revision 24 of the PBAPS FPP that were not previously submitted to the NRC. Some exceptions have been noted.

UFSAR Change Revision Description 2016-032 Updated UFSAR, Chapter 10, to reflect changes related to removal of ECR 12-00045, Rev. 3 00 credit for Boraflex for Unit 3.

EC555179 2017-017 00 Updated UFSAR, Chapter 4, to reflect changes related to the Main Steam EC618900 Isolation Valve (MSIV) extended poppet design.

2019-001 00 Updated UFSAR, Chapter 6, to reflect changes in support of clarifying 10 IR 3959274-30 CFR 50.46 reporting criteria related to peak cladding temperature.

2019-002 00 Updated UFSAR, Chapter 7, to reflect changes related to the Unit 3 Plant EC556371 Process Computer (PPC).

2019-022 00 Updated U FSAR, Chapter 12, to reflect changes related to remova I of the EC629661 discharge canal to intake cross-tie fish screen.

2020-005 00 Updated UFSAR, Chapter 9, to reflect changes related to storage of EC622525 Greater-Than-Class C {GTCC) waste in a cask on the ISFSI.

2020-006 00 Updated UFSAR Chapter 7 to reflect changes related to the removal of an EC630209 Area Radiation Monitor in Radwaste (RW) Building.

2020-015 00 Updated UFSAR, Chapter 1, to reflect changes relatedto adding systems IR4346216 to the 50.69 description.

2020-021 00 Updated FPP, Chapters 3 and 5, to reflect changes related to combustible EC633145 free zone reevaluation efforts.

Updated UFSAR, Chapter 10, to reflect changes to related to removing 2020-022111 00 credit for NETCO insert retention force to prevent seismic uplift and EC 633053 remove bend stress relaxation testing (PB-2020-030-S and PB-2020-002-E).

2021-002 00 Updated UFSAR, Chapter 7, to reflect changes in support of fleetwide IR 4290220-46 evaluation for 50% Traversing In-Core Probe (TIP} channels out of service.

2021-003 00 Updated UFSAR Chapter 7 to reflect changes in support of the Reactor EC632407 Protection System (RPS) Division A cable replacement.

2021-009 00 Updated UFSAR, Chapter 7, to reflect changes associated with the Unit 2 EC630995 Main Control Room (MCR) Chessell Recorder replacement.

2021-010 00 Updated UFSAR, Chapter 7, to reflect changes associated with the Unit 3 EC 630996 Main Control Room (MCR) Chessell Recorder replacement.

2021-012 00 Updated FPP, Chapter 5, to correct/clarify structural steel fire proofing IR4402022 statement regarding Fire Area 6N.

2021-013 Updated UFSAR Chapter 1, Figure 1.6.2, to revise the Reactor Heat EC 633800 00 Balance core inlet enthalpy value to reflect changes made during Measurement Uncertainty Recapture.

2021-014 Updated UFSAR, Chapter 5, to reflect changes related to implementation IR4413627 00 of TSTF-568 concerning primary oxygen concentration as approved by Amendment Nos. 336 / 339.

Page 2 of 3 UFSAR Change 2021-015 EC629261 2021-016111 EC629260 2021-017 IR4381341 2021-018 EC634351 2021-020 JR 4408417-01 IR 4428649-01 2021-022 EC-635066 2021-023 2021-025 IR4444937 2021-026 EC 634786 2021-027 EC629252 2021-028 IR 4424682-02 2021-030 JR 4413346-05 2021-032 IR 4152934-24 2022-003 EC 629642 2022-005 2022-006 IR 4488970-01 2022-008 IR 4505686-02 2022-009 EC 629260 Rev. 2 Revision 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 Description Updated UFSAR, Chapter 10, to reflect changes related to allowing for the receipt and handling of new unirradiated GNF3 fuel to be stored in Spent Fuel Pool (SFP).

Updated UFSAR, Chapters 3, 4, 6, 7, 14, Appendix K, Appendix Q, and Appendix R, to reflect the impact of the introduction of new GNF3 nuclear fuel assemblies.

Updated UFSAR, Chapter 10, to reflect changes related to preventing the transfer of Reactor Building Closed Cooling Water (RBCCW) to Drywell Chilled Water (DWCW) during certain conditions.

Updated UFSAR, Appendix A, to reflect changes to clarify permissible piping weld examination deviations.

Updated FPP, Chapter 3, to reflect updates related to Fire School and CO2 manual operations.

Updated U FSAR, Appendix Q and Appendix R, to reflect changes associated with FPP license Renewal (LR)/Subsequent license Renewal (SLR} SO-year sprinkler testing commitment change evaluation.

Updated UFSAR, Appendix Q and Appendix R, to reflect changes related to 50.69 implementation.

Updated UFSAR, Chapter 11, FPP Appendix B to reflect changes related to updating References for Turbine overspeed conditions.

Updated UFSAR, Chapters Sand 7, to reflect changes associated with the installation of a permanent drain for the Torus on Unit 2.

Updated UFSAR, Appendix R, to reflect changes related to lnvessel Visual Inspection (IWI) Program updates.

Updated FPP, Chapter 3, to reflect changes related to the replacement of Half-Mile Ray lights with Light Emitting Diode (LED) lanterns.

Updated UFSAR, Appendix R, to reflect updates related to a CO2 system testing commitment change.

Updated UFSAR, Chapter 14, to reflect changes related to Emergency Procedure and Severe Accident Guidelines (EPG/SAG), Revision 4, updates.

Updated UFSAR, Chapter 7, to reflect changes related to the removal of a temporary change associated for UFSAR Change 2020-017.

Updated UFSAR, Chapter 1, to reflect changes related to adding the Emergency Service Water (ESW)/Emergency Cooling Water and Tower (ECW) to the 10 CFR 50.69 list of systems.

Updated UFSAR, Chapters 4 and 7, to reflect changes related to revising Main Steam Isolation Valve (MSIV) stroke time testing.

Updated UFSAR, Chapter 10, to reflect changes to clarify use of Auxiliary Steam to support High Pressure Coolant Injection (HPCl}/Reactor Core Isolation Cooling (RCIC)/Reactor Feedwater Pump (RFP) during Startup efforts.

Updated UFSAR, Chapters 3 and 9, to reflect changes to References related to the.latest revision for the GNF3 Fuel Design Cycle Independent Analyses Report.

Page 3 of 3 UFSAR Change 2023-002 EC 618424 (Partial)

EC 627497 (Partial)

EC 627500 (Partial) 20?,3-003 (Editorial)

IR 1070442-09 IR 4499263-11 Revision Description Updated UFSAR, Chapters 7, 9, 10, 14, and FPP Table A-3, to reflect 00 changes related to as-building of partially installed modifications in the plant (reference ECs 618424, 627497, and 627500}.

Updated UFSAR, Cover Page, Chapters 1, 2, 6, 7, 8, 10, 13, Appendix D, 00 Appendix M, Appendix Q, and Appendix R, to reflect minor editorial changes identified during the UFSAR updating efforts.

<1> - The changes identified were described in the PBAPS Biennial 1 0 CFR 50.59 and 10 CFR 72.48 Report submitted by letter dated February 9, 2023.

ATTACHMENT 2 Peach Bottom Atomic Power Station Units 2 and 3 Updated Final Safety Analysis Report, Revision 29 Fire Protection Report, Revision 24 Electronic File Directory Structure

ATTACHMENT 2 Electronic File Directory Structure Page 1 of 12

"}\\l-'I*J -.. '*-..,.. PatflT :i,J:"'*; 'lf:,tl:>;.J**.i -,,t l:~i*!.,~1-. ?:i ?//,:,,,.. *_,cc.*,AR/

i(,~.;.:.:...... :t;'., fl', ?.~tl:'::Ji.;},;;c\\*,>~'~;'t\\d;/'"'j, *- V" "'"'.,o.:;., 'ill,v'... ::s; f?\\";:::

F'-

c*-

, ,,_:;,,,,,;?,,.... i:,;,=/\\_*,:***: *:

ii'c o'

  • i

_**1:"':;_,,,-_,;,n,,~*-,...~-:,-

0,'*,

UFSAR Files Names C:\\PEA UFSAR REV 29 PEA Chapter 00 (000) - Cover Page and General Table of Contents.pdf 313,704 C:\\PEA UFSAR REV 29 PEA Chapter 01 (001) Table of Contents.pdf 97,183 C:\\PEA UFSAR REV 29 PEA Chapter 01 (002) Sections 1 thru 15.pdf 1,174,565 C:\\PEA UFSAR REV 29 PEA Chapter 01 (003) Figures.pdf 5,111,885 C:\\PEA UFSAR REV 29 PEA Chapter 02 (001) Table of Contents.pdf 72,559 C:\\PEA UFSAR REV 29 PEA Chapter 02 (002) Sections 1 thru 9.pdf 11,319,168 C:\\PEA UFSAR REV 29 PEA Chapter 02 (003) Tables 2.2.17 thru 2.2.24.1.pdf 1,285,539 C:\\PEA UFSAR REV 29 PEA Chapter 02 (004) Figures.pdf 9,678,564 C:\\PEA UFSAR REV 29 PEA Chapter 03 (001) Table of Contents.pdf 65,510 C:\\PEA UFSAR REV 29 PEA Chapter 03 (002) Sections 1 thru 8.pdf 773,323 C:\\PEA UFSAR REV 29 PEA Chapter 03 {003) Figures.pdf 8,369,864 C:\\PEA UFSAR REV 29 PEA Chapter 04 (001) Table of Contents.pdf 46,968 C:\\PEA UFSAR REV 29 PEA Chapter 04 (002) Sections 1 thru 11.pdf 699,437 C:\\PEA UFSAR REV 29 PEA Chapter 04 (003) Figures.pdf 520,674 C:\\PEA UFSAR REV 29 PEA Chapter 05 (001) Table ofContents.pdf 43,540 C:\\PEA UFSAR REV 29 PEA Chapter 05 (002) Sections 1 thru 3.pdf 1,917,692 C:\\PEA UFSAR REV 29 PEA Chapter 05 (003) Figures.pdf 3,353,970 C:\\PEA UFSAR REV 29 PEA Chapter 06 (001) Table of Contents.pdf 81,136 C:\\PEA UFSAR REV 29 PEA Chapter 06 (002) Sections 1 thru 7.pdf 273,360 C:\\PEA UFSAR REV 29 PEA Chapter 06 (003) Figures.pdf 1,346,096 C:\\PEA UFSAR REV 29 PEA Chapter 07 (001) Table of Contents.pdf 237,691 C:\\PEA UFSAR REV 29 PEA Chapter 07 (002) Sections 1 thru 9.pdf 1,447,920 C:\\PEA UFSAR REV 29 PEA Chapter 07 (003) Sections 10 thru 23.pdf 708,725 C:\\PEA UFSAR REV 29 PEA Chapter 07 (004) Figures.pdf 7,793,936 C:\\PEA UFSAR REV 29 PEA Chapter 08 (001) Table of Contents.pdf 78,384 C:\\PEA UFSAR REV 29 PEA Chapter 08 (002) Sections 01 thru 08.pdf 1,238,617 C:\\PEA UFSAR REV 29 PEA Chapter 08 (003) Figures.pdf 111,426 C:\\PEA UFSAR REV 29 PEA Chapter 09 (001) Table of Contents.pdf 43,889 C:\\PEA UFSAR REV 29 PEA Chapter 09 (002) Sections 1 thru 4.pdf 374,817 C:\\PEA UFSAR REV 29 PEA Chapter 09 (003) Figures.pdf 455,286 C:\\PEA UFSAR REV 29 PEA Chapter 10 (001) Table of Contents.pdf 50,528 C:\\PEA UFSAR REV 29 PEA Chapter 10 (002) Sections 1 thru 24.pdf 850,114 C:\\PEA UFSAR REV 29 PEA Chapter 10 (003) Figures.pdf 2,489,975 C:\\PEA UFSAR REV 29 PEA Chapter 11 (001) Table of Contents.pdf 18,629

ATTACHMENT 2 Electronic File Directory Structure Page 2 of 12 C:\\PEA UFSAR REV 29 PEA Chapter 11 (002) Sections 1 thru 8.pdf 179,835 C:\\PEA UFSAR REV 29 PEA Chapter 11 (003) Figures.pdf 59,853 C:\\PEA UFSAR REV 29 PEA Chapter 12 (001) Table ofContents.pdf 19,523 C:\\PEA UFSAR REV 29 PEA Chapter 12 (002) Sections 1 thru 4.pdf 303,948 C:\\PEA UFSAR REV 29 PEA Chapter 12 (003) Figures.pdf 1,423,576 C:\\PEA UFSAR REV 29 PEA Chapter 13 (001) Table of Contents.pdf 73,437 C:\\PEA UFSAR REV 29 PEA Chapter 13 {002) Sections 1 thru 8.pdf 438,491 C:\\PEA UFSAR REV 29 1 PEA Chapter 13 (003) Figures.pdf 268,099 C:\\PEA UFSAR REV 29 PEA Chapter 14 (001) Table of Contents.pdf 114,099 C:\\PEA UFSAR REV 29 PEA Chapter 14 (002) Sections 1 thru 10.pdf 1,878,084 C:\\PEA UFSAR REV 29 PEA Chapter 14 (003) Figures.pdf 17,350,167 c:\\PEA UFSAR REV 29 PEA Appendix A (001) Table of Contents.pdf 23,691 c:\\PEA UFSAR REV 29 PEA Appendix A (002).pdf 498,592 c:\\PEA UFSAR REV 29 PEA Appendix A (003) Figures.pdf 1,825,458 c:\\PEA UFSAR REV 29 PEA Appendix B.pdf 14,637 c:\\PEA UFSAR REV 29 PEA Appendix C (001) Table of Contents.pdf 47,440 c:\\PEA UFSAR REV 29 PEA Appendix C (002).pdf 637,480 c:\\PEA UFSAR REV 29 PEA Appendix C (003) Figures.pdf 4,559,807 c:\\PEA UFSAR REV 29 PEA Appendix D (001) Table of Contents.pdf 14,544 c:\\PEA UFSAR REV 29 PEA Appendix D (002).pdf 46,409 c:\\PEA UFSAR REV 29 PEA Appendix D (003) Figures.pdf 29,857 c:\\PEA UFSAR REV 29 PEA Appendix E (001) Table of Contents.pdf 20,210 c:\\PEA UFSAR REV 29 PEA Appendix E (002).pdf 120,652 c:\\PEA UFSAR REV 29 PEA Appendix E (003) Figures.pdf 226,161 c:\\PEA UFSAR REV 29 PEA Appendix F (001) Table of Contents.pdf 16,263 c:\\PEA UFSAR REV 29 PEA Appendix F (002).pdf 54,886 c:\\PEA UFSAR REV 29 PEA Appendix G (001) Table of Contents.pdf 45,634 c:\\PEA UFSAR REV 29 PEA Appendix G (002).pdf 149,233 c:\\PEA UFSAR REV 29 PEA Appendix G (003) Matrixs.pdf 5,792,983 c:\\PEA UFSAR REV 29 PEA Appendix G (004) Figures.pdf 1,189,900 c:\\PEA UFSAR REV 29 PEA Appendix H (001) Table of Contents.pdf 48,968 c:\\PEA UFSAR REV 29 PEA Appendix H {002).pdf 387,573 c:\\PEA UFSAR REV 29 PEA Appendix I (001) Table of Contents.pdf 16,239 c:\\PEA UFSAR REV 29 PEA Appendix I (002).pdf 15,116 c:\\PEA UFSAR REV 29 PEA Appendix J (001) Table of Contents.pdf 22,325 c:\\PEA UFSAR REV 29 PEA Appendix J (002).pdf 285,579

ATTACHMENT 2 Electronic File Directory Structure Page 3 of 12 c:\\PEA UFSAR REV 29 PEA Appendix J (003} Figures.pdf 411,111 c:\\PEA UFSAR REV 29 PEA Appendix K (001) Table of Contents.pdf 63,046 c:\\PEA UFSAR REV 29 PEA Appendix K (002) Exhibit l.pdf 3,887,819 c:\\PEA UFSAR REV 29 PEA Appendix K (003} Exhibit 11.pdf 1,494,049 c:\\PEA UFSAR REV 29 PEA Appendix K (004) Exhibit 111.pdf 1,654,699 c:\\PEA UFSAR REV 29 PEA Appendix K (005) Exhibit IV.pdf 24,026 c:\\PEA UFSAR REV29 PEA Appendix K (006) Exhibit V.pdf 39,959 c:\\PEA UFSAR REV 29 PEA Appendix K (007} Exhibit VI.A Unit 2.pdf 6,480,017 c:\\PEA UFSAR REV 29 PEA Appendix K (008) Exhibit VI.B Unit 3.pdf 25,538 c:\\PEA UFSAR REV 29 PEA Appendix K (009) Exhibit Vll.pdf 22,598 c:\\PEA UFSAR REV 29 PEA Appendix K (010) Figu res.pdf 289,561 c:\\PEA UFSAR REV 29 PEA Appendix L.pdf 14,805 c:\\PEA UFSAR REV 29 PEA Appendix M (001) Table ofContents.pdf 44,135 c:\\PEA UFSAR REV 29 PEA Appendix M (002).pdf 218,214 c:\\PEA UFSAR REV 29 PEA Appendix M (003) Figures.pdf 1,667,554 c:\\PEA UFSAR REV 29 PEA Appendix N (001) Table of Contents.pdf 15,789 c:\\PEA UFSAR REV 29 PEA Appendix N (002).pdf 19,662 c:\\PEA UFSAR REV 29 PEA Appendix N (003) Tables.pdf 5,519,884 c:\\PEA UFSAR REV 29 PEA Appendix O (001) Table of Contents.pdf 12,663 c:\\PEA UFSAR REV 29 PEA Appendix O (002).pdf 36,360 c:\\PEA UFSAR REV 29 PEA Appendix P.pdf 14,750 c:\\PEA UFSAR REV 29 PEA Appendix Q (001) Table of Contents.pdf 122,827 c:\\PEA UFSAR REV 29 PEA Appendix Q (002).pdf 407,942 c:\\PEA UFSAR REV 29 PEA Appendix Q (003) Figure.pdf 30,676 c:\\PEA UFSAR REV 29 PEA Appendix R (001) Table of Contents Pages R-i to R-iv.pdf 96,205 c:\\PEA UFSAR REV 29 PEA Appendix R (002) Pages R-1 to R-89.pdf 838,892 c:\\PEA UFSAR REV 29 PEA Appendix R (003) Commitment List Pages R-90 to R-124.pdf 579,667 FPP File Names c:\\PEA FPP REV 24 PEA FPP (001) Table of Contents.pdf 52,330 c:\\PEA FPP REV 24 PEA FPP (002) Sections 1 thru 4.pdf 1,039,302 c:\\PEA FPP REV 24 PEA FPP (003) Sections 5 thru 7.pdf 1,167,145 c:\\PEA FPP REV 24 PEA FPP (004) Appendix A* Tables.pdf 2,432,533 c:\\PEA FPP REV 24 PEA FPP (005) Appendix B-Figures.pdf 4,532,945 c:\\PEA FPP REV 24 PEA FPP (006) Appendix C.pdf 72,543

ATTACHMENT 2 Electronic File Directory Structure Page4 of12

'"-i'Y' >. Directory~ath>.
<:**,>:~*>,: 1_*;::>i*, *',< :*"< i:'-*-><-:'.":'*i.:'
    • .*//*:;;_UFSARReference*or;nniing.Narries;<'":.',.(. '-,*t >.*:\\*>,.:,;.c-t_,: <*_:-er, File s1~a(BvtesL

\\;-r*

UFSAR Drawing File Names c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 A-50, Sheet 0001, Rev 004, RADIATION ZONING BOTH UNITS IN OPERATION EL 91FT - 061N.pdf 558,745 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 A-55, Sheet 0001, Rev 004, RADIATION ZONING BOTH UNITS IN OPERATION EL 234FT - OOIN.pdf 462,080 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 C-2, Sheet 0001, Rev 020, PLOT PLAN WALL-FLOW-DEFLECTORS AS-BUILT DWG.pdf 926,433 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 C-2, Sheet 0002, Rev 000, PLOT PLAN.pdf 316,423 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 C-84, Sheet 0001, Rev 007, PUMP STRUCTURE ARRANGEMENT DRAWING BLOCK-OUT A-15.pdf 456,063 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 E-1, Sheet 0001, Rev 056, TCCP 13-00204, 14-00251 SINGLE LINE DIAGRAM ST.pdf 928,793 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 E-10, Sheet 0001, Rev 036, SINGLE LINE METER, RELAY DIAGRAM STARTUP, EMERGENCY POWER SYSTEMS.pdf 313,713 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 E-12, Sheet 0001, Rev 012, SINGLE LINE METER AND RELAY DIAGRAM STANDBY DIESEL GENS AND 4160 VOLT EMER POWER SYSTEM - UNIT 3.pdf 1,513,005 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 E-1615, Sheet 0001, Rev 083 SINGLE LINE METER AND RELAY DIAGRAM E124 AND E224 EMERG. L.C.pdf 811,832 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 E-1617, Sheet 0001, Rev 076, SINGLE LINE METER AND RELAY DIAGRAM E-324 AND E424 EMERG.pdf 279,189 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 E-1619, Sheet 0001, Rev 037, SINGLE LINE METER AND RELAY DIAGRAM E124-D-A, E324-D-A AND 434-D-A.pdf 434,015 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 E-1621, Sheet 0001, Rev 071, SINGLE LINE METER AND RELAY DIAGRAM E324-T-B AND 424-T-B TURB MCC.pdf 321,903 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 E-1717, Sheet 0001, Rev 072, SINGLE LINE METER AND RELAY DIAGRAM E334 AND E434 EM ERG LC AND E334-R.pdf 288,057 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-13, Sheet 0001, Rev 013, EQUIPMENT LOCATION REACTOR AND RADWASTE BUILDING UNIT NO 2 PLAN AT EL.pdf 374,220 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-15, Sheet 0001, Rev 029, EQUIPMENT LOCATION REACTOR AND RADWASTE BLDG UNIT NO 2 PLAN AT EL 135.pdf 559,359 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-13, Sheet 0014, Rev 015, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf 234,153 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-13, Sheet 0015, Rev 021, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEMS.pdf 42,547 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-13, Sheet 0016, Rev 014, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf 354,360 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-13, Sheet 0017, Rev 019, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEMS.pdf 208,035 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-13, Sheet 0018, Rev 016, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEMS.pdf 161,179 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-13, Sheet 0019, Rev 016,.FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC. SYS.pdf 215,054 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-13, Sheet 0020, Rev 014, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf 233,862 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-13, Sheet 0021, Rev 014, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf 290,449 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-13, Sheet 0022, Rev 017, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf 286,976 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-13, Sheet 0023, Rev 017, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYS.pdf 420,800 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-13, Sheet 0024, Rev 019, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC SYSTEMS.pdf 527,936 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-23, Sheet 0001, Rev 009, FUNCTL CONTROL DIAG NEUTRON MONITORING SYSTEM.pdf 526,155 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-23, Sheet 0014, Rev 008, FUNCTL CONTROL DIAG NEUTRON MONITORING SYS.pdf 347,395 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-35, Sheet 0001, Rev 016, FUNCTL CONTROL DIAG REACTOR WATER CLEAN-UP SYSTEM.pdf 210,563 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-35, Sheet 0002, Rev 017, FUNCTIONAL CONTROL DIAGRAM FOR REACTOR WATER C[EAf:JOf>.pdf 128,396 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-35, Sheet 0003, Rev 016, FUNCTIONAL CONTROL DIAGRAIVil=OR REACTOR WATEIITl.~P.pdf 257,525 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M*l-CC-35, Sheet 0004, Rev 018, FUNCTIONAL CONTROL DIAGRAM FOR REACTOR WATER CLEANUP.pdf 290,152 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-38, Sheet 0001, Rev 011, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE.pdf 189,598 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-38, Sheet 0002, Rev 006, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE.pdf 252,328 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-38, Sheet 0003, Rev 009, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE.pdf 114,201 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-38, Sheet 0004, Rev 007, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE ISOLATIOfil COOLING SYSTEM.pdf 359,339 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-38, Sheet 0005, Rev 004, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE ISOCZiTIOi'iie5oLING SYSTEM.pdf 306,015 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-38, Sheet 0006, Rev 006, FUNCTIONAL CONTROL DIAGRAM RIGA PRESSRE COOCZiNT INJECTING SYSTEM.pdf 292,284 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-38, Sheet 0007, Rev 006, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTING SYSTEM.pdf 496,332 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-38, Sheet 0008, Rev 007, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE ISOLATION COOLING SYSTEM.pdf 242,777 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-38, Sheet 0009, Rev 009, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE ISOLATION COOLING SYSTEM.pdf 173,151 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-38, Sheet 0010, Rev 007, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE ISOLATION COOLING SYSTEM.pdf 240,670 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-38, Sheet 0011, Rev 005, FUNCTIONAL CONTROL DIAGRAM "REACTOR CORE ISOLATION COOLING SYSTEM.pdf l;j/U,:,,!:,

c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-38, Sheet 0012, Rev 006, FUNCTIONAL CONTROL DIAGRAM REACTOR CORE ISOLATION COOLING SYSTEM.pdf 382,130 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-39, Sheet 0001, Rev 012, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTING SYSTEM.pdf 218,6158 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-39, Sheet 0001A, Rev 004, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTING SYSTE.pdf 266,737 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-39, Sheet 0002, Rev 003, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 362,702 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-39, Sheet 0002A, Rev 005, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COLLANT INJECTION SYSTE.pdf 288,774 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-39, Sheet 0003, Rev 006, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 360,559

ATTACHMENT 2 Electronic File Directory Structure Page 5 of12

y,,,,. ~\\1,~/.
    • ~* * *' **.)* ' <\\...0, I>,* X,,,ffAi;/}/{';.i'i:"'t~c:1,..
  • l1\\:/f:;;~f, )N.,,,. *> :it")UfSA~. ~ ** ' ***

,*;,::s;*C;?'iJ'f:fi. ;(Sf }J,~./ ff:;.0.-,f ff:c.,'f1{ :;"..',{,;;; :;,:'*,!£ :;, <

f:II~ Sll:~.. (ilytes)tt c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M*l-CC-39, Sheet 0004, Rev 004, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTING SVSTEM.pdf 308,305 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-39, Sheet 0005, Rev 007, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTING SVSTEM.pdf 345,002 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-39, Sheet 0006, Rev 006, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 359,753 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-39, Sheet 0007, Rev 007, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 1,109,737 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-39, Sheet 0007A, Rev 004, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 201,844 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-39, Sheet 0008, Rev 007, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 154,881 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-39, Sheet OOOSA, Rev 005, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SVSTEM.pdf 432,369 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-39, Sheet 0009, Rev 004, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 321,681 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-39, Sheet 0010, Rev 004, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOlANT INJECTION SYSTEM.pdf 308,084 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l*CC-39, Sheet 0011, Rev 007, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 322,525 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC*39, Sheet 0012, Rev 005, FUNCTIONAL CONTROL DIAGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 365,324 lc:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-4, Sheet 0001, Rev 022, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 133,002 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-4, Sheet 0003, Rev 015, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYS.pdf 193,344 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-4, Sheet 0004, Rev 015, WIRING DIAGRAM FUNC CONTROL DIAGRAM RECIRC FLOW CONTROL S.pdf 455,894 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-4, Sheet 0006, Rev 020, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 85,132 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-4, Sheet 0007, Rev 021, FUNCTIONAL CONTROL DIAGRAM REORCULATION FLOW CONTROL SYSTEM.pdf 136,596 c:\\PEA UFSAR REFERENCE DRJl.\\il/lNGS, REV 29 M-1-CC-4, Sheet 0008, Rev 017, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSiEM.pdf 171,928 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-4, Sheet 0009, Rev 015, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 232,148 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC*4, Sheet 0010, Rev 016, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 114,267 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-4, Sheet 0011, Rev 017, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 111,350 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-4, Sheet 0012, Rev 019, FUNCTIONAL CONTROL DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 184,563 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-40, Sheet 0001, Rev 011, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOAL SYSTEM.pdf 348,380 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-40, Sheet 0002, Rev 014, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 154,742 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-40, Sheet 0003, Rev 009, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 128,087 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-40, Sheet 0004, Rev 011, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT.pdf 147,828 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-40, Sheet 0005, Rev 006, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 310,866 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-40, Sheet 0006, Rev 007, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT.pdf 560,831 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-40, Sheet 0007, Rev 009, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 364,165 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-40, Sheet 0008, Rev 009, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 421,883 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-40, Sheet 0009, Rev 010, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT.pdf 314,746 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-40, Sheet 0010, Rev 009, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 400,884 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-40, Sheet 0011, Rev 009, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 193,914 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-40, Sheet 0012, Rev 005, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SVSTEM.pdf 398,590 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-40, Sheet 0013, Rev 010, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVAL SYSTEM.pdf 124,564 c:\\PEA UFSAR REFERENCE DRAW1NGS, REV 29 M-l-CC-40, Sheet 0014, Rev 010, FUNCTIONAL CONTROL DIAGRAM RESIDUAL HEAT REMOVALSYSTEM.pdf 171,690 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-41, Sheet 0002, Rev 001, FUNCTIONAL CONTROL DIAG CORE SPRAY SVSTEM.pdf 362,043 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-41, Sheet 0003, Rev 006, FUt,/CTIONAL CONTROL DIAGRAM CORE SPRAY SYSTEM.pdf 230,685 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-41, Sheet 0004, Rev 005, FUNCTIONAL CONTROL DIAG CORE SPRAY SYSTEM.pdf 321,613 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-41, Sheet OOOS, Rev 007, FUNCTIONAL CONTROL DIAG CORE SPRAY SYSTEM.pdf 592,446 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC*41, Sheet 0006, Rev 004, FUNCTIONAL CONTROL DIAG CORE SPRAY SYSTEM.pdf 253,847 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-41, Sheet 0007, Rev ODS, FUNCTIONAL CONTROL DIAGRAM CORE SPRAY SYSTEM.pdf 151,997 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-41, Sheet 0008, Rev 005, FUNCTIONAL CONTROL DIAG CORE SPRAY SYSTEM.pdf 355,743 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-42, Sheet 0001, Rev 011, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SVSTEM.pdf 502,641 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-42, Sheet 0002, Rev 003, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 356,844 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M*l-CC-42, Sheet 0003, Rev 006, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYRDRAULIC SYSTEM.pdf 403,598 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-l-CC-42, Sheet 0004, Rev 002, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 390,045 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-42, Sheet 0005, Rev 003, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 370,793 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-42, Sheet 0006, Rev 004, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 360,162 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-42, Sheet 0007, Rev 002, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 349,471 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-42, Sheet 0009, Rev 001, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SVSTEM.pdf 261,356

ATTACHMENT 2 Electronic File Directory Structure Page 6 of 12

  • Directofyflatfr.,,.
:~** UFSARReference'DrawlngJIJa'ines" ' ',..

File Si:ie(Bytes),~

c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-1-CC-42, Sheet 0009A, Rev 005, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 239,061 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 I M-l-CC-42, Sheet 0010, Rev 011, FUNCTIONAL CONTROL DIAGRAM cCJN..,-ROL RODD_RIVE HYDRAULIC SYSTIM-Jldf 471,305 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 jM-1-C_C-42,Sheet 0011, Rev OOl, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.e,df 416,469 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 j M-1-CC-42, Sheet 0012, Rev 006, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 410,892 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 j M-1-CC-42, Sheet 00131 Rev O()~, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 399,295 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 J M-1-CC-42~~t 0014, Rev 003, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM,.pdf 307,055 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 jM-l-CC-42, Sheet 0015, Rev 004, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 381,985 c:~PEA UFSAR REFERENCE DRAWINGS, REV ~jl\\lH-,CC-42, Sheet 0016, Rev ()()3J FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM.pdf 157,019 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 I M-1-CC-42, Sheet 0018, Rev 001, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEM-Jldf 269,179 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 I M-l-CC-42, Sheet 0018A, Rev 003, FUNCTIONAL CONTROL DIAGRAM CONTROL ROD DRIVE HYDRAULIC SYSTEllll,.e,df 380,111 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 I M-1-CC-5, Sheet 0001, Rev 010, FUNCTL CONTROL DIAG STAND-BY LIQUID CONTROL SYSTEM,0001.pdf 362,780 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 I M-1-DD-3, Sheet 0001, Rev 006, PROCESS DIAGRAfVI STANDBY LIQUID CONTROL SYSTEM.pdf 407,266 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 jM-1-DD-5 Sheet 0001 Rev 008 PROC DIAGRAM REACTOR WATER CLEAN-UP SYSTEM HIGH PRESSURE.e,df 296,271 c:\\PEA UFSAR REFERENCE DRAWINGS, REV~_lM-!-DD-6, Sheet 0001, Rev 006, PROCESS DIAG HIGH PRESS COOLANT INJECTION SYS CONTROL RO.pdf 416,241 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 I M-1-DD-8, Sheet 0002, Rev 013, RADWASTE PROCJ:.SS Dl~GRAM.e,df 616,530 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 jM-1-DD-9, Shee! 0001, Rev 009, PROCESS DIAG RESIDL.Jt\\.1-,J::l,J:.AT REMOVAL (RHR) CONTROL ROD DRl.pdf 695,003 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 _IM-1-T-20, Sheet 0001, Rev 014, INSTRUMENT ENGINEERING DIAGRAM NEUTRONJvlOUNTING SYSTEM.pdf 508,726 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 IM-1-T-20, Sheet,0002, Rev 012, NEUTRON MONJIC)RlNG,,SYSTEM.e,df 951,196 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29

!M-l-T-20, Sheet 0003, Rev 014, NEUTRON MONITORING SYSTEM INSTRUMENT ENGINEERING DIAGRAM.pdf 457,894 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29. j M-1-T-W, Sheet 0004, Rev 013.,)IIJ~BUMENT ENGINEERING DIAGRAM_NELJT_RON MONITORING SYSTEM.pdf 575,483 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29

[rvl-l-T-25, Sheet 00011 Rev 016, INS'f'RI.Jrv!ENT ENGINEERING DIAGRAM RECIRCtJ.LAllON FLOW CONTROL SYSTEM PID - HISTORY.pdf 178,587 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 IM-1-T-25, Sheet 0002&e,v_018, INSTRUMENT ENGINEERING DIA§~AM RECIRCULATION FLOW CONTROL SYSTEM - HISTORY.pdf 168,550 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 LM-1-T-25, Sheet 0003, Rev 016, INSTRUMENT ENGINEERING DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM PID.pdf 214,536 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 jM-1-T-25, She,et 0004, Rev 018, INSTRUMENT ENGINEERING DIAGRAM RECIRCULATION FLOW CONTROL SYSTEM.pdf 188,531 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 I M-1-T-29, Sheet 0001, Rev 012, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC. SYSTEMS.e,df.

177,889 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 I M-l-T-29, Sheet 0002, Rev_012, FUNCTIONAL CONTROL DIAGRAM NUCLEAR BOILER MISC. SYSTEMS.pdf 2S0,227 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 _ [iyi-1-T-49, Sheet 0001, Rev 012, REACTOR PROTECTION SYSTEM IED PID.pdf 506,565 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 jM-1-T-49, Sheet 0002, Rev 007, REACTOR PROTECTION SYSTEM JED PID.pdf 405,918 c:\\PEA UFSAR REFERENCE DRAWINGS,~\\/ 29 IM-1-T-49, Sheet 0003, Rev 015, INSTRUMENT ENGINEERING DIAGRAM REACTOR PROTECTION SYSTEM.pdf 234,490 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 IM-1-T-49, Sheet 0004, Rev 006, INSTRUMENT ENGINEERll\\l_<:i_ DIAGRAM REACTOR PROTECTION_SYS P AND ICl.pdf 422,616 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 JM-1-T-49, Sheet 0005, Rev 012,,IIIJS!,RUMENT ENGINEERING DIAGRAM_REACT"OR PROTECTION SYSTEM.pdf 309,789 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 j M*l-T-49, Sheet 0006, B.i!v_014, INSTRUMENT ENGINEERIN§. DIA_Gl!,'\\M REACTOR PROTECTION SYS P AND ID.pdf 244,128 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 I M-2, Sheet 0001, Rev 020, GENERAL ARRANGEMENT PLAN AT EL 116-0.pdf 603,164 c:\\PEA UFSAR REFERENCE DRAWINGSL REV 29 jM-2406, Sheet 0001, Rev 009, 2-12 YEAR ONSITE RADWSTE STORAGE FACILITY PLAN EL 13SFT-061N AND SEC.pdf 504,897 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 j M-2430, Sheet 0001, Rev 011, DRAIN AND SUMP SYSTEM.pdf 414,023 c:\\P~_LJFSAR REFERENCE DRAWINGS, REV 29 _JM-3, Sheet 0001,Rev 021, GENERALARRANGEM,ENT _PLA_r,J AT EL 135FT

  • 0 IN.pdf 728,339 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 I M-300, Sheet 0001, Rev 049, P & I DIAGRAM LEG_ENCl.pdf 389,903 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 j M-300, Sheet 0002, Rev 0117, P & I_ DIAGRAM LEGEND.pdf 256,493 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 j M-303, Sheet 0001, Rev 076, MAIN STEf.M BYPASS AND CROSSAROUND.pdf 618,759 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 jM-303, Sheet 0002, _Rev_060, MAIN STEAM BYPASS AND CROSSAROUND.pdf 384,860 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 I M-303, Sheet 0003, Rev 070, MAIN STEAJ'v1., BYPASS AND CROSSAROUND.pdf 617,605 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 I M-303, Sheet 0004, Rev 065, P AND I DIAGRAM MAIN STEAM, BY-PASS AND CROSSAROUND.pdf S73,014 c:\\PEA UFSAR REFERENCE DRAWINGS, ~V ~9-IM-304, Sheet 0001, Rev 054, T_URBINE AND E_XT,RACTION _STEAM.pdf 397,209 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 jM-304, Sheet 0002, Rev 056, TURBINE AND EXTRACTION STEAM.pdf 400,289 c:',,PEAUFSAR REFERENCE DRAWINGS, REV 29 jM-307, Sheet 0001, Rev 067, P AND I DIAGRAM CONDENSATE SYSTEM.pdf 340,625 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 jM-307, Sheet 0002, Rev 077, P AND I DIAGRAM CON_[)_EJ\\JSATE SYSTEM-Jldf 382,309 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 I M-307, Sh~_t 0003, Rev 041, P AND I DIAG~ CONDENSATE SYSTEM,.edf 256,231 c:\\PEA UFSAR REFERENCE DRAWINGS, ~EV 29 I M-307, Sheet 0004, Rev 065, CONDENSATE SYSTEM.pdf 358,395 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 IM-307, Sheet 0005, Rev 079, P&I DIAGRAM CONDENSATE SYSTEM.pdf 411,565 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 jM-~71 _She_et 0006, Rev 044, P & I DIAGRAM CONDENSATE SYSTEM.pdf 269,262

ATTACHMENT 2 Electronic File Directory Structure Page 7 of12 1:,:i'./',*.,.;*c.c:.Dlr'e~i>1:yPath- :,;,:*,:;.;*:'.. ;i* SJ'.:'.':,C,:;*,,.~:*>.c*,r,; >;;.,_./.'~/-; i, '°,,,* __,,, :, ~'CcUFS.i\\RReferericeDfaWing:Nari-iei{'Sc* *"<.a*.*;;;"**;':.*;'.:.*, \\> ;/.,'\\.:'*'./ ;-:>i/ _;:r / '.'FileSJzeJBytesh c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-308, Sheet 0001, Rev 067, FEEDWATER AND FEED PUMPS.pdf 379,456 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-308, Sheet 0002, Rev 045, FEEDWATER AND FEED PUMPS.pdf 459,533 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-308, Sheet 0003, Rev 063, FEEDWATER AND FEED PUMPS.par-717,551 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-308, Sheet 0004, Rev 046, FEEDWATER AND FEED PUMPS (2).pdf 573,459 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-308, Sheet 0004, Rev 046, FEEDWATER AND FEED PUMPS.pdf 590,173 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-308, Sheet 0005, Rev 043, FEEDWATER AND FEED PUMPS.pdf 181,704 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-308, Sheet 0006, Rev 006, FEEDWATER AND FEED PUMPS.pdf 176,911 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-310, Sheet 0001, Rev 068, AIR EJECTION AND OFF GAS.pdf 690,560 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-310, Sheet 0002, Rev 063, AIR EJECTOR AND OFF GAS.pdf 395,804 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-310, Sheet 0003, Rev 070, AIR EJECTION AND OFF GAS.pdf 208,025 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-310, Sheet 0004, Rev 051, AIR EJECTION AND OFF GAS.pdf 310,556 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-310, Sheet 0005, Rev 004, AIR EJECTION AND OFF GAS.pdf 301,586 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-311, Sheet 0001, Rev 050, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf 231,245 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-311, Sheet 0003, Rev 039, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf 668,377 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-311, Sheet 0004, Rev 039, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf 610,082 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-311, Sheet 0005, Rev 039, CONDENSATE FILTER DEMINERALIZER SYSTEM.pd!

576,667 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-311, Sheet 0006, Rev 040, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf 502,322 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-311, Sheet 0007, Rev 055, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf 340,364 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-311, Sheet 0008, Rev 038, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf 279,116 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-311, Sheet 0009, Rev 040, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf 236,727 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-311, Sheet 0010, Rev 039, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf 242,330 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-311, Sheet 0011, Rev 038, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf 280,018 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-311, Sheet 0012, Rev 039, CONDENSATE FILTER DEMINERALIZER SYSTEM.pdf 176,525 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-312, Sheet 0001, Rev 060, CIRCULATING WATER SYSTEM.pdf 623,103 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-312, Sheet 0002, Rev 058, CIRCULATING WATER SYSTEM.pd!

1,003,026 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-314, Sheet 0001, Rev 076, SERVICE WATER SYSTEM.pdf 586,839 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-314, Sheet 0002, Rev 064, SERVICE WATER SYSTEM.pd!

276,064 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-314, Sheet 0003, Rev 071, SERVICE WATER SYSTEM.pdf 269,084 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-314, Sheet 0004, Rev 069, SERVICE WATER SYSTEM.pd!

228,283 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-314, Sheet 0005, Rev 071, SERVICE WATER SYSTEM.pdf 564,290 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-314, Sheet 0006, Rev 067, SERVICE WATER SYSTEM.pdf 588,979 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-314, Sheet 0007, Rev 063, SERVICE WATER SYSTEM.pdf 283,889 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-314, Sheet 0008, Rev 067, SERVICE WATER SYSTEM.pdf 238,213 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-314, Sheet 0009, Rev 04S, SERVICE WATER SYSTEM.pdf 165,310 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-315, Sheet 0001, Rev 090, EMERGENCY SERVICE WATER AND HIGH PRESSURE SERVICE WATER SYSTEM.pd!

486,168 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-315, Sheet 0001, Rev 092, EMERGENCY SERVICE WATER AND HIGH PRESSURE SERVICE WATER SYSTEM.pdf 12,517,501 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-315, Sheet 0002, Rev 057, EMERGENCY SERVICE WATER AND HIGH PRESSURE SERVICE WATER SYSTEMS.pd!

228,038 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-315, Sheet 0003, Rev 066, EMERGENCY SERVICE WATER AND HIGH PRESSURE SERVICE WATER SYSTEM.pdf 271,622 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-315, Sheet 0004, Rev 056, EMERGENCY SERVICE WATER AND HIGH PRESSURE.pdf 802,648 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-315, Sheet 0005, Rev 059, EM ERG SERV WTR, HIGH PRESS SERV WTR SYSTEM.pdf 227,454 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-315, Sheet 0006, Rev 003, PID EMERGENCY SERVICE WATER AND HIGH PRESS SERVICE WATER SY.pdf 381,070 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-315, Sheet 0007, Rev 003, PIO EMERGENCY SERVICE WATER AND HIGH PRESS SERVICE WATER SY.pdf 320,020 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-316, Sheet 0001, Rev 062, COOLING WATER REACTOR BUILDING.pdf 717,580 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-316, Sheet 0002, Rev 064, COOLING WATER-TURBINE BUILDING.pdf 752,106 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-316, Sheet 0003, Rev 053, COOLING WATER REACTOR BUILDING.pdf 681,658 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-316, Sheet 0004, Rev 057, COOLING WATER* TURBINE BLDG.. pdf 252,064 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-317, Sheet 0001, Rev 083, RAW WATER SYSTEM.pdf 338,630 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-317, Sheet 0002, Rev 054, RAW WATER SYSTEM.pdf 494,328 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-319, Sheet 0001, Rev 036, MAKE-UP DEMINERALIZER WATER.pdf 322,317 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-319, Sheet 0002, Rev 053, MAKE-UP DEMINERALIZER WATER.pd!

784,423

ATTACHMENT 2 Electronic File Directory Structure Page 8 of12 i/' :.<:: *, '

      • . Dlriil:toryPath,,, '
  • , \\ *.;

.1

.
, '.. ' ' :,;.:,. ; :;'"'*** : -'".'* /,' <,' \\;.UFS~RReferenceOiawirigNames./",

__,,': >c- _.J *-<,*...,**... *,,.. :; *.c'.

  • File Si~e (Bytes)\\

c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-319, Sheet 0003, Rev 011, MAKEUP DEMINERALIZER WATER,pdf 164,266 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-319, Sheet 0004, Rev 020, MAKE UP DEMINERALIZER WATER.pdf 205,135 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0001, Rev 039, COMPRESSED AIR - NOTES AND INDEX TITLE SHEET.pdf 286,334 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0002, Rev 044, AIR COMPRESSOR 2AK001 AND DRYERS.pdf 464,554 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0003, Rev 044, AIR COMPRESSOR 2BK001 AND DRYERS.pdf 541,844 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0004, Rev 041, AIR COMPRESSORS 2CK001 AND 2DK001.pdf 541,835 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0005, Rev 040, RW AIR COMPRESSORS OOK308 AND OOK309 AND RESPIRATORY AIR CO.pdf 342,804 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0006, Rev 044, CONDENSATE BACKWASH SYS AIR COMPRESSOR 2AK315 AND LOW PRESS AIR BLOWER.pdf 388,867 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0007, Rev 037, INSTRUMENT AIR TURBINE BUILDING.pdf 470,612 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0008, Rev 034, INSTRUMENT AIR TURBINE BUILDING EL 102.pdf 346,917 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0009, Rev 043, COMPRESSED AIR SYSTEM INSTRUMENT AIR TURBINE BUILDING EL.116.pdf 507,574 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0010, Rev 034, INSTRUMENT AIR TURBINE BUILDING EL 116.pdf 275,326 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0011, Rev 036, INSTRUMENT AIR TURBINE BUILDING EL 116.pdf 475,517 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0012, Rev 048, COMPRESSED AIR SYSTEM INSTRUMENT Al TURBINE.pdf 26B,743 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0012, Rev 048, COMPRESSED AIR SYSTEM INSTRUMENT Al TURINE.pdf 248,539 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0013, Rev 040, INSTRUMENT AIR REACTOR BUILDING EL 91-6.pdf 380,224 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0014, Rev 036, INSTRUMENT AIR REACTOR,BUILDING l:L 116.pdf 223,025 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0015, Rev 039, INSTRUMENT AIR REACTOR BUILDING EL 135.pdf 355,998 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0016, Rev 042, INSTRUMENT AIR REACTOR BUILDING EL 165.pdf 315,263 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0017, Rev 039, COMPRESSED AIR SYSTEM INSTRUMENT AIR REACTOR BLDG EL 195.pdf 323,590 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0018, Rev 036, INSTRUMENT AIR REACTOR BUILDING EL. 234.pdf 283,640 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0019, Rev 048, COMPRESSED AIR SYSTEM SERVICE AIR TURBINE BUILDING EL. 102, 116, 135 AND 165.pdf 257,898 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0020, Rev 040, SERVICE AIR REACTOR BUILDING EL 91-6 AND 116.pdf 295,336 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0021, Rev 038, SERVICE AIR REACTOR BUILDING EL 135.pdf 274,172 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0022, Rev 037, SERVICE AIR REACTOR BLDG EL. 165, 195 AND 234.pdf 370,024 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0023, Rev 039, AIR COMPRESSOR 3AK001 AND DRYERS.pdf 284,204 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0024, Rev 039, AIR COMPRESSOR 3BK001 AND DRYERS.pdf 514,574 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0025, Rev 041, AIR COMPRESSOR 3CK001 AND 3DK001.pdf 436,282 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0026, Rev 046, CONDENSATE BACKWASH SYS AIR COMP 3AK315 AND LOW PRESS AIRBLOWER 30K11.pdf 402,257 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0027, Rev 035, INSTRUMENT AIR TURBINE BUILDING EL 102.pdf 224,880 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0028, Rev 035, INSTRUMENT AIR TURBINE BUILDING EL 102.pdf 360,177 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0029, Rev 042, COMPRESSED AIR SYSTEM INSTRUMENT AIR TURBINE BUILDING EL. 116.pdf 229,305 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0030, Rev 036, COMPRESSED AIR SYSTEM INSTRUMENT AIR TURBINE BUILDING EL. 116.pdf 270,636 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0031, Rev 036, INSTRUMENT AIR TURBINE BUILDING EL. 135.pdf 420,138 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0032, Rev 047, INSTRUMENT AIR TURBINE BUILDING EL. 165.pdf 294,001 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0033, Rev 038, INSTRUMENT AIR REACTOR BUILDING EL. 91-6.pdf 472,017 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0034, Rev 037, COMPRESSED AIR SYSTEM INSTRUMENT AIR REACTOR BUILDING EL 116.pdf 192,906 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0035, Rev 038, COMPRESSED AIR SYSTEM INSTRUMENT AIR REACTOR BUILDING EL135.pdf 207,151 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0036, Rev 039, COMPRESSED AIR SYSTEM INSTRUMENT AIR REACTOR BLDG EL. 165,0.pdf 298,142 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0037, Rev 040, INSTRUMENT AIR REACTOR BUILDING EL. 195.pdf 364,195 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0038, Rev 036, INSTRUMENT AIR REACTOR BUILDING EL. 234.pdf 284,631 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0039, Rev 046, COMPRESSED AIR SYSTEM SERVICE AIR TURBINE BLDG EL 102,116,135 AND 165.pdf 270,560 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0040, Rev 037, SERVICE AIR REACTOR BUILDING EL. 91-6 AND 116.pdf 297,656 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0041, Rev 036, SERVICE AIR REACTOR BUILDING EL. 135,0041.pdf 269,510 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0042, Rev 037, SERVICE AIR REACTOR BUILDING EL.165, 195 AND 234.pdf 249,093 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0043, Rev 043, INSTRUMENT AIR RADWASTE BLDG EL 135 AND 165.pdf 278,634 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0044, Rev 035, INSTRUMENT AIR RADWASTE BUILDING EL.pdf 297,996 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0045, Rev 037, INSTRUMENT AIR RADWASTE BUILDING EL. 91-6.pdf 234,371 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0046, Rev 037, SERVICE AIR RADWASTE BLDG EL. 91-6, 116, 135 AND 165.pdf 265,066 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0047, Rev 043, COMPRESSED AIR SYSTEM SERVICE AIR COMMON AREAS AND OFF GAS TUNNEL.pdf 349,848

ATTACHMENT 2 Electronic File Directory Structure Page 9 of 12 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0048, Rev 040, SERVICE AIR ADMIN.pdf 300,134 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0049, Rev 045, COMPRESSED AIR SYSTEM INSTRUMENT AIR AUXILIARY BOILER BUILDING.pdf 277,268 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0050, Rev 038, COMPRESSED AIR SYSTEM INSTRUMENT AIR RECOMBINER BLDG.pdf 261,886 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0051, Rev 041, AIR COMPRESSORS 2AK001, 2BK001, 2CK001, 2DK001.pdf 425,894 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-320, Sheet 0052, Rev 002, AIR COMPRESSORS 3AK001, 3BK001, 3CK001, 3DK001.pdf 433,871 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-322, Sheet 0001, Rev 035, COOLING TOWERS.pdf 499,388 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-322, Sheet 0002, Rev 030, COOLING TOWERS - COMMON INSTRUMENT LIST.pdf 343,504 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-324, Sheet 0001, Rev 064, AUXILIARY STEAM SYSTEM.pdf 703,542 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-324, Sheet 0002, Rev 060, AUXILIARY STEAM SYSTEM.pdf 387,148 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-324, Sheet 0003, Rev 044, AUXILIARY STEAM SYSTEM.pdf 296,843 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-327, Sheet 0002, Rev 057, CHILLED WATER SYSTEM DRYWELL COOLING.pdf 269,907 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-327, Sheet 0003, Rev 046, CHILLED WATER SYSTEM DRYWELL COOLING.pdf 391,878 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-327, Sheet 0004, Rev 051, CHILLED WTR. SYS. DRYWELL COOLING.pdf 374,008 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-330, Sheet 0001, Rev 038, EMERGENCY COOLING SYSTEM.pdf 613,004 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-331, Sheet 0001, Rev 075, OFF-GAS RECOMBINER SYSTEM.pdf 624,262 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-331, Sheet 0002, Rev 054, P AND ID OFF-GAS RECOMBINER SYSTEM.pdf 302,209 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-331, Sheet 0003, Rev 076, OFF-GAS RECOMBINER SYSTEM.pdf 633,509 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-331, Sheet 0004, Rev 058, P AND ID OFF-GAS RECOMBINER SYSTEM.pdf 267,261 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-331, Sheet 0005, Rev 061, OFF-GAS RECOMBINER SYSTEM.pdf 455,633 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-331, Sheet 0006, Rev 061, OFF-GAS RECOMBINER SYSTEM.pdf 351,237 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-331, Sheet 0007, Rev 063, OFF-GAS RECOMBINER SYSTEM.pdf 212,864 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-333, Sheet 0001, Rev 059, P AND ID INSTRUMENT NITROGEN.pdf 849,476 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-333, Sheet 0002, Rev 060, INSTRUMENT NITROGEN.pdf 873,568 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-334, Sheet 0001, Rev 046, VENTILATION RAD MONITORING SYS-U2 AND COMMON.pdf 340,229 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-334, Sheet 0002, Rev 033, VENTILATION RADIATION MONITORING SYSTEM.pdf 240,833 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-351, Sheet 0001, Rev 081, NUCLEAR BOILER.pdf 549,858 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-351, Sheet 0002, Rev 073, NUCLEAR BOILER.pdf 415,606 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-351, Sheet 0003, Rev 076, NUCLEAR BOILER.pdf 747,561 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-351, Sheet 0004, Rev 071, NUCLEAR BOILER.pdf 633,976 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-352, Sheet 0001, Rev 065, NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 361,820 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-352, Sheet 0002, Rev 069, NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 667,224 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-352, Sheet 0003, Rev 055, NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 506,974 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-352, Sheet 0004, Rev 065, NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 567,341 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-352, Sheet 0005, Rev 046, NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 301,146 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-352, Sheet 0006, Rev 039, NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 315,343 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-352, Sheet 0007, Rev 000, PID NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 292,764 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-352, Sheet 0008, Rev 000, PID - NUCLEAR BOILER VESSEL INSTRUMENTATION.pdf 333,544 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-353, Sheet 0001, Rev 062, REACTOR RECIRCULATION PUMP SYSTEM.pdf 287,286 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-353, Sheet 0002, Rev 059, REACTOR RECIRCULATION PUMP SYSTEM.pdf 288,362 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-353, Sheet 0003, Rev 065, REACTOR RECIRCULATION PUMP SYSTEM.pdf 506,249 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-353, Sheet 0004, Rev 061, REACTOR RECIRCULATION PUMP SYSTEM.pdf 386,843 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-354, Sheet 0001, Rev 078, REACTOR WATER CLEAN-UP SYSTEM.pdf 679,225 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-355, Sheet 0001, Rev 034, C~EAN-UP FILTER AND DE:MINERALIZER SYSTEM.pdf 280,184 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-355, Sheet 0002, Rev 032, CLEAN-UP FILTER AND DEMINERALIZER SYSTEM.pdf 203,771 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-355, Sheet 0003, Rev 035, CLEAN-UP FILTER AND DEMINERALIZER SYSTEM.pdf 233,155 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-355, Sheet 0004, Rev 033, CLEAN-UP FILTER AND DEMINERALIZER SYSTEM.pdf 172,754 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-356, Sheet 0002, Rev 076, CONTROL ROD DRIVE HYDRAULIC SYSTEM PART A.pdf 234,176 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-357, Sheet 0001, Rev 037, CONTROL ROD DRIVE HYDRAULIC SYSTEM - PART B.pdf 363,230 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-357, Sheet 0002, Rev 036, CONTROL ROD DRIVE HYDRAULIC SYSTEM - PART B.pdf 242,375 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-358, Sheet 0001, Rev 039, STANDBY LIQUID CONTROL SYSTEM.pdf 275,659

ATTACHMENT 2 Electronic File Directory Structure Page lOof 12 i?t't'.';t* *. i /' oirectorvJ>ai:h*** *iO*;es.,t,> ;_*;;: I: >*,;J :i* '/.: "Ii c;-:,>*:,:;:,;;:;.:<..,-./ _:*c/)'.".i )ii.UFSARRefe'rencebrawingNamei(\\' <*::_:;.; __ i.,;/S*,~'.,f;., **.. :.

,.**.:*§<.'(:..
  • a *. Fite s1ze(Bvtes))

c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-358, Sheet 0002, Rev 039, STANDBY LIQUID CONTROL SYSTEM.pdf 330,377 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-359, Sheet 0001, Rev 050, REACTOR CORE ISOLATION COOLING SYSTEM.pdf 519,117 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-359, Sheet 0002, Rev 048, REACTOR CORE ISOLATION COOLING SYSTEM.pdf 619,460 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-360, Sheet 0001, Rev 056, R.C.I.C. PUMP TURBINE DETAILS.pdf 334,768 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-360, Sheet 0002, Rev 054, R.C.I.C. PUMP TURBINE DETAILS.pdf 326,914 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-360, Sheet 0003, Rev 047, R.C.I.C. PUMP-TURBN DETAILS LUBE OIL AND CONTROL SYSTEM UNl.pdf 269,226 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-360, Sheet 0004, Rev 039, R.C.I.C. PUMP-TURBN DETAILS LUBE OIL AND CONTROL SYS UNIT 3.pdf 279,194 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-361, Sheet 0001, Rev 087, RESIDUAL HEAT REMOVALSYSTEM.pdf 782,321 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-361, Sheet 0002, Rev 071, RESIDUAL HEAT REMOVAL SYSTEM.pdf 496,508 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-361, Sheet 0003, Rev 073, RESIDUAL HEAT REMOVAL SYSTEM.pdf 316,513 c:\\PEA UFSAR REFERENCE DRAWINGS, REY 29 M-361, Sheet 0004, Rev 074, RESIDUAL HEAT REMOVALSYSTEM.pdf 496,390 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-362, Sheet 0001, Rev 064, CORE SPRAY COOLING SYSTEM.pdf 237,662 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-362, Sheet 0002, Rev 064, P AND ID CORE SPRAY COOLING SYSTEM.pdf 592,259 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-363, Sheet 0001, Rev 044, FUEL POOL COOLING AND CLEAN-UP.pdf 375,728 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-363, Sheet 0002, Rev 045, FUEL POOL COOLING AND CLEAN-UP.pdf 503,574 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-364, Sheet 0001, Rev 028, FUEL POOL FILTER DEMINERALIZER SYS.* pdf 193,122 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-364, Sheet 0002, Rev 025, FUEL POOL FILTER DEMINERALIZER SYS.pdf 640,790 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-365, Sheet 0001, Rev 064, HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 441,337 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-365, Sheet 0002, Rev 066, HIGH PRESSURE COOLANT INJECTION SYSTEM.pdf 326,452 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-366, Sheet 0001, Rev 058, HPCI PUMP TURBINE DETAILS.pdf 436,599 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-366, Sheet 0002, Rev 050, HPCI PUMP TURBINE DETAILS LUBE OIL AND CONTROL SYSTEMS.pdf 204,080 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-366, Sheet 0003, Rev 045, H.P.C.I. PUMP-TURBINE DETAILS LUBE OIL AND CONTROL SYSTEMS.pdf 681,467 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-366, Sheet 0004, Rev 053, HPIC PUMP TURBINE DETAILS.pdf 265,169 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-367, Sheet 0001, Rev 095, CONTAINMENT ATMOSPHERIC CONTROL SYSTEM.pdf 872,959 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-367, Sheet 0002, Rev 082, CONTAINMENT ATMOSPHERIC CONTROL SYSTEM.pdf 664,903 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-367, Sheet 0003, Rev 078, CONTAINMENT ATMOSPHERIC CONTROL SYSTEM.pdf 220,903 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-367, Sheet 0004, Rev 003, P AND I DIAG CNTNMNT ATMOSPHERIC CONTROL SYSTEM.pdf 264,517 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-368, Sheet 0001, Rev 036, P AND ID RADWASTE LIQUID COLLECTION SYSTEM.pdf 415,808 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-369, Sheet 0001, Rev 030, RADWASTE LIQUID COLLECTION SYSTEM.pdf 303,528 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-372, Sheet 0001, Rev 065, CONTAINMENT ATMOSPHERE DILUTION SYSTEM.pdf 247,467 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-372, Sheet 0002, Rev 054, CONTAINMENT ATMOSPHERE DILUTION SYSTEM.pdf 303,807 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-372, Sheet 0003, Rev 004, P AND I DIAG CNTNMNT ATMOSPHERE DILUTION SYS.pdf 343,618 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-372, Sheet 0003, Rev 005, P AND I DIAG CNTNMNT ATMOSPHERE DILUTION SYS.pdf 327,226 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-372, Sheet 0004, Rev 004, CONTAINMENT ATMOSPHERE DILUTION SYSTEM.pdf 323,769 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-374, Sheet 0001, Rev 018, POST ACCIDENT SAMPLING SYSTEM INSTRUMENT AND EQUIPMENT LIST.pdf 403,073 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-374, Sheet 0002, Rev 020, POST ACCIDENT SAMPLING SYSTEM.pdf 369,656 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-377, Sheet 0001, Rev 044, DIESEL GEN AUX SYSTEMS STARTING AIR SYSTEM.pdf 433,490 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-377, Sheet 0002, Rev 047, DIESEL GENERATOR AUXILIARY SYSTEMS AIR COOLANT, JACKET COOLANT SYSTEM.pdf 218,350 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-377, Sheet 0003, Rev 045, DIESEL GENERATOR AUXILIARY SYSTEMS LUBE OIL SYSTEM.pdf 208,599 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-377, Sheet 0004, Rev 041, DIESEL GENERATOR AUXILIARY SYSTEMS DIESEL FUEL OILSYSTEM.pdf 241,605 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-377, Sheet 0005, Rev 009, DIESEL GENERATOR AUX SYSTEMS COMB AIR INTAKE EXHAUST SYSTEM.pdf 154,104 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-384, Sheet 0001, Rev 040, P AND ID - CONTROL ROOM HVAC.pdf 315,437 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-384, Sheet 0002, Rev 006, P AND ID - CONTROL ROOM HVAC.pdf 302,198 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-384, Sheet 0003, Rev 006, P AND ID - CONTROL ROOM HVAC.pdf 266,970 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-385, Sheet 0001, Rev 030, EMER. DIESEL BLD,BOILER BLD, SHOP, WAREHOUSE BLDG TEMP CONTROL DIAG.. pdf 330,383 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-387, Sheet 0001, Rev 017, TURBINE BLDG. VENTILATION FLOW DIAGRAM.pdf 253,252 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-388, Sheet 0001, Rev 037, REACTOR BUILDING VENTILATION FLOW DIAGRAM.pdf 203,869 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-389, Sheet 0001, Rev 028, RADWASTE BUILDING VENTILATION FLOW DIAGRAM 2,pdf 168,410 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-390, Sheet 0001, Rev 028, DRYWELL COOLING FLOW DIAGRAM.pdf 377,655 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-391, Sheet 0001, Rev 034, PRIMARY AND SECONDARY CNTNMNT ISOLATION CONTROL DIAG.pdf 422,268

ATTACHMENT 2.

Electronic FIie Directory Structure Page 11of 12

,.t,*'t : ;; ~. Dliei:toi:yPath '..... *:>

/.,:/;.* :* '*"..

  • . "**
    *i' "

.\\. ;*,** * **. JJF!iAR Referenci!'l;lrawlrig Nam:es'.*,... *, :<;. '_.;\\ /*0 **,,,:'

    • .. :*"**'*./J':: '.;',: FIie S~e (iJyiesh c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-391, Sheet 0002, Rev 031, PRIMARY AND SECONDARY CNTNMNT ISOLATION CONTROL DIAG.pdf 383,591 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-397, Sheet 0001, Rev 061, STANDBY GAS TREATMENT CONTROL DIAGRAM.pdf 334,066 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-397, Sheet 0002, Rev 046, STANDBY GAS TREATMENT CONTROL DIAGRAM.pdf 257,753 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-397, Sheet 0003, Rev 003, STANDBY GAS TREATMENT CONTROL DIAGRAM.pdf 320,267 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-399, Sheet 0001, Rev 032, EMERGENCY SWITCHGEAR, BATTERY RM, LABORATORY SUPPLY AND EXH.pdf 407,810 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-399, Sheet 0002, Rev 004, EMERGENCY SWITCHGEAR, BATTERY RM, LABORATORY SUPPLY, EXHAUS.pdf 237,963 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-399, Sheet 0003, Rev 003, EMERGENCY SWITCHGEAR, BATTERY ROOM, LABORATO.pdf 295,096

.c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-399, Sheet 0004, Rev 005, EMERGENCY SWITCHGEAR, BATTERY RM, LABORATORY SUPPLY AND EXH.pdf 248,177 ic:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-4, Sheet 0001, Rev 025, GENERAL ARRANGEMENT PLAN AT EL 165-0 3AE07, 3BE07, 3CE07.pdf 446,174 ic:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-5, Sheet 0001, Rev 013, GENERAL ARRANGEMENT PLAN AT EL 195FT-OOIN AT EL135--0 AND EL165-0.pdf 323,105 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-6, Sheet 0001, Rev 012, GENERAL ARRANGEMENT PLAN AT EL 234-0 PUMPS TAG NO 2AP01, 26P01.pdf 341,332 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-7, Sheet 0001, Rev 013, GENERAL ARRANGEMENT SECTIONS A-A, B-B APPL TURB DRIVES FOR REACTOR FE.pdf 403,069 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-86, Sheet 0001, Rev 024, PIPING AND MECHANICAL REACTOR BLDG UNIT NO 2 PLAN AT EL 165-0 AREA 7.pdf 623,174 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-96, Sheet 0001, Rev 019, PIPING AND MECHANICAL REACTOR BLOG UNIT NO 2 PLAN AT EL 165T-OOIN ARE.pdf 561,043 lc:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 M-I-CC-41, Sheet 0001, Rev 009, FUNCTIONAL CONTROL DIAGRAM CORE SPRAY SYSTEM.pdf 281,229 c:\\PEA UFSAR REFERENCE DRAWINGS, REV 29 S-54, Sheet 0001, Rev 030, CONTAINMENT VESSELS - REQUIREMENTS SUPPRESSION CHAMBER* UNITS 2, 3.pdf 795,868

ENCLOSURE 1 Peach Bottom Atomic Power Station Units 2 and 3 Updated Final Safety Analysis Report, Revision 29 Fire Protection Report, Revision 24 Included on Digital Versatile Disk {DVD}

J ENCLOSURE2 Peach Bottom Atomic Power Station Units 2 and 3 Updated Final Safety Analysis Report, Revision 29 Fire Protection Report, Revision 24 UFSAR / FPP Reference Drawings Included on Digital Versatile Disk (DVD)