Text
- 3
.~
- ---, u.:;
. ')
~
- L tfmm{o,,
UNITED STATES NUCLEAR REGULATORY COMMISSION a
'6 MASHINGTON, o. C. 20655
/
- ,,e*
N2 0 %
Docket Nos.:
50-275 and 50-323 MEMORANDUM FOR: Attached List 3
THRU:
George W. Knighton, Chief Licensirg Branch No. 3
/
)
Division of Licensing
//.
j FROM:
Hans Schierling, Project Manager Licensing Branch No. 3 1
Division of Licensing
]j
SUBJECT:
SALP{NPUTFORDIABLOCANYON l
The SALP Board for Diablo Canyon Unit 1 and Unit 2 is currently scheduled to meet on October 17, 1984.
In accordance with NRR Office Letter No. 44, "NRR Inputs to SALP Process," you are raquested to provide input to the NRR SALP evaluation for NRR activities on Diablo Canyon Unit 1 for the 18 month period
' i;j from January 1, 1983 through June 30, 1984.
I is the listing of the NRR activities selected for evaluation i
including the assigned individual. It is noted that the activities do not always cover the entire 18 month period. You are requested to evaluate each of the activities from the NRR perspective witit regard to the 7 1
criteria provi:$ed in Enclosure 2. You should designate PG&E's performance as Categon/ 1, 2 or 3 in accordance with the definitions in Enclosure 2.
An overall performance category should also be provided. Specific elements to be considered in the evaluation are given in NRC Manual Chapter 0516.
5 r
This evalt& tion is for Diablo Canyon Unit 1 only.
You should identify any NRR s
effott during the evaluation period that specifically relates to Unit 2.
If you previously provided any SALP input on Diablo Canyon for the evaluation period, please indicate.
You are requested to provide your SALP input by September 26, 1984 in accordance with the attached format (Enclosure 3).
(lmh
- 0704290090 8704*7, Ha'ns Schierling, Project Manager
.i pDR FOIA Licensing Branch No. 3 HOLMESe6-197 PDR Division of Licensing i+
cc:
D. Eisenhut R. Vollmer R. Bernero i
T. Speis g
H. Thompson j
p T. Novak m.a h _.
,a..-.._.-..;..,....,,..-
1
.n A'
. = -
z..
.;y
... ~
l ADDRESSEES:
J. P. Knight
,1 P. T. Kuo H. Polk M. Hartzman J. Wemiel H. Walker D. Lasher F. Coffman F. niitt J. Pulsipher T. Marsh C. Liang i
R. Bosnak
'I
~
K. Manoli T. Sullivan L. Reiter
-L. Crocker l
F. Anderson
~
R. Heischman D. Kubicki i
B. Buckley i
S. Brocoum I
I i
i 1
1 0
i I
_......_m_..._.__....._..._
' ~
3:-
.g.
j l
i Diablo Canyon Unit 1 i
Selected NRR Review and Licensing Activities
~
SALP Period January 1, 1983 - June 30, 1964
-l I
I 1.
IOVP, ITP, Related NRC Issues (SSERs 18, 19, 20 and 24)
Review Period 1/1/83 - 3/31/84 (overall evaluation J. P. Knight) l a.
seismic aspects in civil / structural area (P. T. Kuo, H. Polk) 1 i
b.
piping, supports and mechanical equipment, excluding recent effort by Review Group (M. Hartzman) t c.
auxiliary systems (J. Wermiel) i d.
equipment qualification (H. Walker) l 2.
Allegations (effort related to SSER 21, 22 and 26) a.
CCW operational limits (J. Wermiel) b.
systems interaction program (D. Lasher, F. Coffman) c.
coating concerns (F. Witt, J. Pulsipher) d.
RHR low flow alarm (T. Marsh, C. Liang) e.
bolted connections (H. Polk) t 3.
Pipina and Supports Review Effort,(allegations, staff concerns, license conditions, effort related to SSER 25)
(evaluation to be provided by each of NRC participants:
J. P. Knight, R. Bosnak, M. Hartzman, K. Manoli, T. Sullivan) 4.
Seismic Desian Bases Reevaluation Program (S. Brocoua, L. Reiter) 1 5.
Shift Advisor Qualifications (L. Crocker) 6.
Technical Specifications (F. Anderson) 7.
Programmatic Provisions for Onsite Activities (engineering, training, procedure controls, QA audits and findings) (R. Heishman) 8.
Fire Protection (D. Kubicki) 9.
SSER 27 and License Amendment 10 Activities (B. Buckley) 10.
Event Reporting (G. Holahan) 1
.,,,...a
- -*a m ar= emere w m*=
- =***-s-*******
- '.N****
. 3. y
.;.y.,.. t.
c :-
-1 q.
t I.
Evaluation Criteria (1) Management involvement in ass'uring quality (2) Approach to resolution of technical issues from safety standpoint (3) Responsiveness to NRC initiatives
'1 (4) Enforcement history (5) Reporting and analysis of reportable events (6) Staffing (including management) s i
(7) Training effectiveness and qualification
-i l
II. SALP Performance Categories Category 1.
A combination of attributes which demonstrates achievement of superior safety performance; i.e., licensee management attention and involvement are agressive and oriented toward nuclear safety; licensee resources are ample and effectively j
used such that a high level of performance with respect to operational safety l
or construction is being achieved.
1 Category 2.
i A combination of attributes which demonstrates achievement of satisfactory i
safety performance; i.e., licensee management attention and involvement are l
evident and are concerned with nuclear safety; licensee resources are adequate j
and are reasonably effective such that satisfactory performance with respect to operational safety or construction is being achieved.
i i
Category 3.
A combination of attributes which demonstrates achievement of only minimally satisfactory safety performance; i.e., license management attention or involve-ment is acceptable and considers nuclear safety, but weaknesses are evident; licensee resources appear to be strained or not effectively used such that minimally satifactory performance with respect to operational safety or construction is being achieved.
i
.-c l
Ii SALP Evaluation Diablo Canyon Unit 1. January 1,1983 - June 30,1984 NRR Activity:
,t Prepared by:
Branch:
I,'
Overall Performance Category:
9 Evaluation Performance I
Criterion Category Basis 1
- s 7'
'{
1.
Management Involvement in Assuring Quality
-s
,*i c.
J2 2.
Approach to Resolution of b
Technical Issues from Safety Standpoint I
i 3.
Responsiveness to NRC I,
i Initiatives
,i :
e 3
1 V<
,j 4
Enforcement History h}
i, 1
5.
Reporting and Analysis of Reportable Events 4
6.
Staffing (Including l~
Management) 7 i'.
.,j, i
7.
Training Effectiveness and Qualification
'l
--