Augmented Insp Repts 50-280/86-42 & 50-281/86-42 on 861209- 870114.Violation Noted:Failure to Fully Follow Procedures, Provide Adequate Instruction for & Document Performance of Maint Operations
ML20211C516
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/10/1987
From: Panciera V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20211C439 List:
References
50-280-86-42, 50-281-86-42, NUDOCS 8702200119
Download: ML20211C516 (53)


See also: IR 05000280/1986042

Text

{{#Wiki_filter:'

   .
             y                                      UsesTSO STATSS
     '     f                           NUCLEAR REGULATORY COMMISSHM
   .
         f                                             Reescos as
         g                                   tel e4ARIETTA STREET.N.W.
         *
                                              ATLANTA.G80A41A 30333
          *$
              .....
                               '
                             .
         Report Nos.: 50-280/06-42 and 50-281/86-42
         Licensee: Virgirtia Electric and Power C'ompany
                    Richmond, VA 23261
         Docket Nos.: 50-280 and 50-281                            License Nos.: DPR-32 and DPR-37
         Facility Name: Surry 1 and 2
         Inspection Conducted: December 9,1986 - January 14, 1987
         Team Inspectors:    J. Caldwell
                             M. A. Caruso
                             W. T. Cooper
                             8. R. Crowley
                             J. T. Gilliland
                             W. E. Holland
                             T. A. Peebles
                             P. A. Taylor
         Contributing Inspectors:     A. R. Herdt
                                      J. D. Ennis
                                      P. M. Mad n
                                      W. Ros
         Approved by: _mm                   I /L n s
                      Vincent W. Panciera, Team ~ Lea' der'
                                                                   h ~
                                                                                      a ~
                                                                                              7
                                                                                   /Date Sigried
                      Division of Reactor Safety
                                                     SL)l9tARY
         Scope: This special, announced augmented inspection was conducted for the Surry
         Unit 2 feedwater pipe rupture event of December 9,1986. The areas inspected
         included the sequence of events, effects of failure, metallurgical aspects, items
         contributing to the likelihood or severity of the event, licensee's response to
         the event, aspects that made handling the event more difficult, consideration of
         shutdown of Unit 1, investigation and corrective actions planned and safety
         considerations for station restart.
         Results: One violation was identified (paragraph 11.a.(2)).
                                                                           .
                                                                   '
         0,g22Kg[[{ $$$$ go
 -
          o

t

     '
 .
   '
 .
                                         REPORT DETAILS
                           .
       1.  Persons Contacted
                                                '
           Licensee Employees
           W. L. Stewart, Vice President, Nuclear Operations
           R. J. Hardwick, Corporate Manager for Licensing and Safety
           R. F. Saunders, Surry Station Manager
          *R. W. Calder, Nuclear Engineering Manager
          "H. L. Miller, Assistant Station Manager for Licensing and Safety
          *D. L. Benson, Assistant Station Manager for Operations and Maintenance
           J. M. McAvoy, System Metallurgist
          *W. D. Craft, Licensing Coordinator
          *W.  R. Benthall, Nuclear Specialist
           Other licensee employees contacted included engineers, technicians,
           operators, mechanics, security members and office personnel.
           NRC Residen' Inspector
          *W.  Holland
          * Attended exit interview.
                                                                                       .
       2.  Exit Interview
           The inspection scope and findings were summarized on January 14, 1987, with
           those persons indicated in paragraph 1 above. The inspectors described
           the areas inspected and discussed in detail the inspection findings listed
           below.    No dissenting comments were received from the licensee.
           Violation 50-281/86-42-02 - Inadequate Procedure for the Maintenance of the
           Main Steam Trip Valve (paragraph 11.a.(2)).
                                                        ~
            Inspector Followup Item 50-280, 281/86-42-01 - Clarification of Surface
           Preparation Methods in NOE Procedures (paragraph 8.e.).
           The licensee did not identify as proprietary any of the material provided
            to or reviewed by the inspectors during this inspection.
       3.   Licensee Action on Previous Enforcement Matters
           This subject was not addressed in the inspection.
       4.  Unresolved Items
           Unresolved items were not identified during the inspection.

L .-

                   4
                                                                                    0
                             .
     .     . ~ . --        .    --    .-        . _ _ - - _.- _   . . _ _ - -    . - . - _ _ _ -   - - ..   -
         '
    .
       b
    =
                                                                2

4

-
                   5. Augmented Inspection Team (AIT) Activities
:                     Shortly after the pipe rupture event, Region II was notified by the Surry
                      Senior Resident Inspector (SRI) who was on site, and had proceeded to the

y

                      control roong to assess the situation. The Regional personnel immediately

1 staffed the regional response center at about 2:45 p.m. NRC Headquarters

                      was then notified at approximately 3:00 p.m. that a main feedwater line pipe
                      rupture in the turbine building had occurred. An open line between the
                      Surty site and the NRC Operations Center was maintained until early hours

, of the next morning. About 3:30 p.m., a decision was made by Regional

management to send an inspection team to the site. This team consisted of

{ Regional based personnel and the SRIs from North Anna and Surry. The team

                      arrived on site about 9:30 p.m. on December 9, 1986. After a meeting with

j plant management to assess the operational status of the unit, the team

!                     toured the damaged area of the turbine building in the vicinity of the feed-

l pump suction piping. During a meeting at 9:00 a.m. on December 10, 1986,

                      with plant management, NRC inspection assignments were outlined. Virginia

4

                      Power agreed to provide any assistance required by the team. In addition,

l the ground rules to be applied by the inspection team regarding quarantine ! of equipment were discussed. Virginia Power agreed to seek NRC concurrence ! ' before any work was accomplished for restoration of systems. During the

                      morning of December 10, 1986, the team's status was upgraded to an Augmented

! Inspection Team (AIT), and an engineer from the Office of Nuclear Reactor l Regulation, knowledgeable in water hammer phenomena, was assigned to the l team. The team conducted inspections during the remainder of the week 1 ending December 12, 1986, to ascertain the circumstances involved in the j accident. An executive summary was transmitted to the Region II office on l December 17, 1986. This summary provided the significant facts concerning

the event. The AIT did not conclude its inspection at that time due to the

! ongoing activities by the licensee to develop a root cause analysis, which I required subsequent inspection activities. AIT activities continued during ! the weeks of December 22 and 29, 1986, and January 12, 1987. An AIT exit l meeting with plant management was held on January 14, 1987, after review of

the licensee's investigative report entitled "Surry Unit 2 Reactor Trip and

! Feedwater Pipe Failure Report" and proposed corrective actions which were j presented to the NRC on January 12, 1987, in addition to the AIT inspection i activities, inspectors knowledgeable in security, fire protection systems, l water chemistry and check valve design were assigned to review specific ! concerns in these areas. Where applicable, their inspection findings have i been incorporated into this AIT inspection report. t ,

                  6.  Overview of the Event                                                      .
                      On December 9, 1986, with both units operating at 100 percent reactor power,

! a Unit 2 reactor trip followed by a main feedwater (MFW) line rupture

                      occurred. Unit 2 had completed a refueling outage and returned to full

I power operation on December 8, 1986. ! A low-low level in the C Steam Generator ($/G) caus6d a reactor trip and l start of the two motor driven auxiliary feedwater pumps.

                                                                              .'
  e
                                                                                                          '
                                                                                                       .  .

I

   '

.

 .

e 3

        The control room operators noted the S/G code safety valves lifting and
        regulated S/G pressure through the atmospheric dump valves. Approximately
        30 seconds after the trip the unit's electrical busses auto-transferred to
        offsite power. A small steam release noise was heard followed by a very
        loud noise approximately five seconds later.
        A shift supervisor who was in the turbine building, realizing that a large
        steam break had occurred, went to the control room and alerted the control
        room watch. All secondary pumps (high pressure drain, condensate and main
        feedwater) were secured, and the break was isolated. Water to the S/GS was
        supplied by the auxiliary feedwater system.
        The primary systems responded normally to the loss of load transient.
        Reactor coolant temperature, pressure, and pressurizer level were stabilized
        in the desired band.
        A notification of unusual event was declared by the licensee at 2:27 p.m.
        and was upgraded later to an ALERT in order to ensure accountability of all
        station personnel.
        The 18-inch suction line to the A main feedwater pump was subsequently
        found to have ruptured at the elbow where the line connects to the 24-inch
        condensate header.
        In addition, station halon and cardox systems actuated because of water
        short-circuiting control systems in the area. Control room habitability
        was a concern prior to initiating control room ventilation because doors
        were blocked open to allow better control room access without recognizing
        that carbon dioxide had been discharged in the areas above. The carbon
        dioxide was apparently coming into the control room from the hallway. The
        emergency was terminated at 4:23 p.m. after personnel accountability had
        been established.
        Eight individuals were injured due to the steam and water. Four of the
        injured subt.equently died. Two of the injured were treated and released.
        Two individuals remained hospitalized. One, individual was later released.
        Unit 2 was placed in cold shutdown at 7:04 a.m. hours on December 10, 1986.
     7. Sequence of Events
        a.    Initial Plant Conditions Prior to the Unit 2 Event
              Unit 2 had achieved stable 100 percent power operation on December 8,
              1986, following a refueling outage. Unit 1 was operating at 100
              percent power.
              Two major maintenance or surveillance activities were in progress:
              the troubleshootin
              coolant pump (RCP)g     of a B
                                  breaker,   train
                                           and  theunderfrequendy
                                                    troubleshooting ofrelay for 111ary
                                                                        an aux  a reactor
                                                          .                  .
                                                        ,
                !
                                                                                       9
                                                                                          .
 .'
   .
 '
                                        4
        instrument air ccepressor. The first item had required the racking
        in and closing of the B reactor trip bypass breaker. The A and B
        reactor trip breakers were still closed. The second item required
        the shutdown of the running auxiliary instrument air compressor and the
        attempted start of the non-running auxiliary instrument air compressor.
        The delay in starting the auxiliary instrument air compressor caused
        the instrument air pressure to decrease to approximately 78 psig,
        instead of the normal 100 psig.
        Some minor construction activity was occurring in the vicinity of the
        main feedwater (MFW) pumps, such as installing insulation on piping.
        The unit's data gathering computer (Prodac 250) was out of service,
        but reactor trip information was available from a sequence of events
        (SOE) alarm printer and a newly installed Emergency Response Facility
        Computer (ERFC). The SOE alarm printer prints information continuously
        on a millisecond basis, but is limited in scope to alarms. The ERFC
        displays s'y stem parameters, but only updates in fifteen second incre-
        ments and samples the parameters at different times. The ERFC is
        intended for a broader picture than the SOE alarm printer. Interviews
        with the Shift Supervisor and Control Room Operators (CRO) were used
        to correlate times and to fill in gaps of the event.
        The SOE alarm printer time of the reactor trip was 1420:03(RT00)and
        the ERFC time of the reactor trip was between 1421:15-:30 and has been
        correlated to be 1421:15. Therefore, the SOE information will be
        addressed in increments per the ERFC clock with specifics referred to
        as seconds of time from the RT per the SOE alarm printer.
        Other sequence of events information was developed by the licensee,
        using security alarm computer data, interviews with additional person-
        nel, and time motion studies. This information correlates with this
        SOE data.
     b. Secondary System Conditions Prior To The Event
        Both MFV pumps were operating with a suction pressure of 370 psig, a
        discharge pressure of 1040 psig and a temperature of 374 degrees F.
        The condensate system was operating normally with one of two high pres-
        sure heater drain pumps, two of two low pressure heater drain pumps,
        and two of three condensate pumps running. The full flow condensate
        polishing system and all feedwater h9aters were in service.        .
     c. Plant Conditions and Personnel Actions During The Event
        1421:(00-15) ERFC time
        The first indication of a problem occurred at RT -03 when the Unit 2
        control room received an annunciator alarm for!the B steam generator
        (S/G) as MFV flow was less than steam flow. This indication and the
                                                  .'
          '

.

                                                                              O i
 .'
 ,
                                    5
    subsequent alarm on the A S/G indicated that the C main steam trip
    valve (MSTV) had inadvertently closed. The closure of the MSTV caused
    the steam flow from the other S/Gs to begin to increase by 50 percent
    and caused the mismatch alarm, since the MFW flow to the S/Gs had not
    yet responded.                   .
    A direct indication of the C MSTV closing was not received as the
    valve-closed limit switches did not function properly. However,
    indication and alarm that the valve was not fully open was available to
    the CRO.
    The closure of the C MSTV caused MFW pressure downstream of the C MFW
    flow control valve (FCV) to increase from 865 psig to 970 psig with
    the A and B MFW pressures initially stable at 845 and 835 psig,
    respectively..                                                         -
    The other steam generator MSTVs closed shortly afterward due to the
    higher than normal steam flow in those lines caused by the continuing
    100 percent demand of the main turbine. The MSTVs are reverse seated
    check valves held open against the steam flow by air operated pistons.
    As the MSTV discs are partially in the steam flow path, an increase
    in steam flow places more closing force on the disc. All three MSTVs
    closed and seated properly and steam flow was stopped.
    1421:(15-30)
    A low-low S/G 1evel annunciator signal which was received for C S/G and
    was the initiating signal for the reactor trip at 1421:15 (RT 00) and
    for the starting of the two motor driven auxiliary feedwater pumps.
    The reactor trip resulted in a trip of the main turbine generator. The
    stopping of steam flow to the main turbine by the MSTVs closing caused
    the S/G pressures to increase. As C MSTV had closed first, its pres-
    sure increased first. This increase in pressure collapsed the bubbles
    in its S/G which caused the level to decrease to the reactor trip low-
    Iow level setpoint.
    At RT +03, the CR0 manually tripped th'e reactor. One control rod
    (M-10) indicated that it had inserted from 228 steps to 35 steps.
    Reactor power was verified to have decreased to normal post-trip decay

l

    values.
    At RT +04, the CRO, noting that the S/G code safety valves were
    lif ting, took the S/G Power Operated Relief Valves (PORV) out of manual
    and began to regulate S/G pressure through this atmospheric dump mode.
    S/G pressures had increased from their initta) values of 820, 814 and

! 1

                                                    I

i * .

                                             ,
                                                                         '

! l -

                 ~
             .
               .
             -
                                                                                      6
                                                      815 psig and were 936, 979, and 1055 psig.* The S/G pressures all
                                                       responded to the individual MSTV closings, and since C MSTV had been
                                                      closed longest, it caused the C S/G to reach the highest pressure.
                                                       The AFW flows were greatest to the S/G with the least pressure. AFW
                                                       flow was 344, 300 and 98 gpa.    .
                                                       Pressure downstream of the MFW FCVs increased to 1054, 1042 and
                                                       1090 psig.
                                                       1421:(30 -45)
                                                       Pressure downstream of the MFW FCVs decreased to 1008, 1015 and
                                                       1028 psig. S/G pressures were 1028, 1013, and 1055 psig. The C S/G
                                                       PORV was being used to control primary temperature and C S/G pressure
                                                       remained constant.
                                                       Low-low levels occurred in the A and B S/Gs in response to their
                                                       increasing pressure which caused the automatic initiation of the third
                                                       auxiliary feedwater pump. The steam inlet valve to the turbine driven
                                                       auxiliary feedwater pump opened and the pump started. S/G 1evels as
                                                      a percent of wide range instrumentation were 74, 73 and 75 versus
                                                       a normal operating level of 84 percent. AFW flow was 337, 317 and
                                                       109 gpm.
                                                       1421:(45-1422:00)                                                                     .
                                                       The three MFW FCVs received an automatic signal to close and in a few
                                                       seconds were closed. This signal is generated to minimize primary
                                                       system cooldown following a reactor trip and is generated when the
                                                       primary temperature decreases to less than 554 degrees F. The MFW pump
                                                       recirculation valves (FCV-FW-250A and 2508) for A and 8 MFW pumps auto-
                                                      opened a few seconds later. Each recire valve opens when flow from its
                                                      MFW pump decreases to less than 2800 gpm.
                                                       Pressure downstream of the MFW FCVs increased on A to 1059 and
                                                      decreased on B and C to 812 and 949 psig. Pressure in the S/Gs
                                                       remained constant at 1028, 1013 and 1065 psig. The A MFW FCV may have
                                                      been slightly slow in closing, and as the discharge pressure of the
                                                      MFW pumps was increasing to its high of 1290 psig, the pressure down-
                                                       stream of the A MFW FCV would have increased.
                                                      The unit's electrical busses auto-transferred to offsite power at
                                                       RT +32, when the main generator, as is normal, auto-transferred on
                                                       a 30-second delay signal following a main turbine generator trip.

1

                                                   *When pressures, flows, etc., are listed in sequence, the order refers
                                                       respectively to the A, 8, and C steam generatob.

'

                                                                                                                  .
                                                                                                              ,

d

 u
   . . - . _
                   _ _ . . . _ - . _________._._._--.__ - ,._ ______._ _ _.- _
                                                         _
                                                                                          __m, - _ . _ _ - _ _ _ _ _ _-- - .. _ -.. , . -. -
 .'
    '
 .-                                       7
        Five seconds later at RT +37, a small steam release was seen and heard
        in the vicinity of the A MFW pump and the first point heater steam-side
        safety relief.
        1422:(00 -15)                      .
                .,           .
        Pressure downstream of the MFW FCVs decreased to 445 psig which
        indicates that the downstream MFW check valves were operating and the
        pressure of the water in the lines was decreasing to its saturation
        pressure. The S/G pressures decreased to 997, 1003 and 1020 psig and
        levels remained in the 74 percent range. The AFW flow was 342, 317 and
        98 gps. The MFW pump discharge pressure reached a peak of 1290 psig
        and the suction pressure rose to 550-600 psig as the condensata pumps
        responded to the minimal recirculation flow conditions.
        The noise of a small steam release was followed at approximately RT +42
        by a very loud noise from the vicinity of the MFW pump suction piping.
        The primary system responded normally to the loss of load transient.
        Reactor coolant system temperature was stabilized at 552 degrees F and
        pressurizer level was recovered as it reached the low level setpoint.
        Reactor coolant system pressure decreased from 2235 to 2015 psig in
        response to the cooldown.
        The probable time for the piping break appears to have occurred at
        RT +42.    The break occurred in an elbow where the 24-inch MFW suction
        header splits off at a tee to an 18-inch branch line in an elbow toward
        the suction of the A MFW pump. About ten feet farther down the 24-inch
        header toward the suction of the 8 MFW pump is where the high pressure
        heater drain pumps' discharge flow is combined with the condensate
      , flow.
        Approximately 15 seconds after the large pipe rupture, at RT +57, the A

, '

        MFW pump tripped due to low suction pressure. The time delay relays
        which operate in conjunction with a suction pressure of less than
                                                 and the SOE alarm printer agrees
        55 psig
        with       wereoffound
              the time    pump set
                                 trip.atThe
                                         15Bseconds,V
                                             MF        pump rectre valve indicated that

,

        it closed while the A rectre valve remained open, as it should have,

i

        for 60 seconds after the pump trip. A reason for the 8 recirc valve

r closing is that the B MFW pump continued to run and the flow in that l line increased to greater than the rectre re-setpoint of 4000 GPM. , This increase in flow was caused by a backward flow path through-the

tripped A MFW pump. It was later found that this pump's discharge

j check valve was disabled. The 8 MFW pump continued to run for 23 l seconds.

!

                                                         !
                                                  .'
          &
                                                                               O
                                                                                     t
           -
       .
         .
       -
                                             8
             1422:(15-30)
             An operations supervisor was in the turbine building observing construc-
             tion activity around the MFW pumps. He heard and saw the large steam
             break, And immediately ran to the control room to alert the operators.
             He also' told them that people had been injured. The shift supervisor
             then ordered that all secondary pumps be secured.
             1422:(30-45)
             When the CR0s began to secure the secondary pumps, the B MFW pump
             was found " auto-off" with its yellow disagreement light on, which
             occurred at RT +81, or about 1422:36. Its time delay relays were also
i
             found set at 15 seconds. Therefore, its trip point of 70 psig was
             reached at RT 66 or about 24 seconds after the break. The high pres -
             sure heater drain pump was running and had to be turned off, and both
             low pressure heater drain pumps had tripped. After all secondary pumps
             were secured, the steam release stopped.
             The ERFC and SOE alarm printer agreed with the operators on the above
             time sequence.
             1424
             The CR0 noted that primary temperature was stable at about 550
             degrees F.

'

             The NRC Senior Resident Inspector arrived in the Control Room.

! 1425

             The CR0 secured the B RCP to avoid adding heat to the reactor coolant
             system. Plant conditions were stable with RCS temperature being

l maintained at approximately 540 degrees F by releasing decay heat

             through the C S/G power operated relief valve (PORV).
                                                      '
             1427
             An Unusual Event was declared.
             1430

l Ground and air ambulances were called.

             The CR0 changed the normal suction of the charging pumps to refueling
             water storage tank.
             The B and C S/G low-low level alarms cleared and the steam driven APW
             pump was secured.                               !
             The Regional response center called the c,ontrol room.      ,
                                                        ,
  b en
                     _.                                             _
        ~
    .
      ,
    .
                            ,            9
          1440
          An Alert was declared to assist in personnel accountability.
          1445                            .
                   _
          The CR0 secured the A RCP.
          The Shift Supervisor noted that the condenser still had a vacuum and as
'
          there was no steam for the main turbine gland seal, opened the vacuum
          breaker.
          State and local authorities were notified of the Alert.
          1500
          NRC Operations Center was notified of the Alert.
          Reactor coolant system temperature was 530 degrees F, pressurizer level
          was 25 percent, and pressurizer pressure was 2160 psig.
          1506
          The CR0 secured B auxiliary motor driven feedwater pump.
          1514
'
          The CR0 began emergency boration to cold shutdown concentration as part
          of the normal post trip procedure.
          1518

. '

          Personnel accountability initiated.

I 1535 i The corporate Emergency Response Cente'r was activated.

          1539
          The CR0 secured emergency boration.

i !

          1548
          Personnel accountability completed.
          1625
          The Alert was terminated. The control rod (M410) which had indicated
          that it inserted only to 35 steps now was noted to indicate fully
          inserted.
                                                  .'
  -

!

            ..-                                    .             . - -           -
                                                                                     - . .                  .                      . - _ .
                  -
                      .
.
                  .
                -
                                                                                             10
:
                                                         1821
                                                         Cooldown at 50 degrees F per hour was initiated.

,

                                                        2130           ,                        .
                                                                       <

t ,

                                                        NRC team arrived on site.
                                                        0355 December 10, 1986
                                                        Unit placed on residual heat removal system with ter.perature at
                                                         350 degrees F and pressure at 450 psig.
                                                        0704

i The unit achieved cold shutdown conditions.

                                                                           '
                                   8.       Effects of Fai1'ure

! a. Pipe Rupture

                                                        The rupture of the 18-inch A MFW suction pipe occurred on a 90 degree

! elbow at a point about one foot from where the suction pipa joins the '

,                                                       condensate supply header.          The point at which the break occurred
                                                         relative to the main feedwater pump is indicated on Figure 1, which is
                                                        a picture of the identical undamaged Unit 1 piping configuration.
                                                         Figure 2 shows the rupture location from the condensate supply header

,

                                                        side. Figure 2 clearly indicates that the rupture was a catastrophic,
360 degree circumferential break. Figure 3 shows the broken pipe from
the MFW pump suction side.

!

                                           b.           Pipe Whip

i

                                                        Observation of the damaged A MFW pump suction piping indicated sig-
                                                        nificant movement of the piping following the rupture. The piping,
                                                        attached to the pump suction, dropped and rotated away from the break

,

                                                        point, pivoting on the elbow near the pump suction. Although the
                                                        piping came to rest against a prtion of the B MFW pump discharge

l piping it did not appear to have damaged it significantly. ! Inspection of the area following the event also revealed that one

                                                        piece of suction piping had ripped off and was blown some distanca from
'
                                                        the break point. The piece was about two feet by three feet in size.
                                                        It appears that the joint between the' suction pipe and condensate
                                                        supply header provided lateral support of the suction piping assembly
                                                         including the suction isolation valve. The loss of this support along

,

                                                       with the weight distribution of the suction pipe assembly probably

i

                                                        contributed to the pivot and rotation of the assembly. It is also

'

                                                         likely that back flow by the B MFW pump througli the damaged A MFW
                                                        pump discharge check valve and out the broken suction pipe contributed
                                                        to pipe whip motion of the feed pump suct, ion pipe.
                                                                                                         *

l '

                                                            ,
         ~

l .

                                                                                                                                 .
  ---,--r--         - , , - -m-r--    ..,,ew   ,----+-+--m                   ,-m-  w
       ~
   .
     .
   .
                                             11
         c. Personnel Injury
            Those injured were eight contractor employees who were working in
            the general area, but not on the affected pipe itself. Six of these
            individuals were hospitalized f.or treatment of severe burns. Three
            were evacuated directly from the site by helicopter, and three others
            were taken off site by ambulance. The other two, who were less
            severely injured, were treated at a clinic and released.
            One of those hospitalized died the afternoon of the following day and
            another victim died two days after the accident. Two others. died
            several days later. The others remained in serious to critical condi-
            tion. One of the two hospitalized improved and was later released,
            but the other was still in serious condition more than a month after
            the accident.
            These contractor personnel were employed by Daniel Construction Company
            of Greenville, South Carolina, and by Insulation Specialties Inc.,     of
            Hopewell, Virginia. They were doing instrument line relocation and
            pipe insulation work,
         d. Plant Cooldown
            The loss of the suction, piping to the A MFW pump and subsequent steam
            release had no adverse effects on the plant cooldown. The MSTVs had
            closed as had the MFW FCVs before the pipe rupture. These actions           -
            isolated the S/Gs from the rupture. The normal cooldown mode for a
            MSTV closure event is steam release by the code safeties, and S/G PORVs
            and continued feedwater flow from the auxiliary feedwater system.
         e. Employee Concerns
            On December 11, 1986, a former employee at Surry (a carpenter)

,

            contacted the NRC and expressed concern about grinding activities at

} Surry. The employee said that during June 1986, he and four other

            carpenters were directed to grind on p,ipe in the containment building.

'

            He stated that his foreman advised his crew that they were carpenters
and not qualified to perform this work activity. They were terminated
            for refusing to do the work. A case was filed with the Department of
Labor (DOL). The employee did not know the current status of his DOL
issue. The employee stated that the group of carpenters who remained

i did perform grinding activities at various locations, including in the l turbine building. He did not know if they actually performed gririding i

            on the pipe that ruptured but wanted the NRC to determine if the pipe
            rupture was connected with the carpenters' grinding work.

J As discussed in paragraph 9 below, preliminary investigations show ! that the pipe rupture was caused by a corrosion / erosion mechanism on i the inside surface of the pipe. It is clear tfhat the rupture was not ! related to grinding on the outside of the pipe.

                                                       ,'
 w
                                                                                      n
       .
   .
     .
   *
                                          12
         As further followup to the employee's concern, the inspector discussed
         grinding practices at the site with licensee officials. The licensee
         was aware of the employee's concern based on the individual's DOL case
         in June 1986, and the employee's contacts with the news media after the
         pipe rupture. The licensee stated that the work to which the former
         employee-referred was buffing or cleaning pipe welds in preparation for
         non-destructive examination (NDE) and was not grinding. The licensee's
         representative said their practice had always been to use carpenters or
         laborers to help pipe fitters clean or buff pipe welds in preparation
         for NDE. The carpenters or laborers worked under direction of the pipe
         fitters and were never allowed to grind pipe.
         The inspectors interviewed both the foreman who had terminated the
         carpenters in June, and a carpenter who was on shift at the time the
         other carpenters were terminated. Both agreed with the Itcensee's
         statements about carpenters being used only for cleaning or buffing
         pipe welds in preparation for NDE. They both also stated that the
         issue was that the carpenters who were terminated wanted pipe fitters'
         pay. When they refused to buff pipe without pipe fitters' pay, they
         were terminated. The foreman was the same foreman, who the concerned
         employee stated, had advised his crew that they were carpenters and not
         qualified to perform this work activity. During the interview, the
         foreman stated that, at the time of the termination he advised the
         carpenters only that the work they were requested to perform (buffing
         pipe welds) was not outside their work classification.
         The inspectors also reviewed U. S. 00L letter dated November 21, 1986,
         relative to the employee's concern. The letter states in part:
               "
                 ... it is our conclusion that your allegations are unprovable
               for the following reason: Your termination, although officially
               recorded as involuntary, arose from a refusal to accept a work
               assignment arising from previous and ongoing personal and
               jurisdiction disputes with supervisor (s). These disputes were
               unrelated to any safety and health issue."
                                                     ~
         The inspector also reviewed the licens e's program for control of

! grinding on pipe. During fabrication of piping systems, grinding !

         is controlled by Volume 2 of the Corporate Welding Manual including
         Procedure P-101, Revision 2, " General Piping and Pressure Vessel

, Welding Procedure," and Attachment A to P-101, " Weld Grinding Standard '

         and Techniques." For NDE, surface preparation is covered by NDE proce-
         dures. The inspectors reviewed a number of NDE procedures from the
         NDE Manual and found that the procedures specify the surface condition

i required but do not always clearly specify the method of surface i preparation required to obtain the surface condition. NDE Procedure .

         NDE-3.1, Revision 3, Preparation, Issue and Control of Nondestructive
         Examination Procedures, requires in paragraph 4.3.2.5 that NDE proce-
         dure list all actions which should be completeif prior to implementing
         the procedure, such as surface condition and preparation, temperature

j of parts, etc. The licensee agreed to ev,aluate NDE procedures and

 -
,

\ [

                            -- - -          .      -       - -        -.             -     ---.
          -

.

      .
        *

j .

                                                         13

-

                    determine if clarification is needed in specifying required surface
                    preparation methods. Pending review of the licensee's evaluation,

!

                    Inspector Followup Item 280, 281/86-42-01, Clarification of Surface
                    Preparation Methods in NOE Procedures, is identified.
                                                                         -
                                                            .
                            4
            9. Metallurgical Aspects
               As noted in paragraph 8.a. above, the 18-inch suction line to the A main

i feed pump failed catastrophically completely severing the line from the !

               24-inch header (see Figures 1, 2 and 3). The failure occurred in an 18-inch
               90 degree elbow approximately one foot downstream of a tee in the 24-inch                              >
               header. The suction line was completely separated and dislocated from the
               header. Immediately after the failure, the licensee initiated a comprehen-
               sive analysis to determine the reasons for the failure and the necessary
               corrective actions. The following summarizes the licensee's analysis:                      -
               a.   Initial Observations

. ] The failed 18-inch suction line was fabricated from ASTM A-106, '

                    Grade B, Extra Strong carbon steel seamless pipe and ASTM A-234,
Grade B, Extra Strong, WP8 carbon steel wrought fittings with a

j nominal wall thickness of 0.500 inches.

4

                    When the 18-inch elbow failed, a fragment approximately two feet by

, three feet was ejected from the outside of the elbow. The free end of j the severed line was displaced in a horizontal direction approximately

                    6.5 feet and was wedged against the bottom of the B main feed pump
                    discharge line. During the displacement, the A suction line rotated
                    around the point of connection at the inlet to the pump, severely                         ,
deforming that portion of the line. The failed elbow, the short
                    section of pipe between the elbow and the 24-inch header, and a short
'
                    section of pipe downstream of the elbow were removed for a detailed

i study. The three parts were re-assembled as close as possible to

understand better the failure origination point and the sequence of

l the failure after origination. The licensee performed a field i metallurgical investigation of the fai, led elbow as detailed below. ! (1) The investigation consisted of the following:

                          -
                                     Visual inspection of the system failure location.
                          -
                                     Removal of the fractured elbow from the suction line.      .
                          -
                                     Visual 5X magnification evaluation and photography of
                                     fracture surfaces, and elbow surface conditions.
                                                                                                                '
                          -
                                     Ultrasonic wall thickness measurements, on a two-inch grid
                                     pattern, of the failed elbow.
                                                                   ,'
  sem
                                   .
                                                                                                  -,------m._     ~ ,
                                                                                                                             .
   O
       -
   .                                                                                             14
                          -
                               Metallurgical replicas taken on the elbow at several surface
                               locations.
                          -
                               Mechanical measurements of elbow thickness.
                 (2) Th'e_ investigation resulted in the following observations:
                          -
                               Visual inspection of the inside surface of the elbow revealed
                               a dimpled surface appearance, generally thinned wall and a
                               number of localized very thin areas. The localized thin
                               areas were small in area, usually less than one inch across,
                               with remaining wall thickness as small as 1/16-inch. The
                               areas were fairly smooth and blended smoothly into the
                               surrounding material. Ultrasonic thickness measurements
                               showed the wall thinning to be a gradual sloping change over'
                               most of the surface of the elbow. The general thickness of
                               the elbow varied from 0.120 inches to 0.390 inches. The
                               short section of upstream pipe varied in thickness from
                               0.150 inches to 0.450 inches. Near the elbow, thickness
                               measurements on the section of downstream pipe revealed
                               thicknesses from 0.295 inches to 0.405 inches. The wall
                               thickness of pipe a short distance downstream of the elbow
                               was within manufacturer's tolerance.
                               As noted above, the nominal wall thickness should have been
                               0.500 inches.
                          -
                               Field metallurgical replicas taken on the surface of the
                               elbow revealed a microstructure typical of ASTM A-106 Grade 8
                               material with no signs of strain.
                          -
                               The fracture surface was typical of a ductile tearing mode
                               failure. Tears, which appeared to be fracture origination
                               points, were noted at two localized thin cavity areas of the
                               fracture. Small defects, indicative of laps, laminations
                               and inclusions, typical for A-106, Grade B, materials, were
                               noted at the fracture surface. One of these small defects
                               was noted at one of the thin overload tear areas and could

j have been the start of the fracture. l (3) The licensee's analysis revealed the following probable scenario ! for the pipe failure:

                                                                                                                                                               ,
                          -
                               The pipe failed because of a thinned wall. A corrosion /

l erosion mechanism is the probable cause of the wall loss. l Wall loss by this mechanism occurs by a gouging out pattern _

                               on the carbon steel surface under the action of a flowing

i

                               medium and an electrochemical action. This phenomenon has                                                                             .
                               been well documented for two phase fIow such as extraction                                                                            ,
                               steam systems. The licensee has an inspection procedure
                               documented for monitoring the t,hickness of its two phase
                                                                                                                                      .
 .
                                                                                                                                                                 O
     ..- . . - -   . .- .
                        .
                                    , - _ _ . . . _ - - - . . , - - , , , , , . . . _ _ . - , , - - , , _ . . . . . . , _ . . . - . _   _.., --.--,,-, - _ .--
                                                              .
                   O
                     .
                   -
                                                                                                15
                                                systems (see Surry Administrative Procedure SUAD-M-33,
                                                No. ADM-89.13. " Secondary Piping Inspections"). However,
                                                for single phase flow in systems, such as feedwater and
                                                condensate, the problem had not been recognized. The only
                                            ,
                                             '
                                                place where the phenomenon has been documented in a single
                                                phase flow system is in the steam generator feed ring
                                                J-tubes. The design geometry of the failed elbow in the
                                                feedwater suction line is similar to the design geometry of
                                                the feed ring J-tubes. Both consist of a header or large
                                                diameter pipe and a right angle discharge pipe with a 90 or
                                                ISO degree turn. The licensee concluded that the turbulent
                                                flow created by the geometry and the low oxygen feedwater
                                                probably contributed to the corrosion / erosion thinning of the
                                                pipe wall.
                                          -
                                                Because of the thinned wall (as low as 0.048-inches in a
                                                localized area and 0.100-inch over a more general area),
                                               ' local membrane stresses were near yield at system pressure
                                                and temperature of 367 psig and 374 degrees F, respectively.
                                                The system underwent an upward pressure transient (see para-
                                                graph 7.c. above) resulting in a localized tensile overload
                                                failure in a thin wall cavity. Using the ASME Code minimum
                                                wall equation, and assuming an internal pipe pressure of
                                                600 psig, a temperature of 370 degrees F, and an ultimate
                                                strength of 60,000 psi, results in a calculated burst thick-

, '

                                                ness of 0.090 inches and a yield thickness of 0.173 inches.
                                                Therefore, with a local cavity thickness of 0.048 inches,

l a general thickness of 0.100-inch, and a upward pressure I transient, the material easily exceeded its burst strength.

                                                The initial tensile overload tear was considered to have
                                                arrested and not to have developed into an unstable tearing
                                                mode. Water flashing to steam was heard by station person-
                                                nel. As water continued to flash to steam for a few seconds
                                                and pressure continued to increase in the elbow, an unstable
                                                tear developed in a second t,hin walled area. The pipe then
                                                ruptured, ejecting the fragment from the elbow.
b. Metallurgical Analysis
                                    (1) VEPCO
                                          VEPC0 has hired Failure Analysis Associates (FAA) to perform a
                                         complete metallurgical analysis of the failed elbow. The
                                          following is a summary of the work to be performed and the

.

                                          preliminary results as of January 14, 1987:

l l (a) Phase 1 - Scheduled for completion a, bout February 1, 1987

                                                -
                                                             Tensile Tests
                                                                                                                     .' -
                                     >
          _
                                                                                                                          ,
 , _ , . . . - - -     --.    . . -                .,- - --,         . - - - - - - . , - - - - - , - - - - - - - ~ ~
      . .
    .
 O
 .-                                   16
                      Tee, elbow and across the weld tested. Results
                      complete. Acceptable to specifications.
                 -
                      Charpy Impact Tests
            '
              ~
                      Elbow tested. Small specimens used due to thickness of
                      material. Results appear to be satisfactory. Complete
                      curve will be generated to correlate results with full
                      size specimens.
                -
                      Hardness Tests
                      Elbow base material, elbow heat affected zone (HAZ),
                      tee base material, tee HAZ and weld material tested.
                      Results complete and appear to be satisfactory.
                -
                      Chemistry
                      Elbow base material, tee base material, and weld
                      material tested. Results complete and appear to be
                      satisfactory. Trace elements are almost nonexistent.
                -
                      Micro and Macro Examinations
                      Work partially complete. At 50X, inside surface
                      dimpled, outside surface smooth.   Structure typical         -
                      Pearlite / Ferrite.
                -
                      Scanning Electron Microscope Examination
                      Started.
                -
                      Oxide Layer Micro Probe Study
                      Started.
          (b) Phase 2 - Scheduled for compietion about the end of February,
                1987.

l l

                -
                      Finite Element Analysis
                -
                      Basic Stress Analysis
                                                                           -
                                                                           .
                      Complete.   Primary stresses 8500 psi, secondary thermal

,

                      stresses 5000 psi. Code allowable 15,000 psi primary,

j 22,500 psi primary plus secondary. _ , i

                                                  *
                                                .

i

                                                                             g

'

                                                                                 .
                         -                - --     _-- -
                                                                            . _ _        . _ .                                                                       . . _ . .           _ ._      _ _
        '
    .
      ~
    -
                                                                                                                                17

f

                                                          (c) Phase 3 - Scheduled for completion about mid-March,1987.
                                                                                  -
                                                                                        Establish J-Resistance Curves tad perform detailed

,

                                                                                        fracture mechanics analysis.
                                                                                                                                        '
                                                               !
                                                                    _                   Contract is being finalized. FAA will have basic
                                                                                        contract. Material Engineering Associates (MEA) will
                                                                                        be used as a subcontractor.
I
                                  (2) NRC
                                                          The NRC has hired Brookhaven National Laboratories to perform an
                                                          independent metallurgical analysis of the failed elbow. The
                                                          tests being conducted are essentially the same as the VEPCO
                                                          Phase 1 tests. Tests are scheduled for completion about the same
                                                          time as the VEPCO Phase 1 tests.
                     10. Chemistry - Corrosion
                         a.       Introduction
                                 A Region II chemistry specialist / inspector visited the Surry site
                                  on December 22-23, 1986 to examine the sections of the feedwater
                                  suction lines from both units that had been exposed by the licensee
                                  subsequent to the rupture in Unit 2. The inspector also reviewed
                                  chemistry data that had been documented since the startup of Unit 2
                                  in 1973 to assess the chemistry control of the secondary water system
                                 during the operational history of this unit. Based on the information
                                  that is summarized below, the inspector evaluated the licensee's

-

'
                                  preliminary theory that the pipe rupture was the result of extensive
                                  erosion / corrosion of the 18-inch suction line to a feedwater pump,
especially in the vicinity of the intersection of this pipe and the

i

                                  feedwater header.
                         b.       Inspection
                                                                                                                                                                   "
                                  (1) Visual Inspection

! (a) Unit 1 - On December 21, 1986, the licensee had cut out

'

                                                                                  the suction line to A feedwater pump from, and including,
                                                                                  the junction with the feedwater header to, and including, the
                                                                                  isolation valve. The upstream portions of this pipe had been
                                                                                  further separated and stored indoors while the downstream
                                                                                  segments had been stored in'the open overnight.
                                                                                  The most significant observations were as follows:
                                                                                  -
                                                                                       An adhesive black film, conside, red to be Fe 034

i (magnetite), covered the inner ' surface of the junction

                                                                                        segment (i.e., approximately four feet of the header and

'

                                                                                        the 18-inch pipe past the. initial 90* bend) except in a
                                       '

, .-

                                                                                                                                                                                                 9
          . . . , _ _.      . _ . _ _ _ . . _ _ . , _ _ _ . _ _ _ _ _ . _ _                      - _ . _ _ _ . , _ . , _ _ - . . - . _ . _ , _ , , _ _ _ _ _ . - .             _ _ - . _      -_       _ _ _ , , _ . - .
      *
 .,
    *
  .
                                                                  18
                                         limited region in the lower part of the 90' bend. A
                                 -
                                         similar patch of black oxide was located on the surface
                                         of the second bend. Although there were small areas of

. black oxide in the other portions of the suction line,

                         ,
                          *
                                         most inner surfaces were covered with a thin layer of
                               _
                                         red powder that was assumed to be Fe O2 3 (hematite).
                                 -
                                         The weld bead that formed the inner junction of the
                                         header and 18-inch pipe had been worn smooth on the
                                         downstream side, and significant (approximately
                                         one quarter-inch) amounts of weld metal had been lost.
                                 -
                                         The weld bead joining the upstream segment of the
                                         18-inch pipe to the first elbow had also been worn
                                         smooth except in the quadrant approximating the outer    *
                                         portion of the bend in the elbow.
                                  -
                                         The weld discussed above also exhibited a scallop shaped
                                         depression that indicated a limited region of signifi-
                                         cant loss of metal. This gouged area was located
                                         in both the weld bead and adjacent pipe approximately
                                         90 degrees from the direction of flow in the header.
                                  -
                                         An indication of a scratch or gauged area, approximately
                                         0.5 inch x 12 inches was observed in the isolated black
                                         region on the top (horizontal) side of the second elbow
                                         from the header.
                    (b) Unit 2 - After tne 18-inch suction line ruptured the licensee
                                  had cut out this line at the tee weld at the header and five
                                  feet downstream of the first elbow from the header. The
                                  section of pipe that was removed included the failed region
                                  and the 2-ft. x 3-ft. hole formed by the expulsion of the

! weakest section of the first elbow.

                                  The exposed openings in the header and the 18-inch suction
                                   line had been capped with plastic for protection against
                                  dust.
                                 The most significant observations relating to the feedwater
                                  header and the remaining section of the suction pipe are
                                   listed below:
                                  -
                                         Approximately one inch *of water remained at the bottom

( of the header, and evidence of fresh rusting was

                                         observed beneath the water.

I

                                                                           !
                                                                       '
                                                                     ,
                                                                                               Q
        , - . . . -  , . - - .              , . . - , , , . , , .
        *
    .
      *
    ,                                     19
                     -
                           The entire length of the header from the upstream
                           elbow to the most distant section downstream that
                           was visible with a flashlight was coated with red
                           iron oxide. The layer of oxide was not deep,
                ,          however, and appeared as a film over roughened iron
                 +
                   _       and was easily wiped off.
                     -
                           The nearest elbow on the header upstream from the
                           opening was black in color.
                     -
                           The downstream region of the inside bead of the weld
                           head that held the 18-inch pipe to the header was gouged
                           out in the same manner and location as observed in
                           Unit 1. Also, as in Unit 1, this weld bead had been
                           worn smooth with the pipe except on part of the upstream
                           side.
                     -
                           A concave area of approximately two inches in diameter
                           had been formed immediately below the weld in the
                           remaining stub of the 18-inch pipe.
                     -
                           The inner surface of the initial foot of the downstream
                           run of the suction pipe was red in color while the
                           remainder of the visible portions were black. The line
                           of demarcation was very sharp.
               (c) Evidence of thinning
                     The licensee had completed detailed ultrasonic tests of the
                     Unit 1 suction line to A pump so that profiles of pipe
                     thickness were available to the inspector. These profiles
                     and visual evidence of thinning at the ends of cut out
                     sections of this 18-inch pipe showed clearly that widespread
                     wastage had occurred from the header to several (approxi-
                     mately 5) feet downstream of the first elbow from the header.
                     However, the thinning was no,t evident from the inner surfaces
                     of the pipe beer.use the loss of metal had been very uniform,
                     as if polished with coarse emery cloth, even where the pipes
                     were red in color. The degradation of the welds at the tee
                     junction and the single gouged region in each unit were the
                     only obvious indications of metal having been removed in a
                     non-uniform fashion.
          (2) Audit of Chemistry Records                                       ,
               The inspector reviewed archived documentation of daily analyses of
               the condensate, feedwater, and reactor coolant from the startup of
               Unit 2 (March 1973) until the unit was sh,utdown in February 1979.
                                                     ,'

+o

  -                                                                                 - - - - - - - - , . ,
                                         .                                                 -. .
                    .
             .
                  '
            .
                                                                                      20
                              Through previous inspections, the inspector was already familiar
                         '
                             with the licensee's chemistry control subsequent to the replace-
                             ment of the steam generators in Unit 2; i.e., from 1980 to the
                              present time.
                                                                                         '
                                    4
                             As'_one of the first nuclear power plants constructed in the United
                              States, both units at Surry began operation with a chemistry
                              control program that included the use of hydrazine to control the
detrimental effect of dissolved oxygen - as an oxidant of carbon
                              steel pipe. For two years the licensee also had added phosphate
                              salts to the feedwater to control pH and to prevent attack of the
                              carbon steel by hydrogen ions. In 1975 the phosphate control

l

                              program had been discarded in favor of the use of ammonia in an
                              effort to minimize or eliminate denting of the tubes in the steam
                              generator. During part of 1976-1977 cyclohexamine had been also -
                              added for pH control but was soon replaced by the use of morpho-
                              l i ne.. When the units started up after replacement of the steam
                              generators, the licensee, following the recommendation of the
                              Steam Generators Owners Group (SG0G), based the chemistry control
                              on all-volatile-chemical treatment (AVT) with hydrazine and ammonia.

'

                             Because of the original design of the Surry units (copper-alloy
                             condenser tubes, absence of a condensate cleanup system, copper-
                             alloy feedwater heater tubes) and the relatively high salinity of
                              the condenser cooling water, control of secondary water chemistry
                              had been difficult, as indicated by the following examples:

l

                             -
                                           Intrusions of chloride ions in concentrations of tens of

i

                                           parts per million (ppm) occurred several times in 1973,

I 1975, 1977, and 1978 as the result of condenser tube

                                           failures. (The current upper limit recommended by the SGOG
                                           to prevent corrosive attack of iron pipe is 20 parts per
                                           billion (ppb)).
         '                   -
                                           During four weeks in 1975 the pH of the feedwater remained
                                           below a value 8, and thus ingreased the vulnerability of
                                           carbon steel pipe to corrosion by hydrogen ions (acid).            The
                                           SGOG recommends that the pH of the feedwater be maintained
                                           between 8.8-9.2 in ferrous / copper systems such as were
                                           present in the Surry units prior to 1980.            In systems that
                                           do not contain copper components, the SGOG recommends that
                                           the feedwater be maintained in a more basic condition (pH
                                           of 9.3 to 9.6) to increase the electrochemical stability'of
                                           iron in water and to minimize the dissolution of iron through
                                           reaction with hydrogen ions (acids).
                             -
                                           During the period when cyclohexamine was used, the pH of
                                           the feedwater exceeded 9.5 and, occasionally even 10.0.
                                           Although the higher pH benefited the! reduction of iron
                                           corrosion, it also caused accelerated corrosion of the
                                           copper-bearing alloys in the co,ndenser and feedwater heater
                           '
   .
 . - --,~._,_____-_,,,,_     . - _ . _ -         _ _ _ ...__ _ __ , - _ . __ _ _ -_.-
                                                                         . .- .-              .
       .
   .
     .
   -
                                                                                                21
                                                     tubes. Inasmuch as copper ions in solution exacerbate
                                                    .several forms of chemical corrosion of carbon steel and alloy
                                                     600 (Inconel), the SGOG recommends that the concentration of
                                                     copper in feedwater be kept below 2 ppb. The presence of
                                               ,     higher concentrations of copper in the feedwater of the Surry
                                                 _   units before 1980 was considered to be a major cause of the
                                                     degradation of the original inconel steam generator tubes.
                                                     The licensee replaced the copper alloy condenser tubes with
                                                      titanium during the steam generator replacement outage but is
                                                      only now planning the replacement of the feedwater heater
                                                      tubes with non-copper alloys.
                                            -
                                                      Throughout the operational history of Unit 2 the licensee had
                                                      observed the concentration of oxygen in the condensate and
                                                      feedwater to have been less than the limit detectable by the
                                                      most sensitive analytical instrumentation (except during 10
                                                      days in 1975 when, because of seal failures, the concentra-
                                                      tion of oxygen increased to approximately 20 ppb.) The
                                                      inspector considered that the lowest detectable limit had
                                                      been 0-10 ppb during this period - which is consistent with
                                                      the limiting concentration, 5 ppb, currently recommended by
                                                      the SGOG. Control of oxygen had been maintained by the
                                                      addition of hydrazine; however, during much of the early
                                                      operating history the residual concentration of hydrazine had
                                                      been close to the detectable limits (approximately 5 ppb).
                                                      Currently the licensee adds sufficient hydrazine to ensure    -
                                                      that the residual is greater than 20 ppb, as recommended by
                                                      the SGOG, so that oxygen is quantitatively reduced and elimi-
                                                      nated as an oxidant.
                          (3) Conclusions

l The tee and upper elbow of the 18-inch pipe to the A feedwater l

                                            pump in both Surry units were visually observed to have been

! degraded through extensive thinning and severe, but localized, ( gouging. However, the interrelationship between the roles of l corrosion and erosion was not clear. The degree to which the I feedwater pipe had been protected against general corrosion by a

                                             film of magnetite was difficult to establish because the pipes
                                            had been opened and exposed to moist air. Although general
                                            corrosion, as well as more localized forms of chemical attack,
                                            may have been aggravated by the occasional presence of corrosive
                                             impurities in the feedwater during the initial seven years of
                                             plant operation, there was no visual or ultrasonic evidence to
                                             support this speculation. A more comprehensive analysis of this
                                             subject is presented in the Appendix to this report.
                                                                                                      !
                                                                                                   .-
 .

,

       , . - . . , - - .-
                          _ . _ . , - - , .        - .--,-,.,-.--,-.---.-_-------- --_- .-- ,
                                                                                                                                                             -
                        *
                    .
                      .
                    *
                                                                                                       22
                          11.    Items Which Could Have Contributed to the Likelihood or Severity of the
                                 Event
,                                a.      General
                                                                                                             '
                                          The inspectors reviewed system operating procedures, system maintenance
                                          history and the operating status of selected systems to determine those
                                          factors which contributed to the closure of the C steam generator
                                          main steam trip valve (MSTV TV-MS-201C) and the subsequent reactor trip
                                          and feedwater pipe ruture.
                                          (1). Plant Service Air / Instrument Air System (SA/IA)
                                                    The inspectors reviewed control room logs, interviewed control

i

                                                    room operators and examined equipment in the plant associated
                                                   with SA/IA system. This system supplies air to the air operated
                                                   MSTVs. The air pressure supplied to the air operated cylinders
                                                    associated with each MSTV holds the MSTV open during normal plant
                                                    operation. The air pressure is automatically vented off the
                                                    operating cylinders following a trip signal or manually vented by
                                                    the operator action. The MSTV will then shut, assisted by the
                                                    steam flow acting on the value disc. Prior to the reactor trip,
                                                    the operating status of the SA/IA system was as follows:
,
                                                    SA/IA blue auxiliary air compressor was in operation; the three
                                                    turbine building air compressors were in automatic mode, one was
                                                    off; one of the condensate polisher air compressors was floating

i on the SA/IA system. System pressure indications as observed from

                                                    the control room was approximately 100 psig (normal operating
                                                    range is 95-110 psig).

I

                                                    Planned maintenance was being performed on the SA/IA grey
                                                    auxiliary compressor which consisted of the installation of a new
                                                    temperature sensing element. Following this maintenance, the grey
                                                    compressor was scheduled to be placed in service. Both the blue
                                                    and grey air compressors share a. single power source. In order to
                                                    position the transfer switch from the operating blue compressor to                                                       '
                                                    the grey compressor, the electrical power supply is required to be
                                                    deenergized. Control room operators were aware of these operations
                                                    and were adjusting air flow from the condensate polisher air
                                                    system. System pressure decreased to approximately 85 psig as both
                                                    blue and grey compressors were deenergized.
                                                   At the time of the reactor trip, control room operators noted that
                                                    SA/IA system pressure was approximately 78 psig.                                                           Subsequent to
                                                    the reactor trip, the blue air compressor was placed back into
                                                    service.
                                                                                                                                                           !

! ,'

           .
                                                                                                                                                                           _
  _ , _ _ _ . . - -        _
                              _ .. . ,m_       . - _ _ . _ - . . _ . , - - - . - . . , , - - - - - - . - - , . - - - . - - _ - - _ _ _ . - - - - - . . - -
              _ _ _ _ _   _  ___                                   _ _ _ _    _______ _           _                   _ __   _ _ _ . _
                        '
            .
                  .
            '
                                                                           23
                                                                                                                                         1
                                 Discussions with control room operators indicated that operating                                       ;

, experience has shown that SA/IA receiver pressure has decreased as ' low as 55 psig without any MSTV closing. As noted by this

                                  event, the only MSTV to close as a result of the lower instrument
                                  air pressure was the C MSTV.
                                                                                                                                         I
,                                The inspectors reviewed operating procedures for the SA/IA system.
                                 Discussions were also held with operators to determine adherence
                                  to procedures; no problems were identified.

' During December 15-19, 1986, the licensee tested and opened for

                                  inspection the C steam generator MSTV. The detailed inspection
                                 and testing of the valve and the results are discussed in a
                                  separate paragraph in this report. The problem discovered during                                     ,
                                  this inspection, however, showed that the valve disc operator                            -

.

                                  assembly had previously been assembled incorrectly and permitted
                                  the~ valve disc to be positioned in the steam flow path at an
                                 angle greater than that allowed by design. This condition,

j coupled with the drop in SA/IA system air pressure prior to the

                                  reactor trip, appeared to have allowed rapid closure of the MSTV
                                 by steam flow forces.                                                                                 '

'

                                  Following the event, soap bubble air leak testing of instrument
                                 air piping and components to the C MSTV was conducted under
                                 normal system pressure condition. No significant leakage was
                                  identified that would have affected MSTV air operated cylinder

,

                                 operation.
                            (2) C Main Steam Trip Valve (MSTV).
                                 The action which initiated the reactor trip and subsequent

i feedwater rupture was the inadvertent closing of the C MSTV. I A review of the maintenance history indicated this valve was I

                                 overhauled during the most recent refueling outage in November

i i

                                 1986. On November 27, 1986, following the overhaul, the valve

'

                                 position limit switch was adjusted and the valve was cold-cycled
                                  satisfactorily per Periodic Test 14.2.                  On November 29, 1986, with
                                 Unit 2 in hot standby, the C MSTV was again cycled, and the
                                 valve failed to open fully. The reactor operator generated a Work
                                 Order 046251, which indicated that the C MSTV was binding and
                                 capable of only partially opening. That same day, November 29,
                                  1986, it was determined that the cause of the C MSTV was nots
                                 fully opening because of water in the valve. The next operating
                                 shift drained the water and successfully cycled the valve on                                           '
                                 November 30, 1986. However, Work Order 046251 remained open
                                 because the valve appeared to operate somewhat differently from
                                 the other MSTVs, even though it met its intended safety function
                                 as required by Technical Specifications.
                                                                                           '
                                                                                           .
                                                                                        e
       =
  _. . _ _ _ _ _ _                      . _ _ _ _ _ _ _ _ _ _ _ -_                                  _ _ _ _. _ ._ _ _
                                                                                                                                    ___         _ _ _ - _ _ , _ _ .
           .
    .
         .
    .
                                                                                24
                                              Following the event and the initial AIT inspection, the C MSTV

,

                                             was released to the licensee for inspection and testing. The
                                              licensee developed a detailed testing and inspection program
                                              to determine the cause of the valve's inadvertent closure.
                                              The results of this program are as follows:
                                                   Prior to disassembly, the valve was cycled and determined
                                                   to only open approximately 62 degrees. Normal full open
                                                   position should be 80 +2 degrees. Disassembly of the valve
                                                   revealed the valve cover had been installed one stud or
                                                   approximately 15 degrees off. This cover has a stop tube
                                                   welded to it which normally limits valve disc travel to 80
                                                   +2 degrees when going full open. With the cover installed
                                                   approximately 15 degrees off, the stop tube was positioned
                                                   such that it limited the disc travel to only 62 degrees which
                                                   left the disc approximately 25% from the full open position,
                                                   exposing the disc to the closing force of main steam flow.
                                                   This pragram also revealed that the radius lever had been

i installed on the rock shaft one spline tooth off, which would !

                                                   have limited valve travel to 75 degrees had it not been for
                                                   the valve cover misalignment. This also would leave a
                                                   portion of the disc exposed to the closing force of the steam
                                                   flow. The misalignment of the radius lever also contributed
                                                   to the failure of the C MSTV closed limit switch to indicate
                                                   that the valve had closed. During testing, the licensee
                                                   determined that placement of the radius lever up one spline
                                                   tooth prevented the limit switch from fully engaging in the
                                                   closed position. A maintenance history review revealed that

l the limit switch was adjusted before the valve was retested

                                                   after maintenance. This adjustment appeared to be on the

i '

                                                   lower limit switch, but a complete determination of what was
                                                   actually adjusted could not be made dua to lack of documenta-
                                                   tion. The operation of the closed limit switch was deter-
                                                   mined to be intermittent. During the cold and hot cycle, the
                                                   switch was depressed enough ,to actuate. But during and
                                                   following the event, the switch, even though engaged, was not
                                                   depressed enough to actuate, although only slight additional
                                                   movement caused the closed limit switch to actuate.
                                             Several observations can be made based on the licensee's inves-
                                             tigation into the C MSTV closure. The maintenance procedure
                                             MMP-C-MS-002 used for overhaul of C MSTV was not correctTy '
                                             followed. The procedure was inadequate in that it did not
                                             prevent, nor did the post maintenance testing discover the
                                             improper assembly of the C MSTV. The licensee failed to
                                             document all the non-routine work associated with this valve
                                             overhaul. A review of MMP-C-MS-002 shows that step 5.4.8 which
                                             reinstalls the radius levers does not prdvide adequate instruc-
                                             tions to maintenance personnel or quality control (QC) inspectors
                                                                                                                            *
                                                                                                                        .
 ~~
                                                                                                                                                                      .
      __     __ _ _ _ _ . _ _ _ _ _ . _ __ =        _ . _ - . - _ , , _ . _ . _
                                                          -
                                                                                _ _ . - _ _ _ , , _ . _ _ _ , _ _ . - _ _ - _ _ _ _ . , . _ , ,                     - - _ _ _ - . - , , _
     '
 .
   .
 -
                                     25
           as to the proper reinstallation alignment. Investigation by the
           licensee revealed that the maintenance person reinstalling the
           valve decided, based on comments from a QC inspector, to reinstall                                    ,
           the radius lever up one spline tooth from the previous installa-
           ti,on. This decision was made without any documentation or
           engineering review. This decision alone resulted in limiting
           valve travel to only 75 degrees exposing the disc to steam flow
           and appears to be the cause of the failure of the closed limit
           switch to operate.
           Step 5.4.12 required the QC inspector to check and record the arc
           of valve travel. The recorded data was 80 degrees - although
           the licensee determined after the event that it was only 75
           degrees. The inaccurate documentation appears to be a result of
           the QC inspector performing this verification by visual check                                       <
           only. Since the step calls for a quantitative result, the step
           should have required that some type of instrumentation be used to
           determine the arc of the valve travel. Also, the QC inspector
           should not have documented it as 80 degrees unless there was a
           means of precise verification.
           Although Step 5.4.15 required replacement of the valve cover, the
           step does not mention anything about cover alignment; specifi-
           cally, there is no mention of any problem that cculd result from
           cover misalignment. This would have illustrated the importance of
           proper alignment. The inadequacy of the step resulted in the
           misalignment of the cover, preventing full travel of the valve
           disc, and leaving the disc exposed to the closing force of steam
           flow.
           Finally, step 6.3 requires a post maintenance test be performed
           which only tested the operation of the valve based on the open and
           closed limit switches. This test, PT-14.2, does not verify full
           valve disc travel, and therefore was not adequate to verify proper
           valve reassembly. However, it should be noted that the test was
           adequate to verify the safety function of the valve which is to
           close. Also this test was used to verify that the valve was in
           compliance with Technical Specifications.
           The fact that the C MSTV was reassembled so that the disc was
           always exposed to the closing forces steam flow, coupled with the

'

           low air pressure, resulted in the inadvertent closure of the C
           MSTV.    This inadvertent closure of the C MSTV resulted in a
           reactor scram but did not contribute to or cause the rupture of
           the main feed piping. This rupture would have happened during any
           normal pressure transient of the feedwater system. Even though
the inadvertent closure of the C MSTV did not cause the feed

! line rupture and the safety function of t,he valve along with

                                                   -
                                                 .
         3
                                                                                                             9
       .                                                - - - - . - - . - _ . - - . _ , _ - - . . - - . - _.       .
                                                      _ . __
           *
   .
         '
   .
                                                             26
                         compliance witti Technical Specifications were verified, the
                          fact.that the valve was reassembled in such a way that it resulted
                         in an inadvertent reactor scram and a challenge to the unit's
                         safety system is still a significant problem.
                         TkchnicalSpecification6.'4.Arequiresthatdetailedwritten
                         procedures with appropriate check-off lists and instructions shall
                         be provided for preventive or corrective maintenance operation
                         which would have an effect on the safety of the reactor. The
                         failure of the licensee to fully follow procedures, provide
                         adequate instruction for and document the performance of maintence
                         operations involved in the performance of the procedure to over-
                         haul the C MSTV will be identified as Violation 50-281/86-42-02.
                    (3) Feedwater Pump Discharge Check Valve (No. 2-N-127)
                         Dur,ing the initial investigation of the feedwater pipe rupture
                         event, an abnormal pressure transient of the A MN pump suction
                         piping was suspected to be the cause of the rupture. For such a
                         pressure transient to occur, the A MN pump discharge check
                         valve (2-N-127) would have had to be permitted flow in the
                         reverse direction. Since this was a potential cause of the pipe
                         rupture, a review of the maintenance history and an internal
                         inspection was conducted on the check valve (2-N-127).
                         A review of the maintenance history on this particular check valve        -
                         revealed that the valve was scheduled to be inspected in late
 '
                         1984. The licensee decided not to inspect the valve, based
                         on a satisfactory inspection perforced on a Unit 1 feed pump
                         discharge system check valve and on the operational history of the
                         valve. It should also be noted that during the startup prior to
                         this event, the B main feed pump was operated with the A main
                         feed pump secured. There was no mention of a problem with high
                         feed pump suction pressures, and the A main feed pump was
                         started successfully on December 5, 1986.
                         The licensee disassembled 2-N-12'7 after the event.           Inspection
                         of the internals showed the disc was not fully seated. One of the
                         two hinge pins was missing, and the valve seat was displaced. The
                         condition of the check valve at the time of the inspection would
                         have allowed for flow in the reverse direction. The licensee has
                         been able to determine, based on the operation of the A and B
                         main feed pumps, that reverse flow tarough the A main feed p~ ump
                         did not occur at the time of the' event. As discussed in the
                         sequence of events paragraph that the A main feed pump was still
                         operating after pipe rupture.          Therefore, flow past the check
                         valve into A feed pump suction piping could not have occurred
                         prior to the pipe rupture. This conclusion strengthens the
                         supposition that the feed water pipe ruptfured during a normal
                         pressure transient and that back flow past the chec' valve did
                         not cause a pressure spike which resulted in the pipe rupture.
                                                                                                 .

t

     - .     -.       ,_     , _ - - . . . - _   ,
                .-7                            -   ,_
                                                      __     _          _
      -
  .
    *
  .
                                           27
                However, the condition of the check valve would have contributed
                to the amount of feed water which exited the feed line break
                and possibly the extent of the pipe whip after the event. The
                 licensee has inspected the other Unit 1 and Unit 2 feed pump
                ch;eck valves and discovered additional discrepancies (see para-
                graph 15.c.). The condition of each of these valves at the time
                of inspection was such that they would have performed properly and
                not allowed significant reverse flow.
           (4) Feedwater System Maintenance History
                A review of recent feed water system maintenance history did not
                 reveal any identified problems with the A or B main feed pump
                 suction piping. The licensee has identified some problems with
                the feed water system such as pin hole leaks which were associated

'

                with erosion, but these problems were located in the feed water
                pump, discharge recirculation piping. While the licensee did not
                have a program to inspect the feedwater piping for thickness, it
                does have a formal ultrasonic inspection program to determine
                 thickness for the following secondary system areas:
                -
                       Turbine Exhaust Cross Under Piping
                -
                       1st and 2nd Point Extraction System
                -
                       3rd and 4th Point Extraction System
                -
                       Moisture Separation Drain Liner
                -
                       Moisture Separator Reheater Inlet Piping
        - (5) Safety System Equipment Review

! A discussion with the Superintendent of Operations and a review of

i
                 pertinent documents - i.e., plan of the day, the tagging log, the
                 reactor operator's log, the shift. supervisor's log and the minimum
                equipment list for criticality and power operation checklist--
                 indicated that all safety-related equipment required to support
                 unit operation was operable.    The only safety-related equipment
                 problems indentified prior to the event were (1) the inoperability
                of one of the three charging pumps (only two are required to be
                 operable by technical specifications); and (2) a service water
                 pump which was operable but listed in an alert condition.       '
                 During the event, all safety systems responded as required.
                These systems include the operation of the reactor protection

a

'
                 system (RPS), the steam generator safety relief valves and the
                 auxiliary feedwater system. The secondary power-operated relief
                                                           -
                                                         .
                                                                                   Q
                                                                                     .e>-ww- w---- - - - v-v--
       _       _ _ .     _      _      __              . _ _ _ _        _  _      . .        -
                                                                                                 . _ _ __ _ .- _ ._
             *
         .
           *
         .

'

                                                                     28
                                          valves (PORVs) were in the manual mode of operation. The opera-
                                          tors.took manual control of the secondary PORVs to control steam
                                          generator pressure, allowing the secondary relief valves to shut
                                          and to control the removal of decay heat in the primary plant.
                                            _
                                                                                                                    ,
The only equipment which did not respond as required was (1)

'

.
                                          control rod (M-10) which indicated 35 steps for a short time
                                          following the reactor trip before indicating fully inserted;
!                                         (2) the fire protection system which spuriously initiated as
                                          discussed in paragraph 13; (3) the instrumentation which failed
,
                                          to indicate closure of the C MSTV as discussed in paragraph

6

                                          11.a.(2); and (4) the security door card readers which failed as
                                          discussed in paragraph 13.b.

t b. Review of Maintenance Activities Being Performed Prior to the Event

                                  Discussions with licensee personnel and review of the maintenance
activities being conducted prior to the event did not indicate any

]' maintenance activities which would have contributed to the initiation

                                  or resulted in the feed water pipe rupture. Maintenance activities

j being conducted by the individuals who were injured were unrelated to l the feed water system rupture and would not have contributed to the

                                  cause of the event.

i

                     12.   Licensee's Response to the Event

4

                           a.     Operator Response
                                  The response of the operators to the initial reactor trip and later
                                  pipe rupture was excellent. The break was isolated rapidly. The only
!                                 problem that occurred was a control rod gave an indication of not

i being fully inserted by 35 steps. Emergency procedures were followed i quickly and orderly to assure adequate shutdown margin. It should be

                                  noted that the licensee has conducted tests with the plant in a cold
                                  condition, but has been unable to duplicate this rod position

i ' anomaly. The licensee intends to conduct additional testing during

                                  startup.
                           b.     Emergency Response
                                  The inspectors discussed various aspects of the licensee's response
                                                                                                           ~
                                  to the feedwater pipe rupture with licensee employees. The first
                                  person responding to the accident was a senior instrument technician
                                  who had been perfor'ning quarterly calibrations on security equipment.
                                  He responded to a station security call for first aid assistance to the
                                  Unit 2 truck bay. Upon arrival, one injured employee was observed
                                  leaving the accident area. The technician escorted the individual to
                                  the high level intake structure and set up a triage area. Three                   .
                                  additional personnel subsequently exited the decident area and were               '
                                                                                .
                                                                              .
  6 .n
                          _      _ _ _ _ . _ _ _ _ _ _                       _ _ _ _ _ _ _ _ _ _ __               _     ___     _- _ _
                                                                                                                                       l
        .
    .
      .
    -
                                                                         29

. i

                                      given first aid by the team that was present. The technician unsuc-
                                      cessfully attempted to contact the Unit 2 Control Room using a security
                                       radio. The technician then proceeded to the maintenance services area
                                       to call for assistance. Upon arrival, the technician discovered two
                                      additional accident victims. The technician used the plant page system
                                                                                                                                       ,
                                                       '
                                                                                                                                       j
                                       to notify the control room who called in offsite medical support,                               i
                                       including two medical evacuation helicopters and two local rescue
                                       squads.
                                      The licensee prepared the victims for transport and moved them to the
                                       licensee's heliport, located behind the training building. The three

i

                                      most seriously injured personnel were air evacuated to hospital burn
                                       units while three were transported by ambulance.
                                       Licensee personnel interviewed following the event have stated that                      <      !

, the site's emergency team functioned extremely well and was well -

                                      coordinated. Further, licensee representatives have stated that the

i Alert was declared so that a personnel accountability could be made i because it was not kncwn at the time of the event how many people

                                       had been in the area when the feedwater pipe ruptured.

.

                                      The inspector reviewed the actions required by the licensee's emergency
                                      plan and determined that the actions taken by the licensee were in

4

                                      accordance with the actions specified in the plan.

! c. Emergency Information Activities '

                                      The accident spurred extensive interest from the media in the immediate
                                      plant area, throughout Virginia,=and-nationwide. Virginia Power issued - -
                                       its first press release slightly more than an hour after the declara-

! tion of the alert. This initial announcement was followed by several

                                      others later in the day and into the evening.                     Follow-up announcements
                                      were issued the next few days. In accordance with the company emer-
                                      gency information policy, Virginia Power began steps to open the
                                       near-site media center in the Surry, Virginia, Community Center.

4

!                                     Because the Alert was cancelled before,the media center was fully

l operational, reporters were briefed at the emergency operations !

                                       facility at the site. Virginia Power also opened its main media center

i at company headquarters in Richmond and issued information from there

                                       for several days thereafter.
                                      The day after the accident press conferences were held at noon at.the
                                      on-site training facility and at the Richmond media center. An NRC

l public affairs officer went to the site with the Augmented Inspection i Team. He answered telephone media inquiries from the resident

                                       inspector's office and participated in three press conferences with
Virginia Power. NRC also responded to inquiries received by the public
                                      affairs offices in the Region II office and in, Headquarters.

1 . .

'
                                                                                                    .
  -

,

                                                                                                                             ,
         -----.,,n---,-,_,.--                            -,,
       '
   .
     .
   .
                                                     30
                  In addition to written announcements, news briefings, and answers to
                  telephone inquiries, Virginia Power also made available to reporters
                  both videotapes and still pictures of the accident scene.
                  Both NRC and Virginia Power continued for several weeks to respond to
                  media 'imquiries about the accident and the followup investigations. A
                  briefing of NRC by Virginia Power on January 12, 1987, attracted media
                  coverage, as did a technical meeting convened in NRC Headquarters on
                  January 15. Virginia Power on January 22 held a special media briefing
                  on the results of its investigation. NRC received numerous requests
                  from reporters and for copies of the AIT report.
         13. Aspects That Made Handling The Event More Difficult
              a.  Security System / Personnel Actions
                  (1) At,the time the pipe ruptured, water and steam saturated a
                        security card reader located approximately fifty feet from the
                        break point and shorted out the entire plant card reader system.
                        As a result, key-cards would not open plant doors. Security
                        personnel responded to the control room and provided access
                        control while doors into the control room were opened for easy
                        access and to improve control room ventilation. Guards admitted
                        personnel on the basis of personal recognition. The Senior
                        Resident Inspector reported observing that plant management and
                        operations personnel were immediately admitted by the guards and
                        nonessential personnel were excluded. The card reader system
                        returned to service approximately 20 minutes after the pipe break
                        and functioned normally thereafter. An operator reported being
                        delayed in the stairway outside the control room as a result of

I the card reader failure. Due to the hot water conditions on the

                        turbine building basement floor and the discharge of Halon fire
                        suppression system in the emergency switchgear rooms below the

! control room and the carbon dioxide fire suppression system in the

                        cable tray rooms above the control room, the operator had no safe
                        way to exit the stairway other than the control room itself. The

l operator was admitted to the control room by someone opening the l door from inside the control room. The licensee is considering * ! installing electronic override switches which would permit the ( opening of electronically locked doors in emergency situations. l l Plant management personnel reported that security provided fast

                        and excellent support during the emergency.
                                                                                      '
                  (2) The security radio repeater is. located in cable tray room 1
                        (turbine building elevation 45), which is equipped with a Cardox
                        fire suppression system. As a result of steam infiltrating
                        various electrical systems this Cardox system was activated and
                        the full volume of Cardox was discharged!into the room. The
                        security repeater, located approximately five feet from a Cardox
                        discharge nozzle, failed and was la,ter found to be covered with a
 .

l

                            ._- ___ _  -__      _ _ _ _ - _
                                                                . ___ _.. _ -___-_.-.     - _ _ _ _ - - _ _
                            -                                                               _ - - _ . .    -                --
         *
      .
      .'                                       31
                   thick layer of ice. As a result, security communications were
                   limited to the non-repeater or " simplex" mode. Since the hand-
                   held security radios have only four watts of transmitting power,
  ,
  '
                   some communications clarity was lost between units inside
                   buildings. Loss of the radio repeater may also have prevented
                   cohtact with the Unit 2 control room by the first responder as
                   described in paragraph 12.b.
              (3) A truck carrying water coolers containing ice was the only
                   vehicle admitted to the protected area during the emergency.
                   While the truck was processed expeditiously, it was not processed
                   as an emergency vehicle, which would have allowed its immediate
                   entry. This resulted from the lack of information available to
                   security personnel at the vehicle gate about the exact nature
                   of the emergency and lack of understanding that the truck was
                   bringing in ice and ice water for use in treating the burn
                   v i ct,i m s . The licensee has recognized the importance of ensuring
                   that personnel functioning in a supporting role know what is
                   happening so they may better understand and, therefore, better
                   respond to tasks they are given or situations as they arise.
              (4) One security badge /keycard was temporarfly lost during the
                   emergency. Badges were retrieved from five victims before they
                   were transported from the site, but the badge on one individual
                   was overlooked. As part of the personnel accountability process,
                   security realized that one badge, belonging to one of the                                                   -
                   victims, was unaccounted for. That badge was deleted from the
                   access control computer and computer records were checked to
                   ensure that the badge had not been.used since the accident.                                          The
                   individual's wife found the badge on his shirt at the hospital
                   and the badge was returned to the plant the morning following
                   the accident.
'
              (5) At the time of the pipe break, two security shifts were on duty,
                   which permitted security to provide a great deal of manpower to
                   support the plant. The inspector, determined that one security
                   shift could have provided the manpower to perform the actions
                   taken by security during this event. The security force, however,

'

                   would have had to suspend all routine activities if only one
                   shift had been available.

'

.
              (6) The Surry security organization has examined its performance
                   and identified ten areas in which improvements can and should be
                   made.      Recommendations in these areas were submitted to both
                   security and plant management for evaluation and possible
                   implementation on December 19, 1986.
           b. Fire Protection System Actuations and Main Control Room Habitability
                                                                                          l
              Within minutes of the feedwater pipe rupture event in the Unit 2
              turbine building, portions of the Unit 2 turbine building sprinkler

I

              system actuated.     Sixty-two sprinkler hea'ds opened in the immediate
    .
                                                            - - _ - , . - - .- - - - - _ _              --
                                                                                                             . . _ _ - _
  -            . - . - - - -.       ~.    .  - -   . -    - . - - - - - - - - . -                    _ - -   .
           , -
       ,

4

!
         -
       ,
                                                                32

i

i                             area of the feedwater pipe rupture due to the high heat levels                   !

3 ' associated with the event. As they opened, these sprinkler heads ' immediately began discharging water to cool the turbine building

                              atmosphere.

, ! As a result of the sprinkler wa'ter and feedwater discharge, the carbon

                              dioxide and the Halon fire suppression system control panels were
                              affected. The carbon dioxide fire suppression system control panels
for both Units 1 and 2 cable tray rooms are located near the Unit 2

i cable tray room access door along the column line 9 wall on elevation j 45'-0". The sprinkler water discharge from the sprinkler heads

                              directly over and adjacent to these panels intruded into the carbon
                                                                                                               ,

1

                                                                                                               '
                              dioxide fire suppression system control panels through multiple open

i '

                              conduit ends which extend from the panels to the cable tray raceway
                              above. As a result, the water intrusion into these panels caused the -
                              time limit switches to short-circuit in the closed position. When

!

                              these switches closed the carbon dioxide fire suppression systems, at

i approximately 2:32 p.m. (12 minutes into the event) the Robertshaw fire l protection panel / printer in the main control room recorded the initial

                              discharge of the Unit 2 cable tray room carbon dioxide fire suppression

j system. In addition, at approximately 2:34 p. m. (14 minutes into the l'

                              event) the Robertshaw panel recorded the second discharge of carbon
'
                              dioxide into the Unit 2 cable tray room. It should be noted that the
                              bulk of carbon dioxide discharge was in the Unit I cable tray room,

-

                              which was noticed by the licensee's loss prevention staff who c'onducted

i '

                              the personnel search and initiated the venting of carbon dioxide from
                              the cable tray rooms. The Robertshaw fire protection panel / printer did
                              not register a Unit I discharge throughout the duration of the pipe

.

                              rupture event. Thus, as a result of the water affecting the time

!

                              limit switches in the carbon dioxide control panels, the discharge
                              timers did not function as designed. As a result, a total of 17 tons

. of carbon dioxide was discharged into the cable tray rooms, i '

                              In addition, the Halon fire suppression system protecting Units 1

l and 2 emergency switchgear rooms on elevation 9'-6" actuated at approx-

                              imately 3:02 p.m. (42 minutes into the, event as documented by the

! Robertshaw panel printer). The Halon system actuation was caused j by sprinkler water discharge and feedwater runoff which flowed under

the elevation 27'-0" fire door No. 30 installed in the column line 9
wall. The water runoff cascaded down the column line 9 wall, which
                              separates Units 1 and 2 turbine buildings, on the Unit 1 side, entered
                              a Halon system conduit through a conduit fitting which had the fitting
                              cover plate removed at the time of the event. The specific conduit

3 fitting is located directly below the open grating floor on the Unit 1

                              side of the elevation 27'-0" column line 9 wall fire door No. 30. The

l runoff water which entered the subject conduit flowed through the j conduit and into Halon control panel 1-FPH-CP-1 located on the Unit 1 J side of the column line 9 wall on elevation 9'-6". This water intru- ! sion caused short-circuiting of the time limit!, battery charger and the t

                                                                                    *
                                                                                  .
    4=
                                                                                                           .
                                                                                                            -   - -
         '
     .
       .
     .                                                        33
                     dual zone modules. With the shorting of the dual zone modules, which
                     are associated with the manual remote actuation circuit located in
                     the control room, the Halon system actuated discharging 7 percent to                                  i
                     10 percent Halon concentration into the emergency switchgear rooms.                                   !
                                                                 '
                     Since H'alon extinguishing agent is heavier than air, thi, discharge
                     into the emergency switchgear rooms on elevation 9'-6" had essentially
                     no effect on the habitability of the main control room. Upon the
                     initial discharge of the emergency switchgear Halon fire suppression                                  i
                     system some Halon leakage into the main control room through floor
                     penetrations in the Unit I computer room and through the control room
                     emergency air bottle discharge piping was noticed. However, it should
                     be noted that these concentrations of Halon which resulted from the
                     emergency switchgear room discharge would not have put the control room
                     personnel at risk.
                     Upon verification of the carbon dioxide system discharge by the main
                     control room personnel, two nembers of the licensee's loss prevention
                     staff entered the cable tray rooms with self contained breathing
                     apparatus to conduct a search for personnel. As a part of this search,
                     measures were tsken to vent the carbon dioxide from the cable tray                                    ,
                     rooms by opening the doors to the Units 1 and 2 mechanical equipment                                  '
                     rooms and the respective cable tray room access doors located on
                     elevation 45'-0" of the Units 1 and 2 turbine buildings.                  In addition,
                     while the carbon dioxide was being vented from the cable tray rooms,
                     the main control room annex door in the turbine building / control room
                     complex wall and the main control room door separating the annex from
                     the main control room were blocked open. Thus, carbon dioxide being
                     heavier than air, flowed down from elevation 45'-0" to elevation 27'-0"
                     and into the main control room annex and the main control room through                                ,
                     the open doors. In addition, during the time the carbon dioxide was
                     being vented from the cable tray rooms, the main control room exhaust
fan (1-VS-F-15) was operating. The operation of this fan created e

i negative pressure in the main control room and the main control room

                     annex thus, causing the vented carbon dioxide to be drawn into the
                     control room complex.                         ,
                                                                                                                           i

1 ' Presence of carbon dioxide in the control room can also be attributed i

                     to the fact that at the time of the event control room ventilation                                    L
                ~
                     unit 1-VS-AC4 was out of service for design modifications and that a                                  l
                     temporary unit which obtained its makeup air from mechanical equipment
,                    room I was in service. Therefore, when carbon dioxide vented from the                                 !

l respective cable tray room came into the mechanical equipment room', l this allowed the te.nporary control room HVAC fan unit to draw the gas r I

                     into the control room ventilation system.
                     Control room personnel in the main control room annex and near the

1 main control room door experienced shortness of breath, dizziness and

                     nausea. But it should be noted that once theyl recognized that carbon                                 :
                     dioxide was present the control room operators took the appropriate                                   '
                     corrective actions and initiated control , room emergency air supply
                       '
  .-
                                                                                                         ,

I--~~.. _ _ - _ _ m , _.- - - ...__,,_..._,_-m.__.~... _ _ _ _ . _ . , _ , _ - _ ,

                                                                                                                    . m_-.
                       _.       .__. __          _                            . _ . _ .           _.     ..
              '
          .
            .
          .
                                                                                              34
                              fans 1-VSF-41 and 2-VSF-41. The starting of these fans placed the main
                              control room at a higher pressure than the turbine building. This

'

                              action assisted in diluting and exhausting the existing carbon dioxide
                              levels and kept any additional carbon dioxide from infiltrating into
                              themajncontrolroom.                                               .
                              As a result of the spurious fire protection system actuations associ-
                              ated with the feedwater pipe break event, the licensee has proposed
                              the following carbon dioxide /Halon fire protection system modifica-
                              tions:
                              (1) Seal the open ends of all conduits leading to the carbon dioxide
                                            system control panels throughout the plant.
                              (2) Replace all components within both the Unit 1 and Unit 2 cable
                                           tray room carbon dioxide control panels that show visible signs

q of corrosion. . !

                              (3) Fully test both systems to confirm proper system operation.

1 l (4) Seal the Unit I control panel. A 1-1/2-inch hole and a 1 inch

                                           hole exist in the right side wall near the bottom of the panel.
                              (5) Replace missing 2-inch conduit cover under the elevation 27'-0"

, '

                                           turbine building column line 9 wall platform and walk down all
                                           other conduits to ensure that covers to conduit, pull boxes, and
                                           junction boxes are in place and properly sealed.

i

                              (6) Repair door seal on the Halon control panel and relocate

! identification sign, i !

                              (7) Replace all existing Halon panel modules which are no longer

i manufactured and upgrade these modules to current state-of-the-art

                                           equipment

< j (8) Perform functional tests of the H.alon system for both units 1

                                           and 2 emergency switchgear rooms to ensure proper operation.
                             (9) Replace Halon system check valves in discharge lines or replace

j rubber seals. l (10) Have all Halon cylinder heads replaced or reworked to ensure, , bottles will not leak and that seals are in good condition.

                          (11) Have Halon bottles filled and placed in discharge header.
                          (12) Have Halon pressure switch covers and solenoid covers removed and

I

                                           inspect for corrosion or water damage. ,
                                                                                                       .
                                                                                                     .
                                  4
  ..

l '. * I <

   -- - -       . - _.     . _ . -_. - . .                - . - - - _ . _ - - . - - _ _ _ . .               .. -   _ _ _ . _ _ _ _ -
          ..            .                   ,.     - .            _   -   . - - - - -
                                                                                               -
    '
 .
 ,-                                                 35
                  Based on our review of the above modifications, it appears that upon
                  their completion the probabilities of spurious cable tray room carbon
                  dioxide and emergency switchgear room fire suppression system actua-
                  tions due to water / steam intrusion will be greatly reduced. However,
                   it is our recommendation that the licensee, in addition to implementing
                  the abo,ve proposed modifications, consider the following with respect
                  to ensurthg control room habitability and personnel safety:
                  -
                          Install a wintergreen odorizer on the Units 1 and 2 cable tray
                          room carbon dioxide system,
                  -
                          Install a permanent oxygen analyzer with a control room audible
                          alarm in the main control room annex,
                  -
                          Develop a procedure which will require the control room operators-

' to pressurize the control room in the event of a gaseous fire

                          suppression system actuation in either the cable tray room or the
                          emerge.ncy switchgear rooms, and
                  -
                          Install predischarge visual and audible warning devices near the
                          Units 1 and 2 cable tray room doors and inside the cable tray
                          rooms which will activate to alert personnel prior to a carbon
                          dioxide system discharge.

,

             c.   Other System Interactions

. i There does not appear to have been other significant system interac-

                  tions which impeded the safe shutdown of the plant. All shutdown
                  systems responded as designed, and an orderly plant cooldown was
                  accomplished.

l l 14. Consideration of Shut Down of Unit 1

             At 12:30 p.m. on December 10, licensee management decided to shut down Surry
             Unit 1 and operation of the unit was placed on power ramp down at 5:30 p.m.
             The unit was subsequently cooled down and pl, aced on residual heat removal
             and is currently in a cold shutdown condition.
             The decision to shut down the unit was based on preliminary findings
             resulting from the Unit 2 main feed pump suction pipe rupture. These
             findings indicated that there might have been significant thinning of the

l pipe wall due to a corrosion / erosion mechanism not fully understood at the

             time. The shutdown plan included inspections of selected Unit 1 piping.to
             ascertain its condition with regard to pipe wall thinning.
             Subsequent ultrasonic examination of the identical elbow that failed in
             Unit 2 revealed similar but not as severe pipe wall thinning.
                                                                    !
                                                                *
                                                              .
                      O
                                                                                          O
                                                                                             e
    -              . _                 .-                  . _ .-                                             .-                                                   -  .                       - . - -
              .
      .
           .
      -
                                                                                                                      36
                                   The licensee gave priority to Unit 1 inspection and hardware replacement in
                                   parallel with its investigation to determine the root cause of the Unit 2
                                   pipe rupture. This was done in order to facilitate restart of Unit 1.
                          15.      Investigatipns and Corrective Actions Taken
                                                                               ~
                                   a.                Initial Activity
                                                     The licensee agreed to a quarantine of all equipment and systems
,                                                    which could be significant to the ongoing investigation of the event.
                                                     Consequently, all activities undertaken with regard to restoration work
                                                     or investigations were done with the concurrence of the NRC team on
                                                     site. During the first week following the event, . concurrence was given
                                                     for some turbine generator work on the turbine deck which was not
                                                     relevant to the investigation and work involving cleanup and restora--
                                                     tion of the damaged area. The following equipment was inspected:

, (1) A main feed pump suction indication in the control room pegged at

                                                                       1000 psi. The pressure transmitter associated with this indica-
                                                                       tion was inspected to determine operability. Subsequently, it
                                                                       was determined that the transmitter housing was 1/3 full of water
                                                                       and it appeared that the electrical portion of the transmitter
                                                                       was not operable due to shorting.
                                                     (2) A calibration and circuit check was performed on pressure cutoff
                                                                       switch for the high pressure heater drain pump. This was done to                                                                          -
                                                                       determine if the section of line leading from the HP heater drain
                                                                       pump discharge to the condensate header had been pressurized to
                                                                       at least 600 psi. The switch was designed to cut off the pump if
'
                                                                       a 600 psi pressure was exceeded. The switch was calibrated and
                                                                       found to be operable indicating that a line pressure of greater

l than 600 psi was not present.

                                                                                                                                                                     5
                                                    On December 16, 1986, this quarantine was lifted.

l b. Piping Systems ,

Based on the failure of Surry Unit 2 main feedwater pump suction line

,

                                                     and the fact that the Surry Unit 1 suction line design was similar to

-

                                                     Surry Unit 2, the licensee decided to shut down Surry Unit I and
inspect the main feedwater pump suction line. The Surry Unit 1

, suction line was found to have reduced wall thicknesses similar to i Surry Unit 2. When pipe wall thinning was found in Surry Unit 1,' l the licensee decided to inspect similar piping at North Anna Unit 1.

                                                    Approximately 4900 ultrasonic inspections were made on North Anna
Unit 1 piping. No measurements indicated pipe wall thickness below

,

                                                     the required minimum. The feedwater pump suction piping and header
                                                    wall thicknesses were within original pipe manufacturing specifica-

l tions, and the high pressure drain pump dischdrge piping was no more

                                                     than 15 percent below the original specifications.
                                                                                                                                 .'
                                                                                                                                                                                                                   l
                                                        #
  .

f

        , - - * - - - - -   ,m-., . - - , - - - . , , . , - , - ~ , - - , - - - - - - - - - - - ,,,,,--,,,--,-+.-,.m.    _ _ , ,    --
                                                                                                                                       . - - - - - - , , - -, , ,,   - - - - . , . - - - - - - - + -  ---s------
      .
  .
    .
  -
                                        37
        As a result of finding thinned pipe at both units, the licensee
        initiated a pipe wall thickness measuring inspection program to
        define the extent of pipe wall thinning at Surry Units 1 and 2.       The
        following summarizes the criteria for the program, the acceptance
        criteria, and the inspection results to date.
        (1) Corrosion / Erosion Parameters
               In the review to determine the parameters affecting corrosion /
              erosion, the licensee found limited data available from industry
              experience with bulk single phase corrosion / erosion. The
              available literature correlates single phase corrosion / erosion to
              two phase wet steam corrosion / erosion.    The parameters that
              appear to affect corrosion / erosion in single phase flow are:
                                                                                  .
              -
                     Material         -
                                         Phenomenon occurs in carbon steels. The
                                         resistance to corrosion / erosion
                    '
                                         increases with alloying.
              -
                     Fluid Velocities - High fluid velocities increase
                                         corrosion / erosion.
              -
                     Temperature      -
                                         Corrosion / erosion takes place batween
                                         195 and 440*F.
              -
                     High Water Purity- Corrosion / erosion.affected by oxygen
                                         content.
              These parameters and the corrosion / erosion process relate to the
              rate of buildup and removal of the protective magnitite (Fe34   0)
              layer.
              Based on the above information, the licensee established the
              following criteria to select systems to be inspected:
              -
                    System handles water or steam
              -
                     System piping is carbon steel
              -
                     System temperature is greater than 195"F
              -
                     System is deoxygenated (low ppb range)
              As added verification of these criteria, the licensee also
              included in the program specific locations within systems outside
              the criteria, including safety-related systems, such as, the'
              auxiliary feedwater system (oxygenated and less than 195*F),
              charging system (stainless steel) and condensate system prior to
              the point heater (less than 195*F).
        (2) Rating Scheme
              Within a system, a rating scheme, based oh temperature, velocity,
              and geometry, was used to identify potentially high corrosion /
              erosion wear regions.                  ..                 .
                                                    ,

.-

                              9
            .
        .
          *
        .                                          38
                        After consideration of the above criteria and rating scheme, the
                        licensee decided to inspect components beyond those identified
                        as priority by the rating scheme. In addition to the components
                        picked for the auxiliary feedwater system, charging system, and
                        condensate system to the 4th point heater, the following compo-
                        nents were included in the wall thickness inspection program for
                        both Surry 1 and Surry 2:
                        -
                              Every fitting and selected locations on straight pipe from
                              the inlet of the 4th point heaters to the feedwater pumps
                              and from the feedwater pumps to the feedwater regulating
                              valves.
                        -
                              Selected locations along sweeps and straight lengths of pipes
                              from the feedwater regulating valves to the containment for'
                              loops A, B and C. There were no priority points in these
                              sections of pipe using the rating scheme.
                        -
                              High priority points on B feedwater loops from the contain-
                              ment to the steam generator. The points picked were
                              representative of similar configurations in loops A and C
                              and also included some unusual configurations.
                   (3) Acceptance Criteria
                        The licensee developed an acceptance criteria to provide guidance
                        in determining whether a fitting or section of pipe needed to be
                        replaced immediately, replaced at some future time in its operat-
                        ing life, or monitored by inspection during its operating life.
                        The acceptance criteria were based on the existing wall thickness,
                        as measured by the inspection program, the calculated corrosion
                        wear rate, and the Code minimum required wall thickness. The
                        wear rate was calculated by dividing the wear to date (assumed
                        to be the nominal specification thickness plus manufacturer's
                        tolerance minus the existing as measured thickness) by the number
                        of years of operating history.       ,
                        The following acceptance categories were defined:
                        (a)   Immediate Replacement      -
                                                                Existing thickness below
                                                                minimum Code or below 0.100
                                                                inches.                    ,
                        (b) Engineering Evaluation         -
                                                                Existing thickness greater
                                                                than Code minimum but
                                                                calculated (based on wear
                                                                rate) to still be acceptable
                                                                at the time to next outage
                                                                plus I/2 year.
                                                               .'

_ -. . . . . .-

               .
   *

.

                                                                                 39
 *

.

             (c) Potential Next Outage                                                -
                                                                                                Existing thickness greater than
                       Replacement                                                              acceptable thicknest at time to
                                                                                                next outage plus 1/2 year but
                                                                                                less than acceptable thickness
               ,                                                                    ,           at time to next two outages
                a
                                                                                                plus 1/2 year. Inspect at
                   _
                                                                                                next outage.
             (d) Each Outage Inspection                                               -
                                                                                                Existing thickness greater
                                                                                                than acceptable thickness at
                                                                                                time to next two outages plus
                                                                                                1/2 year but less than
                                                                                                acceptable to next three
                                                                                                outages plus one year.
                                                                                                                                ,
             (e) Place Component in                                                   -
                                                                                                Existing thickness greater
                       Station's Inspection                                                     than acceptable thickness at
                       Program                                                                  time to next three outages
                                                                                                plus one year.
        (4) Summary of Inspection Results and Replacement as of January 8,
             1987
                                                                                                      Unit 1         Unit 2
             Components to be Inspected                                                                588            588
             Inspection Requests Issued                                                 - - - -
                                                                                                       515-           208
             Inspections Complete                                                                      427            150
             Components Designated for Immediate                                                        48               7
                  Replacement
             Components Designated for Potential                                                         8               4
                  Replacement at Next Refueling Outage
             Components Designated for Inspection                                                       40               8
                  at Next Refueling Outage
             Components Removed                                                                         38               7
             Components Installed                                                                        8               0
     b. Main Steam Trip Valve
        Because of deficiencies found in the Unit 2 C MSTV (see paragraph
        11.a.(2), the licensee inspected the internals of the remaining Unit 2
        MSTV and the three Unit 1 MSTVs.                                              No assembly deficiencies were found.
        In addition, each pair,of air actuating cylinders for each valve was
        rebuilt.
                                                                                                .'
                                                                                                                              9
                                   _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ . . _ _ _
              .                                  .            __                                _                        __.
         ~
     .
                                                                                                    '
       .
     -
                                                                                40
                                        c.    Main Feed Pump Discharge Check Valve
                                                           '
                                              The remaining three main feed pump discharge check valves were
                                               inspected. The results were as follows:                                       ,
                                                     5
                                              Unit 2 8 Check Valve     -
                                                                          Both c' lamp assemblies had loose bolts and the
                                                                          lock wires for these bolts were missing. The
                                                                          lock plates exhibited some erosion but the
disc / seat assembly was not displaced.

t

                                              Unit 1 B Check Valve     -
                                                                          Both clamp assemblies had loose bolts and the
                                                                          lock wires for these bolts were missing. The
                                                                          lock plates exhibited extensive erosion but
                                                                          the disc / seat assembly was not displaced.
                                                                          The left side hinge pin was missing.
                                              Unit 1 A Check Valve - No defects found.         This valve was overhauled
-
                                                                          in May 1986.

'

                                              The check valves will be modified as follows:
                                              (1) New hinge pins will be installed that are secured in place by a
                                                    lock pin which is welded in place. The lock pin will project
                                                    through a hole in the hinge pin. This modification will be
                                                    completed prior to startup of the units.
                                              (2) The clamp assembly which holds the seat to the valve body will be
                                                    eliminated by welding the disc / seat assembly onto the valve body.      "
                                                    This modification required a material change. Due to the unavail-
ability of this material, the modification will be made at the

l next scheduled outage of sufficient duration when the material is

                                                    available or during the next refueling outage.
                                              (3) The check valves will be periodically inspected in accordance
                                                    with an inspection plan to be developed by the licensee.
                                                                                         '
                            16. Safety Considerations for Station Restart
                                        By letter dated January 14, 1987', the licensee submitted a report entitled
                                        "Surry Unit 2 Reactor Trip and Feedwater Pipe Failure." This report
                                        provides detailed information on the December 9, 1986 event and a recovery
                                        plan and corrective actions for NRC review and concurrence prior to station
                                        restart.
                                        The AIT has reviewed this report and has conducted an independent inspection
                                        effort which provides the bases for our concurrence with the licensee's
                                        restart plan.
                                                                                                  I
                                                                                             *
                                                                                           .
 ee.
         .. ~ . . - _ _ _ _ _ , , . _ .
                   _       _             _                              _                _        _           _      _ _     .
              .
 >   .
            .                                                                                                                      ,
     -
                                                                                      41                                           '
                           The Itcensee's report outlines a program which has been implemented for
                             initial inspection, hardware replacement and periodic inspection of the
                           main feed and condensate piping systems.                        This program provides for
                           development of a model which is believed to predict the erosion-corrosion
                           mechanism and the rate of pipe wall thinning in a conservative manner. The
                             licensee, ush g this model, developed an inspection / replacement program
                            for various fittings in the feed / condensate systems. This program defines
                           conservative acceptance criteria for the fitting replacement which predict
                            the time that would elapse before minimum allowable wall thickness would
                           occur (see Section 15.b). In addition, a periodic inspection program has
                           been established. The periodic inspections would provide information to
                           continually reaffirm or modify the model. Thus, the present inspection /
                            replacement program would permit a satisfactory knowledge of the present
                            state of the plant's condensate /feedwater systems. Future inspections
                           together with the current information would continually provide assurance

j that the loss of wall thickness is not occurring at the rate which could

                           result-in prem.ature failure. These actions provide additional confidence in
                           the startup and permits the carrying out of a conservative inspection
                           program which adequately defines weak points in the feed and condensate
                            systems.

l This replacement / inspection program is an interim measure to be utilized

                          as more information_is developed with regard to the mechanism of erosion /

'

                          corrosion. The licensee intends to develop a long range program of correc-
                           tive action that includes geometry as well as material changes to the feed
                          and condensate systems.                                                                                *
                           Inspection performed on the other single phase systems in the plant showed.                         -
                          no indication of the type of failure experienced in the feed / condensate
                           system (i.e., wall thinning due to corrosion / erosions). In addition, the
                           licensee will continue the inspection program previously developed for two-
                          phase flow systems.
                          The AIT has also reviewed the licensee's corrective actions with regard to
                          the MSTV maintenance procedures and the proposed short-term and longer term
                          hardware improvements for the main feed pump discharge check valves, and
                          concludes that the licensee actions are satisfactory.
                          In addition, as a result of the AIT inspection and re. view of the licensee's
                          program, the following conclusions and findings were developed.
                          a.       Sequence of Events
                                                                                                                         .
                                   The inspectors performed an independent evaluation of the event
                                   scenario, including the sequence of events and their cause of the
                                   events. The inspectors' conclusions are that the reactor primary
                                   system and all safety-related components reacted properly to a loss of
                                   load transient initiated by the closure of one of the main steam trip
                                   valves. The pipe rupture occurred before the bain feedwater discharge

l  ;

                                      >
   _
                                                                                                                           9
       - , - . - -   ..-,c-------          - ., - - - - . - - - - - ---,- ,- _ _ ----               .. -- - .
     .                                                      -                                                                                   _.
         .
   .
                                                                   *
       .
   -
                                                                                     42
                                check valve could malfunction. The only contribution to the event was
                                that the malfunction of the MFW pump discharge check valve caused
                                 steam / water to be discharged from the break. We concur with the
licensee's evaluation of the sequence of events.
                                                                                             '
                 b.             WaterbammerOccurrence
                                 Inspection of the Surry Unit 2 condensate and feedwater piping
                                conducted following the pipe rupture event did not indicate that
                                feedwater system water hammer occurred during the event. Reviews of
                                PWR operating experience regarding water hammer in feedwater systems
                                 indicate that severe water hammer loads usually result in extreme
                                damage to pipe nanger supports and instrumentation and are usually
                                the result of feedwater control valve instability. The Surry Unit 2
                                feedwater piping from the containment penetration back through the A
                                main feedwater pump, haater drain pump and condensate pumps have been
                                inspected by the team, and there is no indication of this type of
                                damage anywhere but in the vicinity of the rupture. Inspection by
                                the licensee has also indicated no such damage. In addition to this,
                                measurements of pressure between the steam generator and feedwater
                                control valves indicate there was no leakage from the steam generator
                                back through the feedwater system.
                 c.             Metallurgical
                                The pipe rupture occurred due to severe pipe wall thinning. The
                                general thinning condition appears to have been caused by a corrosion /
                                erosion mechanism with thinner localized areas related to high
                                turbulent flow. The fracture appeared to have originated at one of the
                                local severely thinned areas. The licensee's preliminary metallurgical
                                analysis indicated that the material met all specification require-
                                ments. Additional tests are in process by the licensee and the NRC to
                                fully define all material properties. The licensee has outlined an
                                inspection program for the feedwater and condensate piping systems,
                                based on conservatively predicting the corrosion / erosion mechanism and
                                the rate of wall thinning which should, ensure that the wall thickness
                                is monitored adequately to preclude premature failure. The licensee's
                                results and inspection program are outlined in their report, "Surry
                                Unit 2 reactor trip and feedwater pipe failure" submitted by letter
                                dated January 14, 1987. We concur that the report covers the metallur-
                                gical aspects of the problem adequately,
                 d.             Chemistry
                                                                                                                                            '
                                The methodology used to control secondary water chemistry to prevent
                                localized corrosion of stea:n generator components (as recommended by
                                the Steam Generator Owners Group) may result in " aggressive" water
                                chemistry conditions that favor general corros, ion of carbon steel.

I I  ;

                                                                                                                                          -
                                   *
 .
                                                                                                                                              *
           . _ .  ,_.._,____._x         _ .__.._____,__ ._.   ,_,.. _ ,_________.___ ,.___ ,_. _.,___, . _____.__ __.__ - ._._____._ _.~_
                                                                           ._   _ .-                                  . _ -                  _                       _ .            ._ .
                 .
          .
               .
          *
                                                                                                                 43
.
                                                         The formation and retentien of an adhesive film of magnetite on the
                                                         inner surfaces of carbon steel pipe, in regions of single phase and
                                                         turbulent flow, may be affected by variables other than regeneration
                                                        by oxygen.
                                                                                                                    '
                                          e.             Emergen'cy Preparedness
                                                         The facility's emergency organization responded to the pipe rupture
                                                         event in a commendable manner. The plant staff worked together effi-
                                                         ciently to minimize personnel injuries and to mitigate the consequences
                                                         of the event. Offsite support requested for the injured personnel
                                                         responded to the call for assistance expeditiously to transport the
                                                         injured personnel to area medical facilities.                                          Verbatim compliance

.

                                                        with the actions specified in the Emergency Plan appears to have been
;.                                                       exercised by the plant staff in responding to the event.                                                                 <
f. Public Information

<

                                                         Virginia Power implemented an aggressive and candid program to inform

'

                                                         news agencies - and, through them, the public - of the basic facts
                                                         concerning the accident and of continually updated findings as the
                                                         Company's own investigation went forward.                                Key ranking company execu-
                                                         tive spent an unusual amount of time in briefing reporters in several
;                                                        news conferences.              Reporters were taken on several tours for a first-
 !                                                       hand look at the accident area and at pieces of the broken pipe.

I ! g. Plant Systems

                                                         (1) The inspectors reviewed the' licensee's program for determining
                                                                       the cause of the C MSTV closure and also the failure of the MFW
                                                                       pump discharge check valve to fully close during the event. The
                                                                       licensee's technical evaluation and the corrective actions taken
                                                                       to restore the above components to normal operation were deter-
                                                                       mined to be comprehensive and acceptable.
                                                         (2) An apparent violation of Maintenance Procedure MMP-C-MS-002 which
                                                                        initially overhauled the C MSTV wits identified. This procedure
                                                                       lacked detailed instructions, was not fully followed and did not
                                                                       provide adequate documentation to show the repair of the MSTV
                                                                       was accomplished in a quality manner. The licensee was informed
                                                                       that similar problems may exist with other system maintenance
                                                                       procedures and licensee review should be conducted.                                                    ,
                                                         (3) The inadequate maintenance performed on the C MSTV did not prevent
                                                                       the valve from performing its safety function or cause it to be in

l

                                                                       noncompliance with Technical Specifications.
                                                         (4) The reactor trip was a direct result of the improper overhaul of
                                                                       the C MSTV in conjunction with the lower than normal instrument

, l

                                                                       air pressure.     However, the MFW line rupture was not caused by
                                                                       the MSTV closure but occurred due to the normal pressure transient
                                                                       which followed the reactor trip.                     ;
                                                                                                                              '
                                                              '
    ,_
                                                                                                                                                                                ,
   , - , . - - - - - . - - , - - , - - - . - - - - - , - - . . - , - ~ , .                   - - - - - - - - - ,                - - - - . . - ~ - - - - - - - - ~ ~ - - - - -
                                                                                                                                                    -
                                                                                                                                                                                         - - - -
                       .
             .
                     ~
             -
                                                                      44
                                                        .
                                (5) The maintenance performed on the C MSTV indicated several cases
                                             where anomalies were resolved without either proper documentation,
                                             notification of supervision or engineering review. Examples are
                                             the changing of the radius levers on the rock shafts and the
                                             need to adjust the MSTV lijnit switch following maintenance. Had
                                             these problems received the proper attention and evaluation, the
                                              improper reassembly of the C MSTV could have been identified

'

.
                                             before causing a reactor trip and a challenge to the reactor
                                             safety systems.
                                (6) The post maintenance test used to check the operation of the
                                             MSTVs following maintenance only verified their safety function
                                             and compliance with Technical Specification. Additional testing
,
                                             should have been required to verify full are travel of the valve
                                             disc and therefore proper reassembly of the valve would have been
                                             confirmed.
                          h.    Security
                                The actions of security personnel during the event provided prompt
                                personnel access to sensitive operational areas including the control
                                room. As a result of evaluating the security aspects of the event,
                                the licensee is considering additional training and hardware changes
                                to further facilitate emergency access to restricted areas.
                          1.    Fire Protection
4
                                As a result of the feedwater pipe rupture event in the Surry Unit 2
                                turbine building, Units 1 and 2 cable tray room carbon dioxide fire
                                suppression systems and emergency switchgear room Halon fire suppres-
                                sion systems spuriously actuated causing control room habitability
                                problems during the event. Based on our review, we conclude that the

l

                                licensee's staff has properly analyzed what caused the spurious fire

! '

                                protection system actuations and has initiated modifications to the
                                subject fire suppression systems which will greatly reduce the prob-

, abilities that these systems will spur,iously operate due to water / steam j intrusion. In addition, it should be noted that once carbon dioxide !

                                leakage into the control room was recognized, the licensee's control
                                room operations staff initiated prompt corrective actions to maintain
                                control room habitability. However, with respect to ensuring control
                                room habitability and personnel safety we recommend that the licensee
                                consider the following:
                                -
                                            The installation of a wintergreen odorizer on the Units 1 and 2
                                             cable tray room carbon dioxide system,
                                -
                                            The installation of a permanent carbon dioxide analyzer with a
                                             control room audible alarm in the main co,ntrol room annex,
                                                                                 .'
    4
  ,- - _ _ _. .. _ -_ _ _    __     .._,.___m...,_,
                                                                                                                                                                                     l
               .
     .
             *                                                                                                                                                                        '
    .
                                                                          45
                                                                                                                                                                                      i
                                                                                                                                                                                      !
                              -
                                     The development of a procedure which will require the control
                                     room operators to pressurize the control room in the event of a
                                     gaseous fire suppression system actuation in either the cable
                                     tray room or the emergency switchgear rooms, and                                                                                                 '
                                                                                                                                                                                      ,
                              -
                                     Th'e_ installation of predischarge visual and audible warning
                                     devices near the Units 1 and 2 cable tray room doors and inside
                                     the cable tray rooms which will activate to alert personnel prior
                                     to a carbon dioxide system discharge.
                                                                                                                                                                                 a
                                           .
                                                                               O

, I .*

                                                                                 *

i ,

 w
                                                                                                                                                                            e
                                                                                                                                                                                   .
   . -.- , -     , - - - - --   .n ,    ,     y .,, - .,-. - . ,, .-- - ,    ,       ,- ,en,- n--- , _ ---, -w,-_.,-- - - - - . - - -- _ - - - , - - - - - . _ - _ . _ _ _ . - -
                    .         _ _ _                 -_.  .    .                _      ._. _ . _ - _ _       -. .
                   .
               .
                 ~
               .
t
                                                            APPENDIX
                                            .
  ,
                                         CHEMISTRY-CORROSION CONSIDERATION OF THE SURRY
                                               UNIT 2 FEEDWATER P.IPE RUPTURE EVENT
                        1. Fundamentals of Generalized Corrosion
                           Although the eventual rupture of the 18-inch suction pipe may have been
                           initiated at a point on the upper-inside region of the first elbow down-
                           stream of the header, both visual evidence and ultrasonic measurements

,

                           showed that generalized wastage of the pipe, with resulting thinning from
                           the nominal 0.5-inch wall thickness, had been the obvious precursor to the
                           pipe failure. Because of the uniform nature of the thinning there was no
                           evidence of other types of mechanical or chemical attack.
                           Generalized thinning of iron surfaces is considered to be caused by erosion /
'
                           corrosion processes, with either process being dominant. The potential for
                           mechanical and hydraulic erosion is greatest in regions of turbulence and
                           non-single phase flow and is enhanced by increased flow and temperature.
                           Consequently, erosion mechanisms can be expected in the regions of the
                           tee junction of the feedwater header and suction pipe, and, to a lesser
                           degree, in the elbow regions of the suction pipe. The role of corrosion,
                           specifically in the Surry feedwater system, is more speculative because of
                           the multiple chemical reactions that might have occurred during the thirteen          -
                           years of normal and abnormal chemistry control. The licensee has tenta-
                           tively assumed that general corrosion occurred because the carbon steel

! pipes had been in contact with ' aggressive' (low dissolved oxygen) water. ' Removal of iron from a carbon steel pipe is thought to occur through

                           oxidation processes that establish a corrosion electropotential between

i

                           metallic iron (as an anode) and an oxidant in the water layer adjacent
to the metal surface (cathode). Depending on the magnitude of the corrosion

i potential the oxidant in feedwater could have been hydrogen tons, cupric or

                           cuprous ions, or oxygen. All of these cathodic reactions are enhanced by

j the presence of chloride ions. l In stagnant water systems the ferrous ions (Fe++) generated at the metal / l

                           water interface are amenable to further oxidation by dissolved oxygen to

j produce insoluble iron oxides such as Fe 02 3 (hematite) and Fe 03 4 (magnetite) l as well as other, less stable, hydrous oxides of iron. The formation of

                           magnetite also can occur in the absence of. measurable amounts of dissolved

t

                           oxygen. One mechanism that has been prop ~osed is further electrochemical
                           reaction of hydrogen ions (H+) and the trace concentrations of soluble
                           ferrous hydroxide in the aqueous layer adjacent to the metal surface.
                           The formation of magnetite rather than hematite is favored by increased

[ temperature (especially between 300-350 degrees F) ,and again under stagnant

                           conditions. Under optimum conditions, a non-porous', adhesive film of
                           magnetite forms on iron or steel surface. The film eventually terminates
                                                                             '
                                                                           ;
                                                                                                                   .
          * eo
    , , - -           r
       .
     .
             Appendix                                                                  2
                                   further removal of iron by electrochemical attack by eliminating the anodic
                                   reactor (Fe*+ Fe++). The oxide is in chemical equilibrium with the adjacent
                                  water and will degrade if the equilibrium is impacted by chemical and/or
                                   hydraulic factors.
              2.                   Role of Pass'ivity and Corrosion in the Thinning of the Feedwater Pipes
                                                                                                                                 a
                                    a.                  Observations
                                                        As the result of his visual inspection the inspector could not
                                                        establish the extent to which the chemistry of the feedwater abetted
                                                        the thinning process or provided protection against the continuous
                                                        removal of iron from regions of turbulence and single phase flow.
                                                        The appearance of the pipe in Unit 1 was significantly different from
                                                        Unit 2; however the extent of thinning was similar in both units, but <
                                                        it was less severe in Unit 1. The presence of.a thin layer of red
                                                        hematite in.the region of the rupture in Unit 2 can be attributed
                                                        to removal of any previous magnetite film during the expulsion of
                                                        water / steam followed by inflow of moist air while the pipes were hot.
                                                        Upstream and downstream of the rupture the pipes appeared to have
                                                         retained a magnetite film.
                                                        The appearance of the pipe in Unit I was considered to be more repre-
                                                         sentative of the true condition of the inner surface of the feedwater
                                                         system during plant operation, although most the suction line had been
                                                         exposed to air for 24 to 48 hours before being insps:ted. However,
                                                         this unit was shut down normally and the pipes drained at ambient
                                                         temperature before the pipes were cut u Such conditions.are less
                                                         conducive to conversion of magnetite to hematite.
                                                         The most significant nbservation was that in Unit 1 the suction pipe
                                                         tee with the header and the first elbow had a black coloration although

, l extensive thinning had occurred. Conversely, downstream sections of

                                                          the suction lines that experienced much less thinning had a thin layer
                                                          of red, non passivating, hematite.
                                                                                                 '
                                        b.                Effect of Chemical Variables
                                                          The role of chemistry control, especially before the original steam
                                                          generators were replaced, is also not clear. The very large amounts of
                                                           iron oxide sludge that has been periodically removed from all of the

! steam generators throughout the thirteen years of operation is proof

                                                           that wastage was occurring. However, this oxide sludge is thought'to
                                                           have originated predominantly in the high pressure pipes of the second-
                                                           ary water system which have been subjected to both dry and moisture

l

                                                           laden steam.

l

                                                                                                          !
                                                                                                   l
   -
 -      - - - - _ - - - , , _ _ _ _ , _ _ , , _ _ _ , _             , _ _ _ _ _ _ _
      .
    .
    *
                      Appendix                                                                                                          3
                                                   During the last four years the deposition of sludge in the steam
                                                   generators had decreased considerably, a phenomenon that has been
                                                   attributed to higher purity condensate and feedwater and to AVT
                                                   chemistry control following the criteria of the Steam Generators
                                                  Owners Group (SGOG).                                                                    .
                                                   Before 1980 several relatively brief periods of inleakage of James
                                                   River water upset chemistry control and allowed ppe amounts of chloride
                                                   to enter the secondary water system. Consequently, stress corrosion of
                                                   carbon steel and inconel components of the steam generator occurred as
                                                  well as denting of the inconel steam generator tubes through formation
                                                   of magnetite in the tube / tube sheet regions. The effect of these
                                                   transients on the general wastage of carbon steel pipe is not obvious.
                                                  The licensee's tentative scenario stresses the capability of pure,
                                                  deaerated water to attack carbon steel:
                                                                             '

!

                                                                                              Fe*+ Fe*+ + 2e-
                                                                               2e-           +2H+ + 20H" + H                            2 + 20H'_
                                                                                                                                                               ~                      -
                                                                                              Fe* (solid) + 2H+ + 20H + Fe++ + 20H +H 2 (gas)
                                                  The trace amount of Fe (OH)2 is continuously removed from the region of
                                                   formation before it can be further converted (oxidized) to adhesive and
                                                   passivating magnetite.
                                                  (1) Effect of pH

l It is the purpose of pH control, however to minimize this 1 mechanism of attack by reducing the concentration of hydrogen

                                                                 ions. During the first seven years of operation the licensee
                                                                 controlled pH with several chemicals;                                                                       i.e., sodium phosphate,
                                                                 cyclohexamine, morpho 11ne, and ammonia, and the pH of the feed-
                                                                water and condensate varied from less than 8 (conducive to general
                                                                 corrosion of iron) to greater tha,n 10 (not conducive to general
                                                                 corrosion of iron - although conducive to loss of copper from
                                                                 condense and feedwater tubes.) Since startup after the steam
                                                                 generator replacement outages the pH has been maintained between
                                                                 8.8 and 9.2, as recommended by the SGOG, as a compromise range to
                                                                minimize the corrosion of copper and iron in both the low and high
                                                                 pressure lines in the secondary system.
                                                  (2) Effect of Dissolved Oxygen
                                                                The licensee, as well as various investigators of corrosion
                                                                mechanisms, considers very low concentrations of oxygen to be

, detrimental to control of generalized thinning of carbon steel. 1

                                                                 In steady state conditions diffusion of dxygen to the metal -
                                                                water interface aids in the initial formation of magnetite and its
                                                                continued replacement. Under such conditions redLcing agents are
                                                      '
 --
      -- . - , . _ , - - - . . , , - - , - - - , , . - - - - - - - , - - - - - - - - - - - - - - - - - - - - - - - - - - - , - - - - - , - - - - - - - - - - - - - - - - - -
                               _ _ , - _ -                               .__                       -
          ,
      ..
         '
       *                    Appendix                                                         4
                                                          harmful since they tend to reverse the formation of ferrous ton
                                                          through the reactions written above. However, this argument must
                                                          be balanced against the cathodic attack of oxygen on iron (if the
                                                          iron surface is not isolated by impervious Fe 03 4 (magnetite).
                                                            8
                                                          In' a dynamic environment, such as in the feedwater pipe, all
                                                              .
                                                          equilibria are changed because of the high probability that the
                                                          products of electrochemical reactions will be removed immediately.
                            3.             Conclusions
                                           On the basis of current technology and the understanding of the mechanisms
                                           of localized corrosion, the damage experienced by the or'31nal steam
                                           generator tubes during the initial seven years of plant operation is
                                           understandable. However, the inspector has not been able to correlate the -
                                           cause of steam generator tube denting to the generalized thinning of the A
                                           feedwater suct, ion pipe. Also, the inspector has not been convinced that the
                                           feedwater system was ever coated completely with magnetite, or if it were,
                                           that the magnetite protected the pipe from erosion / corrosion. It is evident
                                           that thinning occurred in regions of hydraulic turbulence, and consequently
                                           erosion appears to have been the dominant cause of thinning.
                                           The degree to which generalized corrosion mechanisms abetted the transfer of
metallic or ionic iron from the pipe surface has not been established.

.

                                                                                                              .
                                                                                                                                I
                                                                                                                 .                       .
_

1 ,

  "

! g <

  ,n.-      -- , , - - , , ,-               ,,,r,_n.,,,         ,,-n__-_     nn,- n.- -.,_,n   ,n . , - - - ,   ,-n. , .n.,,--..n-.,-- --.,,.----n.- ,,,,.---,,.m--. , - _ , .
 ___.___ ____         _ _ _ . _ _ _ _ _ _ _ _ _ _ _ ___ _ __ _ _ _ _                                       _                                  ..                                                                                              -- -
                                                                                                                                                                   '
                                                                                                         .,e eemf                                * ':
                                                                                                                                                         ;;                             , ;;                                                                  *
                                                                                                                              ~
                                                                                                                                                               <                                             -
                           .
                                                                                                , . .                                                                   : .,               ,
                                                                         ,
                                                                                                                                       ,
                                                                                                                                                                                                                                                                 '
                                                                  .                                        .                                                                                                                            1
                  '
                                                                                                                                                                                                                                        \
                                                                                                                                                                                                .
                                                                                                                                                                 g'__.
                                                     /
                -
                                                                                                                                               4
                                                                                                                                                                                                                 ,
                                                          s                                  ;           :-
                                                                                                                                         -
                                                                                                                                                                                  ^
                                                                                                                                                                                                  ,
                                                                                                                                                                                                  f        .
                                                                                                                                                                     ~                            <
                                                                                                                                                                                                                                                ,
                                                                                               e
                                                                                                                                                               Y                                 , ~,              '
                                                                                                                                                                                                                                                                ,
                                                                                 _
                                                                                                                                                                                                                   ,-, .
                                                                                                                                                                                                                       .
                                                                                                                                                                                                                   a+s
                                                                                                                                                                 g         .
                                                                                                                                                                                                               '

1

                                                                                                                                                                       7[                              '

I -

                                                                                                                        -
                                                                                                                                                       '
                                                                                                                                                                  %                        '
                                                                                                                                                                                              ,                [                                           _7
                                                                                                                                                                                                                                                           .
              -
                                    -

l

                                                                                 ,
                                                                                       ,  .
                                                                                              3,. g                                                                                                                                                   ,
                                 g                                     '
                                                                                                       . .           l      .
                                                                                                                                                           :
                                                                                                                                                             '
                                                                                                                                                                                         -:          .                 ' ,
                                                                                                                                                                                                                             . >                   .<
                                                                                                                                                                                                                                                      \
                                                                                                      .v
                                                                                                                                                                                                                               -
                                                    ...,        .                                .o                                                      ,
                                                           , . <                                                                .
                                                                                                                                                      ,
                                                                                   .
                                                                                                                                                                                       ,
                                                                                                                                                                                                                                 '
                                                                                            *    i                                                 /                                  /
                                                                     .. , .j .
                                                                                                   p.-
                                                                                                    .
                                                                                                             .
                                                                                                                 ,
                                                                                                                                                 -
                                                                                                                                                                                    ,
                                                                                                                                                                                                                                 .
                                                                                                                                                                                                                                 3
                                                                               '
                                                                                       w                       -
                                                                                                                                           ,.
                                                                                                                                                                                                                           '
                                                                                     :   'M                                              /,                                      ,'                                                ,
                                                                                                                                                                                                                                                   ,    ,_
                                                                                                                                                                                                                                     ,    ,
                                            :                                                                                         .
                                                                                                                                                                               ,
                                                                                                                                                                                                                                            4
                                                                                                                                    '
                                                                           '                                                                                                                             '
                                                                                                                                  ,                                          .                                                        .
                                       '                                                                                                                                                     ,
                                                                                                                                                                                                                                              '                 i
                                                                                                                                                                                                                         ,
                                                                                                                                                                                                                                                         *

l i "B" "A" Location 24" Condensate l MFW Pump MFW Pump of Rupture Supply Header

                                                                                                                     in "A" Suction
                                                                                                                            Pipe
                                                                                                                                                                                                                                                                .
                                                                                                                                            Figure 1
                                                                                                                                                                                         __       __
                                                                                                                                                                                  . _ - _ _ _ _ _ _                                  ._ _ _ _ _ _ _ .

< l

                                                      - '
                                                              ;
                                                                                   ..                       l-
                                                                                                                 .
                                                                                                                            77 7       -
                                                                                                                                         -
                                                                                                                                               -         *
                                                                                                                                                            .
                                                                                                                                                                              g
                                                                                                                                                                                                                                                      ,
                                                                                                                                                                                                                                                          t
                                                                      ,.
. . <,3 / .e- . .
           .
                                                                                                                                                      <c                       (,
                                                                                                                                                 ..
                                                                                                                                                                                  ;
                                                          .
                                                                                                                                                 y.:
                                                                                                        y
                                                                                                                        -
                                                                                                              .1
                                                        ','
         '
                                                                l                  ~
                                                                                      ._
                                                                                            T*              i               g       --
                                                                                                                                             '
                             -
                                        &*                        -
                                                                    f-
                                                                         ~
                                                                                      s         .
                                                                                                      .
                                                                                                            l
                                                                                                            :
                                                                                                                                                                                                                                                          _
                                                                                                                                                                                                                                                          :
                                                                .
                                                                       4                                                                                       _.
                                                                                                                                                                                                                                                          !
                                                                                                                                                                                                                                                          .
                                                            '
                                                                                            %
                                         ?                                        r               >
                                                                                                                            s     -
                                                                                                                                                                                                      \                                                   ,.
                                                                                                  -
                                                      . , , . .                       ~'$ ~                                  %                                                                                            >
                                                                                                                                                                                                                               ~ l}                       i
                               ! . ' , ,,

l ,

                                   ...
                                        * ' *                                -        -
               f                    .,.      l.                                                                                                                           ,
                                                                                                                                                                                                                                                          i
                                e J _ summme-
                                                                                          -
                                                                                                                                           '
                                         M 'W!9 M                                                                                                                                                                 , _ . ,
                                                                                                                                                                                                ',
                                                                                                                                                                                                    <
                                                                                                                                                           .                .
                                                                                                                                                    -
                  -                                                            .
                                                                                                                                                                                                                            _..
                                                                                                                                                                                                                             .
                 "B"                                                             "A'"                   Location       24" Condensate
             MFW Pump                                                    MFW Pump                      of Rupture         Supply Header
                                                                                                    in "A" Suction
                                                                                                           Pipe
                                                                                                                                                                                                                                                           i
                                                                                                                   Figure 1
 _ _ _ .       . _ - - - . .               . . _ . -.                                   .   -__
                                                                                                         .                                                        _ _ . .             _
                                                                                                                                                                                                      . _ _ _ _ -                ._.                    .
                                                                                                             - - - - - -                                      A         -             '                     -- . - - - . - - - - . . . - , -
                                                                                                                                                                                                                                                                       - - - - . - - -
    =

!

i
                                                                                                            nypw
                                                                                                     '
                                                                        .                                     ,              ?Ji-
                                                                                                                         ,              l'    .t
                                                                 4% 1 4
                                                       . s.       *:m         &'..
                                                     ,
                                                                           *-Y1 *                                                                                                                                                                            .t
                                                                                                                                                                                                                                                             ,
                            .,
                                      y                     ,     .wK ..                     .-
                                                                                                     .                                                                                                                                                      , ~g
                                                                                                                                                                                                                                                            jy
     g'                   .                                                     8 '/               7 % s'
                      - %g[pq m) 'ktJi [4
                                   -                                        u    ,1;                   :)                                                                                                                                             y ' :"*-
                         Qf3;p* '%,1      ' Wy'-               . 's
                                                                                           '
                                                                                                ,-7 ' ' ' ' .             -;     _,w              %j {+,                                            ( ..                                     -, 3[, i
                                                                                                                                                                                                                                                  ,
                                                                                                                                           <w-am
                                                                                                                           -                                                                                                                        c..
                       w:1"     <.                  t 9*'                                                                                         G;wikhiar&,W, m "x'
                                                                                                                                                                                                          '
                                                                                                                                                                                                                                                                '
                                             ?                                                                                                         *;
                                                                                                                                                            (yOf+'f'( - :,
                                                                                                                                                                                    -
                                                              ,                                                                                    ,                                                               ,

i occ ,, .

                                                 s
                                                              s                                                                                                     ~             .
                               f                     y                                                                                                                         ?
                       -
                                 gpg+'
                                   ;ye ;                                                                                            <                                        .
                                                                                                                                                                                                                                                  ,<
                                                                                                                                                                                                                                                  . .;'
                                                                                                                                                                                                                                                       -

l

                                                   I                                                                                               ,                           av     4. -
                                                    V                                                                                                                -: y~^ 'an                                                                1,
                                                                                                                                                *
                                                                                                                                                  j,,'U ., ,~. , (;t
                                                                                                                                                                                                         -

1 r . ,

                                                                                                                                                                                                                                             '!
                                                                               ; ;n:$f.%; 'u ;.g gy ...
                                                                                                         .
                                                       <                                                                     n                       ,                                     ' t' : -a- / .
                                                                                                                                                                                                  .
,
                                                         i                                  .Yh
                 ;;
                   _.
                         n,                         s
                                                           \             yh'%k'i%.h
                                                                          '
                                                                                                v           .-
                                                                                                                      -

+

                            ;g                  n
             ,                                                 .,                       -
                                                                                 '\
                                                                                    '
                                                                                         .
                                                                                                                                                                                                                                                             '
    .              i                                                                                                                                                                                                                                                n
          gs                                                #3                                                                                 s
                                                                                                                                                                            -
                                                                                                                                                                                                                                                                    ;
                                                       f4                           3                                                                                                                                                                               2
,
      ,
               .\,
                                                                .a .
                                                             7. a '
                                                                                  .
                                                                                -Q,L                       f
                                                                                                                  ,
'
                                                                                      ci            e
                  \.                                   *3f                                        *
  ,                 s                                  +m-                 ., y                                                                        s                                                   ,
                       '.
                          '
                                                         .]                   N'
                                                                                    <;,..e-                                                               N -                                                                    ,
                                                                                                                                                                                                                                                                fj
                                                 ,      ;                                                                                                       . ,                                    . ,
                                                                                V !! f ,
                                                                                                                                                                                                                                                          ~
        f._                   \.           -
                                                                                                                                                            ,
                                                                                                                                                                                                                     4
                                                                                                                                                                                                                                                        ,,_,,

< l

        v                            -
                                       .
                                             -
                                                                              :;,
                                                                                 y
                                                                                                m
                                                                                                <
                                                                                                  . -
                                                                                                                                     - *;
                                                                                                                                                   m
                                                                                                                                                                                                                                                -
                                                                                                                                                                                                                                                         ,
                                        .
                                                                                                'E,'<
                                                                                                .   -                                        '_- '
            ,, ,                      f

l

               -
                                                                                      \                                              _ t.
                                                                                      &;*                  h                      f ff              Q       Q ',\
                                                                            '
                                                                               .if?b                                       b                ' ';                      ,
                                                                               q E O.tk
                                                                                                                                                                           ~'
                                                                                                                                       p,?e
                                                                                ,                                                                                                                                                                    Aq,7
                                                                                 ,m,.                                  4uc          g^ 4 :,
                         .,
                                                                                        $.W;f h                                                                                                                                                       p];q j&
                                                                    '
                                                                        "hkh                                                                                                                                                                    IM
                   -
                                                                                                                              m           .
                                                                                                                                                                               A-                                                               s\
                                                                                                                                                                                                                                                                  .
                                                                                                                        Al
                                                                                 , wen,.c.e4In f
                                                                                                       .
                                                                      *                                                                                                   '
                          '
                                     2h
                                                                                                                                                                                                                                                                     -
                                                    - - - . _ _ _ _ _ _ . _ _ _ .
   O
                                                                                  r>        -
           ,.
                             7          _ YNY;$%@                                               gv., y g                                                                            ,; bj
                               y        e
                                               i%?Q *
                            J;Jgg           ty;,..                                               + ;; 4                                                     g.g 7. t y9                
                                 ~.  ..     4;l, ,.                                           l    *
                                                                                                          '
                                                                                                            ~- O'"klR                                     f '" , . .'
                                                                                                                                                                        !id
                ~.                    N sy ,og ,
                                                                                                
                                                                                                   --
                                                                                                                 ,.;f:;,
                                                                                                                      :~                      . ,, ,
                                                                                                                                                          n                   e
                                                                                                                                                                                        ,
                                                                                                                 t      -          . ;; 3                           t,          .
                                             a ':.L .                                                                     '
                                                                                                                                   ~.5' ; .jf            f.I;q)?2'"
                   -      .
                                               b y-
                                                  .-
                                                                                                                . . ,
                                                                                                            j;;L ,
                                                                                                                            -
                                                                                                                              . =y
                                                                                                                                     .y              .   1'
                                                                                                                                                              s, g
                                                                                                                                                                  -
                                                                                                                                                                                  .
                                                                                                                                                                                 ,7
                                                                                                                                                 'hNfI;f.; .t ';; bl. }R
                                                1
                 ~
                                                  OA'F '                                                       '{, J. .,[[? N
                                                                                                                                                                       yp;,g.,
                                          -
                                                                                                                                                            .
                                                                                                      ,
                                                                                                - ',                   ..
                                                                                                        i ~
                    ,
                                                                                                                                                                                            _
                                                                                          .
   -                                                                                   ..
                                                             ,,
                                                  -
                                                                                                                                                                                          e
   [-                                                     ' -
                                                                  ~
                                                                                                                                                       ,
                                                                                                                                                                    -
                                                                                                                                                                           7              a
    !-
    ,x .
                                                           e.                                                                              ,.                            j                m
                                            s,               ~.                                                                                                       }
                                                                                                                                                                      #
                                              #                            .
                                                                                                                                                                       *'
                                                   ia%
                                      f
                                          (  $                                s
                                  f'
                                                                        h
                               '
                                                                    D
                                                                  .+;                ,
                                                                             i,
                                                                      ,,
                                                          ?:
                                                  ;.                ,
                                                                                                 %
                      I                                             .
                                                  $
                                                    ay
                                                                                                               '
                ,.';    ,                   Fl$
                      cg w ~                                                                                                                                  [
                                                                 '
                                                                                                                                         .
                                                                                                                              .
                   .
                                                                                                                            _
         ,
                                    ep                                                                                                   .
              7
                            v arg                                                                                                       .:                                   ~

- .

   - _ _ _ _ . _ . . . _ _ _ . _ _ . _ _.                                  __                __
                                                                                                                                                                                                                                                            e

, l

                                                                                                                                                                                                                -e       -
            em                                                  w-                                              . . . . .

l . ,

                                                                                                         '

i 4. . ,

                                                                              _
                                                                                                                               4                       '                                                                                                      f

l s ..

                                                                                                                                                                                                                             ,

1 '

                                                              .                                                           g      -
                                                                                                                                                                                                                                ~
                                                                                                                                                                                                                                  . _ -t
                                                                                                                                                                                                                                                    -   '

, .

                                                                                                                                                                                                                     .
                                                                                                                                                                                                                                    ....'
                                                                                                                                                                                                                                          -
                                                                                                                                                  .

i *-

                                                                                                                                                      '..
                                                                                                                                                              ~
                                                                                                                                                                                   Ruptured 'A" MFW Suction Pipe

l' '

                                                                                                                                     g\                             ,~
                                                                                                                                                                       *         ' fiesting Against "B" MFW Pump
                                                                                                                                               %                                        Discharge Pipe. (Post Rupture                                 '
              .
                                                                                                                                      .
                                                                                                                                                              4                                   Configuration)
                                                                         .                                                                                        -
                                                                                                                                                                  *
                                                                                                                                                                                                                       .                    e     ,
                                                                                ,
                                                                                                                                                                                                                                  -

'

                i..' 4.,                       ..                     ._
                                                                                  .
                                                                                                                        &                 'e                                                                       -
                    .
                #
                                      h,[         ,, ' ,
                                                            '
                                                                                 ~.                                                                                                                                                                       ,
                                                         e'                           <:
                                             '
                        : '          ,
                                                                                                ,  .
                                                                                    '
                                                                                                                                                    /
                                                                                                                                                                                      *                      %
                                                                                                                                             ,
                                                                         -
                                                                                         .
                                                                                                           =
                                                                                                                                                .        .
                                        '
                                                                                           '
                                                                                                       '       :                                                                   ~      - -
                          -                .
                                                                                 4                   .
                                                                                                                                             .
                                                                                                                                               .                                                .
                                                                                                                                                    >

1 .

                                                                                                                           .                        *           '                   -
                                                                                                                                                                                                           -
-
,
                                                                                       .
                                                                                                   e                                                                                                           .-          ,
                                                                                         *                                              -
                                                                                                                                                                                                                                                 ,
l                                                                  8                e.          e.         /

I g Y f ,

                                                                                                                             >                                                                ,

l

                                                                                                                                                                         .
                                                                                                                                                                                            )     M
                                                                                                                                          .-                                 .

l

 i

'

                                                                                                                                          Figure 3

'

                                _. .                                                                                                                       ._              _                           .--
   a ...,m.,.-maa_   _-_a_.Au___.h._a__-2        .   _____m-    a     .a--_.-.,44    4_am___2,_____s.            ma   _ _          . .__             . _ _ _ _ _ _ .     4 .___..am .mam._ __ _,, m2,.m _ ,.,
                   '

.l ,

                                                             *
                                                                                                                    *
                                                                                                                                                   ,
                                          ,                  ..                                                                   9
                                                             -
                                                                  ,
                                            .                                                                                                                        i
                                                                                                                                                                      !                                       ,
                                                         '
                                                                                                                                           -
                                                                                                      -
                                                                                                                               .
                                                          .
                                                !                *
                                                                     ,                                  ,
                                                                                                                                                                       .
                                                                    ,

,

                     :.
                                                3-           /
                                                                a                                               .
                                                                                                              %.-           -
                                                                                                                              -
                                                                                                                                           ..
                                                                                                                                                 .    .
                                                           r                                                                                         :

l

                                                                                                                          .
                                                                                                                                                .
                                                                                                                                                       -

, .; -

                                                                                                                                     .
                                                                                                                                                           ,
                                                   ,
                                                                                                            e                                   "a
                                                                                                                                                                   ^
                                                                                                        -
                                                                                  c

\ .

                                                                                                                                             ..
                                              .

,

                     W_                                             ?',                                         ^
                                                                                                                                 ::      .                -
i
 -

}}