AUG 0 6 E MEMORANDUM FOR:
J. P. Jaudon, Chief, Projects Section A Reactor Projects Branch FROM:
R. A. Cooley, Chief, Operator Licensing Section, Reactor Safety Branch
SUBJECT:
SALP INPUT FOR COOPER NUCLEAR STATION During the SALP period February 1,1985 to July 31, 1986, the Operator Licensing Section administered three sets of Replacement exams and one set of Requalification exams.
The results are shown below for replacement exams:
Date R0 Passed Failed June 1985 7
7 0
SR0 1
1 0
March 1986 R07 4
3 SR0 4
4 0
June 1986 R07 2
0 The requalification examinations that were administered in September of 1985 found the Requal Progran, to be satisfactory.
Comparing the results of this SALP period with the last, Cooper Nuclear Station has made a noticeable improvement in their training programs.
If you need additional information concerning operator licensing activities at Cooper, please contact D. Graves (860-8168) or myself (860-8147).
b/
R. A. Cooley, Chief, Operator Licensing Section cc:
E. Johnson J. Gagliardo T. Westennan 1
D. Graves l
D. DuBois, SRI W. Long, NRR RIV:RSB/0L p t RACooley:gb
$/4/86 8806200013 000615 PDR FOIA
. _.