Forwards Results of Survey Re Compliance W/Rsb 5-1 Natural Circulation Test Criterion for Westinghouse PWRs
ML20209D853
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 01/30/1985
From: Novak T
Office of Nuclear Reactor Regulation
To: Houston R
Office of Nuclear Reactor Regulation
Shared Package
ML082410749 List: ... further results
References
FOIA-86-197 TAC-51638, NUDOCS 8502070099
Download: ML20209D853 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

DISTRIBUTION:

January 30, 1985 Central Files LB #4 r/f EAdensam MEMORANDUM FOR:

R. Wayne Houston, Assistant Director L01shan for Reactor Safety gl Division of Systems Integration oo BYoungblood FROM:

Thomas M. Novak, Assistant Director JStevens for Licensing CStahle Division of Licensing KJabbour GKnighton

SUBJECT:

TESTING TO SATISFY BRANCH TECHNICAL POSITION 5-1 FOR WESTINGHOUSE PWRS By memorandum dated September 26, 1984, you requested a survey of Westinghouse plants that were issued an operating license after January 1,1979, te determine their compliance with RSB 5-1 natural circulation test criterion as stated in Cartion 5 of their SERs. Enclosed are the results of that survey for plants in LB 1-4.

Individual project managers should be contacted for review of any test results and/or comparisons that are already submitted.

If 'a plant needs to do more to demonstrate compliance with RSB 5-1 natural cir-culation test criterion, we recommend that only a comparison with the Diablo Canyon test be required.

/S/

Thomas M. Novak, Assistant Director for Licensing Division of Licensing

Enclosure:

As stated Ob1b L:LB #4

  1. 4

@Tfmvak

(

JHopkins/hmc EAdensam

)

1/y/85 1/6/85 1$/85 4

~

7 ENCLOSURE PLANT SURVEY RESULTS st Diablo Canyon 1 Test to be performed; expected 1 quarter CY85.

Sequoyah 1 (2) 9 natural circulation tests have been performed.

McGuire 1 (2) 4 natural circulation tests have been performed.

Summer Test comparison submitted 8/84.

Callaway 1 Commitment to make a comparison with Diablo Canyon 1 test results.

Byron 1 Commitment to make a comparison with Diablo Canyon 1 test results.

Catawba 1 No commitment; however, a Duke Power Co. plant like McGuire 1 (2).

\\