Requests Addl Info Re Buried Electrical Conduits,Including Mechanical Properties of Conduit,Per 841002-05 & 1107-08 Design Calculation Audits.Info Requested by 841231
ML20209B894
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 12/14/1984
From: Lear G
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML082410749 List: ... further results
References
FOIA-86-197 NUDOCS 8704280536
Download: ML20209B894 (2)


Text

.

  1. ps* **Guq'o, UNITED STATES

[?

s %,V[ j NUCLEAR REGULATORY COMMISSION 7,.

C WASHINGTON, D. C. 20555 if I

/

DEC 141984 Docket No. 50-323 MEMORANDUM FOR:

, ChiefI Division of Licensing FROM:

George E. Lear, Chief Structural & Geotechnical Engineering Branch Division of Engineering

SUBJECT:

REQ

  • JEST FOR ADDITIONAL INFORMATION ON BURIED ELECTRICAL CONDUITS FOR DIABLO CANYON UNIT 2 Based on the Unit 2 design calculation audits of October 2-5 and November 7-8, 1984 the Structural and Geotechnical Engineering Branch (SGEB) finds that additional information on the buried electrical conduit is required from the licensee before the adequacy of the design can be assessed. The particular information necessary is:

A.

Design calculations used to qualify the conduit between the pull boxes.

B.

The soil properties along the conduit runs.

C.

The mechanical properties of the conduit.

D.

The mechanical characteristics of the flexible joints used to isolate the conduit from the pull boxes, including the spring constants for the lateral and axial translaticrs.

E.

Movements of the pull boxes due to earthquake motion.

This information should be provided by December 31, 1984 in order to support the current projected schedule.

c/

J hpWW George IL/ Lear, Chief Structural & Geotechnical Engineering Branch Division of Engineering cc: See next page 0