ML20195G751

From kanterella
Jump to navigation Jump to search
Forwards SALP Input for Plant Insp During Assessment Period Mar 1986 - Mar 1987
ML20195G751
Person / Time
Site: Haddam Neck, 05000000
Issue date: 03/19/1987
From: Caphton D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mccabe E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20195F814 List: ... further results
References
FOIA-87-830 NUDOCS 8806280124
Download: ML20195G751 (3)


Text

y

(

EAR IF?W r

VEMDRANDUM FOR:

E. C. McCabe, Chief. Section 3B Division of Reactor Projects.

FRDM:

D. L. Caphton, Senior Technical Reviewer, TPS, OB Division of Reactor Safety

SUBJECT:

DRS SALP REPORT ON HADDAM NECK Enclosed is the SALP input for DRS inspection of the Haddam Neck plant during the assessment period of March 1, 1986 to March 31, 1987.

This SALP input includes DRS inspections through 87-01 and at this time DRS has no other inspections scheduled for the assessment period.

',hp 4

?

4 d

d Donald L. Caphton Senior Technical Reviewer, DRS

Enclosure:

As Stated cc w/ enclosure:

W. Johnston, DRS L. Bettenhausen, DRS J. Durr, DRS P. Eselgroth, DRS J. Johnson, DRS E. Wenzinger, DRP

. ir ::7.d0.1 :..... :.. ;.:... :. 4 in a:cer:3cce W.t.""i rrack.r.of niorr",d..;n Act,titm?h: ' E 'b O

  • 5-A(,

0*S FOIA-1 l

o 0806200124 000615 PDR FOIA BOLEYO7-830 PDR

SALP Physical Protection Licensee:

Public Service Gas & Electric Hope Creek Assessment Period:

11/1/85 - 11/30/86 Board Meeting Date:

1/19/87 Report Draft Due Date (SG):

11/20/86 Report Draft Due Date (DRP):

12/01/86 Prepared by:

_R. J. Bailey V

m#>d Date: /4 / / 4 Physical Se writy Inspector C

G

=/

Date: / A" JrEnard R. Ke g, Cpf f Chi ef,NMS&SB Date: /k/dd JaArs F.uoyder, Chief f

/

NMear Materials Safety and Safeguards Branch Responsible DRP Section Chief:

L. J. Norrholm, DRP Copies to:

DRP Resident Inspector DRP Branch Chief SG License File SG Licensee Inspection File Information in this re:Ord was deleted SG Section Chief in accc.finre r,$ "i fritdom ciinfamation UsM_

Act. ext: t L J 3 4 I: 00!hn "nSS rm.

{*b G. McCorkle, NMSS

l'

,,Mio.

SALP Physical Protection Licensee: Public Service Gas and Electric Company Artificial Island Security Program (Salem / Hope Creek)

Salem 10-01 12-31-87)

Hope Cr(eek (12-01 01-15-88)

Assessment Period:

Salem Board Meeting Week of:

Hope Cr(eek2-01-88) 22 88)

(02-Report Draft Oue Date (SG):

_12 24-87 Salem 01-11-88)

Hope Cr(eek (125 88)

Report Draft Due Date (ORP):

Prepared by: /

u DATE: /- M -diF R. J. BaFIA(,' Physica)r Security Inspectef~

Reviewed by:

Chief, SGS:

/

~

DATE:

/'M'#d

/RichardF/Keimig,Chiet//

SafeguysSection

[/

Approved by:

Chief, NHS&SB

/%W J m t H. 90.yner 7 Chief _

DATE:

//n /s4

/

earMaurialsSafetyBranch

.u Responsible DRP Section Chief:

P. Swetland to tes to:

OR Resident inspector DRP Branch Chief fG SG Section Chief information in tha r:: rd w:s di '.ed en ee n pection File T. Martin, DRSS in a:terdar.ce with Frit:cm ef ini:rm:ts:n R. Erickson, NRR A:t, en tien R. Manili, NRR F01A-3s

.Q

-_