Discusses Operator & Senior Operator Licensing Exams Administered During SALP Period.One Generic Weakness Noted During SALP Period.Candidates Routinely Had Difficulty Mitigating or Responding to Major Plant Emergencies
ML20195G593
Person / Time
Site: South Texas, 05000000
Issue date: 01/06/1988
From: Pellet J
NRC
To: Constable G
NRC
Shared Package
ML20195F814 List: ... further results
References
FOIA-87-830 NUDOCS 8806280063
Download: ML20195G593 (2)


Text

.

/

1 JAN 6 1988 MEMORANDUM FOR: G. L. Constable, Chief, Reactor Project Section D FROM: J. L. Pellet, Chief, Operator Licensing Section

SUBJECT:

SOUTH TEXAS PROJECT SALP INPUT ON OPERATOR LICENSING Dur'ing this SALP period, the following operator and senior operator license examinations were administered at the South Texas Project (STP):

July 1986: 26 SR0 written examinations administered, 25 passed; November 1986: 20 SR0 and 2 R0 written examinations administered,16 SR0 and 1 R0 passed; January 1987: 41 SR0 and 1 R0 operating tests were administered to candidates that passed the previously administered written examinations, 39 SR0 and 1 RO passed; and May 1987: 11 SR0 and 3 R0 written and operating examinations administered, 10 SR0 and 3 R0 passed.

The above totals include some retakes. As a result of these examinations, STP has 50 SR0 and 4 R0 licensed operators. We consider this very good performance for cold license examinations.

One generic weakness was identified during the SALP period. Candidates routinely had difficulty mitigating or responding to major plant emergencies or transients with the unit not at power (i.e., in Modes 5 or 6). This weakness was identified to STP in the examination reports for January and May 1987.

Additionally, note that while STP has had a simulator on site during this SALP period, we found that the simulator was not sufficiently close to the plant to permit using it for examinations.

We have reviewed NRC Manual Chapter 0516 and, based on the above performance, would suggest the category ratings below as applicable for the "Training and Qualification Effectiveness" section as it applies to licensed operator training:

1. Management Involvement in Quality: 2
2. Approach to the Resolution of Technical Issues from a Safety Standpoint: 2 REth#f.<-

C:0LS49 JWhittemore:cs JPellet

/

1////88 1//v/88 8006230063 000610 PDR FOIA DOLEYO7-030 PDft ,

a. .

,t g

s

. G. L , Constable - 3. Responsiveness to NRC Initiatives: 2

4. Enforcement History: N/A-5. Operational and Construction Events: N/A
6. Staffing: 1 If additional information is required, please contact me or Mr. John Whittemore of my staff.

\

J. L. Pellet, Chief Operator Licensing Section CC: