Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000280/19993028 September 1999NRC Operator Licensing Retake Exam Repts 50-280/99-302 & 50-281/99-302 for Retake Exam Tests Administered on 990824. Exam Results:One SRO Candidate Received Part B re-take Operating Exam & PassedJob Performance Measure
IR 05000280/199930114 May 1999NRC Operator Licensing Exam Repts 50-280/99-301 & 50-281/99-301 (Including Completed & Graded Exams) for Tests Administered on 990329-0401 & 990412-15Shutdown Margin
Reserve Station Service Transformer
Job Performance Measure
Coast down
IR 05000280/199800513 July 1998Insp Repts 50-280/98-05 & 50-281/98-05 on 980503-0613.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant SupportLiquid penetrant
Pressure Boundary Leakage
Through-Wall Leak
Through Wall Leak
Unidentified leakage
IR 05000280/19970117 October 1997Partially Withheld Insp Repts 50-280/97-11 & 50-281/97-11 on 970924 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Plant Support by Regional Safeguards SpecialistSafe Shutdown
ML20216B25829 August 1997Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Licensee Failed to Monitor Performance & Establish Goals Commensurate W/Safety for Emergency Switch Gear Heating VentilationSafe Shutdown
Boric Acid
Emergency Lighting
Maintenance Rule Program
PNO-II-93-062, on 931115,Unit 2 Tripped from 95% Reactor Power.Caused by Three Main Feedwater Regulating Valves Closed.Unit Has Been Taken to cold-shutdown to Investigate Cause of SG Level Oscillations16 November 1993PNO-II-93-062:on 931115,Unit 2 Tripped from 95% Reactor Power.Caused by Three Main Feedwater Regulating Valves Closed.Unit Has Been Taken to cold-shutdown to Investigate Cause of SG Level Oscillations
IR 05000280/199330020 October 1993Exam Repts 50-280/93-300 & 50-281/93-300 on 930920-24.Exam Results:Three SROs Passed Exam & One Out of Four ROs Failed Exam
PNO-II-93-037, on 930820,unscheduled Shutdown in Excess of 72 H Occurred Due to Need to Repair Leak in Joint on SG B. RCS Temp Reduced Below 200 Degrees F.Licensee to Inspect Drain Valve Assemblies on Sg.State of VA Notified23 August 1993PNO-II-93-037:on 930820,unscheduled Shutdown in Excess of 72 H Occurred Due to Need to Repair Leak in Joint on SG B. RCS Temp Reduced Below 200 Degrees F.Licensee to Inspect Drain Valve Assemblies on Sg.State of VA Notified
IR 05000280/199102223 August 1991Insp Repts 50-280/91-22,50-281/91-22,50-338/91-18 & 50-339/91-18 on 910731 & 0801-02.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Pipe Wall Thinning Insp & Replacement ProgramNondestructive Examination
IR 05000280/19910158 July 1991Insp Repts 50-280/91-15 & 50-281/91-15 on 910520-22 & 0619. No Violations Noted.Major Areas Inspected:Isi Including Observation of Visual & Nondestructive Exams on Main Steam Sys Piping WeldsBoric Acid
Nondestructive Examination
Liquid penetrant
IR 05000280/199100917 April 1991Insp Repts 50-280/91-09 & 50-281/91-09 on 910326-29.No Violations Noted.Major Areas Inspected:Audits & Appraisals, Training & Qualifications External Exposure Control,Control of Radioactive Matl & Contamination
IR 05000280/199100612 April 1991Insp Repts 50-280/91-06 & 50-281/91-06 on 910224-0330. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Surveillance,Procedures,Esf Sys Walkdown & Review of Licensee Self Assessment CapabilitiesBoric Acid
Fitness for Duty
Temporary Modification
Grace period
ML20128Q54212 April 1991Notice of Violation from Insp on 910224-0330.Violation Noted:Periodic Surveillance 2-PT-18.61 & PT-53.3 Were Not Performed within TS Period City Requirements
PNO-II-90-066, on 901023,util Made 1 H Rept Per 10CFR50.72 Re Entry Into Station Emergency Plan for Shutdown of Unit 2. Caused by Svc Water Flow,Less That Design Basis Required Flow.Licensee Currently Evaluating Situation23 October 1990PNO-II-90-066:on 901023,util Made 1 H Rept Per 10CFR50.72 Re Entry Into Station Emergency Plan for Shutdown of Unit 2. Caused by Svc Water Flow,Less That Design Basis Required Flow.Licensee Currently Evaluating Situation
IR 05000280/199002324 August 1990Partially Withheld Insp Repts 50-280/90-23 & 50-281/90-23 on 900723-27 (Ref 10CFR 2.790(d)).Major Areas Inspected: Review of Procedures,Records,Operations & Physical Inventory for Use,Control & Accountability of SNM
PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing21 September 1989PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing
IR 05000280/198805011 January 1989Partially Withheld Insp Repts 50-280/88-50 & 50-281/88-50 on 881212-16 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program,Mgt Support,Plans,Audits,Barriers & Assessment
IR 05000280/198804026 October 1988Insp Repts 50-280/88-40,50-281/88-40,50-338/88-28 & 50-339/88-28 on 880926-30.No Violations or Deviations Noted. Major Areas Inspected:Control Room Habitability & Insp Followup ItemsSafe Shutdown
ML20155F5038 June 1988EN-88-048:notifies of Intent to Issue Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000 to Util,Based on Number of Violations,Including Failure to Adequately Evaluate Radiation Hazards Re Incore Detector
ML20155F5808 June 1988EN-88-047:on 880613,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000 Will Be Issued to Licensee.Action Based on Failure to Verify Boric Acid Piping Heat Tracing Circuits on Monthly BasisBoric Acid
PNO-II-88-011, on 880206,slight Positive Pressure Created in Primary Drain Tank Due to Large Vol of Water & Overhead Gas Compressor Inoperable,Causing Gaseous Leak in Auxiliary Bldg.Cause Not Stated8 February 1988PNO-II-88-011:on 880206,slight Positive Pressure Created in Primary Drain Tank Due to Large Vol of Water & Overhead Gas Compressor Inoperable,Causing Gaseous Leak in Auxiliary Bldg.Cause Not Stated
PNO-II-87-078, on 871126,licensee Removed Unit 1 from Svc to Repair Leaking Manway Cover on Secondary Side of C Steam Generator.Unit Cooled Down & Manway Gasket Replaced. Commonwealth of Virginia Informed30 November 1987PNO-II-87-078:on 871126,licensee Removed Unit 1 from Svc to Repair Leaking Manway Cover on Secondary Side of C Steam Generator.Unit Cooled Down & Manway Gasket Replaced. Commonwealth of Virginia Informed
PNO-II-87-061, on 870920,automatic Trip from 100% Power Occurred.Caused by Phase to Ground Fault in B Phase at Electrical Connection on B Reactor Coolant Pump.Safety Injection Signal Reset21 September 1987PNO-II-87-061:on 870920,automatic Trip from 100% Power Occurred.Caused by Phase to Ground Fault in B Phase at Electrical Connection on B Reactor Coolant Pump.Safety Injection Signal Reset
PNO-II-87-053A, on 870730,State of Ny,Dept of Environ Conservation & Dept of Radiation Health Completed Survey of Miscellaneous Boxes & Equipment W/Markings from VEPCO Found in Abandoned Bldg in Springwater,Ny.No Problems Noted30 July 1987PNO-II-87-053A:on 870730,State of Ny,Dept of Environ Conservation & Dept of Radiation Health Completed Survey of Miscellaneous Boxes & Equipment W/Markings from VEPCO Found in Abandoned Bldg in Springwater,Ny.No Problems Noted
PNO-II-87-053, on 870728,licensee Notified That Fireman Discovered Miscellaneous Boxes & Equipment in Abandoned Bldg Outside Springwater,Ny.Matl Might Be Clean Surplus Matl Disposed of After Cancellation of North Anna 329 July 1987PNO-II-87-053:on 870728,licensee Notified That Fireman Discovered Miscellaneous Boxes & Equipment in Abandoned Bldg Outside Springwater,Ny.Matl Might Be Clean Surplus Matl Disposed of After Cancellation of North Anna 3
PNO-II-87-040, on 870623,unit Manually Shut Down Following Estimated 40 Gpm Leak in Rcs.Caused by Packing on Reactor Coolant Loop Stop Valve.Licensee Preparing Unit to Go to Mode 5 to Effect Repairs23 June 1987PNO-II-87-040:on 870623,unit Manually Shut Down Following Estimated 40 Gpm Leak in Rcs.Caused by Packing on Reactor Coolant Loop Stop Valve.Licensee Preparing Unit to Go to Mode 5 to Effect Repairs
IR 05000280/198701122 June 1987Insp Repts 50-280/87-11 & 50-281/87-11 on 870427-0501.Three Potential Enforcement Findings Noted.Major Areas Inspected: Audit Performed in Feb 1987 by Util of Industrial DistributorsNondestructive Examination
PNO-II-87-037, on 870607,licensee Entered 24 H Limiting Condition for Operation When Outside Recirculation Spray Pump B Failed Periodic Surveillance Test Due to High Vibration & Low Discharge Pressure.Unit Shut Down9 June 1987PNO-II-87-037:on 870607,licensee Entered 24 H Limiting Condition for Operation When Outside Recirculation Spray Pump B Failed Periodic Surveillance Test Due to High Vibration & Low Discharge Pressure.Unit Shut Down
IR 05000280/198700921 May 1987Insp Repts 50-280/87-09 & 50-281/87-09 on 870405-0502.No Violations Identified.Major Areas Inspected:Licensee Actions on Previous Enforcement Matters,Plant Operations,Maint & Surveillance & LER Review & 10CFR21 ReviewsBoric Acid
Offsite Dose Calculation Manual
PNO-II-87-032, updates PNO-II-87-029.Util Determined That Partial Closure of Isolation Valve Which Brought About Reactor Scram on 870516 Caused by Shearing of Valve Stem Above Backseat.Metallurgist Evaluating Break21 May 1987PNO-II-87-032:updates PNO-II-87-029.Util Determined That Partial Closure of Isolation Valve Which Brought About Reactor Scram on 870516 Caused by Shearing of Valve Stem Above Backseat.Metallurgist Evaluating Break
PNO-II-87-029, on 870516,unit Tripped on Low Reactor Coolant Flow Rate in Loop A.Caused by Partial Closure of Hot Loop Isolation Valve.Outage of 12 Days Planned to Correct Problem.Resident Inspector Will Provide Followup18 May 1987PNO-II-87-029:on 870516,unit Tripped on Low Reactor Coolant Flow Rate in Loop A.Caused by Partial Closure of Hot Loop Isolation Valve.Outage of 12 Days Planned to Correct Problem.Resident Inspector Will Provide Followup
ML20209E17230 March 1987Exam Rept 50-280/OL-87-01 Administered on 870209-11.Exam Results:Two Reactor Operators & Three Senior Reactor Operators Passed Exams.Written Exam & Answer Key Encl
ML20205Q14824 March 1987Notice of Violation from Insp on 870209-13
IR 05000280/198700320 March 1987Insp Repts 50-280/87-03 & 50-281/87-03 on 870209-13. Violations Noted:Failure to Adhere to Radiation Control Procedures,To Comply W/Low Level Radwaste Disposal Facility Agreement State License Conditions & W/Dot RegulationsHigh Radiation Area
Locked High Radiation Area
Process Control Program
Exclusive Use
Overexposure
IR 05000280/19870046 March 1987Insp Repts 50-280/87-04 & 50-281/87-04 on 870201-28.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint,Surveillance,Licensee Action on Previous Enforcement Matters & TMI Action Item CloseoutBoric Acid
Post Accident Monitoring
ML20207T5822 March 1987Notice of Violation from Insp on 861113-20 & 870209
IR 05000281/198603623 February 1987Insp Rept 50-281/86-36 on 861113-20 & 870209.Violations Noted:Failure to Properly Valve Penetrations for Type a Test in Accordance w/10CFR50,App J.Four Unresolved Items IdentifiedExemption Request
PNO-II-87-011A, on 870213,leak Discovered in Svc Water Line Below Floor of Unit 2 Turbine Bldg.Util Will Replace Defective Portion of Unit 2 Side of Svc Water Piping.Unit 1 Side of Same Sys Tested & Acceptable18 February 1987PNO-II-87-011A:on 870213,leak Discovered in Svc Water Line Below Floor of Unit 2 Turbine Bldg.Util Will Replace Defective Portion of Unit 2 Side of Svc Water Piping.Unit 1 Side of Same Sys Tested & Acceptable
IR 05000280/198700218 February 1987Insp Repts 50-280/87-02 & 50-281/87-02 on 870202-06.No Violations or Deviations Noted.Major Areas Inspected:Exam Onsite in Area of Info Notices,Unplanned Radiological Releases,Effluent Monitors & Effluent ReportingOffsite Dose Calculation Manual
Process Control Program
IR 05000280/198604112 February 1987Insp Repts 50-280/86-41 & 50-281/86-41 on 861207-870131.No Violations or Deviations Noted.Major Areas Inspected:Action on Previous Enforcement Matters,Plant Operations,Maint & Surveillance & IE Bulletin Followup
PNO-II-87-011, heatup of Unit 1 Beginning in Preparation for Return to Svc.Restart of Unit 2 Scheduled 2 to 3 Wks Later.Licensee Informed of Region II Acceptance of Restart Plan in 870210 Augmented Insp Team Rept12 February 1987PNO-II-87-011:heatup of Unit 1 Beginning in Preparation for Return to Svc.Restart of Unit 2 Scheduled 2 to 3 Wks Later.Licensee Informed of Region II Acceptance of Restart Plan in 870210 Augmented Insp Team Rept
ML20211C51610 February 1987Augmented Insp Repts 50-280/86-42 & 50-281/86-42 on 861209- 870114.Violation Noted:Failure to Fully Follow Procedures, Provide Adequate Instruction for & Document Performance of Maint Operations
IR 05000280/198604210 February 1987Augmented Insp Repts 50-280/86-42 & 50-281/86-42 on 861209- 870114.Violation Noted:Failure to Fully Follow Procedures, Provide Adequate Instruction for & Document Performance of Maint Operations
ML20211C47810 February 1987Notice of Violation from Insp on 861209-870114
IR 05000280/19870014 February 1987Insp Repts 50-280/87-01 & 50-281/87-01 on 870112-15.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection Sys Interaction Events Associated w/861209 Feedwater Pipe RuptureFire Barrier
ML20212F9006 January 1987Notice of Violation from Insp on 861020-23 & 27-31
IR 05000280/198603829 December 1986Insp Repts 50-280/86-38 & 50-281/86-38 on 861102-1206.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance,Outages,Followup on Region Identified Items & Insp of Dry Spent Nuclear Fuel FacilityBoric Acid
Stroke time
Hydrostatic
IR 05000280/198604023 December 1986Insp Repts 50-280/86-40 & 50-281/86-40 on 861129-1203.No Violations or Deviations Noted.Major Areas inspected:post- Refueling Startup Tests,Thermal Power Determination & RCS Leakage MeasurementsUnidentified leakage
PNO-II-86-091D, licensee Repts Two Addl Deaths Occurred as Result of Injuries from 861209 Accident.Caused by Break of 18-inch Feedwater Sys Suction Line Scalding Eight Workers W/Hot Water & Steam.Number of Dead Now Four16 December 1986PNO-II-86-091D:licensee Repts Two Addl Deaths Occurred as Result of Injuries from 861209 Accident.Caused by Break of 18-inch Feedwater Sys Suction Line Scalding Eight Workers W/Hot Water & Steam.Number of Dead Now Four
PNO-II-86-091C, ultrasonic Testing of Unit 1 Piping Elbow Disclosed Min Pipe Wall Thickness of 0.16 Inch.Design Specs Require 0.36 Inch Min Thickness.Ultrasonic Testing Continuing15 December 1986PNO-II-86-091C:ultrasonic Testing of Unit 1 Piping Elbow Disclosed Min Pipe Wall Thickness of 0.16 Inch.Design Specs Require 0.36 Inch Min Thickness.Ultrasonic Testing Continuing