IR 05000280/1982016
| ML20054M932 | |
| Person / Time | |
|---|---|
| Site: | Surry, North Anna, 05000000 |
| Issue date: | 06/22/1982 |
| From: | Brickley R, Burnett P, Carter J, Julian C, Tessier J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20054M930 | List: |
| References | |
| 50-280-82-16, 50-281-82-16, 50-338-82-16, 50-339-82-16, NUDOCS 8207150162 | |
| Download: ML20054M932 (3) | |
Text
/
'
UNITED STATES
!"
7, NUCLEAR REGULATORY COMMISSION i
$
$
REGION 11 p'[
101 MARIETTA ST., N.W., SUITE 3100 o,
ATLANTA, GEORGIA 30303
'
%
Report flos. 50-338/82-16, 50-339/82-16, 50-280/82-16 and 50-281/82-16 Licensee: Virginia Electric and Power Company P. O. Box 26666 Richmond, VA 23261 Facility flame: florth Anna 1 & 2, Surry 1 & 2 Docket Nos. 50-338, 50-339, 50-280, and 50-281 l
License flos. NPF-4, NPF-7, DPR-23, and DPR-37 Inspection at VEPC0 Corporate Offices in Richmond, Virginia 6/8/72-Inspector:
Id. N 78 M
R. H. Brickley, Reag Engineer, Region IV Date Signed
~
Other Personnel d/
i ' 15 G'
7 L< Carter, fluclear Engineer, NRR Date Signed
74 h99
$ 3kT G/9/92 J. H. Tessier, Physil:ist, Argonne Dat'e Signed National oratory
/
. JMouW 6 - O P 2-
'.I. Burnett, Reactor Inspector, Date Signed Regio II Approved by:
Aru- /h le-?E-F1-C.~ Julian, Sbction Cliief, Division of Date Signed Project and Resident Programs SUttt1ARY Inspection on fiay 18 - 19, 1982 Areas Inspected This special, announced inspection involved C1-inspector-hours on site in the areas of validation of the computer code RETRAN.
Results In the areas inspected, no apparent violations or deviations were identified.
t 8207150162 820623 PDR ADOCK 05000280 G
f
..
.
DETAILS 1.
Persons Contacted Licensee Employees
- R. W. Cross, Supervisor, Nuclear Fuel Engineering (NFE)
- C. P. Sange, Director, NFA & PQ
- J. D. Faehl, QA Engineer
- N. A. Smith, Nuclear Fuel Engineer
- J. E. Streightiff, Senior Nuclear Fuel Technician
- R. M. Berryman, Director, NFE
- L. M. Girvin, Manager, Nuclear Fuel
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on May 19, 1982, with those persons indicated in paragraph 1 above.
The inspector summarized the scope and findings of his inspection activities. Management comments were for clarification or acknowledgement of the statements of the inspector.
3.
Licensee Action on Previous Inspection Findings Not inspected 4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Validation of Computer Codes This special inspection is part of a series of inspections being conducted at the request of NRR regarding the development, verification, and use of the RETRAN computer code by tne nuclear industry. The basic objectives of these inspections are to assure that RETRAN computer code has been developed, maintained, and modified in accordance with the design control measures contained in ANSI N45.2.11-1974; and to verify that the organiz-ation's computer code activities address the requirement of 10 CFR Part 21, 10 CFR Part 50.55e and 50.59 as applicable.
The VEPC0 QA Manual, Fuel Resources Department (FRD) QA Manual, and Nuclear Fuel Engineering (NFE) Policy and Procedures Manual were reviewed to determine that those design control measures contained in ANSI N45.2.11-1974 that are applicable to a code user were adequately addressed i.e. inputs, interfaces, changes, and verification. The license agreement between the Electric Power Research Institute and VEPC0, NFE/S file 8.5 (September 1981 Loss of Normal Feedwater Reanalysis, Surry Units 1 and 2), and the RETRANP01
r
..
.
Production Code Notebook were examined for implementation of procedural requirements.
The following two items were identified for followup during a future inspection:
a.
Procedure No. NFE 16.1 (Report Under 10 CFR 21, 10 CFR 50 and the Technical Specifications) and FRD QAM No. 15.2 (Reporting of Fuel-Related Items to the NRC as Defined by 10 CFR 50.55(e), and 10 CFR Part 21) need revising to bring these into conformance with the VEPC0 QA Manual.
(Inspector followup item 50-280/82-16-01)
b.
Departmental procedures that implement the VEPC0 QA program should be reviewed by QA personnel for conformance to QA requirements.
,
(Inspector followup item 50-280/82-16-02)
No violations or deviations were identified in the areas inspected.