ML16340B547

From kanterella
Jump to navigation Jump to search

Responds to 810311 Request for Status of Outstanding Issues. Delineates Util Submittals W/O SER Input & Expected Util Submittals.Tmi & non-TMI Full Power SERs Expected Out by 810331 W/Environ Qualifications & Breakwater Items Open
ML16340B547
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/19/1981
From: Buckley B
Office of Nuclear Reactor Regulation
To: Tedesco R
Office of Nuclear Reactor Regulation
References
NUDOCS 8104020073
Download: ML16340B547 (10)


Text

'E M+ >S 1981 MEMORANDUM FOR:

R, L. Tedesco, Assistant Director for Licensing, DL FROM:

THRU:

SUBJECT:

B.

C. Buckley, ProJect Manager, Licensing Branch No. 3, DL F. J. Miraglia, Acting Chief, Licensing Branch No. 3, DL STATUS OF OUTSTANDING ISSUES ON DIABLO CANYON, UNITS 1

& 2 As requested by your March 11, 1,981 memorandum, enclosure (1) delineates the issues for which information from PG&E has been submitted but.no SER input have been received.

Enclosure (2) identifies those issues that PG&E must provide and the ex@ected submittal dates from PG&E.

I am still optimistic; for"getting-both TMI'nd non-TMI'fullppower SER s out by March 31, 1981, b'ut with the following items open:

TMI SER - Environmental gualifications

- Emergency planning Non-TMI SER - Breakwater I would like to point out that K. Jabbour is completing the non-TMI SER due out March 31, 1981.

cc:

H. Denton D. Eisenhut Division Directors K. Jabbour Bart Buckley, Project Manager Licensing Branch No.

3 Division of Licensing 8 a04088 ~~

DISTRIBUTION'OCKET FILE 50-275/323 PDR LPD)

NSI;C TERA LB3 File BBuckley FMiraglia JLee OFF1CEQ SURNAME/

DATE/

DL, BCBuc ley:j

~ ~ ~ ~ ~ ~ ~

3/Q/81 Lb Fg) g ia 8

NRC FORM 318 (lO/801 NRCM 0240 OFFICIAL RECORD COPY

. e USGPO: 1980-329 824

I 4

'I

'I p

I II

'L X f

'I tl Q'I

'l l gD.Q, RBGII

~o cs rw csO

~eke,@Q-sh sh *gs 4 UNITED STATES NUCL'EAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 M+ >S tSsi SUBJECT.:

'EMORANDUM FOR:

R. L. Tedesco, Assistant Director for Li'censina, DL FRDN:

B.

C. Bockley, Project Nanager, Licensing Branch No. 3, DL THRU:

Q,t.'F. J. Niraglia, Acting Chiet',Licensing Branch No. 3, DL STATUS OF OUTSTANDING I'SSUES ON DIABLO CANYON, UNITS 1

& 2 As requested by your March ll, 1981 memorandum, enclosure (1) delineates the issues for which information from PG&E has been submitted but no SER input have been received.

Enclosure (2) i'dentifies those issues that PG&E must provide and the expected submittal dates from PG&E.

I'm stil1 optimistic for getting both TNIrca'nd non'-TMI full.'power-SEg's"out by March 31, 1981, but with the following items open:

TMI SER

-. Environmental qualifications

- Emergency planning Non-TMI'ER - Breakwater I would like to point out that K. Jabbour.is completing the non-TMI SER due out March 31, 1981.

cc:

H. Denton D. Ei.senhut Division Di'rectors K. Jabbour Bart Buckley Project Mansager Llcensi'ng Branch No.

3 Division of Li'censing

0 f i

ENCL09"RE 1 OPEN ISSUES -

INFORtrATION HAS BEEN SUB.'IITTED BY PEARSE Plant Name:

Diablo Canyon, Units 1

and 2

Technical Input to DL for Full Power SSER:

3/17/81

, Project 8anaaer:

Bart Buckley Extension:

28355 Date:

Parch 20, 1981 (5:00)

DIVISION BRANCH 9SI RSB REV IEMER Orr Or EN.ISSUES II.K.2 Item 13 - Thermal Mechanical Reoort Item 17 - Voiding in RCS Item 19 Benchmark Analysis SEO.

AFW Flow II.K.3 Item 1

Auto PORV Isol.

Item 5 - Auto Trio of RCPs Item 17 ECCS outaaes Item 25 - Effect of Loss of AC power on Pump seals Item'30 - SB LOCA Analysis Item 31 - Plant Specific Analysis STATUS S

S S

COHHENTS Exoect SER inout 3/20/81 Expect SER input 3/20/81 Expect SER input 3/20/81 Exoect SER inout 3/20/81 Expect SER input 3/20/81, II II II II II II II II II I(

II II DE CSB EQB OAB Pulsipher Ashe Spraul II.F.l Items 2(d), 2(e},,2(f)

S II'.E.4.2 Containment Isolation De endabilit S

II.B.2 Plant Shielding Equip. Oval.

Applicants response to NRC letter of 1/22/81 on OA Proqram this is not, the same as OA-01 list

~

S

ENCLOSURE 1

OPEN ISSUES INFORflA ION HAS BEEN S"""MITTED BY P":~E Plant Na~':

Diablo Canyon, Units 1

and 2-Technical Input to DL for.Full Power SSER:

3/17/81 Project !!anaaer:

Bart Buckley Extension.

28355 Date:

March 20, 1981 (5:PO)

DIVISION EPPO NMSS BRANCH EPLB.

REV I EHER Van Kniel OPEN ISSUES Earthauake letter Security STATUS CÃlMENTS SER input due 3/20/81

II V

ENCLOSURE 2

OPEN ISSUES INFORl1ATION HAS NO BEEN SUBMITTED T('l:8E Pl'an'. '!a-,e'Diablo Canyon, Units 1

and 2, Techn

=>,I, Input to DL for Full Power SSER:

3/17/81 Project ~!anaper:

Bart Buckley Extension:

28355 Date:

/'arch'20, 1981 (5:00) 0 IV I S ION BRANCH DSI

= CPB AEB REVIEWER Huano Lewis OPEN ISSUES II.F.2 Instr. for detection of Inadequate Core Cooling III.A.2 A pendi,x A Meteoroloqy STATUS COMMENTS Due 3/20/81 Draft due in 3/20/81 DE EQB OAB HTEB HGEB CHEB Ashe Spraul Halapatz Fliegel Harrison Envir. Qual. of Class IE Eq.

Acceptability of OA-Ol list, GDC-51 Breakwater structure damage Appendix R

Fire Protection Meeting scheduled for 3/20 Draft due in 3/24/81 Discussion with applicant continuina, expect issue to be resolved on 3/20/81 Final submittal due 3/24/81 Due in 3/24/81 Draft due 3 20 81

pe SAR ~4 1')