ML20195G189

From kanterella
Jump to navigation Jump to search
Informs That Two Senior Operators Passed Exams Administered in Feb 1984.Plant Requalification Program Evaluated as Satisfactory,Based on Sample of Licensed Personnel in Jul 1984
ML20195G189
Person / Time
Site: 05000000, Fort Saint Vrain
Issue date: 03/06/1983
From: Cooley R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Plumlee G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20195F814 List: ... further results
References
FOIA-87-830 NUDOCS 8806270252
Download: ML20195G189 (1)


Text

co# "%, UNITED STATES Oi. i* NUCLEAR REGULATORY COMMISSION

  • \ , REGloN IV k, . if 811 RYAN PLAZA DRIVE. SUITE 1000 0,,,,, ARLINGTON, TEXAS 79011 Marr.h 6,1984 MEMORANDUM FOR: G. L. Plumlee, Ft. St. Vrain Senior Resident Inspector FROM: R. Cooley, Chief, Operator Licensing Section

SUBJECT:

FORT ST. VRAIN SALP INPUT ON OPERATOR LICENSING Two Senior Reactor Operator replacemant retake examinations were administered in February, 1984. Both candidates passed the examination.

The Fort St. Vrain Requalification Program was evaluated as satisfactory after administering examinations to a sample of licensed personnel in July, 1984. Overall operator licensing performance, based on this small sample, has been acceptable during the SALP review period.

If you need additional assistance on this topic, J. Pellet (FTS 728-8159) is cognizant of Fort St. Vrain operator licensing status.

i I

l

. RRalp M %4 A. Cooley cc: R. Denise E. Johnson D. Hunter

! R. Cooley R. Ireland P. Wagner

M. Murphy

\ J. Pellet i

8806270352 000615 EY 30 PDR F0M i9f30 d-I