IR 05000280/1982015

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Repts 50-280/82-15 & 50-281/82-15 on 820601-04.No Noncompliance Noted.Major Areas Inspected:Site Orientation,Security Plan & Implementing Procedures & Organization Mgt.Details Withheld (Ref 10CFR73.21)
ML20054G802
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/14/1982
From: Hall B, Mcguire D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20054G801 List:
References
50-280-82-15, 50-281-82-15, NUDOCS 8206220313
Download: ML20054G802 (1)


Text

_-_

-

--

- - - -

~ AFEGUARDSsMORMATION S

,,[ - ~s%

NUCLEAR REGULATORY COMMISSION

+

y'

'g REGION ll

,

.

,'

aC 101 MARIETTA ST., N.W.. SUITE 3100

\\,...../

^"J0'hTrMT Report Nos.

50-280/82-15 and 50-281/82-15 Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37 Licensee:

Virginia Electric and Power Company Richmond, VA 23262 Facility Name:

Surry Nuclear Power Station 1 and 2 Inspection at:

Near Williamsburg, VA Inspection conducted: June 1-4, 1982 Date of Last Physical Security Inspection Visit: December 20-23, 1981 Type of Inspection:

Unannounced Physical Security Inspector:

M af d

.. Aggt I. L. Hall, Physical Security Inspector ate Signed Approved by:

_

h 2-D. R. McGuire, Chief, Physical Protection D4te signed Section, Technical Inspection Branch Division of Engineering and Technical Programs Inspection Summary Areas Inspected:

Included Site Orientation; Security Plan and Implementing Procedures; Security Organization-Management; Security Organization-Personnel; Security Organization-Response; Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers-Protected Areas; Physical Barriers-Vital Areas; Security System Power Supply; Lighting; Assessment Aids; Access Control-Personnel; Access Control-Packages; Access Control-Vehicles; Detection Aids-Protected Areas; Detection Aids-Vital Areas; Alarm Stations; and Communications.

The inspection involved 40 inspector hours on site by one NRC inspector.

The inspection was begun during a regular work period.

Eight inspection hours were accomplished during offshift periods.

Results:

The licensee was found to be in compliance with NRC requirements within the 21 areas examined during the inspection.

S-F2 - N - /hl -

Copy C

ot_ fo Coples CCLOS'IE CONTAINS

//

Pages SAFEGUARDS INFORyJTION.

This Document is not to be UPON SEPARATION THIS reproduced without specifio PAGE IS DECONTROLLED.

approval of IE:II B206220313 820616 PDR ADOCK 05000280 Q

PDR SAFEGU%RDS INFORMATION


-

- -