Similar Documents at Surry |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML18152B4211999-05-25025 May 1999 Forwards Rev 1 to Relief Request P-11 to Clarify Original Intent of Request by Specifically Requesting Relief from Requirements of Section 6.1 of OM-6 ML18152A4741999-05-19019 May 1999 Forwards Completed Registration Form for Renewal of ASTs at Surry Nuclear Power Station,Iaw Section 9VAC 25-91-100.F ML18152B4171999-05-17017 May 1999 Provides Notification of Number of Steam Generator Tubes That Were Plugged During Spring 1999 Refueling Outage Planned ISI ML20217D6621999-05-14014 May 1999 Forwards NRC Operator Licensing Exams 50-280/99-301 & 50-281/99-301 (Including Completed & Graded Exams) for Tests Administered on 990329-0401 & 990412-15.Nine Candidates Passed (& One Failed) Exam ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML18152B4121999-05-0303 May 1999 Forwards Application for Renewal of License for SV Ross. Encl Withheld Per 10CFR2.790(a)(6) ML18152B4101999-04-29029 April 1999 Forwards Scope & Objectives for 990803 Surry Power Station Emergency Exercise.Without Encls ML18152B6561999-04-23023 April 1999 Forwards Annual Radioactive Effluent Release Rept for Surry Power Station,Jan-Dec 1998, Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released During CY98 ML18152B6491999-04-13013 April 1999 Forwards MOR for Mar 1999 for Surry Power Station,Units 1 & 2.MOR for Feb 1999 Incorrectly Stated Gross Electrical Energy Generated (Mwh) for Unit 2.Rept Should Have Stated Monthly Figure as 568965.0 ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML18153A2721999-03-29029 March 1999 Forwards LER 99-002-00 Per 10CFR50.73.Listed Commitments Contained in Ltr 1999-09-08
[Table view] Category:NRC TO UTILITY
MONTHYEARML20059C4011990-08-24024 August 1990 Forwards Insp Repts 50-280/90-23 & 50-281/90-23 on 900723-27.Violations Noted ML20055H4491990-07-0303 July 1990 Forwards Summary of 900625 Meeting W/Util in Region II Ofc Re Emergency Preparedness Upgrade Program.List of Attendees Also Encl ML20059M8771990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20245C3141989-06-0808 June 1989 Advises That Parts of 890324 Rev 23 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable for Inclusion Into Plan.Changes Inconsistent W/Provisions Listed in Encl.Encl Withheld (Ref 10CFR73.21) ML20247D1731989-05-18018 May 1989 Forwards Amends 127 to Licenses DPR-32 & DPR-37 & Safety Evaluation.Amends Change Tech Spec 6.5.B.7, Station Operating Records by Clarifying Requirement to Retain Photographs of Scope Traces of Welds ML20236B7391989-03-0101 March 1989 Advises That 890104 Rev 2 to Security Contingency Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20235U1831989-02-24024 February 1989 Confirms Mgt Meeting at Util on 890228,per 890217 Telcon. Proposed Meeting Agenda Encl ML20245E8621989-01-13013 January 1989 Forwards Insp Repts 50-280/88-50 & 50-281/88-50 on 881212-16.No Violations or Deviations Noted ML20196C5261988-11-23023 November 1988 Forwards Insp Repts 50-280/88-40,50-281/88-40,50-338/88-28 & 50-339/88-28 on 880926-30.No Violations or Deviations Noted ML20155J1801988-10-14014 October 1988 Advises That 880914 Rev 13 to Guard Training & Qualification Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20153E7671988-08-23023 August 1988 Informs That Safety Sys Functional Insp Will Be Conducted by Region II Insp Team at Facilities on 880912-16 & 26-30.Insp Effort Will Be Focused on Svc Water Sys & Associated Sys Served by Svc Water ML20207H9161988-08-19019 August 1988 Advises That 880616 Rev to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20151Q5111988-08-0404 August 1988 Ack Receipt of Payment of Civil Penalty in Amount of $100,000,per Util .Violation B Re Maint Procedure for Replacing in-core Flux Mapping Detector Remains as Stated ML20151K7321988-07-22022 July 1988 Advises That 880218 Rev to Plant Emergency Plan Meets Planning Stds of 10CFR50.47(b) & Requirements of App E & Acceptable ML20151V7121988-04-27027 April 1988 Advises That Portion 880318 Rev 21 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable.Other Portions Are Not Consistent W/Provisions of 10CFR50.54(p) as Delineated in Encl.Encl Withheld (Ref 10CFR73.21) ML20148J0841988-03-10010 March 1988 Ack Receipt of 880222 Response to 880125 Notice of Violation for Insp Repts 50-280/87-35 & 50-281/87-35 ML20234F2961987-12-31031 December 1987 Advises That 871116 Rev 19 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable.Encl Withheld (Ref 10CFR73.21) ML20237A5171987-12-0707 December 1987 Advises That Operator Licensing Exams Scheduled for Wk of 880314,including Written,Simulator/Operating & Plant Oral Exams.Encl List of Approved Ref Matl Requested by 880114 to Avoid Delay in Administering Exams ML20234A9741987-09-0808 September 1987 Forwards Request for Addl Info Re 861211 Proposed Amend to Physical Security Plan,Including Rev to Existing Schedule for Safeguards Requirements to Indicate Implementation within 180 Days.Response Requested within 30 Days IR 05000280/19870121987-07-0808 July 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-280/87-12 & 50-281/87-12.Corrective Actions Will Be Examined During Future Insps ML20234F2591987-06-25025 June 1987 Ack Receipt of Transmitting Rev 11 to Surry ISFSI Security Personnel Training & Qualification Plan. Changes Consistent W/Provisions of 10CFR72.84 & Acceptable ML20234C8301987-06-25025 June 1987 Advises That 870529 Rev 11 to Guard Training & Qualification Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20214V9731987-05-21021 May 1987 Forwards Insp Repts 50-280/87-09 & 50-281/87-09 on 870405-0502.Vo Violatios or Deviations Noted.Attention Directed to Unresolved Item Identified in Rept.Matter Will Be Pursued During Future Insp ML20215J3941987-05-0505 May 1987 Forwards NRC Granting Extension to 871201 for Providing Schedule of plant-specific Implementation Re USI A-46, Equipment Seismic Adequacy Verification Requirements ML20206C0271987-04-0909 April 1987 Advises That 1987 Financial Info Submitted by Satisfies Requirements of 10CFR140.21 ML20209E1641987-04-0303 April 1987 Forwards Exam Rept 50-280/OL-87-01 Administered on 870209-11.Written Exam Questions & Answer Key & Util Comments Re Written Exam Also Encl ML20206C4421987-03-27027 March 1987 Ack Receipt of 861113 Response to 861014 Notice of Violation Re Insp Repts 50-280/86-20 & 50-281/86-20.Violation Re Inadequate Procedures for Work Performed on Recirculation Spray HXs Classified as Severity Level V Violation ML20205N3731987-03-25025 March 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-280/86-42 & 50-281/86-42 ML20205Q1121987-03-24024 March 1987 Forwards Insp Repts 50-280/87-03 & 50-281/87-03 on 870209-13 & Notice of Violation.Concern Expressed That Implementation of Radioactive Matls Transportation Program Permitted Situation to Develop ML20207T6681987-03-12012 March 1987 Confirms 870325 Meeting in Richmond,Va to Discuss NRC PRA Application Program for Conducting Insps at Nuclear Power Stations,Per 870305 Telcon.Meeting Will Include Technical Discussion of How PRA Will Develop Insp Techniques ML20207T6211987-03-0606 March 1987 Forwards Insp Repts 50-280/87-04 & 50-281/87-04 on 870201- 28.No Violations or Deviations Noted ML20212K8871987-03-0303 March 1987 Forwards Notice of Denial of Amends to Licenses DPR-32 & DPR-37 & Opportunity for Hearing Based on Review of Util 801028,830921 & 850412 Requests to Delete Tech Spec 4.15 Re High Energy Pipe Break Insp Program ML20212H9611987-03-0303 March 1987 Ack Receipt of Transmitting 861121 Rev to Security Contingency Plans.Changes Consistent W/Provisions of 10CFR50.54(p) & Acceptable for Inclusion in Plan ML20207T5791987-03-0202 March 1987 Forwards Safety Insp Rept 50-281/86-36 on 861113-20 & 870209 & Notice of Violation.Type a Test Shall Be Performed During Each Refueling Outage Until Two Consecutive Tests Meet Acceptable Criteria of 10CFR50,App J ML20212J2161987-03-0202 March 1987 Forwards Safety Evaluation & Technical Evaluation Rept Re Util 831104 Response to Generic Ltr 83-28,Item 4.5.2, Reactor Trip Sys On-Line Functional Testing. Response Acceptable ML20212E6971987-02-27027 February 1987 Urges Industry Response to Check Valve Issues Initially Highlighed by San Onofre Unit 1 Event in Nov 1985.Concerns Noted Re Potential Implications for All Nuclear Power Plants in Light of Surry 2 Event.Evaluation of Programs Requested ML20207T6781987-02-23023 February 1987 Forwards Insp Repts 50-280/87-02 & 50-281/87-02 on 870202-06.No Violations or Deviations Noted ML20211M7801987-02-19019 February 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-280/86-34 & 50-281/86-34.Response Meets Requirements of 10CFR2.201 ML20211M9261987-02-17017 February 1987 Forwards NRC Re Policy for Managing Emergency Notification Sys & Health Physics Network.Licensee Should Assign Knowledgeable Individual to Maintain Open,Continuous Communication Channel ML20211M7841987-02-17017 February 1987 Confirms 870420-24 Insp at Facility,Per 870205 Telcon. Compliance W/Sections Iii.G,Iii.J,Iii.L & Iii.O of App R to 10CFR50 Will Be Evaluated During Insp.Listed Addl Info Requested by 870330 ML20207T3681987-02-13013 February 1987 Confirms 870204 Telcon Re Rescheduling 870123 Mgt Meeting to 870312,to Review Results of NRC SALP Program for Mar 1985 - Aug 1986 ML20211M0511987-02-13013 February 1987 Forwards Insp Repts 50-280/86-41 & 50-281/86-41 on 861207- 870131.No Violations or Deviations Noted.Attention to Unresolved Items Requested ML20211C4351987-02-10010 February 1987 Forwards Augmented Insp Repts 50-280/86-42 & 50-281/86-42 on 861209-870114 & Notice of Violation.Rept on 861209 Reactor Trip & Feedwater Pipe Failure Event Reviewed. Staff Concurs W/Planned Actions ML20210V1761987-02-0606 February 1987 Forwards Insp Repts 50-280/87-01 & 50-281/87-01 on 870112-15.No Violations or Deviations Noted ML20210A3691987-01-23023 January 1987 Forwards Summary of 870112 Mgt Meeting W/Util at Plant to Discuss Findings & Plans Re 861209 Pipe Rupture.Util Understands Enough of Failure Mechanism Involved to Take Corrective Actions & Restart Units.Attendees List Encl ML20213A1551987-01-16016 January 1987 Extends Invitation to Participate in 870218 Incident Investigation Program Workshop in Atlanta,Ga.Workshop Will Provide Understanding of Process by Which NRC Investigates Potential Significant Incidents.Agenda Encl.W/O Procedures IR 05000280/19850291987-01-14014 January 1987 Forwards NRC Confirmatory Measurement Results of Util Radiochemical Analyses Submitted in 860711 & Oct 1986 Ltrs, Per Insp Repts 50-280/85-29 & 50-281/85-29.Comparative Results in Disagreement for Fe-55 Analysis.W/O Encls ML20215H6981987-01-12012 January 1987 Forwards Info Re PRA-based Interactive Sys Called Plant Risk Status Info Mgt Sys (Prisim) to Assist NRC Inspectors in Planning Insp Activity.Extends Invitation to Discuss Prisim W/Util Personnel.W/O Encl ML20207P4761987-01-0909 January 1987 Confirms 870123 Mgt Meeting to Review Results of SALP Program.Program Involves Appraisal of Regulatory Performance by Selected NRC Managers.Regulatory Performance Evaluated for Mar 1985 - Aug 1986 ML20207P2161987-01-0808 January 1987 Requests Submittal of Emergency Exercise Info to Chief of Emergency Preparedness Section,Region Ii,To Protect Scenario & Objectives (Ref ) 1990-08-24
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML20217D6621999-05-14014 May 1999 Forwards NRC Operator Licensing Exams 50-280/99-301 & 50-281/99-301 (Including Completed & Graded Exams) for Tests Administered on 990329-0401 & 990412-15.Nine Candidates Passed (& One Failed) Exam ML20199D2291999-01-12012 January 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core of Over Safety-Related Equipment ML20155H8061998-10-29029 October 1998 Responds to Discussing NRC Initiatives & Efforts. Plans for Another Stakeholders Meeting Underway for 981113. Staff Will Continue to Solicit Feedback & Comments from Public on Initiatives ML20151T9351998-08-27027 August 1998 Informs of Change Being Implemented by Region II Re Administrative Processing of Licensee Responses to Novs. Licensee NOV Responses Which Accept Violations & Require No Addl Communication to Be Ack in Cover Ltr of Next Insp Rept ML20237B0001998-07-30030 July 1998 Confirms 980728 Telcon Between D Sommers & R Haag Re Meeting Scheduled for 980810 in Atlanta,Ga to Discuss Recent Mgt Changes & Items of Interest ML20236Q6751998-07-13013 July 1998 Forwards Insp Repts 50-280/98-05 & 50-281/98-05 on 980503-0613.No Violations Were Identified.Conduct of Activities at Surry Facilities Was Generally Characterized by safety-conscious Operations,Sound Engineering & Maint ML20249A7951998-06-12012 June 1998 Responds to from R Saunders & L Liberatori Requesting Waiver of Fee to Review 971031 Plant,Unit 1 Risk-Informed Inservice Insp Submittal ML20217P4601998-05-0101 May 1998 Forwards ERDS Implementation Documents Including Data Point Library Updates for Robinson (Number 248),Peach Bottom (Number 249),Surry (Number 250),Crystal River (Number 251), McGuire (Numbers 252 & 254) & Salem (Number 253).W/o Encl ML20199G0741998-01-23023 January 1998 Discusses 980116 Meeting W/Utility in Atlanta,Ga to Provide VEPCO Opportunity to Discuss Performance at Surry Facility. List of Attendees,Plant Self Assessment ,safety Culture Memo & Suppl Handout Encl ML20198Q6451997-11-10010 November 1997 Ack Receipt of & Check for $55,000 in Payment for Civil Penalty Proposed by NRC in .Corrective Actions Will Be Examined During Future Insps ML20211N2701997-10-0707 October 1997 Forwards Insp Repts 50-280/97-11 & 50-281/97-11 on 970924. No Violations or Deviations Noted.Insp Determined Whether Activities Authorized by Licensee Were Conducted Safely & IAW NRC Requirements IR 05000280/19970011997-08-29029 August 1997 Discusses Insp Repts 50-280/97-01 & 50-281/97-01 on 970113 & 17 & Forwards NOV & Proposed Imposition of Civil Penalty in Amount of $55,000 ML20141D5001997-06-25025 June 1997 Responds to 960408 Submittal Re NRC Bulletin 96-001, Control Rod Insertion Problems. Staff Determined That Required Actions Completed for North Anna Power Stations Units 1 & 2 & for Surry Power Stations,Units 1 & 2 ML20141B2731997-05-0505 May 1997 Ltr Contract:Task Order 44, Initial Exam for Surry NPP, Under Contract NRC-03-94-035,awarded to Sonalyst,Inc ML20137R2791997-03-27027 March 1997 Twentieth Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App FF ML20136C4211997-03-0606 March 1997 Fifteenth Partial Response to FOIA Request for Records. App Y Records Encl & Available in PDR ML20134P3181997-02-20020 February 1997 Notifies Nuclear Power Reactor Licensees of Potential Problem Involving Protected Area Access Control at Nuclear Reactor Sites.Encl Being Withheld Due to Sensitive Info Contained within ML20133F5081996-12-31031 December 1996 Forwards Recent Revision to NRC Enforcement Policy Re All Predecisional Enforcement Conferences Scheduled After 961210.All Open to Public Observation W/Some Exceptions.Copy of Change Noted in 61FR65088 Encl ML20132E3431996-12-19019 December 1996 Fowards Emergency Response Data System Implementation Documents.W/O Encl ML20149M5511996-12-0606 December 1996 Discusses 961118 Meeting Re SALP for Surry Facility.List of Attendees & SALP Slides Encl IR 05000280/19960101996-10-28028 October 1996 Forwards Insp Repts 50-280/96-10 & 50-281/96-10 on 960908-28 & Notice of Violation ML20129H0411996-10-23023 October 1996 Extends Invitation to 961118 SALP Meeting at Plant as Observer.Subsequent to Meeting,Time Scheduled to Discuss Matters of Mutual Interest W/Regard to Regulation & Performance at Plant ML20129B8121996-10-10010 October 1996 Informs That Region II Will Host Annual Training Conference in Atlanta,Ga on 961120-21 to Inform Regional Operations & Training Mgt of Issues & Policies That Affect Licensing of Reactor Plant Operators.Map Encl ML20128G9071996-10-0303 October 1996 Forwards ERDS Implementation Documents & Data Point Library Updates for Listed Plant.W/O Encl ML20134C5451996-09-19019 September 1996 Discusses 960916 Meeting W/Util in Atlanta,Ga Re Licensee Proposal for Reviewing & Revising UFSAR ML20134C5401996-09-11011 September 1996 Confirms Predecisional Enforcement Conference to Be Held on 960909 & 10 in Atlanta,Ga to Discuss Apparent Violation Re Licensee Failure to Follow Procedures for Pressurizer Relief Tank Venting.Subj Meeting to Be Closed IR 05000280/19950201996-08-16016 August 1996 Informs That NRC Has Recently Completed Investigation of Apparent Willful Violation of Operational Procedure at Plant as Followup to Insp Repts 50-280/95-20 & 50-281/95-20 ML20059M8071993-11-16016 November 1993 Forwards Safeguards Info Referenced in Preliminary Draft Guide Re Proposed Rule for Protection Against Manevolent Use of Vehicles at Nuclear Power Plants.Encl Withheld (Ref 10CFR73) ML20059C3471993-10-21021 October 1993 Forwards Exam Repts 50-280/93-300 & 50-281/93-300 Administered During Wk of 930920 ML20128A4951993-01-22022 January 1993 Forwards Amends 173 & 172 to Licenses DPR-32 & DPR-37 & Se. Amends Revise TS to Modify Acceptance Criteria for Functional Testing of Anchor Darling Mechanical Snubbers ML20127D2741993-01-0707 January 1993 Advises That 921222 Rev 16 to Surry,Units 1 & 2 Nuclear Security Personnel Training & Qualification Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable for Inclusion Into Plan ML20128Q3741991-08-26026 August 1991 Forwards Insp Repts 50-280/91-22,50-281/91-22,50-338/91-18 & 50-339/91-18 on 910731 & 0801-02.No Violations Observed ML20128Q3441991-07-11011 July 1991 Forwards Insp Repts 50-280/91-15 & 50-281/91-15 on 910520-22 & 0619.No Violations Observed ML20128Q4651991-04-17017 April 1991 Forwards Insp Repts 50-280/91-09 & 50-281/91-09 on 910326- 29.No Violations Noted ML20128Q5101991-04-12012 April 1991 Forwards Insp Repts 50-280/91-06 & 50-281/91-06 on 910224-0330 & Notice of Violations ML20059C4011990-08-24024 August 1990 Forwards Insp Repts 50-280/90-23 & 50-281/90-23 on 900723-27.Violations Noted ML20055H4491990-07-0303 July 1990 Forwards Summary of 900625 Meeting W/Util in Region II Ofc Re Emergency Preparedness Upgrade Program.List of Attendees Also Encl ML20059M8771990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20245C3141989-06-0808 June 1989 Advises That Parts of 890324 Rev 23 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable for Inclusion Into Plan.Changes Inconsistent W/Provisions Listed in Encl.Encl Withheld (Ref 10CFR73.21) ML20247D1731989-05-18018 May 1989 Forwards Amends 127 to Licenses DPR-32 & DPR-37 & Safety Evaluation.Amends Change Tech Spec 6.5.B.7, Station Operating Records by Clarifying Requirement to Retain Photographs of Scope Traces of Welds ML20236B7391989-03-0101 March 1989 Advises That 890104 Rev 2 to Security Contingency Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20235U1831989-02-24024 February 1989 Confirms Mgt Meeting at Util on 890228,per 890217 Telcon. Proposed Meeting Agenda Encl ML20245E8621989-01-13013 January 1989 Forwards Insp Repts 50-280/88-50 & 50-281/88-50 on 881212-16.No Violations or Deviations Noted ML20196C5261988-11-23023 November 1988 Forwards Insp Repts 50-280/88-40,50-281/88-40,50-338/88-28 & 50-339/88-28 on 880926-30.No Violations or Deviations Noted ML20155J1801988-10-14014 October 1988 Advises That 880914 Rev 13 to Guard Training & Qualification Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20155F7911988-09-0707 September 1988 Final FOIA Request for Documents Re Radwaste Facilities at Plants.Forwards App B Document.App a & B Documents Available in PDR IA-88-419, Final FOIA Request for Documents Re Radwaste Facilities at Plants.Forwards App B Document.App a & B Documents Available in PDR1988-09-0707 September 1988 Final FOIA Request for Documents Re Radwaste Facilities at Plants.Forwards App B Document.App a & B Documents Available in PDR ML20153E7671988-08-23023 August 1988 Informs That Safety Sys Functional Insp Will Be Conducted by Region II Insp Team at Facilities on 880912-16 & 26-30.Insp Effort Will Be Focused on Svc Water Sys & Associated Sys Served by Svc Water ML20207H9161988-08-19019 August 1988 Advises That 880616 Rev to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable 1999-09-08
[Table view] |
See also: IR 05000280/1986042
Text
,
~
e fclb2<)
.D
o
February 10, 1987
Docket Nos. 50-280, 50-281
License Nos. DPR-32, DPR-37
Virginia Electric and Power Company
ATTN: Mr. W. L. Stewart, Vice President,
Nuclear Operations
P. O. Box 26666 DESIGNATED ORIGINAS *g
Richmond, VA 23261
Certified By O//v20w N yk
Gentlemen:
SUBJECT: NRC AUGMENTED INSPECTION TEAM REPORT NOS. 50-280/86-42 AND 50-281/86-42
This refers to the Nuclear Regulatory Commission (NRC) augmented inspection
conducted by Mr. V.'W. Panciera during the period of December 9, 1986 through
January 14, 1987. The inspection included a review of activities authorized for
your Surry facility. At the conclusion of the inspection, the findings were
discussed with those members of your staff identified in the enclosed inspection
report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Your letter of January 14, 1987, which forwarded your report entitled "Surry
Unit 2, Reactor Trip and Feedwater Pipe Failure," provided detailed information .
g
on the December 9,1987 event and a recovery plan and corrective actions for NRC a
review and concurrence prior to station restart. We have reviewed your report
and concur with the actions you plan to take prior to station restart.
The inspection findings indicate that certain activities appeared to violate
NRC requirements. The violation, references to pertinent requirements and
elements to be included in your response are described in the enclosed Notice
of Violation. In your response to the violation, you may reference certain
paragraphs of the above referenced report when discussing corrective steps that
have been taken.
I During the week of January 12, 1987, a subsequent NRC inspection was conducted
to evaluate the spurious fire protection system actuations which resulted from
this event. Our assessment of your fire protection system spurious actuation
evaluation and your corrective actions associated with preventing recurrence
l 1s discussed in Section 13.b of this report. It should be noted as a result
i of our assessment we are concerned with personnel safety and control room
habitability due to inadvertent or actual operation of the carbon dioxide
,
fire suppression system. Therefore, the fire protection program and system
1
enhancements outlined in our inspection report and discussed with your staff
i should be considered for implementation.
l
,
0702200095 070210
{DR ADOCK 05000200
PDR 1
ZEDI l\
,
_ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _
.
Go
.' Virginia Electric and Power Company 2 February 10, 1987
During this inspection, the Surry secondary chemistry program was reviewed as a
possible contributor to the pipe rupture. At the request of the inspector, the
plant staff agreed to review the procedures related to oxygen and pH control.
We believe that this review should be completed expeditiously to ensure that
chemistry control maximizes the integrity of carbon steel as well as that of
stainless steel and alloy-600 components.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
~
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
We appreciate your cooperation during our team inspection and subsequent
evaluation of this event. Your voluntary quarantine of components and systems
was very beneficial as was your open discussion of your findings and evaluations.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(original signed by
J. Nel.3on Grace)
J. Nelson Grace
Regional Administrator
Enclosures:
1. Notice of Violation
2. NRC Inspection Report
w/ Appendix
w/encis:
l F. Saunders, Station Manager
. J. Hardwick, Manager - Nuclear
Programs and Licensing
bec w/encis:
INkC Resident Inspector
Document Control Desk
Commonwealth of Virginia
'
RII RI! RI RII '
RII
vVd$
ciera:aw eyes GJenk ns MErnst
2/ob/87 ft/lJPStohr