Forwards Safety Evaluation Re Approval of Safer/Gestr LOCA Analysis for Plant
ML20217E602
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/23/1997
From: Hall J
NRC (Affiliation Not Assigned)
To: Horn G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20217E606 List:
References
TAC-M98293, NUDOCS 9710070098
Download: ML20217E602 (3)


Text

O

, Mr. G. R. Horn September 23, 1997 Sr. Vice President of Energy Supply Nebraska Public Power District 1414 15th Street Columbus, NE.68601

SUBJECT:

APPROVAL OF SAFER /GESTR LOCA ANALYSIS FOR COOPER NUCLEAR STATION (TAC NO. M98293)

Dear Mr. Horn:

By letter dated March 19, 1997, the Nebraska Public Power District (NPPD) submitt ed a report entitied, Cooper Nuclear Station SAFER /GESTR-LOCA Loss-of-Coolant Accident Analysis, NEDC-32687P, Revision 1, prepared by the General Electric Company (GE). In your letter, you requested NRC approval of the SAFER /GESTR methodology for use at the Cooper Nuclear Station (CNS).

The NRC staff has reviewed your letter of March 19, 1997, and the plant-specific SAFER /GESTR LOCA analysis for CNS. As described in the enclosed safety evaluation, the staff concludes that the plant-specific analysis for CNS meets the conditions underlying the previous staff acceptance of the generic SAFER /GESTR-LOCA methodology, thereby ensuring conformance with the criteria of 10 CFR 50.46 for emergency core cooling system performance.

Therefore, the staff finds the SAFER /GESTR methodology acceptable for use at CNS.

l In order to implement the SAFER /GESTR-LOCA methodology at CNS, your Improved Technical Specifications submittal of March 27, 1997, will need to be supplemented to reflect the applicability of the revised methodology, as discussed in the-Enclosure. In addition, your request to withhold the GE report, NEDC-32687P, Revision 1, from pubiic disclosure will be the subject of separate corre,spondence. Please contact me at (301) 415-1336, if you have any questions.

Sincerely, ORIGINAL SIGNED BY:

James R. Hall, Senior Project Manag:r Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-298

Enclosure:

Safety Evaluation '

cc w/ enc 1: See next page

] l DISTRIBUTION:

Docket file PUBLIC PD4-1 r/

EAdensam (EGAl) CHawes ACRS OGC (15B18) TGwynn, RIV JHall

-Document Name: C0098293.LTR OFC PM/PD4-1 LA/PD4-1 NAME JHall/vw/k// CHawes JAlfl gfit }i]ma p #"

[A@t a u a7 Um II*N%

C//d/97 2

v IWO DATE 9 /M97 0FF CIAL RECORD COPY 9710070098 970923 li  !' '

yDR ADOCK 05000298 h ll' lI t l l'*'

PDR s >

L

j#**%lt y UNITED STATES s* }

t NUCLEAR REEULATCRY COMMISSION WASHINGTON, D.C. erama , ,

\,...../ i September 23, 1997 Mr. G. R. Horn Sr. Vice President of Energy Supply Nebraska Public Power District 1414 15th Street Columbus, NE 68601

SUBJECT:

APPROVAL OF SAFER /GESTR LOCA ANALYSIS FOR COOPER NUCLEAR STATION (TAC NO. M98293)

Dear Mr. Horn:

By letter dated March 19, 1997, the Nebraska Public Power District (NPPD) submitted a report entitled, Cooper Nuclear Station SAFER /GESTR-LOCA loss-of-Coolant Acefdent Analysis NEDC-32687P, Revision 1, prepared by the General Electric Conipany (GE). In your letter, you requested NRC approval of the SAFER /GESTR methodology for use at the Cooper Nuclear Station (CNS).

The NRC staff has reviewed your letter of March 19, 1997, and the plant-specific SAFER /GESTR LOCA analysis for CNS. As described in the enclosed safety evaluation, the staff concludes that the plant specific analysis for CNS meets the conditions underlying the previous staff acceptance of the generic SAFER /GESTR-LOCA methodology, thereby ensuring conformance with the criteria of 10 CFR 50.46 for emergency core cooling system performance.

Therefore, the staff finds the SAFER /GESTR methodology acceptable for use at CNS.

In order to implement the SAFER /GESTR-LOCA methodology at CNS, your Improved Technical Specifications submittal of March 27, 1997, will need to be supplemented to reflect the applicability of the revised methodology, as discussed in the Enclosure. In addition, your request to withhold the GE report, NEDC-32687P, Revision 1, from public disclosure will be the subject of separate correspondence. Please contact me at (301) 415-1336, if you have any questions.

Sincerely, nal ames R. Hall. Senior Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-298

Enclosure:

Safety Evaluation cc w/ encl: See next page

. Mr. G. R. Horn Nebraska Public Power Company- Cooper Nuclear Station CC:

Mr. John R McPhail, General Counsel Lincoln Electric System Nebraska Public Power District ATTNt Mr. Ron Stoddard P. O. Box 499 lith & 0 Streets Columbus, NE 68602-0499 Lincuin, NE 68508 Nebraska Public Power District MidAmerican Energy ATTH: Mr. P. D. Graham ATTN: Dr. William D. Leech, Manager-Nuclear Vice President of Huclear Energy 907 Walnut Street i

P. O. Box 98 P. O. Box 657 Brownville, NE 68321. Des Moines, IA 50303-0657 4 Randolph Wood, Director Nebraska Department of Environmental Control Nebraska Public Power District ATIN: Mr. B. L. Houston, Nuclear P. O. Box 98922 Licensing & Safety Manager Lincoln, NE 68509-8922 P. O. Box 98 Brownville, NE 68321 Mr. Larry Bohlken, Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, NE 69305 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 218 Brownville, NE 68321 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611-Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Ms. Cheryl Rogers, LLRW Program Manager Division of Radiological Health Nebraska Department of Health 301 Centennial Mall, South P. O. Box 95007 Lincoln, NE 68509-5007 Mr. Ronald A. Kucera, Department Director of Intergovernmental Cooperation Department of Natural Resources-P.O. Box 176 Jefferson City,- MO 65102

~

J