ML20195H397

From kanterella
Jump to navigation Jump to search
Forwards Proposed Updated SALP Evaluations for Facilities from Nov 1986 - Feb 1988 & Feb 1987 - Feb 1988.Evaluation Based on Insp & Examiner Reviews Conducted During SALP Period
ML20195H397
Person / Time
Site: Nine Mile Point, 05000000
Issue date: 03/07/1988
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Jerrica Johnson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20195F814 List: ... further results
References
FOIA-87-830 NUDOCS 8806280281
Download: ML20195H397 (6)


Text

'

?)

G March 7, 1988 MEMORANDUM FOR:

Jon R. Johnson, Chief Reactor Projects Section 2C, PB 2, DRP l

FROM:

Robert M. Gallo, Chief Operations Branch Division of Reactor Safety

SUBJECT:

NINE MILE POINT UNIT 1 SALP INPUT FOR SALP PERIOD 11/1/86 TO 2/29/88 AND NINE MILE POINT UNIT 2 SALP INPUT FOR SALP PERIOD 2/1/87 TO 2/29/88 Attached is the proposed updated SALP evaluations for Nine Mile Point Unit 1 and 2.

This evaluation is based on DRS inspections and examiner reviews conducted during the SALP period.

If you have any questions with regards to this SALP Input, please centact Tracy Lumb (5381).

(Q 2

Rbbert i.

ef Operations Branch Division of Reactor Safety

Enclosure:

As Stated CC:

W. Johnston, DRS D. Lange, DRS 1

T. Lumb, DRS W. Cook, SRI I

Information in this rc ::d c a; dileted in acccidance with the freedem of Inictmation A;t, exempt ns E FOIA- @

730 62 i 080615 j

DOLEY87-030 PDR r /

i v

~

9 l

\\

ll SALP PHYSICAL PROTECTI0';

b LICENSEE: GDU N.clea-Corporatic.- (0yster Creek Nucly-Generating Station)

ASSE55v,ENT PERIOD:

February 1,1952 through January 31, 1983 E0ARD MEETING DATE:

March 1,1933 REPORT DRAFT DUE,DATE:

February 4, 1983 U6_ M MYhm

.DATE:

g2],323 PREPARED BY:

William Madden

/

REVIEW BY:V CHIEF, SFFS:

~

As y- /97C DATE:

[e'2 CHIEF, NMSE:

W DATE:

2d P/h f) y

'/

RESr0';51 ELE DPRPV SECTION CHIEF:

DATE:

Lowell Tripp

.Informatix;in tW CfA Was dalet In accorg3r.:,,

Act, exem m,,,,,

  • II*:!Cin of Ir:ictmation ~

FOIA C-Q

4 SALP Physical Protection Ucensee: GPU Nuclear Corooration (Oyster Creek Nuclear Generatinc Station)

Assessment Period:

2/1/83 - 4/30/E4 Ecard Meeting Date:

6/11/84 Report Oraf t Due Date (SG):

4/30/24 Report Draf t Due Date (DPRP):

5/14/84 9

'db Date: di-f SY Frepared by:

$/n

1. )

pr sack T. Dun Tap ~, Pny'sicf'3ecuri ty inspector Reviewed by:

C.ief, SGS:

[

Oate: I"

/R.R.Keim/uar,d ig Chier, Safe.

ec* ion Cnief, NMSB:

Date:

(; - 9'-fy J. H. Joyn ef, Nuclear Material and eguards Er nch Responsible DDRP Section Chief:

Date:

Nv53 Secretary (Coord./Distb.)

). (A.

Date:

O - Yd V (initials)

Copies to:

1.

DETP 2.

OPRP Section Chief 3.

Licensee Inspection File 4.

SG Master File Information in this record nas deleted Other:

=

in accordance with the frs;fc.m of infermation Act, en=pjt cr.s 8 FO'A _ % } b M. [,

j

SALP Physical Protection Licensee:

GPU Nuclear Corporation (Oyster Creek Nt.;1 ear Generating Station)_

Assessment Period: May 5, 1984 - June 30, 1985 Board Meeting Date: August 8, 1985 Report Draft Due Date (SG):

July 15,1955 1

Report Draft Due Date (DPRP):

Preptred by:

_ % 24 ' [

Jack)f. D'unlap, Physical Sepr date

/

Inspector 1

Reviewed by:

Chief, SGS:

_ b46MJ

/R. Keimig, Chief, Safeguarc}(

date Section Chief, NMSB: _ UH.foyner,' Chief, Nuclear Materials w

_ "7 /2 <. /s.,

da'te V.

anc Safeguards Branch Responsible DPRP Section Chief:

date HMSB Secretary (Coord./Distb.)

'Y m d

'7-%[

(initpls)

~

~

date Copies to:

1.

OETP 2.

DPRP Section Chief 3.

Licensee Inspection File information in gj "CC d "* #'I' 4.

SG Haster File in accordance t,im Other:

A; a "feedom of,'nt:rmg, g

- (, c OFFICIAL RECORD COPY SALP OYC - 0004.0.0 07/22/85

SALP Physical Protection f

~

Licensee: _GPU Nuclear Corporation (Oys_ter Creek Nuclear Generating Station)

Assessment Period: 7/1/85 - 10/15/86 Board Meeting Date:

November 24, 1986 ReportDraftDueDate(SG): October 22 1986 1

ReportDraftDueDate(DRP):

0ctober 29. 1986 d

C (l [ L Prepared by:

William J.. Madden Physical Security Date Inspector Reviewed by:

b' Chief, SGS:

/-

h -S_ 4 Richarc R eimig, Chief Date Safegua Section, DRSS

(*

Chief, NHS&SB Aw U-7-66 Jarjef 41." o nft./ Chief Date NutJear rials Safety and Safeguards Branch, DRSS Responsible DRP Section Chief:

Allan R. Blough, Chief Date ReactorProjectsSection1A Copies to:

Branch Chief, DRP Licensee SG Inspection File SG Master File T. Martin, Director DRSS

.t Information in this re:ctd was dekted in accordance r;;n t'e frc:6 of inf arcat;cn p.

4t, ex rc.

. s g,pg t

11(L

SALP Physical Protection Licensee: GPU Nuclear Corporation (0yster Creek Nuclear Generating Station)

Assessment Period:

10/16/86 - 9/30/87 Board Meeting Date:

11/17/87 Report Draft Due Date (SG):

10/ 7/87 Report Draft Du Da e l'DRP): 110/12/87 Prepared by: y/t \\ Md' DATE:

fl 'I 'O G. C. Smith Safeguards Specialist Reviewed by:

DATE: M' M

Chief, SGS:

M Richard R~. Keimigythief Safeguards SectitTn Approved by:

a

'f h 6./ M e0 Chief, NHS&SB DATE:

//- T-F7 Jame't H. Joyner,, ChieY glear Mater (kis Safety and Safeguards branch Respons' ole ORP Section Chief:

L Cowgill Copies to:

DRP Resident inspector DRP Branch Chief SG License File SG Licensee Inspection File SG Section Chief Information in this record was d Man 1,'

, NRR hffE dom IInictmr..

t.exfn be 3 ho4.g