PY-CEI-NRR-1055, Forwards Eleventh Quarterly Rept - CEI Seismic Monitoring Network,Apr-June 1989

From kanterella
(Redirected from ML20246K353)
Jump to navigation Jump to search
Forwards Eleventh Quarterly Rept - CEI Seismic Monitoring Network,Apr-June 1989
ML20246K353
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 08/29/1989
From: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20246K360 List:
References
PY-CEI-NRR-1055, NUDOCS 8909050445
Download: ML20246K353 (1)


Text

i

~

l-t THE CLEVELAND ELECTRIC P.O. BOX 97 5 PERRY, OHIO 44081 m TELEPHONE ~ (216) 254 3737 FROM CLEVELAND: 241 1630 5 ADDRESS 4L CENTER ROAD Gerving The Best location in the Nation Al Kaplan PERRY NUCLEAR POWER PLANT vcc mtseem August 29, 1989 NucttAn onoup PY-CEI/NRR-1055 L U.S. Nuclear Regulatory Commission Uscument Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Seismic Quarterly Report Number 11 Centlemen:

Enclosed for your information is Seismic Monitoring Quarterly Report Number 11 for the CEI operated Micro-net, which is monitoring an area in the vicinity of two waste injection wells located 3 miles south of the PNPP site. This report provides data and event analysis for the time period between April 1, 1989 and June 30, 1989. Also incorporated is information related to the installation of an additional temporary sixth station named GEN (for Geneva). ,

i Monitoring Results .

This quarter experienced very little microseismicity, limited to two events with one event on May 30, 1989 (Mc= -0.4) within the corridor and a second event on June 15, 1989 (Mc= -0.4) near ? airport Ha:bor outside of the corridor. Depths of these events remain at approximately 2 km.

Addition of Sixth Monitoring Station As noted in the last quarterly, CEl has been pursuing the addition of a sixth. t

(

station (GEN) in the northeastern most portion of the corridor in Ashtabula County. This temporary station installation was completed in this quarter and the station integrated into the system at the end of June. With the addition of the station CEl vill improve the hypocentral location of any future events near Madison-on-tne-Lake which experienced a magnitude Mc= 2.4 on December 15, 1988.

Should wou have any questions related to this report, please contact us.

Ver tru urs, Al Kaplan Vice President Nuclear Group AK:njc Enclosure cc: T. Colburn 2 gpf P. Hiland Leon Reiter i 8909050445 890829 l PDR ADOCK Cf5000440 p PDC