Rev 5 to EOP-8, LOCA Cooldown
ML20199E446
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/19/1997
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20199E400 List:
References
EOP-8, NUDOCS 9711210208
Download: ML20199E446 (104)


Text

_. ._. _ _ . . -

(

U.S. Nuclear Mogulatory Commission 3F1197-48 Attachment G t

a t

l-

+

4 EOP 8 l LOCA COOLDOWN REVISION 5 (P) e n '

9711210208 971119 FDR ADOCK 05000302 P PDR ,

u

....__...-,-..-.~,.m__..,.m,., .--,,,,...,,n,,,--. .....,w.., . ...,, - , - . . , . . ~ , . . ., ....__,.mi

LOCACD REV05drftP E0P 08 j i

LOCA C00LOOW ,

j.0._INTRY CQl@l H M1 If directed by other procedures, f Iliffi use this procedure. i 2.0- IMEQIATE AGUME MIE - ,

There are no imediate actions for this procedure.

t W

{

Draft "P" printed from K:\opsadmin\eopdraft on November 19, 1997 i

Approved by HNPO _

Date (SIGNATURE ON FILE)

E0P 08 PAGE 1 of 103 LOCACD  :

nA* ,+ n - ,e -e ,we-, .. a-- rvs- ,.n--.--,,m-e v eS, w r,- w c> a-r -m e -s.- e ne e,,-a.. --  :.-,-n., ,-v - - , , - , . - .m..->-,~.v

i l

T l

t BLANK PAGE l

i i

i E0P-08 REV 05 drft P PAGE 2 of 103 LOCACD l

3.0 FOLLOW-UP ACT19lil  :

ACTIONS 0ETAILS STATUS Any of the following conditions exist: ,

o RCS leakage > 100 gpm ,

I o HPI PORY cooling e OTSG tube rupture  !

e -ICC recovery-3.1 Notify personnel of plant e __ STA s.

conditions, o Plant Operators e SSOD (evaluate plant conditions for potential entry into Emergency Plan) 3.2 Notify PPO to CONCURRENTLY -

PERFORM EUP-14, .

Enclosure 2, PPO Post l Event Actions. j 3

-E0P 08 REV 05 drft P PAGE 3 of 103 LOCACD

i

)

l i

f i

5 f

\

BLANK PAGE i .

\

t i

3

\

E,0P-08 REV Of drft P, PAGE 4 of 103 < -

L0t.ACD I

I 1,0 FOLLQV-UP AQJJDMS (CONT'D)

Ell 0fM DETAILS 3.3 1[ at any tima ES systems 1 Ensure applicable ES actuations:

have, QB should have actuated, HPI (1500 psig RCS PRESS) ll{W ensure ES equipment is properly aligned. LPI (500 psig RCS PRESS)

RBIC (4 psig RB PRESS)

RB Spray (30 psig RB PRESS) 2 Bypass or reset ES actuation:

Auto Manual 3 Control ES systems as required.

[ Rule 2,HPIControl)

(Rule 5, EDG Control) 4 J1 RBIC has actuated, aHQ adequate SCM exists, JJ1G trip all RCPs:

_ RCP-1A

_ RCP-lc

__ RCP-1B

__ RCP-10 See lable 1 E0P-08 REV 05 drft P PAGE 5 of 103 LOCACD l

Applicable carry over steps:  ;

3.31[ ES systems have QB should have actuated,1}iN ensure ES...

i E0P-08 REV 05 drft P PAGE 6 of 103 LOCACD

L0 FOLLOW UP ACTIONS (CQ8(ITl ACTIONS DETAltS l 3.4 _. -11 at any time, Twwe indicates > 20'F-superheat, IBLN 60 TO E0P 07,  ;

Inadequate Core Cooling,  !

beginning with Step 3.1-f 3.5 Ensure CC ventilation e CONCURRENTLY PERFORM E0P 14,  :

Enclosure 17, Control Complex operating in emergency mode. Emergency Ventilation.

e 3.6 1E at any time, LPI flow

> 1400 gpm in any injection line, 1 BEN GO TO Step 3.97 in this procedure.  !

3.7 1[ EDG A is supplying

  • PERFORM E0P-14, Enclosure 11. EDG A power to A ES 4160V Bus, Load Management.

JillB perform EDG A load management, 3.8 IE at any time, a CC

  • Notify PPO to CONCURRENTLY PERFORM thiller is HQI running, E0P-14. Enclosure 18, Control 1 BEN start a CC chiller. Complex Chiller Startup.

I 9

EOP -REV 05 drft P -PAGE 7 of 103 LOCACO t

. .....a____.___.._._~ __.;_._..__.._-_..~.._ . . _ _ _ . . . _. . . i

l I

J Applicable carry over steps:

3.3 J1 ES systems have QB should have actuated, J11G ensure ES...

3.4 E hwe indicates > 20'F superheat. J1{W GO TO E0P-07...

3.6 11 LPI flow > 1400 gpm in any injection line, 1l18 ...

3.8 JE a CC chiller is lial running, It[G start a CC chiller.

E0P-08 REV 05 drft P PAGE 8 of 103 LOCACD

2&_f,ql,10)LWP ACTIONS (CONT'DJ MljDils D1IAILS 3.9 .E at any time. during an 01SG tube rupture. ADY of the following conditions exist:

Affected OTSG level

> 90% due to tube rupture BWST level s; 35 ft Atmospheric steaming limit approached while steaming both OTSGs See Figure 1 See Figure 2 Il[G PERFORM E0P-14 Enclosure 12, 0150 TRACC Isolation.

E0P 08 REV 05 drft P PAGE 9 of 103 LOCACD I

Applicable carry over steps:

3.3 E Es systems have QB should have actuated, ILEti ensure ES...

3.4 E hwe indicates > 20'F superheat,]fj GO TO E0P 07... 3.6 E LPI flow > 1400 gpm in any injection line, IlifE... 3.8 E a CC chiller is 1101 running, IllDi start a CC chiller. 3.9 E during an OTSG tube rupture, any of the following (TRACC)... E0P-08 REV 05 drft P PAGE 10 of 103 LOCACD

l
                             . 3.0 ' FOLLOW UP ACTIONS fCONT'D)                                                                                                                           }

t I ACTl'ONS . DETAILS j r 3.10 Ensure emergency RB 1 At least 1 Emergency SW Pump  ! cooling is in service, running: l 4 [ Rule 5.EDGControl) SWF-1A l f SWP-1B 2 At least 1 Emergency SW Raw Water  ; Pump _ running:  ; RWP 2A- i RWP 28 . 3 2 ES selected RB cooling units running in slow speed: r AHF-1A . AHF lC  ; AHF 1B 4 Cl valves to RB cooling units closed:

                                                                                                                -SWV-151 SWV 152 h

SWV-355 t 5 SW valves to RB cooling units open: i SWV-353 SWV-354 g I E0P REV05drftP PAGE 11 of 103 LOCACD . i

                                                                                                                                                                                       .' ]
  . . . , _ , ,.        ,a,. _,   ~,.,_.;,._._,                           __._n._         - - - . - - - -._.u.,
                                                                                                                . _ _ . - - ~ , .                  .
                                      -            -          ..    .-     .-. _ _ _ _ - - = _ .

Appilcable carry over steps: 3.3 E ES systems have QB should have actuated, M ensure ES... 3.4 E h we indicates > 20'F superheat, M GO TO E0P-07... 3.6 E LPI flow > 1400 gpm in any injection line, M... 3.8 E a CC chiller is 1101 running, M start a CC chiller. 3.9 E during an OTSG tube rupture, A.DX of the following iTRACC)... l l E0P-08 REV 05 drft P PAGEi2of103 LOCACD

l 1

                      - 3.0 FOLU4WP ACTIONS-(CONT'D)'                                                                                                     l

[ ACTIONS . DETAILS l

                           .                                                                                                                             i 3.11           Isolate RB sump.
  • Select RB sump pumps to
" PULL TO LOCK"
,

WDP 2A  ! WDP 2B e Close RB sump discharge valves:- WDV WDV 4

                                                                                                                                                        .i
                     ' 3.12:          Close waste gas Hdr                                                                                                1 isolation valves.                                                 WDV-406 I

WDV-405 i 3.13 CONCURRENTLY PERFORM  ; E0P 14. Enclosure 15 E0P Temperature Log (RCS 7 TEMP). !. 3.14 IE-no OTSGs are available for heat transfer, . Il1G GO TO Step 3.20 in this procedure, i i E0P 08? REV'05~drft R . PAGE 13 of 103' LOCACD I

 ..                 ..._z._  :       .._.,._..=.a.._._.,a.       ..   ._                    u_..__,_,..-.._..;._.             .,._..-_._,.a.__.__.,_.

Applicable carry-over ster : 3.3 E ES systems have DB should have actuated, M ensure ES... 3.4 E h as indicates > 20'F superheat, M GO TO E0P 07... 3.6 E LPI flow > 1400 gpm in any injection line, M... 3.8 E a CC chiller is 1101 running, M start a CC chiller. 3.9 E during an OTSG tube rupture, Any of the following (TRACC)... t t E0P-08 REV05drfth PAGE 14 of 103 LOCACD

3.0 FOLLOW-UP ACTIONS (CONT'D) ACTIONS DETAILS  ! STATUS  ; At least one OTSG is available for heat transfer. 3 3.15 If at any time, either o bepress "< 725 PS! STM GEN PRESS  ; 0150 PRESS is < 725 psig. EFlc ACT BYPASS" push buttons: i Ih18 bypass EFIC isolation actuations. __ Channel.A Channel B  : i Channel C Channel D 3.16 Verify Efic is actuated, and EFW is controlled. [ Rule ~3,EFWControl) if Efic is 8.01 actuated, 1 Depress "EFW INITIATE" push

  • IB[H actuate.EFIC. buttons or. EFIC channels A and B.

2 Ensure EfWPs start and control flow: - EFP 1 EFP 2 [ Rule 3, EFW Control) 3 Ensure level in available OTSGs is at or trending towards. V required level. See Table 2 E0P-08' .REV;05 drft P, PAGE 15 of 103 LOCACD , - - - _ _ _ _ . . _ _ _ . . _ , . . . _ . _ _ _ . , _ . , , . .,_ -._ _ _ .~. _ __ . - _ _ - . . _ . _ _ _ . _

Applicable carry-aver steps: 3.3 E ES systems have 0.8 should have actuated, M ensure ES.. . 3.4 E Tinewe indicates > 20*F superheat, M GO TO E0P 07. .. 3.6 E LPI flow > 1400 gpm in any injection line,111G... 3.8 E a CC chiller is NOT running, M start a CC chiller. 3.9 E during an OTSG tube rupture, Any of the following (TRACC)... 3.15 E either OTSG PRESS is < 725 psig, M bypass EFIC... 50P-08 REV 05 drft P PAGE 16 of 103 LOCACD l _

3.03 F0LLOW-UP ACTIONS (CONT'D) ACTIONS -DETAILS l

  ,. 3.17        IE EFP-2 is running, IHEN-CONCURRENTLY PERFORN E0P-14; Enclosure 7, EFP 2              >
                   -Management.

MQIE ,. Cooldown rate may be excessive due to HPI flow. . 3.18 IE RCPs are running, e IE cooldown rate is excessive, IHEN establish RCS IHEN control primary to cooldown. secondary heat-transfer using TBVs or ADVs. See Tcble 3

  • Establish cooldown using TSVs (preferred) or ADVs.

See Table 3 i

     .i E0P-08              REV 05 drft'R      PAGE 17 of 103            LOCACD
                          ;c                                            ..               . ._

2 i Applicable carry-over steps: 3.3 J1 ES systems.have QB should'have actuated, E ensure ES... 3.4 Jf Tince._ indicates > 20'F superheati M.60 TO E0P-07. . . 3.6' jf LPI flow >'1400 gpm in any-injection line, M. . . 3.8: R'a CC chiller is NOT- running, JJi@ start a-CC chiller; 3.9 If during an OTSG tube rupture, hai of the following ;(TRACC)... 3.15 If either OTSG PRESS is < 725 psig, M bypass EFIC... i 4 U h 1 1 -- 4 9 E0P .REV 05 drft f ~ PAGE 18 of.103 LOCACD

            . -.. -             ,.     ...--.,c       ._____ _
                                                 ~

3.0 FOLLOW-UPACTIONS(CONT'DI ACTIONS' DETAILS N0lE Cooldown re.te may be excessive.due to HPI flow. 4 3.19- J1 RCPs are NQI running, o E adequate SCM exists, Itf[N establish RCS AND ICC region 3 or 4 was

                                 -cooldown,                                    previously entered, IllEN maintain cooldown rate
                                                                               < 10'F/hr See4Table ~1 e     E adequate SCM exists, ItiEN establish cooldown using
                                                                              .TBVs (preferred) or ADVs.

See' Table - 1 See Table 3 i e E adequate SCM does NOT exist, INEN lower OTSG PRESS using TBVs (preferred) or ADVs until the higher of the following occurs: See" Table 1 0TSG PRESS reaches 200 psig (if EFP-2 is running on main steam) OTSG PRESS < RCS PRESS E0P-08 PAGE 19 of 103-- LOCACD lREV05drftP

 -   -           - -          =.      -     _
                                                                          \

l Applicable carry-over steps: 3.3 E Es systems havs OE should have actuated, JE M ensure ES... 3.4 E Tineme indicates > 20*F superheat, JEW GO TO E0P-07. .. 3.6 E LPI flow > 1400 gpm in any injection line, IBM... 3.8 E a CC chiller is NOT running, lyfff start a CC chiller. 3.9 E during an OTSG tube rupture, any of the following (TRACC)... 3.15 E either'0TSG PRESS is < 725 psig, JE M bypass EFIC... E0P-08 REV 05 drft P PAGE 20 of 103 LOCACD

                                                                       +

3.0 FOLLOW-UP ACTIONS (CONT'D) ACTIONS DETAILS i w STATUS

Anyofth4Lfollowingconditionsexist

e HPI PORY cooling is in progress, e RCS leakage > 100 gpm.

  • OTSG tube rupture.
e. ICC recovery 3.20 1E at.any time, adequate 1 If RCS PRESS < 1700 psig, SCM exists, IHEN bypass HPI.

AND any ES bypass permit exists, 2 If RCS PRESS < 900 psig, 1818 bypass ES actuation. 181H bypass LPI. See Table .1 b 3.21 If at any time, BWST level e PERFORM E0P-14, Enclosure 19, is < 15 ft, ECCS Suction' Transfer. IBEH transfer ECCS pomp suction to RB sump. 4 E0P-08 REV 05 drft P- PAGE 21 of 103 LOCACD m- %. Y e , ,--

                                                     -                             r           -                    r r

Applicable carry-over steps: 3.3 E ES systems have 0_B should have actuated, M ensure ES... 3.4 E Tinem indicates > 20'F superheat, JHM GO TO E0P-07. . . 3.6 E LPI flow > !400 gpm in any injection line, M... 3.8 E a CC chiller is RQI running, IEW start a CC-chiller. 3.9 E during an OTSG tube rupture, yu of the following (TRACC)... 3.15 E either OTSG PRESS is < 725 psig, IH_W bypass EFIC... 3.20 E adequate SCM exists, 61Q any ES bypass permit exists... - 3.21 E BWST level is < 15 ft, TelEN transfer ECCS pump suction... E0P-08 REV 05 drft P PAGE 22 of 103 LOCACD

3.0 FOLLOW-UPACTI'ONS(CONT'DI ACTIONS DETAILS j 3.22 lE 4 RCPs are operating,. ItifE stop RCP-lD  : l1911 It i i s l' permi s si bl e ; to Li ncrease SCN to ';ensurel adequate RCP; NPSH! 3.23 IE at any time, RCPs are running,

              @ adequate SCM exists, Itife stop RCPs prior to exceeding NPSH limits.

See Figure 3 See Figure 4 3.24 Verify 3 RCPs running. 1E 3 RCPs are ILQ1 running, I lE controlled bleedoff is tLol in 6!!Q all of the following service, conditions exist: IlifE restore controlled bleedoff prior to RCP start. Adequate SCM exists 2 1E all start.permissives are met At least 1 RCP except seal injection, running IlifE bypass RCP start ' permissives. RCS cooldown rate is

                         > desired due to HPI               3    Start additional RCPs (A maximum flow                                    of 3 RCPs may be running to limit RCS cooldawn).

IlifE start RCPs. See Table 1 See Table 3 E0P-08 REV 05 drft P; PAGE 23 of 193 LOCACD

             , _         _    . . - . _..      _ _    . - ~ _ _ _ . _ _   -
       +- :-

Applicable carry-over steps:- 3.3 IE ES systems have QB should have actuated, IllB enst.re ES... 3.4:1E Tw.. indicates > 20*F superheat, IllW 60 T0 E0P-07... 3.6 :E LPI flow > 1400' gpm in any injection line, IllW. . . 3.8 Jf a CC chiller is HQI running, I!iG start a CC chiller. 3.9- IEduringanOTSGtuberupture,Anyofthefollowing(TRACC);....

                                                                                                                                    -i 3.15 IE either OTSG PRESS is < 725 psig,111@ bypass EFIC...

3.201E adequate SCM exists, MQ any ES bypass permit exists... 3.21 JE BWST level is < 15 f t,111@ transfer ECCS pump suction... - 3.23 If RCPs are running,[MQ}adequatelSCMiesists} IllB stop RCPs... L s. E0P-08 REV 05 drft R PAGE 24 of 103 - LOCACD uwv' sfur 7 = 'r r 'erv <w d - w- av e

3.0 'F0LLOW-UP ACTIONS (CONT'DL

                  ' ACTIONS                                      )ETAILS -

3.25 -H adequate SCM exists, o Maintain mt: imum adequate SCM.

            ~ M begin depressurization of RCS.
  • Select A],1 PZR Htes to off:

See Table 1 ' Bank A Bank B Bank C Bank D Bank E

  • If a PZR bubble exists, M perform the following:

CONCURRENTLY PCRFORM E0P-14, . Enclosure 15, E0P

Temperature Log (PZR TEMP)_.

E RCPs are running, M throttle open PZR spray. E RCPs are NOT running, QB PZR spray is @I effective, M use PZR vents until high PRESS Aux spray is established: PZR HPV (RCS previously in ICC region 3 or 4) PORV E PORV, O_B PZR HPV is being used to control RCS-PRESS, M CONCURRENTLY PERFORM E0P-14, Enclosure 13, High PRESS Aux Spray. Lineup, e IE a PZR bubble does tLOJ exist, M throttle HPI flow, [ Rule 2, HPI Control] E0P-08 REV 05 dcft P PAGE 25 of 103 LOCACD

                                    - - . - . . -           ~           ..   - . .. . - - .   - - . . . . . . . . . _    -

l Applicable carry over steps:-- 3.3 /E- ES system shave QB should have actuated, E ensure' ES... 3.4 - E Tune indicates > 20'F- superheat, M GO TO E0P-07. . . , 3.6 E LPI flow > 1400 gpm in any injection line, M... -J 3.8- E a_CC chiller is HQI running,-M start a CC chiller. 3.9 E during an OTSG tube rupture, ici of the following (TRACC)... 3.15 E'either OTSG PRESS is < 725 psig,-M bypass EFIC... I 3.20 E adequate SCM exists, E any-ES bypass permit exists... 3.21-H BWST level is < 15.-ft, E transfer ECCS pump suction... 3.23 E RCPs are running, E fAdequitsjSCM[existh M stop RCPs... I i E0P-08 REV 05 drft'P PAGE 26 of 103 LOCACD

    .+-   ,-        ,         .                   . . . , ,   . - -,
          = . . -       -          .            ~      . _ .   .  . - . - . .         .     -           - . - . - _ - - . . . . - . . . .

I & g j; . 3.0 FOLLOW-UP ACTI'ONS fraMT'_D.1 ACTIONS-_ DETAILS-  ;

    $               - 3,26-
                                  =jf CD pumps are running,-        1             Select both CDP 1A and CDP-1B                              :

JREN align- CD system for- controllers to " HAND" and reduce < Mode 3 operation. -demand to "0". o 2- Ensure only 1 CDP is running. 3 Close CD Htr outlet valves: CDV-44 CDV-43 4- Maintain CD system PRESS between 90 and 150 psig,: , 5 Throttle CDV-242 to maintain DFT i level between 8 and 11 ft, i JL CD pumps are RQI

                                  -running, IEN notify SP0 to ensure CDV-88 " Condensate Reject t6'!CDT21"li'sfcloidd (95 ft TB behind'Atmosp'heific -
                                                          ~

Drain. Tank);

                           -- EOP-08          REV 05 drft P         PAGE 27 of-103                        LOCACD
                                                                                                       -~ _

Applicable carry-over steps: 3.3 E Es system shave QB should have actuated, M ensure ES... 3.4 E Tinese indicates > 20'F superheat, M GO T0- E0P-07. . . 3.6 1 LPI flow > 1400 gpm in any injection line, M... 3.8 E a CC chiller is 1101 running, E start a CC chiller. 3.9 E during an OTSG tube rupture, ADX of the following (TRACC)... 3.15 E either OTSG PRESS is < 725 psig, M bypass EFIC... 3.20 E adequate SCM exists, A!!Q any ES bypass permit exists... 3.21 E BWST level is < 15 ft, 181!i transfer ECCS pump suction...

3.23 E RCPs are running, effD adequate lSCM exists, M stop RCPs...

l EOF-08 REV 05 drft P PAGE 28 of 103 LOCACD

3.0 FOLL.pW-UP ACTIONS (CONT'D) ACTIONS DETAILS 3.27 If at least one EFWP is 1 Trip MFWPs: running,- IH18 stop MFW. FWP-2A FWP-2B 2 Start MFWBP Aux oil pumps: FWP-6A

                                    ,_ FWP-6B 3 Stop MFWBPs:

FWP-1A

                                    ,_ FWP-18 4 __ Ensure level in available OTSGs is at or trending towards reqtired level.

See Table 2 E0P-08 REV 05 drft P PAGE 29 of 103 LOCACD

                         -Applicable carry-over steps:.                                                    .           ;-

3.3 E ES system shave QB should'have' actuated, E ensure ES...t 3.4 ' E Thum' indicates >- 20'F superheat, M GO TO E0P-07. . . 3.6c E LPI flow > 1400 gpm in~any. injection line, M ... 3.8 E a CC chiller is M I running, E start a CC chiller. , 3.9 E- during an OTSG tube = rupture, ni of the followingz (TRACC)... 3.15 E either OTSG PRESS is < 725 psig, M bypass EFIC... . 3.20 E adequate SCM exists, R Q any ES bypass permit exists...

                                                                                                                      ?

3.21 E'BWST level is < 15 ft, M transfer ECCS pump suction... 3.23 E RCPs are running,'8 E adequatelSCM exists,' M stop RCPs... d 4 4 4

                             .EOP-08        REV 05 drft R.                 PAGE 30 of 103-         LOCACD

3.0 FOLLOW-UP ACTIONS iCOE'pl t- , _ ACTIONS DETAILS 3.28 E CDT-1 is available, e = Unlock and open CDV-103 "CDT-1 IjiB notify SP0 to- to EFP Suction" cross-tie CDT-1 and EFT-2 (119 ft Berm by CDT-1). y 1 e Ensure _CDV-290 "CDT-1 to EFP Suction" is open'(119 ft Berm .i.n

                                                                                    ~

coveredivalveboxbyFST-1A). 3.29 E at any time, HPI flow is < 200 gpm/ pump, JB @ ensure MVP recirc valves are open. [ Rule 2, HPI Control] d 3.30 Ensure adequate shutdown 1 Determine required RCS boron margin is maintained concentration, during cooldown. See OP-103C, Reactivity Worth Curves, Curves 18 and 19 2l :E"boration'_isLreqdired; liiG! (0 pen CAvi60

                                                                                           ~

(StarfCAf-1ALor.! CAP-1B CONCURRENTLYLPERFORM AP-490; RCS Boration;;beginning.at Step 3.1 E0P-08 REV 05'drft P PAGE 31 of 103 LOCACD

i y__ 3,_ . i V _-

       -f;                                                                                                '                                                  'i Applicable carry over steps:

7 y 3.3 f ES. system shave DB sh'ould have actuated THEN ensure ES._.._ 3S4 IE Tiac.. indicates ' > 10,'F superheat, l!lEB GO TO E0P ,07. . . . _ iL .: 3.6 :1E,1.PI flow > ~ 1400 gpm-in any injection- line, M. .. - 3.G 1E a CC chi,ller is NOT running, E start a CC chiller.  : 3.9 JEduringanOTSGtuberupture,1[blofthefollowing(TRACC)... . 3,151E either OTSG PRESS is < 72,5 psig, IEEN bypass EFIC. <. 3.20 1E adequate SCM; exists, atig anc ES bypass permit exists... , t 3.21.1E BWST level is < 15 f t, IBfff transfer ECCS. pump suction. . . : 3.23 If RCPs are running, 8hDladsquatelSCM sist)j Illf_N:stop ,RCPs...

                 -               3.29 if; HPI flow is < 200 gkm/ pump,-IBEN ensure MUP recir,: valves...

i 4 > 0 I-s y a

                                                                                                                 .i E0P-08                               -REV 05 drft P                  PAGE 32 of 103                      LOCACD a

v _-, m_._ -mm___ - _______ _ .__.m_________-_____ _.__ - m.- -

s.

                           ~

p i3.0 FOLLOW-UP ACTIONS-(CONT'D) k 1- ' AGIl0td - DETAILS' 3.31 1E level in either OTSG is e Tens 11e limit is 100*F.

                                  -s 12% in,
                                  . AtlD RCPs are running, .          .           See Table. 4-1110 ensure tube to shell=

AT is maintained within .- . I*Il8' Avg T M -- Teoid _ = -A OTSG: (R771). AT-l

                                                                                                                             ~

Avg T M -- Teoid - = B OTSG - (R772) AT j e IE100'Ftensilelimitih-approached, 4

                                                                                       ]113 reduce cooldown rate.
  • Compressive limit is 50'F.

See Table 4

                                                                                                   ~

That - Avg Tu = A OTSG (R771)- AT' Ihot - Avg TM = B OTSG (R772)- AT e 1E 50'F compressive limit is approached, IllB increase cooldown rate. See Table 3 1 E0P-08 REV_05 drft P' PAGE 33 of-103 LOCACD

i i Applicable. carry-ove a steps:- -l J 3.3 E ES system sha re QB should have actuated Ijim ensure ES..... 3.4 !E Ti==.-indicate 1>-20'F'superheat, 1113 60;TO E0P-07. . . l 3.6 -E LPI flow > 1403 gpm in- any injection line,1118... 3.8 -- E a CC chiller is NOT running, IllM start a CC chiller.  ; 3.9 E during an tTSG tube rupture, ADi of the following (T.RACC)....- 3.15 E either OTSC PRESS is <-725 psig, Iji@ bypass EFIC... ' 3.20 E adequate SCM_ exists, AND any. ES bypass permit exists... 3.21_ E BWST level is < 15 ft,1113 transfer ECCS pump suction... 3.23 E RCPs are running, ANQ'sdequste:SCM; exists] I]!M stop RCPs... 3.29 E 'l flow is < 200 gpm/ pump,111@ ensure MUFj recirc valves... I o t i E0P-08 REV 05 drft P PAGE 34 of 103 LOCACD

3.0 F0LLOW-UP ACTIONS (CONT'DL .,

                           -ACTIONS.                                      PETAILS 3.32         1ET adequate SCM exists,-

6MQRCPs- are NOI. running, - IllEN CONCURRENTLY-PERFORM. E0P-14. Enclosure 16, RCP

                   ' Recovery.

See Table l' 3.33 1E at any-time, all the- 1 Notify PPO to bn16ckl^and close CFT-following conditions isolation valve' Bkrs "(119 ft AB): exist: ES MCC 3AB-6B "CFV-5, A CFT Iso" RCS PRESS is

                            < 700 psig                       ES MCC 3AB-6C "CFV-6, B CFT-Iso" Adequate SCM exists        2 ellen CFT isolation. valve Bkes are-closed, AB is accessible             IllE8 close CFT isolation valves:

IllEN close CFT isolation CFV-5 valves. CFV-6 See Table 1 E0P-08 PAGE 35 of 103 LOCACD REV05drftP-l

Applicable carry-over steps: 3.3 1E ES system shave DB should have actuated, EB ensure ES... 3.4 E Toca. indicates > 20'F superheat, M GO TO E0P-07... 3.6 E t.Pl flow > 1400 gpm in any injection line, IUM ... 3.8 E a CC chiller is NOT running, THEN start a CC chiller. 3.9 E during an OTSG tube rupture, f.D.y of the following (TRACC)... , 3.15 E either OTSG PRESS is < 725 psig, M bypass EFIC... 3.20 if adequate SCM exists, AND any ES bypass permit exists... 3.21 1E BWST level is < 15 ft, THEN transfer ECCS pump suction... 3.23 E RCPs are running, 6![Q adequate. SCM exists, THEN stop RCPs... 3.29 lE HPI flow is < 200 gm/ pump, M ensure MVP recirc valves... 3.33 E conditions exists, E close CFT isolation valves. I E0P-08 REV 05 drft P PAGE 36 of 103 LOCACD

 . . . . .   . . . ~           .                                                            - . . . . -                                       . . - . . _ . - - .

4~ s s ..

                                                                                                                     . p,
                     -[(,If 3.0FDLLOWiUP ACTIONS (C0f[L'Dy                                         j
                                                                      ,                          r                                  ,

4.'

                                                   ' ACTIONS
~ DETAILS E'- '
                                         -: V -.
                                                                                                                                           ~4
                      =3.34L            .1E at:any time, a)_1. of the                   11 Ensure BSPs are stopped:
                                        .following' criteria..are me t : ---                                             'BSP-1A-BSPs rdnning. 2 ,5 hrs-                 _BSP-1B             -e-RB PRESS'< 10 psig            2 Select BSVs to " MAN" ana-closed:

RB-PRESS stable or BSV-3 lowering- BSV RBatmosp"here<13-

                                                        . Ci/cc 1.                      3SelectBSVsto"AUJO}:
                                                                                  .i
                                                        .TSC has approved.BS                       BSV-3            n termination S                                                              BSV                                             ]H W stop BSPs.

ac  !

                                                                              )
l s

L i F s E0P-08 REV05-drftn PAGE 37 of 103- LOCACD 2

 .    . - . -               - -                      . . _ _ - . .   . - ..    . . . . ~ . . ~ . . . - . . .   . - - . . -

Applicable carry-over steps:-- , 3.3 11E-ES_systemfshave QB should have actuated, IHEN ensure ES...-  ; 3.4 '1E Tww. indicates >- 20'F superheat, IBEN 60 To E0P-07. . . 3.6 IE LPI' flow > 1400 gpm in any. injection line, IHEN...- 3.8 -1E a-CC chiller-is HQ1 running, IEEN start a CC chiller. 3.9L 1E during an OTSG tube rupture,.jsi of the following (TRACC)... 1 i 3.15 1E either OTSG PRESS is < 725 psig,-IHEN bypass EFIC... 3.20 if adequate SCM exists, AND-any ES bypass permit exists... l 3.21 JI BWST level is < 15 ft, IHE8 transfer ECCS pump suction... 3.231ERCPsarerunning,88Q7adequatelSCMiekistslIHL8stopRCPs... 3.29 If HPI flow -is < 200 gpm/ pump, IHEN ensure MVP recirc valves... . 3.33 IE conditions exists, IHEN close CFT isolation valves. 3.34 If all of the following criteria are met, THER stop BSPs. 4 Y E0P-08 _REV 05 drft P PAGE 38 of 103 LOCACD

   **              r - <m .       - _
                                                                                                                                                     .q
                                                                                                                                                         ]

l

         - 3.'0=~F01 LOW-UP ACTIONS'fCONT'DJ                                                                                                              l a

_ACTIONSL DETAILS- . 3:35 Ifat.any_: time,a' equate d -

                               -SCM_ exists,_

MQ PTS guidelines are

                                 -applicable,                                                                                                           :

JJif3 maintain minimum _ adequate _SCM.  ; See Table 1 [ Rule 2. HPI Control] -

                   ; [ Rule 4, PTS]
         - 3.36 M RCS PRESS is
                                   < 400 psig,-       -

IEf3 continue ~~in this procedure. 3.37 Jf PORV is closed, 1 Obtain key 16 J}i@ ensure PORV.is selected to " LOW", 2 Ensure PORV in-service: , Open RCV-Il -

                                                                                          -Select PORV to "AUT0",

Select PORV to " LOW" (NNI cabinet #3). - 3 Ensure PORV is closed. l-4 ?' E0P-08 REV 05 drft: P PAGE 39 of 103 LOCACD

    ,,-7      c,-,          - . < . , _ .-              . . . _     ...,.

m , ,. - . ._ , . . . . ...m _.

App 1_icable carry over steps:. 3.3 E ES system shhve QB should have actuated, M ensure ES... 3.4 - E Tinem indicates'.') 20'F'superheat, M GO TO E0P-07... 3.6:: E _LPI flow > 1400'gpm'in any injection line,. M ... 3.8- E a CC chiller is' NOT running, M start a CC chiller. 3.9 E during an OTSG tube: rupture, hDi of the following (TRACC)... 3.15 E either OTSG PRESS is < 725 psig, M bypass EFIC...

          -3.21 E BWST levt1;is < 15 ft, M transfer ECCS pump suction....

3.23 E RCPs are running, A g jdeq'uatejSCM sxistss M stop RCPs... 3.29 E HPl flow is < 200 gpm/ pump, M ensure MU.P recirc valves... 3.331E conditions exists, M close CFT isolation valves. 3.34 JE All of the following criteria are met, E stop BSPs. 3.35 E adequate SCM exists, 8M PTS;guidelin'esfare;applicabl.el M ... E0P-08. REV 05.drft .P PAGE 40 of 103 LOCACD

3.0 FOLLOW-UP 8CTIONS'fCONT'D) 1

                           -ACTIONS-                                     DETAILS 3.3R             lE adequate SCM exists,:        1-    IE RCP-1B will be stopped,.

AND RCPs are running, -aND AB is accessible, IEE8 stop RCPfin loop with IBEN PERFORM E0P-14, Enclosure a single RCP running. 13. High PRESS Aux Spray Lineup,- prior to stopping RCP-1B See;Jableil 2 Stop desired RCP: RCP-1A RCP-lC RCP-1B E RCP-ID 9 3.39 1E at any time, EFT-2 1 Close CDV-288 "FST to CDT-1 level is s; 10 ft, Cross-Tie Drain" (119 ft Berm by IEEN notify SP0 to- .FST-1A). cross-tie FST-1A to EFT-2 2 Open CDV-289 "FST to CDT-1 Cross-Tie Iso" (119 ft Berm by FST-1A). 3 Open FSV-918 "FST to CDT-1 Cross-Tie Iso" (119 ft Berm by FST-1A). 4"

                                                          ! Ensure '.CDV-290'~ "CDT;1? toiEFP Suction"-:is;open(119ftBermin coveredLvalve; box by, FST-1 A) .

3.401 ikotify PPOno/ CONCURRENTLY

                    ' PERFORM E0P-14 Enclnsure:21, RBjHydr) gen Monitor Log.

E0P-08 REV 05 drft P PAGE 41 of 103 LOCACD _mm.. - - - . , ,, - , 4 m

1

                                                                                                                                                       /

Applicable carry-over steps:_ 3.3- E'ES systems have QB should have actuated, EM ensure ES.._. 3.4 E The.. indicates > 20*F superheat,- E B 60 To E0P-07..., 3.6::E LPI flow > 1400 gpm in any injection line, Ef 5... 3.8: E a CC chiller is tLQI running, EM start a CC chiller. ,

               '3.9- E during an OTSG tube rupture, ,as of the following (TRACC)...

3.15 E either OTSG PRESS is < 725 psig, E M bypass EFIC... i= 3.21 E BWST level is < 15 ft, BG transfer ECCS' punip suction... 3.23 E RCPs are running, ANQiadequat'e'(.SCM!sxisti,' EM stop RCPs. . . 3.29 E HPl flow is < 200 gpm/ pump, EM ensure NOP recirc valves... 3.33 E conditions exists, E W close CFT isolation valves. 3.34 E A]l of the' following criteria are met,- EM stop BSPs. 3.35 E adequate SCM exists, AhD PTS::Vuidelinesate"appNcable,': EM . . . 3?39fE EFT-l2?laelLifM10fftl; HEN notifRSP01to crossstielFST-1Ai.;;7 T E0P-08 _REV 05 drft P- PAGE 42-of 103 1.0CACD-

   . - . .                                  . _ ~ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ - _ _ _ _ _ _
  - -                     - ..        . . . - .           . - _ ..                         . ..    . _ - , ~ . - - - . - - - . - . - . - . . . . .

o 3.0 FOLLOW-UP ACTIONS (CONT'DF a- ACTIONS- DETAILS -

3. 'l - _ E Al]. of_the_following. .1 E the B. Train'HPI' pump is '

conditions exist:- running, .. . M GO TO Step'3.61'in this 2 LPI pumps available' procedure to align DHP-1A for DHR. RCS leak or-PORV flow

                                                -within capacity of 1                            2              E the A Train.HPI pump is.
                                                ,HPI pump                                                        running,-

IEW GO TO Step 3.79 in this. 4 BSPs flQI running procedure to align DHP-1B for DHR.

                                                .HPI pumps aligned:to BWST g;                              -Adequate:SCM l

SeelTable l IH @ falign I train for DHR. Z E0P-08 REV 05 drft Pr PAGE 43: of 103 LOCACD-t

      .     . . . . . ,.                        ,    _,-     - + , , _ . , . . - . . . . .            ..                . . .                      .. -          . . . - . - - ..-

Applicable carry over steps: 3.3 E ES systems have OE should have actuated, M ensure ES... 3.4 E hue indicates > 20'f superheat, M GO TO E0P 07... 3.6 E LPi flow > 1400 gpm in any injection line, M... 3.8 E a CC chiller is RQ1 running, M start a CC chiller. 3.9 E during an OTSG tube rupture, ADy of the following (TRACC)... 3.21 E BWS1 level is < 15 f t, M transfer ECCS pump suction... 3.23 E RCPs are running, M Q adequate.SCH exists', E stop RCPs... 3.29 E HPl flow is < 200 gpm/ pump, M ensure MVP recirc valves... 3.33 E conditions exists, M close CFT isolation valves. 3.34 E AU of the following criteria 'are met, M stop BSPs. 3.35 E adequate SCH exists, MQ PTS guidelines are appitcabla, M... 3.39 E EFT-2;1evel is_ t 10__ f t, M notify SP0 to cross-tie FST-1A... E0P 08 REV 05 drft P ' AGE 44 of 103 LOCACD

h0__LOLLOWdlf_AGIl0HLICONIiDJ aCllMS DETAILS 3.42 ___ WULU RCS PRESS is  ! Ensure BWST to DilP valves are open:

              < 250 psig, l}jlu ensure LPI pumps are        DilV 34 running.

DilV 35 [ Rule 5, LDG Contre 1] 2 Ensure LPI pumps and required cooling water pumps are running: r. DCP 1A .__ DCP 1B RWP 3A .__ RWP 3B DilP 1A DitP 1B 3 Ensure LPI injection valves are open: DilV 5 DilV 6 4 Ensure LPI control valves are in "AUT0" and set for 3000 gpm: DilV-Il0 DilV-ll l 3.43 WitLU adequate SCH exists, J11LN maintain minimum adequate SCH. See Tatile 1 [ Rule?,llPIControl) [ Rule 4, PTS) [0P 08 REV 05 drft P PAGE 45 of 103 LOCACD

1 Applicable carry over steps: 3.3 E ES systems have DB should have actuated, J1tG ensure ES... 3.6 11 LPI flow > 1400 gpm in any injection line,111W... 3.8 11 a CC chiller is 11Q1 running, M start a CC chiller. 1.9 E during an OTSG tube rupture, An,y of the following (TRACC)... 3.21 E BWST level is < 15 ft, M transfer ECCS pump suction... 3.23 E RCPs are running, ANQ adequate SCM exists, It1W stop RCPs... 3.2911 HPI flow is < 200 gpm/ pump, J11G ensure MVP recirc valves... 3.34 1[ .all of the following criteria are met, JJ1W stop BSPs. 3.3511 adequate SCM exists, AtiQ PTS guidelines 'are-applicable, IllW... 3.39 IE EFT-2 level is 5; _10 ft; ItiW notify SP0 to cross-tie FST-1A... E0P-08 REV 05 drft P PAGE 46 of 103 LOCACD i (

3.0 FOLLOW-UP ACTIONS (CONTfD) AC710NS . DETAllS STATUS Adequate SCM exists. i M911 , cooldown rate may be excessive due to ECC$ flow. . P 3.44 Control OTSG heat

  • If RCPs are RQI running, transfer. AND ICC region 3 or 4 was previously entered.

IB[N maintain cooldown rate

                                                                                                                          < 10'F/hrf e                   if cooldown rate is excessive, J11[H control primary to
                                                                                             ^

secondary heat transfer using TBVs or ADVs. t See Table 3 (Rule 3,EfWControl) 3.45 _ lul[N di of the- following MVP-1A conditions exist: MVP-1B All llPI valves ~' throttled closed MVP-lc LPI flow maintaining  : adequate SCM Tince. stable or lowering  ;

                                    '-              JJ1EB stop all MVPs.

See Table 1  ; i E0P-08 REV 05_drft P PAGE 47 of 103 LOCACD ; _ . _ . _ _ . . . . . . . _ . . _ _ _ _ . . . , . . _ . . . _ _ _ . _ - _ . ~ . _ - . _ _ . . _ . . _ . . . _ . . _ _ _ _ _ . _ . . , _ . _ _ .

Applicable carry over stops: 3.3 E ES systems have QB should have actuated, M ensure ES...  ; 3.6 E LPI flow > 1400 9pm in any injection line, M ... 3.8 E a CC chiller is 11Q1 running, M start a CC chiller. 3.9 E during an OTSG tube rupture, ADy of the following (TRACC)... 3.21 E BWST level is < 15 ft, E transfer ECCS pump suction... 3.23 E RCPs are running, AlfD adequate _SCM exists, M stop RCP:...  ; 3.34 E all_ of the following criteria are met, M stop BSPs. 3.39 E . EFT 2 level-is. S'10 ft, M notify SPO.toLcross tie FST-1A... . P t E0P 08 REV 05 drft P PAGE 48 of 103 LOCACD

L0 FOLLOW UP ACTIONS (C0!fT'D) , i i ACTIONS DETAILS i 3.46 Ensuru RCPs are shutdown, i RCP-1A 4 RCP-lC RCP-18 RCP 10 l i F Throttle LP! to maintain

                              -3.47 minimum adequate SCM.                                                                DHV Il0

. See Table 1 DHV Ill ' [ Rule 4, PTS) 2 3.48 E both LPI pumps are , - running, MQ total LPI flow is

                                                     < 2000 gpm, IllLN GO TO Step 3.51 in this procedure.                                                                                                              ,

I t 3.49 E Mthifollowing 1 Open DHV 91 conditions exists:~ 2 Throttle RCV-53 to control RCS M "DHP;1A l running PRESS, l _ .LHigh PRESS" Aux'ispraf ~ 1

                                                             ' 1821;al.igned '                                                                                                    .

[AuxTsprayfirequirsd IEEN initiate Aux spray. - f' E0P 08. REV 05 drft R PAGE 49 of 103 LOCACD i

   ,:...,    ..g..,,          ,s#. y     ...g-w    .       -

y.,%,w_,m,..y,..m.,w,,%-,,-,, .v--,,,,sy,-y..., ,.,w-~.- eiw w v,w v* = = -

i Applicable carry over steps: 3.3 1[ ES systems have QB should have actuated, lH[H ensure ES... 3.6 1[ LPI flow > 1400 gpm in any injection line, JU[H... l 3.8 1[ a CC chiller is HQ1 running, IBIN start a CC chiller. 3.9 1[duringanOTSGtuberupture,gayofthefollowing(TRACC)... 3.21 j[ BWS1 level is < 15 ft, 1818 transfer ECCS pump suction... 3.23 1[ RCPs are running, 6NQ adequate.SCH exists, 1818 stop RCPs... 3.341[ gli of the following criteria are met, IM[U stop BSPs. 3.39.1[ EFT-2_ level is c 10-(t, IBIB notify SP01to cross tie'FST-1A... I P E0P 08 REV 05 drft P PAGE 50 of 103 LOCACD

                                                        ._. _ _      ,       .m., .,mm...

LQ__ffLL98L&GTIONS (CONIiDJ ACTIONS DETAILS 5.50 }[I1LU ECCS suction transfer has been completed. IllLN contact 150 for further guidance and EXIT this procedure. E0P-08 REV 05 drft P PAGE 51 of 103 LOCACD

. - . . . ._ _ . .-_. .. . . _ . . .. .._ -.-.. = - .- _ . . - . Applicable carry over steps: 3.3 E ES systems have 0B should have actuated, M ensure ES... 3.8 E a CC chiller is @l running, M start a CC chiller. 3.9 E during an OTSG tube rupture, gy of the following (TRACC)... 3.21 E BWST level is < 15 ft, M transfer ECCS pump suction... 3.34 E All of the following criteria are met, M stop BSPs. 3.39 E EFT 2 level is s 10 ft, E notify SP0 to cross-tie FST 1A... , E0P 08 REV 05 drft P PAGE 52 of 103 LOCACD

            - - - -         -,-,-++..,,,-.,,,.e,y,w.                                        y.

_. _ _ _ _ . _ . _ . . _ _ _ . _ - - - _. . _ . _ _ . _ . _ _ _ . _ . - ~ _. _ _ _ . _ _ _ . . - - . . _ . _ . _ _ _ 3.0 FOLLOW-UP ACTIONS (CONT'D) f i ACTIONS DETAILS  ! IIAIM e ';DNPflA 1s to be aligned for DHR._

  • Adequate SCM exists.

o DHP-1A and DHP-1B are running. o - HP!pumpsarenotLrunning.

  • Total LPI flow < 2000 gpm.

3.51 WBIN the following conditions are met: ECCS suction transfer complete ' PZR level > 80 in RCS TEMP < 280'F RCS PRESS < 215 psig on RCS low range BSPs 801 running Ill1h continue in this procedure. 3.52 Stop DHP-1A 1 Maintain adequate SCM using B Train LPI. See Table' 1 2 Stop DHP-1A 3 Maintain B Train LPI flow

                                                                                                                                                              < 2200 gpm.

E0P 08 REV 05 drft P PAGE 53 of 103 LOCACD e-r,--n-m.,,, ,#,- . . - - - , , ,..~.,e ,._..-..r, m me-r_.,-_ c,m-- ,.,,,e .,_,.v.,--,,-..-.......-e., ,.e.~.e..-.,~,--,..w- - - , , , - - - , , , , - , . .

Applicable carry over steps: 3.3 11 ES systems have DB should have actuated, IR B ensure ES... 3.8 11 a CC chiller is 1f01 running, JHG start a CC chiller, f 3.9 11 during an OTSG tube rupture. ADy of the following (TRACC)... 3.39 JE. EFT 2~1evel is s _10;ft, H W notify SPD to cross tie FST 1A..; I I E0P-08. REV 05 drft P PAGE 54 of 103 LOCACD

h0_ LQLLOW UP AQ1LQM_.10ANIiDJ 6CT10NS Q[IAILS 3.53 JI AB is accessible, 1 Position DCV-177 MS to "0". lild ensure A Dil cooler controls are properly 2 Hotify PPO to perform the following: aligned. Close DCV-195 " Vent to DC 17-POS" (95 ft AB between DH Room entrances). Open DCV 194 " Air Supply to DC 17-POS" (95 ft AB between DH Room entrances). 3.54 Align DHP-1A for DHR. 1 Ensure the foi owing valves are closed: DHV-34 DHV 42 DHV-8 DHV-ll _ DHV-40 2 Open the following valves: DHV-39

                                    .__ DHV-5 3      Select BSV-3 to " MAN" and closed.

E0P-08 REV 05 drft P PAGE 55 of 103 LOCACD

Applicable carry over steps: 3.8 1[ a CC chiller is ILQI running, JJJIN start a CC chiller. 3.9 J[ during an 01SG tube rupture. Any of the following (TRACC)... 3.39 jf EFT-2 level is s 10 ft; Ilj[N notify SPO to cross-tie FST-1A... E0P-08 REV 05 drft P PAGE 56 of 103 LOCACD

3.0- F01L9W UP ACTIONS (CONT'D1 ACTIONS QUAILS cAullpE Aligning DHR may cause high radiation levels in AB. 3.55 ,_ , Align drop line for DHR 1 Open DHV-41 operation. 2 Open DHV-3 3 Open DHV-4 3.56 _ Start DHP-1A 1 Select DHV-Il0 to " MAN" and closed. 2 Start DHP-1A 3 If air is aligned to DC control valves, JBfB select DHV-Il0 to "AUT0" and 3000 gpm. 4 If air is ((QI aligned to DC control valves, Ilift throttle DHV-Il0 to maintain cooldown rate. See Table 3 E0P-08 REV 05 drft P PAGE 57 of 103 LOCACD

Applicable carry over steps: 3.8 E a CC chiller is M1 running, E start a CC chiller. 3.9 E during an OTSG tube ru,)ture. Any of the following (TRACC)... 3.391E EFT 2;1evel is r: 10 ft, M notify SP0 to cross-tie FST-1A... r F0P-08 REV 05 drft P PAGE 58 of 103 LOCACD

30 FOL10W UP AGH0ff5_LCONT'D) ACTIONS DETAILS 3.57 hdM DH system, 1 Depress " MANUAL PERMISSIVE" push 6!iQ LPI flow are providing buttons on EFIC channels A core cooling, and B. l!!M stop 01SG cooling. 2 Stop EFP-1 3 Close EFP-2 steam supply valves: ASV-204 ASV-5 4 Stop FWP-7 5 Ensure TBVs and ADVs are closed. 3 . 5 E __ Close PORV and HPVs.

  • __ Close PORV.
  • Ensure HPVs are ,losed:

PZR __ RCV-159 RCV-160 Loop A RCV-157 RCV-158 Loop B ___. RCV-163 __ RCV-164 E0P-08 REV 05 drft P PAGE 59 of 103 LOCACD

I Appilcable carry over steps: 3.8 1[ a CC chiller 15 HQI running, JBLN start a CC chiller. [0P 08 REV C5 orft P PAGE 60 of 103 LOCACO

i 3.0 FO R & UP ACTIONS (CONT'D)  ! l i ACTIONS DETAILS i 4 i 3;$9l Lif;high. PRESS Aux spray is . l' 'Open DHV;91 NQIaligned,  ; E Aux spray is required, 2 ' Throttle RCV+53 to control RCS

                                                                                                                                                                            ~     '

IEN init_iate Aux.'. spray. ~ PRESS. t 3.60 Contact TSC for further l guidance.and EXIT this  ! procedure.  ; 3 r + l i a l I t f 4 l E0P 08 REV 05 drft P PAGE 61 of.103 LOCACD , 1

  -.....,,_nr._.._-c.        . , . , . _,w  v.,,,       . . , , , _ . . , . . , . , , _ , , _ , . , , -   ,,,m, -,,_,.......,,,.,..s,,,,,,.         ,...,,,.,,,,,y..,                   #  ,%.e.,     ,    y   n.m- r#... , _. ,

i

                                                                                                                                                                                            )

l Applicable carry over steps,  ; 3.3 E ES systems have QB should have actuated, IEN ensure ES... i 3.8 E a CC chiller is HQI running IEN start a CC chiller.  ; 3.9 E during an OTSG tube rupture, gay of the following (TRACC)... 3.21 E BWST level is < 15 ft,- E transfer ECCS pump suction... 3.23 E RCPs are running, NtQ adsquate~ SCM exists," IEN stop RCPs... l t 3.29 E HPI flow is < 200 gpm/ pump, IEN ensure MVP recirc valves... l t 3.35 E adequate SCM exists, #fQ PTS;guidelinesLar_e ap'plicable, IEH... j 3.39 If EFTv2!1evel;isJs;;10 ft, IElf notify: SPOLtocross-tie;'FST1A_.; l l 5

                                                                                                                                                                                          )

i. i 4

                                                                                                                                                                                           ?

t t l I ( k l. I r i _E0P-08_ REV.05 drft P PAGE 62 of 103 LOCACD

 - . _ _ , ~ . - - . , _ - - -     .-wL.-.-           , , .   , _ . , - . - - -___.,..-,_.--..-,-,L.....__..-,.-.-,,... .        - , - - . . . - . . . . , - , . - - - - _ _ - - - - .

3.0 FOLLOW-UP ACTIONS (CONT'DJ ACTIONS DETAILS l HM!)J , o DHP-1A is to be aligned for DHR.

  • Adequate SCM exists.
  • DHP-1A and DHP-18 are available.
  • RCS leak or PORV flow within capacity of 1 HPI pump.

-

  • HPI pumps aligned to BWST.

e BSPs MI running. i MIE It is permis'sible to increase $CM ;to ensure adequate RCP NPSH while aligning DHR. 3.61 jf RCPs are running, J118 maintain RCS PRESS and TEMP > RCP NPSH limits. See figure 3 See' Figure.4 3.62 Raise level in available

  • Control EFW flow using EFW control OTSGs to 2: 90%. valves.

E0F-08 REV 05 drft P PAGE 63 of 103 LOCACD

- .. . - - . - - . _ - ~ - - . - - - - . _ _ - _ . - . . ~ . - . - .. - - . Applicable carry over steps: 3.3 E ES systems have QB should have actuated, J1 TIN ensure ES... I 3.8 M a CC chiller is HQI running, Ji[G start a CC chiller. - 3.9 g during an OTSG tube rupture, ADX of the following (TRACC)... 3.21 E BWST level is < 15 ft, JH M transfer ECCS pump suction... . 3.23 E RCPs are running, M adeq6atejSCM existsi Ilim stop RCPs... [ 3.29 E HPI flow is < 200 gpm/ pump, JF.] ensure MVP recirc valves... . 3.35 E adequate SCM exists, M Q P7 sidelinesf areLapplicable, JBB... 3.39'1E(EFT 2l;1 eve 171s%1.0%, g; notify;SP0(tolcrossptief fST-1A .. i i [ k E0P-08 REV 05 drft R PAGE 64 of 103 LOCACD r . . - . - . , _ , - .. _.._.-._....___.,.._____.._-.m _ . , - . . . . - . _ . . _ , . . _ . , . . . - . _ _ - . _ . - .- ,

i l , 3.0 F0LL M-lF ACTIONS (CONT'D) ACTIONS DETAILS i, 3.63 M the following . conditions are met: PZR level > 80 in , RCS TEMP <.280'F OTSG level 2 90%~ lilG continue in this y procedure. 3.64 Ensure A ES selected MVP is stopped. 3.i5 Ensure DHP-1A is stopped.

                                                                                                                                     ~

3.66 IE AB is accessible, 1- ' Position DCV 177-MS tot"0". Itim ensure A DH cooler .. _ controls are properly 2~ Notify _PP0' toi performLt_he. following' aligned.

                                                                                              ,_,.;Close:DCV-195 " Vent'to DC-17 POS" (95-ft AB betWeen DH Roomentrances).3 70penDCV-194!" Air lSupalyto.

DC-17 POS" (95 ft AB atween DH Roomentrances)'.- E0P-08 -REV 05 drft P PAGE 65 of-103 LOCACD

  .a      _ . . _ _ .         . - . _ - . - _ _ _ . _ - . . _ .
                                                       -                . - - _ _ _ . _ , _ _ . . _ . _ _ _ _ _.---;-~                              ~~_  __

Applicable carry-over steps: 3.3 E ES systems have QB should have actuated, THEN ensure ES... 3.8 E a CC chiller is NOT running, M start a CC chiller. 3.9 E during an OTSG tube rupture, ADy of the following (TRACC)... 3.21 E BWST level is < 15 f t, JHW transfer ECCS pump suction... 3.23 E RCPs are running, NQ adequate SCM exists,111G stop RCPs... 3.29 E HPI flow is < 200 gpm/ pump,1HW ensure MVP recirc valves... 3.35 E adequate SCH exists, elQ PTS guidelines are applicable, IL1W... 3.39 E' EFT-2 level is s 10 f t, ItiW notify SP0 to cross-tie FST-1A... E0P-08 REV 05 drft P PAGE 66 of 103 LOCACD

3.0 FOLLOW-UP ACTIONS (CONT'D1 ALIIDHS DETAllS 3.67 Align DHP-1A for DHR. 1 Ensure the following valves are closed: DHV-34 DHV-42 DHV-8 DHV-Il DHV-40 2 Open the following valves: DHV-39 DHV-5 3.68 Select DSV-3 to " MAN" and 6 closed. 3.69 Reduce RCS PRESS for DHR operation. See Table 5 CAUTION Aligning DHR may cause high radiation levels in AB. 3.70 RULH RCS PRESS is within 1 Open DHV-41 limits, IULH align drop line for 2 Open DHV-3 DHR operation. 3 Open DHV-4 See Table 5 E0P-08 REV 05 drft P PAGE 67 of 103 LOCACD

Applicable carry over steps: 3.3 E ES systems-have QB should have actuated, Ilid ensure ES... 3.8 E a CC chiller is RQ1 running, E!M start a CC chiller. 3.9 E during an OTSG tube ruptui , Any of-the following (TRACC)... 3.21 E BWST level is < 15 ft,1 tim transfer ECCS pump suction...

                               ~

3.23 E RCPs are running, 8NQ adequate SCM exists; IBM stop RCPs... 3.29 E HPI flow is < 200 gpm/ pump IllM ensure MVP recirc valves... 3.35 E adequate..SCM exists, ANQiPTS. guidelines.are applisable,' 111@. .. 3?39 ELEFT-2flevelfis!s;- 10lft, Iti@_notifyiSPO:toTeross-tieLFST 1Al...

                                                                                                                 ]

E0P REV 05 drft P PAGE 68 of 103 LOCACD

3.0 FOLLQEMP ACTIONS (CONTiDJ mil 0!$ DETAILS 3.71 Start DHP 1A 1 _.. Start DCP-1A 2 Start RWP-3A 3 Select DHV-Il0 to " MAN" and closed. 4 Start DHP-1A 5 IE air is aligned to DC control valves, JJ1G control RCS TEMP: Control DH cooling using DC 177-HS Select DHV-Il0 to "AUT0" and 3000 gpm 6 ,_ 1[ air is 1101 aligned to DC control valves, IllG throttle DHV-Il0 to maintain cocidown rate. 3.72 ___ Ensure RCPs are shutdown. p, RCP-lC RCP-1B RCP-]D E0P-08 REV 05 drft P PAGE 69 of 103 LOCACD

I l Applicable carry over steps: , 3.3 'E ES systems have QB should have actuated, E ensure ES... . , 3.8. E a CC chiller is HQI running. E start a CC chiller.- I i 3.9 E during an 0150 tube rupture. ADX of the following (TRACC)... 3.21 E BWST level is < 15 ft, E transfer ECCS pump suction... , l 3.29 E HPI flow is < 200 gpm/ pump, M ensure MVP recire valves... l 3.35 E adequate SCM exists NG PTS l guidelines-lare applicabibi M... 3.39fE EFTt211evehis (10.lft,lIEN notifyy SPO.lto crossitielF$TilA!.l. . l t E0P-08 REV 05 drft P: PAGE 70 of 103 LOCACD. k ---w.i. .-..--m- . . . . - - - - - , , . , & w..w<,,-n 2---.i.i....--.. . e.-----.-.- _. -- - . . . . . . . -.-%.~-.,

                                                                                                                                                                                    .-v e.-,.,~..       <m,-- .   ,a ...--.,-,--,...-me
   .. - -.. . .   . - -           _ . _= -         . .     .-. -   _ - - .- - _ - - . . -. . - _ . - . _ .                                             - - .           .

1,0 FOLLOW-UP ACTIONS fCONT'D) i

                                                                                                                                                                         -i AQllQM                                                                   DETAILS i

I 3.73 )Eifjf DH system is 1 Depress " MANUAL PERMISSIVE" push  !

                        ,    providing core cooling,                                        buttons on EFIC channels A                                                    ;

ItiW stop OTSG cooling, and B.-  : 2 Close EFW control valves: EFV-58 i EFV-57  ; EFV 56 EFV-55 t 3 Stop EFP 1

                                                                          - 4 Close EFP 2 steam supply valves-                                                            :

ASV-204 ASV-5 5 Stop FWP-7' 6 Ensure 1BVs and ADVs are closed.  ; 3.74 Ensure PORV and HPVs are e PORV' , closed.

  • HPVs:

PZR RCV-159 RCV-160 Loop A RCV-157 4 RCV-158

 .                                                                                          Loop B                             RCV-163 RCV-164 20P 08.             REV 05 drft P                   PAGE 71 of 103                                                     LOCACD                     i ma%5,,..,'.,n$..,cmr     -,m       + , .~ , ,  ,.-.,n,r.,,%--           ._~,...,,rw,-w-y,,.,rmseg.. . , . .w m y ,-w er,    ,.w-- re- rw
      .- .          . ~        .    .   .             . . .  . - - -. - .. - . .                     - - . - .-. - - ..            ~. .       . . - -     .

l, Applicable carry over steps:. l

                        '33 .. E ES systems have' QB should have actuated,~ IllM ensure ES. .. .

3.8- 1E i CC . chiller is NQI_ running -ItiEN start a CC chiller.

                                                                                                                                                            +

L 3.9 1E during' an OTSG.. tube rupture 102 of the' following~ (TRACC)... i

                       . 3.211E BWST-level is <: 15 ft, ItiEN transfer ECCS pump Section...                                                                 l 3.29 IE HPI flow is < 200 gpm/ pump,181H ensure MVP recirc valves...                                                           "

! 3.331[ adequate SCM exists, &NQMS!9uiusljnis3relappilfab1le? It[@... l E0P-08 -REV 05 drft P- PAGE 72 of 103 LOCACD

 -. . . . . - . .      .               -       . . . .    . - - . .          . - - -.                  .~. - -         . . . - - . . .,  .

23.0 FOLLOW-UP ACTIONS (CONT'D) 6LEQHS.. ' DETAILS j

                                                                                                                                          ~
                                                                                                                                            \
                  - 3.75      -;E RCS-leak does HQI-exi s t ,'-

IREN stop the B Train HPI  !

pulpp.

3.76 E hlighl PRESS Aux lsplrs/fis -1 Open DHV-91 ' E al.ignedi

                                                                  ~

8bQ Aux spray is required, 2 Throttle RCV-53 to control RCS  : Id@ initiate [ Aux spray. PRESS. 3.77' E RCS leakage does HQI exist, . 3 IEEH contact TSC for further guidance and EXIT this procedure. 3.78 WHQ ECCS suction transfer is complete, IB M contact TSC for further_ guidance and EXIT this procedure, i f 1.

                         .EOP-08--           .REV 05 drft R          PAGE 73 of 103-                            LOCACD                     ,

L . . Applicable 1 carry-over steps: . ,.

                         ;3.31 E ES-systems have QB shou                   l d have actuated, M ensure ES...

3.8 E a CC chiller is HQI running, E start a CC-chiller. 3.9 E during an OTSG tube rupture, idi of the following (TRACC).... 3.21 E BWST level is.<'15'ft, JE B transfer ECCS' pump suction....

                                                                                                     ~

3.23 E RCPs are running, S QiadequatslSCM epistsi M stop RCPs... 3_.29 E HPI flow is < 200 gpm/ pump, M ensure MVP railrc valves... 3.35 E adequate SCM exists, MQ PTSjuideline'sfapelspplicable? M... ,f 3.;39 IE EFTf 211evslii'siisCIMt,1MLriotifylSPolthcroisstle'JSTllAEi^ l l l l-I l l E0P_-08 REV 05 drft P PAGE 74 of 103 LOCACD  ; i w - y _. - - m ,, . . . - _ . - -.<-2w - , - . . -

32.0_ f0LLOW-UP ACTIONS (CONT'D). ACTIONS. -DETAILS STATUS e DHP-1B.is to be aligned for DHR. e Adequate SCM exists. e DHP-1A and DHP-1B are available.

  • RCS leak or PORV flow within capacity of I HPI pump.

e HPI pumps aligned to BWST. e BSPs HQI running. HQlf It-is-' permissible to" increase SCM to" ensure adequate RCP P'.P_SH while aligning _DHR. 3.79 If RCPs are running, IBEM maintain RCS PRESS and TEMP > RCP NPSH limits. See Figure 3 5051 Figure 4 3.80 Raise level in available e Control EFW flow using EFW control OTSGs to 2: 90%. valves. E0P 08 REV 05 drft P PAGE 75 of 103 LOCACD-

                          ' Applicable carry-over steps *:               ..

3.3 L ES systems have QB should have actuated. ItB ensure ES... 3.8 1E a CC chiller is 1101 running, ItB start a CC chiller. 3.9 If during-an OTSG tube rupture,. Apj of the' following (TRACC)..'. 3.21 1E BWST level is:< 15 ft, Il B transfer ECCS pump suction... 3.231[ RCPs are running, MQ"adequat[SCM[existsj ItB stop RCPs... 3.29 IE HPI flow is < 200 gpm/ pump, ll B ensure MVP recirc valves... 3.35 If adequate SCM exists, MQ P,TS{guidelinesjareiapplicable; M... 3.393 EFT-211evel:isTs;;10ift;cIliEli notifyjSP0(to cfoss-tielFSTilA17 E0P-08 REV 05 drft P PAGE 76 of 103 LOCACD i t

r 3.0 FOLLOW-UP ACTIONS (CONT'DL afl10M DETAILS .- 3,81 juiEE the following conditions are met: PZR level > 80 in-RCS TEMP < 280'F OTSG level 2: =90% IEN-continue in this procedure. 3.82 Ensure B ES::sel' ected MVP is stopped. 3.83 Ensure DHP-1B is stopped. 3,84- If AB-is accessible, lj }P6sitionDCV}}78sMSit6"0" JBEM ensure B DH cooler controls are properly 2 ; Not i fy;[PP0f to/lperfo rm Lthelfol l ow t hg i ' aligned. (Close'DCV-197f"Ventito DC-18-POS" (951ft AB betWeenlDH Room l entrances).. L0penDCV4196'"Airisuppif[tb T -

                                                        ' DC-'18-POS!',(95 ftl AB betwee(DH Roomentrances);

E3P-08 REV 05 drft P PAGE 77 of 103 LOCACD

                                                .-             -.               -    - = - . - -            - -..- ..

Applicable carry-over steps:

    ~       3. 3 , _. ) 'S systems:have E should have actuated,-JB M ensure ES...

3'.8- E a CC chiller is MI running, IBM start a CC chiller. , 3.9 E during an OTSG tube rupture, Dy of the following (TRACC)... 3.21 E BWST level is < 15 ft, JH B transfer ECCS pump suction... 3.23 1E RCPs are running, Nglj; adequate SCM[ exists l JH W stop RCPs... 3.29 IE HPI flow is < 200 gpm/purrp, JHW ensure MVP recirc valves.... 3.35 E adequate SCM exists, egl PTS ll gui.delinsslllarelapplicable? IBM...

3. 391 EFT:2 ;1 evellj i sji 10; f t!3 JEm inot i fylS P0j t_oi;c ro s s it i elF STj l At ._ ,

t

                 -E0P-08        _REV05drftR                     PAGE 78 of 103                      LOCACD
       . _                _        ___ . . . _ .                       .. ~ ._ _         .. _, . . . . . _ _ . _ . _ . _ _ . . . _ _ .     -                ._      _            _
                                                                                                                                                                                     -i
                 - 3.0 FOLLOW-UP ACTIONS (CONT'DJ ACTIONS.                                                                           DETAILS 3.85_                          E AB is accessible,                                                                                                                   ,

AND high PRESS Aux spray-is required, IEN CONCURRENTLY PERFORN , - E0P-14, Enclosure 13,-High  ; PRESS-Aux Spray Lineup.. H AB is NQI accessible, ' IEN control RCS PRESS using PORV. 3.86 Align.DHP-1B for DHR. 1 Ensure the-following valves are closed: DHV-35 DHV-43 DHV-7 DHV-12 DHV-39 2 Open the following valves: DHV-40 DHV ! 3.87 Select BSV-4 to " MAN" and closed. ' 3.88 - Redt.ce RCS PRESS for DHR

                                                - operation.

SselTable'5 n EOP-08 REV 05 drft P- PAGE 79 of 103 LOCACD gr' t ---

                   .er- -m7   m-met     --
                                            'mp     y  m sy:---f- ggo-rw      .    ,-,-py m-g-mgu           -
                                                                                                                  -rur   r      -mew-w   - *           = t       e-n>   e- I --- -

Applicable carry-over steps: 3.3 E ES systems have QB should have actuated, M ensure ES... 3.8 E a CC chiller is 1101 running, M start a CC chiller. 3.9 E during an OTSG tube rupture, ADX of the following (TRACC)... 3.21 E BWST level is < 15 ft, M transfer ECCS pump suction... 3.23 H RCPs are running, 6.NQ adequate SCM exists, M stop RCPs... 3.29 E HPI flot. is < 200 gpm/ pump, M ensure MVP recirc valves... 3.35 E adequate SCM exists, /LiiQ PTS guidelines are'appli. cable, M... 3.39_ E EFT-2 level is sL10 ft, E notify SP0 to crossitie FST-1A... E0P-08 REV 05 drft P PAGE 80 of 103 LOCACD

3.0 FOLLOW-UP ACTIONS (CONT'0) ACTIONS DETAILS CAUTION Aligning DHR may cause high radiation levels in AB. 3.89 HUEH RCS PRESS is within 1 Open DHV-41 limits, THEN align drop line for 2 Open DHV-3 DHR operation. 3 Open DHV-4 See Table ~5 3.90 ___ Start DHP-1B 1 Start DCP-1B 2 Start PWP-3B 3 Select DHV-111 to " MAN" and closed. 4 Start DHP-1B 5 If air is aligned to DC control valves, THEN control RCS TEMP: Control DH cooling using DC-178-MS Select DHV-Ill to "AUT0" and 3000 gpm. 6 IE air is NOT aligned to DC control valves, THEN throttle DHV-Ill to maintain cooldown rate. l E0P-08 REV 05 drft P PAGE 81 of 103 LOCACD l

Applicable carry-over' steps:-  ; 3.3 1[ ES systems have QB should have actuated, 181H ensure.ES.... . 3.8 =1E- a-CC chiller is' tLQI running, JBEH start-a CC chiller. 3.9 _ If during an _0TSG tube rupture, ici_of the foliowing (TRACC).. . 3.21 1E BWST level.is:< 15 ft IBEN transfer ECCS pump suction..._ l 3.23 If RCPs are running,-8NQ: adequate';LSCM.. exist's; IllEN stop RCPs...- -; 3.29 jf HPI flow is < 200 gpm/ pump, JBEN ensure MVP recirc valves... 3.351[adequateSCMexists,8NQPTS196tdel.inesiare1 applicable lIHEN... 3!3911E EFT 2f;1eveRis(s;;-10JtiIliER sot'iffjSP07tsicro's;s-t_lej fSTg1A.- .: ..

                   .EOP-08         REV05LdrftP                 PAGE 82 of 103           LOCACD
                                                                    .                    .-_.. . . . . . . . - - . ~

l

          ^

i}.0 -FOLLOW-UP'ACTI M S (CONT'D)- )

                           . ACTIONS                                             Q.ETAILS                            :

3.91' -Ensure RCPs are shutdown. RCP-1A  ;

                                                                       'RCP-lc
                                                                       .RCP-1B RCP-lD' l
                                                                                                                   'i 3.92             )RlG DH system is                       1       Depress " MANUAL PERMISSIVE" push providing core cooling,                         buttons on EFIC channels A-Ili@ stop OTSG cooling.                         and B.

2 Close EFW control valves: EFV 58 EFV-57 EFV-56 EFV-55 , 3 Stop EFP-1 4 Close EFP-2 steam supply valves: ASV-204 ASV-5 5 Stop FWP-7 6 Ensure TBVs and ADVs are closed. .

              .- E0P-38           REV 05 drft P               PAGE 83 of-103                         LOCACD 4            -

y 3 , , . - , , , n - ~ -- , - a,, -

Applicable carry-over steps: 3.3' :E ES systems have QB should have actuated ,InfE ensure: ES...

                                                                .3.8      E a CC chillerLis HQI running, JEfB start a CC chiller.

3.9 E during an_0TSG tube rupture, M of the following (TRACC)... -! 3.21' E BWST--level is' < 15 f t, IBf3 transfer ECCS pump suction. .. , 3.29 E HPI flow is < 200 gpm/ pump, _IBER ensure MVP recirc valves....

                                                                                                                                                                                                     ~

3.35 E adequate SCM exists, ANQ PTSigu;idelinelsiare~ applicable l IHf3... f 4 4 i E0P_-08 REV'05 drft P PAGE~84 of-103 LOCACD

                                                                                                                                                                                                                    -------,a -       --~
   . . . . .    -.              .             . . - _          .       . . . ~ . . .     -         ..- . . - . .

N 3.0: FOLLOW-UP~ACTIchs (C_0MI.'01

                          -c ACTIONS-                                     DETAll.S 3.93-        -Ensure PORV and HPVs are          'e     PORY -
                   . cl osed. -

e HPVs: PZR ~RCV-159

                                                                                     .RCV-160 Loop A--                 RCV-157, RCV-158                    ,

Loop B RCV-163 RCV-164 3.94 If RCS leak does NOT exist, Ilim stop the A Train HPI pump. 4 1E0P-08 REV 05 drft P PAGE 85 of 103' LOCACD . i

i Applicable carry-over steps:

           -3.34- E ES systems have QB should have' actuated, JJiEH ens' ire ES...                         :;

3.8- E a CC chiller is HQI running,-IH@ start a__CC- chiller. 3.9 E during' an OTSG _ tube rupture, ini of the following '(TRACC)... 3.21 E BWST -level is < 15 ft, IRB transfer ECCS pump suction. .. k 3.29 E HPI- flow is < 200 gpm/ pump,: IHM ensure MVP recirc valves... 3.35 E _ adequate SCM exists, MQ PTS lguidslinksfare] applicable l IRB... E0P-08 REV 05 drft P PAGE 86 of 103 LOCACD

 +e * --ww        e    ,,m..-- ,-.      _        , , . _ ,

3.0 FOLLOW-UP ACTIONS (CONT'D) ACTIONS DETAILS 3.95 IE RCS leakage does ILQI

       -  exist, 111@ contact TSC for further guidance and EXIT this procedure.

3,96 ___ WJ1M ECCS suction transfer

          .is complete, Ili@ contact TSC for further guidance and EXIT this procedure.

E0P-08 REV 05 drft P PAGE 87 of 103 LOCACD

Applicable carry-over steps: 3.3 IE ES systems have DB should have actuated, Ilim ensure ES... E0P-08 REV 05 drft P PAGE 88 of 103 LOCACD -f

. -_-. ~ ..- . _ . ..- -- . .. - .- . . . - ._ 3.0 FOLLOW-UP ACTIONS (CONT'Q1 ACTIONS DETAlt.S STATUS RCS PRESS has lowered and- LPI flow > 1400 gpm in any injection-line. 3.97 1E at any time, o PERFORM E0P-14, Enclosure 19,-

           -BWST level is < 20 ft,                                ECCS Suction Transfer.

IBEH transfer ECCS pump suction to RB sump. 3.98 If LPI flow is > 1400 gpm 1 Notify PP0 to unlock"and close CFT in each injection line, isolation valve Bkrs '(119 ft AB): IBEH close CFT isolation valves. ES MCC 3AB-6B "CFV-5, A CFT Iso" ES MCC 3AB-6C "CFV-6, B CFT Iso" 2 WHEH CFT isolation valve Bkrs are closed, 181H close CFT isolation valves: CFV-5 CFV-6 3 Notify PPO to open CFT isolation valve Bkrs: ES MCC 3AB-6B "CFV-5, A CFT Iso" ES MCC 3AB-6C "CFV-6, B CFT iso" 3.99 LE at any time, a CC e Notify PPO to CONCURRENTLY PERFORM l chiller-is NOT running, E0P-14, Enclosure 18, Control IBEN start a CC chiller. Complex Chiller Startup. E0P-08 REV 05 drft P PAGE 89 of 103 LOCACD

Applicable carry-over steps: l 3.3 1E ES systems have QB should have actuated, IHG ensure ES... 3.97_ If BWST level is < 201., IllQ transfer ECCS pump suction to RB... l 3.99 11 a CC chiller is NOT running, IllW start a CC chiller. l 1 1 l

                                                                                                                                                        =s E0P-08                                                                     REV 05 drft P PAGE 90 of 103 LOCACD

3.0 -F0LLOW-UP' ACTIONS (CONT'D1 ACTIONS- DETAILS 3.100 E at any time, ECCS _ - e; Throttle and maintain LPI: flow at

            -suctions are aligned to RB                                    2000- gpm-_ (1800 to -2200) for each-s ump , --       -                     --            --

train: IHEN control LPI flow. DHV-5 DHV-6 3.101- Close PORV and HPVs.

  • Close PORV.

e Ensure HPVs are closed: , PZR RCV-159 RCV-160 Loop A RCV-157 RCV-158 Loop B RCV-163 RCV-164 3.102 E at any time, All of the 1 Ensure BSPs are stopped: , following criteria are met: BSP-1A _ BSPs running 2: 5 hrs BSP-1B ___ R2 PRESS < 10 psig 2 Select BSVs to " MAN" and closed: RB PRESS stable or BSV-3 lowering-BSV-4 RB atmosphere

                        < 13 Ci/cc .I"'                         -      3 Select BSVs to "AUT0":

TSC has approved BS BSV-3 termination. BSV-4 IllW stop- BSPs.- E0P-08 REV 05 drft P PAGE 91 of 103 LOCACD l

Applicable carry-over step t: 3.3 E ES systems have QB should have actuated, JE W ensure ES... 3.97 E BWST level is < 20 t!, THEN transfer ECCS pump suction to RB... 3.99 E a CC chiller is NOT running, JJi@ start a d chiller. 3.100 E ECCS suctions are aligned to RB sump, Ill@ control LPI flow. 3.102 E all of the following criteria are met, THEN stop BSPs. t E0P-08 REV 05 drft P PAGE 92 of 103 LOCACD

 - ..~ ,    ._    ___            . . _    .       .. - .. . _ _ _ _ . _ _ _     - . _ . _ _ _        _ _ _ _

3.0 F0tkAMP._AGILONi_(GDffilD1

                              -603101{S                                     DEIAILS
         - 3.103-      . Notify PPO-to CONCURRENTLY.

PERFORM E0P-14.- Enclosure 21, RB Hydrogen Monitor;Lof.

         . 3.104        WU[N ECCS suction transfer        e Notify Chemistry to perform CH 6320,-

is complete, Sampling and Analysis of the~ Reactor J1((B request sampling of- Huilding Sump. RB sump for boron concentration and pH. 3.105 Notify TSC.to' determine if boron. precipitation , control?is required. 3~106'

             .          .1[.baronpreclpitatlon control is: required, ISIN-PERFORM'E0P-14, l                        Enclosure 20, Boron Precipitation Control.

3.107 ' Notify TSC for further guidance and EXIT this

                      -procedure, f

E0P-08 REV 05 drft P PAGE 93 of 103 LOCACD

                                                                                                             -l
                                                                                                               }

BLANK PAGE e5 E0P-08 REV 05 drft P PAGE 94 of 103 LOCACD

4.0 FIGURE 1 -LJ31LFOR STEAMING AFFECTED OTSG TO AlfLO_SfBERE BASED ON JjlTIAL DOSE EQUIVAIJ,NT I-131 CONCENTRATION 100 1

                                                                                                .!         _ _  _1._1___j_            f      l    __

__I___i -- _1_ i_ _ _j.__l_ _._j_j__,_. _ _ I _ _p _ _ . . . _ __ . _.__ } 1-- _ l 9 __ - l 2 6 g ___ ___-. ___ e -_. 4: __ O Unacceptable Region E E \ l a' __ _p _ g__ _ !_4__ j [_p _ _ t_j___ _j g _. _ p -..- _ .__ _ -.- _p.-._e__ p__. _._ ._ __ ___ _ _ g . _ ._. _ . . ._ ._ _ ._ _ __ __. _ e _ _ + _ _ . _ __ _ __~ ___.,_+ 1_-.4

              -e __                             _                        1-           .--
                                                                                                          . _ __y a_.-                           ,--__

_ .._ L. _

                                                                                                                         !     \

0 5 10 15 20 25 Initial Dose Equivalent 1-131 Concentration (pCi/cc) Notes: 1. Steaming time unlimited for concentration < 5 Ci/cc.

2. If initial dose equivalent I-131 concentration is
                  > 20.9 Ci/cc, isolate affected OTSG as soon as possible.
3. If initial dose equivalent I-131 concentration is > 5 Ci/cc, use emergency cooldown rates.

E0P-08 REV 05 drft P PAGE 95 of 103 LOCACD

BLANK PAGE E0P-08 REV 05 drft P PAGE 96 of 103 LOCACD

4.0 FIGURE 2 LIMIT FOR STEAMING _AEEECTED OTSG TO ATMOSPHERE BASED ON EQST-TRIP PEAK DOSE EQUIVALENT I-131 CONCENTRATION _{ q_ _! ._p_.L _{ __J l

q. q_ .__.__._._ _.__ __

y _ _ _ . _ _ _J__. ._ _._ _._.7 l i __g__ __ __._ d._ ___ . I E g ._.4 J_ _.,_ ___.+ ___ _.a o. o Unacceptable Region E E l\ , , , , . ,, S' _L4J_ ._

                                             .'._l                 _

_t _ _.p.J _ J_q_Lp. ll g ._____ ._ ._ q_7__._._ p _, _ y _. _- 7._.

                                                                                 . _ .     . __          ,_t_,_                      .-_

3 m

                                       -                           _      _a_.. . _ _ _       _.      _l__._                           _     _

I~. _L ._4__ _t ,_ q _._ _ g._ %__. _ _ ._

                                                                                              .-_p _f_               _                         _._

i l 1 1 30 40 50 60 70 80 90 Post-Trip Peak Dose Equivalent 1-131 Concentration (pCilec) Notes: 1. Steaming time unlimited for concentration left of vertical line.

2. If posthtrip peak aose equivalent I-131 uncontration is
                      > 85.5 pCi/cc, isolate affected 0TSG as soon as possible.

E0P-08 REV 05 drft P PAGE 97 of 103 LOCACD

i BLANK PAGE E0P-08 REV 05 drft P PAGE 98 of 103 LOCACD

4.0 FIGURE 3 RCS PRESS AND TEMP (WIDC RANG 11 ____L_{.

                                ._4_-. ._.) _ _
                                                           !_d _
                                                               . L dd.1_

I L__h-J- d-d h f - y-- r

              -+~ t -                    Unacceptable                                       -J                                   -At                                                                -{ i-
                                                                                                                                                                                                                                   -"~
                                                                                                                                                                        '~~t-~ ~*[l-
                                                                                                     '-~-+-

2500 --- Region l T ~~-

                                                                              =3                                                                                                      ;-

Jg .+. .

                                                                   , ;-4. ___.__                                 3_._-
                                                                                                                                   -.                                                 4
                                                                                                                                                                                     -- * ~

j-- 2300 - -

                                                                                                                                                                                                                               ~~-t-
                                              ------_k- '-]
                                                                                                                                                                               =

_.._-_ __ r, _.___ --.- [ =L

                                                                                                                                      ,e                                                                                                      -
                                                                                                                                         -g
 -O2100      ----- - --                                                             -' - -           -'-         - ' - + -                    -              L'--         ---           - 7 +- -t               i '

in I g __k _.-- __-p i g ___ __.__ y

                                                                                                                                                                                                          -. f-                - + - -

p g3 goo _.r._,_ ,_ r _-__ - . __7---- *- 7-E - NDT UMIT --r f-}

                                                                                                                                                                                                 ~      -                              ~~

0. u) Below and to the Right --

                                                                                                                                           -,-_.-_-w_-~'                      +--[-~        ~t-"J--

3 j j -T _--(j--({ O I-l i ' E 1700 ~ L ~~---

                                                                                                                                                                                                             " . Adequate SCM e          ____.,__                                                             -'_--                   .-   . - --.

t_ Above and to the Left J-_--.._}

                                                                                                                                                                                                                    --t J-

___ ._. _ _ + _ . . .

                                                               -'-'--' ' - + - *
                                                                                                                                                                -+--
                                                                                                                                                                                        --t -

Qj - t e 1500 __[_k,_ -t---

                                           !              +I                                      -__
                                                                                                                            --}

l l

                                                                                                                                                                                                                               ~~~I        :

I__ g_} d I__h-, h ..f _. _ _ .) f e.4 h-j-- d-g _._. _ .., _. .-_1_ d-.- b - L-_I --. - + - - d- b-d- -q-+-- l ~~~*- ' ~ -~ ~~ ~~' 0 1300 J

             ~

_.[d_ ~-

  • l_w~ T- ~ ~ '_
                                                         ._ _-._          ~~~d .                                     F~*                                                 ~l 4 p-i~
                                                                                                                                                                                                                ~ 1-
                                                                                                                                                                                                                    -;-                 i-I~

7-_'L.-- 4 - o __.d --__y.-+__ _ +-_ _. . _1- ._..-.b+

                                                                                                                                 ---+- t -- -y
                                                                                                                                                                                                               -L-               -+j-g---- }-                                       - t-
                                                                                                                                                                                                                                  -{
 *lC 3ggo    _
             -,_} _

w- _ -

                                                                                                                                                                      - -+.----- j -

qg- J-

                                                                                                                                                                                                                               -3
7. _. _. _ ._.--.- _ -

j - -

                                                                                                                                                                                                                               ---{-

4 ._'_.4__._ _ _f-. _ . . b_ - j- -+-

                                                                                                                                                                                                --t            Saturation
                                                                                                                                                                                                                                          }-
             ---&-             b-                                                                                                                                                                                    Curve                y i __"[,._'f p_,-tL i-,r__7 900 a_pi_ _i--"---'_J'--'~i I                        i                      Iii                                                                          i                                            -'!

_17 _. 7 ,.7 7 - j _.f_ '_ jL__ - j j- j f j - 7 . . . - _ _ 7 700 +- t --L"-4 - *- 4; , lj

                  , - --_b                                                                   _-                           4 -.~~_                          ---g                 --

i i j

q. __. __.. __

500

              'l i
  • i I i i H- H-H-M. H-R, i- ,
                                                                                                                                                                                                                                      - r-250                          300                           350                                   400                          450                          500                       550                     600                     650 Tincore (*F)

E0P-08 REV 05 drft P PAGE 99 of 103 LOCACD

i i BLANK PAGE E0P-08 Rf.V 05 drft P PAGE 100 of 103 LOCACD

k 4.0 FIjuRLs RCS PRE 55 AND TEMP- (LOREgli[1 1 Z l t

                                                                                                                                                                                                                                                                                                                          ^

550 I , l, . ... . . . .- .._..- .... - - .

l. . _ . ._.. . - .-.' -. - -, -.

l - - --. j un.w. gam - j _ _ 500 - - . ,. - _ __ _ _ . _ _ . Region  !

                                                                                                                                                                                                                                                                                           ..-         -   a          _.           -

1 y ... ..m _. .. ._. . , . s . .# ,,~. ., , .. . ._ . . ... ,. .-. .mi- .m- _ .,.

                                 . _ . . _. _. - ..                                                                                   ~~            ~'~                      ~                ~~             ~~             ~~           '                           "~              -    -- ~                    ~

NDT UMir < thelow and to the Rr/n <

                                                                                                                                                                                                                                                                    --                                      -    ^     -       -
                   - 400        --               -     -                                                                                    --                       --                                     -       -   -                                -

T g -- -. . -- . , _.-.. -. -... -.- .....- . -,-.._ - . . . - ~.- M M 350 --- - - - - - - - - - - - - - - - - - - - --- 300 - - - t-Adequate SCM

                                      ..           .        ,   .     . _                         .           .                     ..-          .     ..            .                     ~                         ,-                  . , . _             .

Above and to the left J RCP NPSH ,

                                                                                                                                                                                                                                                                  ~

l l-- 250 so, wi. in , 4 Above and to the lefi ,

y. y. g ; 7
                                                                                                            .                        .,                                 .                                                  ~.. . ,            _.,__                                       ..   -..,g               . _     .

7.4 . . -

                                                                                                                  -%,t I 200                                             --                                                                                                -        -         -       - -                  ---

p - -- l W ;_. . ,. . . _1_ ...- ..y p I I _ , .L .= .. . b o 1 4 150 y--- f

                                                                                                                                                                                                                                                                                  +            -           -- -
                                        'tCP NPSH                                                      -       -         --      -                    -                  -                 --      -              -      -      --                                        -   --                                                     -

20.2/1 A'2  ;

                                                                                                                                                                                                                                                                                                        ---7 100      ^b'' 'ad  'h' l'"                                               -           -

r' - - - - + - - -. - saturation - - _. {., . _ _ _ . ..__

                                                                                                                                                                                                                  .,'                                  ..a .

Curve 50 -

                                                                                                     +

l -N- - - - - - - - - - - ~~ - - i _ i ,il 0 - 50 100 150 200 250 300 350 400 450 500 Tincore (*F) E0P-08 REV 05 drft P PAGE 101 of 103- LOCACD

d t BLANK PAGE Ar E0P-08 REV 05 drft P PAGE 102 of 103 LOCACD

__ _m_. ... . _ _ . . _ _ _ . . _ . _ _ _ _ _ _ _ . _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ . . . _ _ . _ _ _ _ . _ i

                                                                                                                  ~

Not'ei See Figures 1 and 2'wh:n , l Tm margin monitors and SPOS are  ; unavailable. RCS SCM , 1 A ua SCM

                                                                                           > 1500 psig                               a 30'F.

s 1500 to > 350 psig 2 50'F . s 350 psig SPDS f

.                                                                                           s 160'F                                 N/A "LLL"        > 20 in        a 1 RCP running with

] adequate ECM  ;

                                                                                            "NAT CIRC"        > 70%

R u$r OTSG levels RC rgingwith j "lSCM" > 90% Inadequate SCM n RCP RCS TEMP Normal Emergency 4 Seatus - l' fIf RCP > 500*F 's 50*F/\;nr :s 240'F/hr Table 3: s 500 to >;280'F ;s:50'F/Ehr 's'59'F/.hr Coold1wn rate limits s 280 to'>'150'F s ; 25'F/ hr $125'F/F hp No'RCPs E500PF $ 2S'F/) hr 3 240*F/hr i ! s 500 to >;.150'F ;s ~ 25'F/% hr. :s - 25'F/F hr - A OTSG A730 A731 A732 A733 A734 Avg R771 . Table 4: Taw Computer points for 01SG Tew B iTSG A735 A736 A737 A738 A739 Avg R772 Taw C RCPs Operating .RC 147 PI RC-143 PI Tabic 5: A Loop 170 prig 215 ptig

  • PCS PRESS for DHR operation B Loop' 215 psig 210 psig No RCPs 215 psig 215 psig f 4

i E0P-08 REV 05 drft P_ PAGE 103 of 103 (LAST PAGE) LOCACD