IR 05000280/1997011
| ML20211N288 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 10/07/1997 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20211N276 | List: |
| References | |
| 50-280-97-11, 50-281-97-11, NUDOCS 9710160083 | |
| Download: ML20211N288 (2) | |
Text
__ _ _
, >
U.S. NUCLEAR REGULATORY COMMISSION
REGION II
Docket Hos 50-280 and 50-281
'
License Nos:
97-11 Licensees Virginia Electric and Power Company Facility:
Surry Power Station Location:
5570 Hog Island Road Surry, VA 23883 Date:
September 24, 1997 Inspector:
D. Thompson, Safeguards Inspector Approved by:
Caudie A. Julian, Acting Chief Special Inspections Branch
'
Division of Reactor Safety 9710160083 971007 PDR ADOCK 05000200
PDR k%yg =
.%
--
-l
.
-
_ _ _ - _ _ _ _ - _ _ - _ _ - _ _ _ _ _ _ _ - _
___
.
.
'
SAFEGUARCS INFORMATION EXECUTIVE SUMMARY Surry Power Station NRC Inspection Report 50-280/281/97-11 This routine announced inspection was conducted in the area of plant support by a regional safeguards specialist.
The specific area evaluated was the Malevolent Use of Vehicles at Nuclear Power Plants.
The inspector concluded that the vehicle barrier system,
using a combination of gates, jersey barriers, bollards, buildings, and terrain, was an acceptable barrier capable of stopping a design basis vehicle traveling at the established speed prior co the vehicle penetrating the protected area
perimeter and causing damage to vital equipment.
The inspector concluded that the engineering staff had performed an excellent analysis of the vehicle threat and had installed a superior vehicle barrier to counter the threat.
(S2.5.1)
The inspector determined that the licensee had installed the
vehicle barrier at a distance that would preclude an explosion from a bomb-laden vehicle from causing damage to vital targets required for the safe shutdown of the reactor.
(S2.5.2)
Based on the inspector's review of the vehicle barrier
system procedures and in discussion with the licensee, the inspector concluded that the plans and procedures were acceptable for implementing the vehicle barrier system.
(S2.5.3)
!
% = - a.o
,
emta.n. nn.w
% m un%%
n ""*""%"*a =
-