Attachrant A ST HL AE-2850 File No.: C9.11/Q39.

Page 1 of 2 Quality Assurance Program Description for the Design and Construction of the ,.

South Texas Project Revision 22 Principal Changes Part A. Houston Lighting _& Power Company (HL&P QAPD)

The following sections were revised to reflect the present organization and assignment of responsibilities.

< Section 1.0

1. Previous Paragraph 1.4 b was deleted. The Manager, Nuclear Engineering no longer has Project activities. The subsequent subparagraphs were renumbered accordingly.
2. Paragraph 1.5.2 was revised to clarify responsibilities for the Manager, Engineerin5 and Licensing; added Licensing personnel.
3. Paragraph 1.5.3 was revised due to minor clarification of the responsibilities of the Principal Engineer, Project Site.
4. Previous Paragraphs 1.5.4 and 1.5.5 were deleted. Responsibilities delineated in these paragraphs are now assigned to icwer tier management levels. The subsequent paragraphs wet'e renumbered accordingly.
5. Paragraph 1.5.4 (previous Paragraph 1.5.6) was revised to incorporate new title and reporting structure; title now is Project Controls Program Director.
6. Paragraph 1.5.5 (previnus Paragraph 1.5.7) was revised to incorporate new title and responsibilities; title now is Manager, Records Management System.
7. Paragraph 1.5.6 was revised to incorporate new title and responsibilities; title now is Manager, Technical Services.  !
8. Added new Paragraph 1.5.7 to describe the responsibilities for the new position of Manager, Records Management and Document Control.
9. Previous Paragraph 1.5.11 was deleted; this department no longer has Project activities.
10. Paragraph 1.6.4 was revised; inspection verification is now Surveillance /

Effectiveness Inspection.

L

11. Paragraph 1.7 was revised to describe the current responsibilities of the Manager, Nuclear Training.
12. Previous Paragraph 1.8 was deleted; the Manager, Nucicar Engineering no longer has Project activities. Subsequent paragraph was renumbered according1v.

LA/NRC/db 8311290175 831122 ,

ADOCK Oi'3)00490 PDR p PDC

5' Attachment A ST-HL-AE-2850 ,

File No.: C9.11/Q39.

Page 2 ef 2 Quality Assurance Program Description for the Design and Construction of the South Texas Project Revision 22 r rincipal Changes Part A, Houston _ Lighting & Power Upmpany (HL&P QAPD)

Section 2.0 Page 14, Paragraph 2.6 was revised to reflect the current management and administration of the site construction training program.

Section 5.0 Page 20, Section 5.0, second paragraph was revised to identify the current responsibilities for audits of HL&P Project Quality Assurance and Westinghouse.

Section 10.0 Page 26, next to last paragraph was revised; title for the inspection verification personnel is now Surveillance / Effectiveness Inspection.

Section 12.0 Page 28, Section 12.0, last paragraph was revised; title for the inspection verification personnel is now Surveillance / Effectiveness Inspection.

Section 18.0 Page 31, last paragraph was revised to identify the current HL&P Quality Assurance group responsible for audits of IIL&P Project Quality Assurance and Westinghouse. -

L4/NRC/db

=

Attachment B ST-HL AE-2850 File No.: G9.11/Q39.

Page'1 of 1 Quality Assurance Prograh Description for the Design and Construction of the South Texas Project Revision 22 Principal Changes Part B. Bechtel Energy _ Corporation (BEC QAPD)

INTRODUCTION Page 2 third paragraph - Editorial change to remove duplicate wording.

SECTION 1 Paragraphs 1.2, 1.2.2, 1.2.3, 1.3.1, 1.3.2, 1.3.4, 1.3.5, 1.3.5, 1.4, 1.4.2, 1.4.4, Table 1 and Figures 1, 2, 2A, 3, 4, 5, 6, 7, 8, 9, and 10 have been revised to reflect the latest organizational changes within the Bechtel l entities and to more clearly define th6 design / construction responsibilities during the completion phase of the project.

SECTION 2 Paragraphs 2.2, 2.4, 2.7, and 2.8 have been revised to reflect the latest organizational changes within the Bechtel entities.

SECTION 3 Third paragraph, page 22 and second paragraph, page 24 have been revised to reflect the latest organizational changes within the Bechtel entities. [

SECTION 18 Item 1,2, and 4 have been revised to reflect the latest organizational changes within the Bechtel entities, i

The above changes do not reduce Bechtel's previous QA programmatic '

commitments.

L i  !

l t

L4/NRC/db i

L . _ _ . _ . . _ _ _ __ ___._

Attachment C ST HL-AE-2850 File No.:.G9.11/Q39.

Page 1 of 5 Quality Assurance Program Description for the Design and Conatruction of the South Texas Project Revision 22 Principal Changes Part C. Ebasco QAPD GENERAL This revision of th3 Quality Assurance Program Description (QAPD) Part C, Revision 22, Inc.orporates changes to address a New York and Site reorganization, and to clarify the Training Section in regards to Reading Assignments.

CllANGES

1. "TABLE OF CONTENTS" Section (2 Pages)

Revision numbers and dates have been revised to reflect the revision of Sections QA I 1, QA-I 2, QA I 3, QA III 2, QA-III-6, QA-III-7, and QA-III-9, QA III-11 Appendix I and Appendix II.

2

2. SECTION QA I 1
a. Table I 1.2 and 1-1,3
1) Added QAI 011, this procedure was deleted in arror.
2) Deleted QAI 023 as it is no longer required due to the stage of comnletion at the South Texas Project.
3) Deleted CSP 94 and SSP 12 as these procedures are no longer required.
4) Deleted "N 5" from the title of SSP 21 due to procedure change.
3. SECTION QA-I 2 Delete the Manager Quality Assurance Site Servicem, the Manager Site Quality Assurance, and the Senior Consulting QA Engineer as these positions are not applicable to the South Texas Project, a) Paragraph 3.1, removeG subdivisions.

b) Deleted Paragraphs 3.1.1 and 3.1.1.1.

i i

L4/NRC/db

k Attachm2nt C ST-HL-AE-2850 File No.: G9.11/Q39.

Page 2 of 5 Quality Assurance Program Description for the Design and Construction or the South Texas Project Revision 22 Principal Changes Part C. Ebasco QAPD

3. SECTION QA-I-2 (cont.)

c) Renumbered Paragraph "3.1.1.2" to "3.1.1".

d) Renumbered Paragraph "3.1.1.2.1" to "3 *.2" and de?sted from 3.1.2 c) "'Jhen necessary, the Quality

  • m urance Site Supervisor may request the Manager Site Quali*, Assurance to assist in the review of quality control procedures."

e) Renumbered Paragraph "3.1.1.2.2" to "3.1.3" and reworded "staff of engineers and inspectors" to "staff of specialists and inspectors".

f) Renumbered Paragraph "3.1.1.2.3" to "3.1.3.1".

g) Renumbered Paragraph "3.1.2" to "3.1.4".

1) Subparagraph c) deleted "Site Quality Assurance".
2) Deleted Paragraph 3.1.3 and added Subparagraphs d) and e) which used to be Subparagraphs 3.1.3 s) and b).

h) Croated new Paragraph 3.2 by combining Paragraph 3.4 and Subparagraphs 3.4.2 a), b), and d).

i 1) Paragraph clarification.

, 2) Subparagraphs b) added "if requested" and deleted "and/or clients".

3) Subparagraph "d)" changed to "c)".

l i) Renumbered Paragraph 3.2 to 3.3 and rewrote to address new Corporato -

Organization.

1) Subparagraph b) added "installation /". [
2) Subparagraph c) rewritten to ad "Review Standard Site f Procedures applicable to Code related site welding operations performed by Ebasco Site Construction forces". ,
3) Subparagraph f) rewritten.

l t L4/NRC/db i

i f

Attachment C ST-HL-AE.2850 Fila No.: C9.11/Q39.

Page 3 of 5 Quality Assurance Program Description for the Design and Construction of the South Texas Project

. Revision 22 Principal Changes Part C. Ebasco QAPD,

3. SECTION QA.I.2 (cont.) '

1

4) Subparagraph h) deleted.
5) Subparagraph i) changed to h).
6) Subparagraph j) rewritten to adi "Review Standard Site Procedures related to site filler material control and monitor implementation of same."
7) Subparagraph k) deleted.
8) Subparagraph 1) changed to k).

j) Renumbered Paragraph 3.3 and 3.4.

k) De?oted Paragraph 3.4.1, 3.4.2, and 3.4.2.1.

4 1) Paragraph 4.1.1 rewritten for clarification.

i m) Paragraph 4.1.2 deleted.

n) Renumbered Paragraph 4.1.3 to 4.1.2 and rewritten for clarification.

i o) Renumbered Paragraph 4.1.4 to 4.1.3 and change title frem "Discipline Manger" to 'Unic Manager".

p) Paragraph 4.1.5 deleted, q) Renumbered Paragraph 4.1.5 to 4.1.4 r) Paragraphs 4.1.7, 4.1.8. and 4.1.9 deleted.

l s) Renumbered Paragraph 4.1.10 to 4.1.5 t) Paragraphs 4.1.11 and 4.1.12 deleted, u) Renumbered Paragraph 4.1.13 to 4.1.6 and change word in paragraph from "their" to "his".

v) Revised Figures I.2.2, 1 2.4, 1 2.6, I.2.7, and I 2.9.

L4/NRC/db

^*

Attachront C ST HL AE 2850 File No.: C9.11/Q39.

Page 4 of 5 Quality Assurance Program Description for the Design and Construction of the South Texas l'roject Revision 22 Principal Changes Part C. Ebasco QAPit.

4. SECTION QA.I-3 a) Paragraph 3.1, added "and reading assignments".

b) Paragraph 3.2 revised to read "organization's Training Department",

c) Paragraph 7.1, deleted "Quality Resources and Training Management".

5. SECT 10N QA.III.2 a) Paragraph 3.1.1, changed "Discipline" to "Unit".
6. SECTION QA-III-6 a) Paragraph 6.0, changed "Quality Systems / Administration (QS. .s)" to "Quality Assurance Analysis".
7. SECTION QA-III 7 a) Paragraph 3.1.2, changed
  • Site Quality Control" to "Quality Program Gite Manager".

b) Paragraph 5.0, changed "Quality Systems / Administration (QS/A)" to j "Quality Assurance Analysis",

t

8. SECTION QA.III 9 a) Paragraph 5.2, deleted requirements for retention of records and

! revised for retention in accordance with Client's Program.

9. SECTION QA.III.11 a) Paragraph 5.2, deleted requirements for retention of records and revised for retention in accordance with Client's Program.

I i

i l

l L4/NRC/db

Attachment C ST HL-AE 2850 File No.: C?.11/Q39.

Page' 5 of 5 Quality Assurance Program Description for the Design and Construction of the South Texas Ptsject Revision 22 Principal Changes Part C, Ebasco QAPD

10. APPENDIX I a) Client or His Designee, revised "Bechtel Energy Corporation" to "Eeehtel".

b) Added, "DESIGNEE - Unless otherwise stated, the responsibility assigned to a particular person may be delegat 4 in writing to a designee".

11. APPENDIX II a) Item #23, revised "Bechtel Energy Corporation (BEC)" to "Bechtel".

l i

I L4/NRC/db