Discusses Retake & Reactor Operator Exams Administered in Feb 1986 & Nov 1987,respectively.Audit of Plant Requalification Program Also Conducted.Requalification Program Evaluated to Be Satisfactory
ML20195G572
Person / Time
Site: River Bend, 05000000
Issue date: 03/24/1987
From: Cooley R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Jaudon J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20195F814 List: ... further results
References
FOIA-87-830 NUDOCS 8806280055
Download: ML20195G572 (1)


Text

[ %, UNITED STATES

.*  ; NUCLEAR REGULATORY COMMISSION b REGION IV f 611 RYAN PLAZA DRIVE. SulTE 1000 9, , ,8 ARLINGTON, TEX AS 76011 MAR 2 41967 MEMORANDUM FOR: J. Jaudon, Chief, Reactor Project Section A FROM: R. A. Cooley, Chief, Operator Licensing Section

SUBJECT:

SALP INPUT FOR RIVER BEND STATION In February, 1986, retake examinations were administered to three (3) Reactor Operator candidates and two (2) Senior Reactor Operator candidates. These candidates had initially)been licenses denied. examined in the preceding SALP period and had Two (2 ReactorOperatorsandone(1)SeniorReactor Operator passed these retake examinations and were issued the appropriate license. The two candidates failing the retake examinations have not reapplied for licenses as of this date.

In Noverrber,1987, examinations were administered to seven (7) Reactor Operator candidates and ten (10) Senior Reactor Operator candidates. All of the Senior Reactor Operator candidates passed and were issued licenses. Five (5) of the Reactor Operator candidates passed and were issued licenses.

Retake examinations are currently being prepared and are scheduled to be administered in May, 1987.

In November, 1987, an audit of the River Bend requalification conducted with six (6) Senior Reactor Operators and three (3) program Reactor was Operators taking NRC written and operating examinations. One (1) Reactor Operator failed a portion of the written examination and was reexamined in accordance with the River Bend requalification program. The requalification program was evaluated to be satisfactory.

f.h.

R. A. C o ey, A

ief Operator Lice ing Section cc: J. E. Gagliardo, RPB T. F. Westennan, RSB

0. D. Chamberlain, RBS SRI l D. N. Graves, RBS Examiner j l

l l

l l

l I

8806200055 80061Dd EY 30 PDR ,,,.

. .- .- .. _