ML19114A251
Text
PBAPS FIRE PROTECTION PROGRAM FPP i
Rev. 17, April 2009 TABLE OF CONTENTS CHAPTER 1 INTRODUCTION CHAPTER 2 FIRE PROTECTION SYSTEM DESCRIPTION 2.1 Fire Protection Water Supply Systems 2.2 Wet Pipe Sprinkler Systems 2.3 Pre-Action Sprinkler Systems 2.4 Deluge Systems 2.5 Water Spray for Charcoal Filters 2.6 Wet Standpipes and Hose Stations 2.7 Foam Extinguishing Stations 2.8 Low Pressure Carbon Dioxide System 2.9 Dry Chemical Systems 2.10 Water Curtain Systems 2.11 Portable Fire Extinguishers 2.12 Fire and Smoke Detection System CHAPTER 3 COMPARISON BETWEEN PBAPS FIRE PROTECTION PROGRAM AND NRC GUIDELINE DOCUMENTS 3.1 NRC Branch Technical Position APCSB 9.5-1, Appendix A 3.2 Appendix R of Title 10 CFR, Part 50 3.3 Safety Evaluation Report CHAPTER 4 EVALUATION OF POTENTIAL FIRE HAZARDS 4.1 Scope of Evaluation 4.2 Procedure CHAPTER 5 ANALYSIS OF CAPABILITY TO ACHIEVE SAFE SHUTDOWN 5.1 Methodology 5.2 Description of Reactor Shutdown Methods 5.3 Safe Shutdown Analysis by Fire Area CHAPTER 6 SPECIAL TOPICS 6.1 Analysis of Associated Circuits 6.2 Analysis of High/Low Pressure Interfaces 6.3 Analysis of the Yard 6.4 Individual Plant Examination for External Events -
Internal Fires Analysis
PBAPS FIRE PROTECTION PROGRAM TABLE OF CONTENTS FPP ii Rev. 17, April 2009 CHAPTER 7 FIRE PROTECTION REQUIREMENTS 7.1 Introduction 7.2 Deleted 7.3 Deleted 7.4 Deleted
PBAPS FIRE PROTECTION PROGRAM FPP iii Rev. 17, April 2009 APPENDIX A TABLES A-1 Fire Protection Program A-2 Heat of Combustion Values A-3 Components Required for Safe Shutdown A-4 Operations That May be Required to be Performed Outside the Control Room A-5 Valves That Serve as Interfaces between Low Pressure Piping and the RCPB
PBAPS FIRE PROTECTION PROGRAM FPP iv Rev. 17, April 2009 APPENDIX B LIST OF FIGURES B-1 DELETED B-2 DELETED B-3 Fire Protection Water Supply Yard Piping B-4 General Floor Plan, EL. 91'-6" B-5 General Arrangement Plan at EL. 116'-0" B-6 General Floor Plan, EL. 135'-0", 150'-0" B-7 General Floor Plan, EL. 165'-0" B-8 General Floor Plan, EL. 195'-0" B-9 General Floor Plan, EL. 234'-0" B-10 General Floor Plan, Diesel Generator Building B-11 General Floor Plan, Recombiner Building B-12 General Floor Plan, C.W. Pump Structure B-13 General Floor Plan, Emergency Cooling Towers B-14 DELETED B-15 DELETED B-16 DELETED B-17 DELETED B-18 DELETED B-19 DELETED
PBAPS FIRE PROTECTION PROGRAM LIST OF FIGURES (cont'd)
FPP v
Rev. 17, April 2009 B-20 DELETED B-21 DELETED B-22 DELETED B-23 DELETED B-24 DELETED B-25 DELETED B-26 DELETED B-27 DELETED B-28 DELETED B-29 DELETED B-30 DELETED B-31 DELETED
PBAPS FIRE PROTECTION PROGRAM FPP vi Rev. 17, April 2009 APPENDIX C Letter References